Amendment 0005 W912DW20R0017 Hydrant Fuels.pdf

PDF 2 MB Posted

Attached to
FY20 Repair of Fuel Hydrant System, Spots 25-28 at Fairchild Air Force Base, Spokane, WA.
Solicitation number
W912DW-20-R-0017
Issued by

About this file

This is a solicitation for the repair of a fuel hydrant system at Fairchild Air Force Base in Spokane, Washington. The solicitation involves repairing pavement, intrusion detection systems, and fueling systems serving aircraft parking spots 25-28 to make them fully functional for KC-135 aircraft. The project consists of airfield pavement repair over 400,000 square feet, repairing the intrusion detection system including cutting pavement and installing conduit and electrical work, and replacing 3,200 linear feet of 18-inch fuel line with a 12-inch circulating system including new hydrants, vaults, and appurtenances. The solicitation also includes potential petroleum contaminated soil remediation. The response due date is September 17, 2020 by 10:00 AM local time. The specifications include an asbestos remediation section due to the potential for discovering asbestos during work on the older fuel lines and hydrant components.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0005, Request for Proposal (RFP) W912DW20R0017, "Repair of Fuel Hydrant System, Spots 25-28 at Fairchild Air Force Base (FAFB), Washington."

Please see Continuation Page for more details.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW20R0017

X 9B. DATED (SEE ITEM 11)

09-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2020

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW20R0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

1. This amendment five (0005) provides for the following changes:

a. Incorporate Section 02 82 00 in its entirety to the RFP.

2. The proposal submittal time and date is extended to 17 September 2020 at 10:00:00 a.m.

LOCAL TIME. The SF1442 Solicitation, Offer and Award is revised to reflect the date extension.

3. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.

Encl:

SF1442 (revised)

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 15-Sep-2020 10:00 AM to 17-Sep-2020 10:00 AM.

(End of Summary of Changes)

Request for Proposals (RFP) W912DW20R0017 "Repair of Fuel Hydrant System Spots 25-28 at Fairchild Air Force Base, Spokane, WA.”

This project w ill be procured on an Unrestricted Basis.

Per DFARS 236.204(ii), Disclosure of the magnitude of construction projects is estimated betw een $10,000,000 and $25,000,000. NAICS Code 236220, Size determination $39,500,000.00

Funds are not currently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available from w hich payment for contract purposes can be made.

Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://projnet.org/projnet. Please see Section 00 21 16, Bidder Inquiry for further instructions.

NOTE: See Block 13A - The government w ill only accept electronic copies of submission. See instruction of submission under section 00 21 16 Para 1.11 "Proposal Submittals"

LORRAINE LAURENTE 206-764-6662

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

09-Jul-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

206-764-6817FAX:TEL: TEL: FAX:

W912DW20R0017 103

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FY20 Spots 25-28 Fuel Hydrant System Repair 20020 Fairchild AFB, WA

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 82 00

ASBESTOS REMEDIATION

11/18

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 ACM

1.2.2 Amended Water

1.2.3 Area Sampling

1.2.4 Asbestos

1.2.5 Asbestos Regulated Area

1.2.6 Asbestos Fibers

1.2.7 Asbestos Permissible Exposure Limit

1.2.8 Authorized Person

1.2.9 Background

1.2.10 Competent Person (CP)

1.2.11 Contractor

1.2.12 Disposal Bag

1.2.13 Disturbance

1.2.14 Encapsulation

1.2.15 Encapsulants

1.2.16 Friable Asbestos Material

1.2.17 Glovebag Technique

1.2.18 Government Consultant (GC)

1.2.19 HEPA Filter Equipment

1.2.20 Model Accreditation Plan (MAP)

1.2.21 Negative Pressure Enclosure (NPE)

1.2.22 NESHAP

1.2.23 Non-Friable Asbestos Material

1.2.24 Permissible Exposure Limits (PELs)

1.2.24.1 PEL-Time Weighted Average(TWA)

1.2.24.2 PEL-Excursion Limit

1.2.25 Personal Sampling

1.2.26 Private Qualified Person (PQP)

1.2.27 Qualified Person (QP)

1.2.28 TEM

1.2.29 Time Weighted Average (TWA)

1.2.30 Transite

1.2.31 Wetting Agent

1.2.32 Worker

1.3 REQUIREMENTS

1.3.1 Description of Work

1.3.2 Unexpected Discovery of Asbestos

1.3.3 Medical Requirements

1.3.3.1 Medical Examinations

1.3.3.2 Medical Records

1.3.4 Employee Training

1.3.5 Permits and Notifications

SECTION 02 82 00 Page 1

W912DW20R0017 R0005

1.3.6 Environment, Safety and Health Compliance

1.3.7 Respiratory Protection Program

1.3.7.1 Respirator Program Records

1.3.7.2 Respirator Fit Testing

1.3.7.3 Respirator Selection and Use Requirements

1.3.8 Asbestos Hazard Control Supervisor

1.3.9 Hazard Communication

1.3.10 Asbestos Hazard Abatement Plan

1.3.11 Testing Laboratory

1.3.12 Landfill Approval

1.3.13 Transporter Certification

1.3.14 Medical Certification

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

1.5.2 Competent Person Documentation

1.5.3 Worker's License

1.5.4 Contractor's License

1.5.5 Air Sampling Results

1.5.6 Pressure Differential Recordings for Local Exhaust System

1.5.7 Federal, State or Local Citations on Previous Projects

1.5.8 Preconstruction Conference

1.6 SECURITY

1.7 EQUIPMENT

1.7.1 Rental Equipment

PART 2 PRODUCTS

2.1 ENCAPSULANTS

2.1.1 Removal Encapsulants

2.1.2 Bridging Encapsulant

2.1.3 Penetrating Encapsulant

2.1.4 Lock-down Encapsulant

2.2 DUCT TAPE

2.3 DISPOSAL CONTAINERS

2.4 SHEET PLASTIC

2.4.1 Flame Resistant

2.4.2 Reinforced

2.5 MASTIC REMOVING SOLVENT

2.6 LEAK-TIGHT WRAPPING

2.7 VIEWING INSPECTION WINDOW

2.8 WETTING AGENTS

PART 3 EXECUTION

3.1 EQUIPMENT

3.1.1 Air Monitoring Equipment

3.1.2 Respirators

3.1.2.1 Respirators for Handling Asbestos

3.1.3 Exterior Whole Body Protection

3.1.3.1 Outer Protective Clothing

3.1.3.2 Personal Decontamination Unit

3.1.3.3 Eye Protection

3.1.4 Regulated Areas

3.1.5 Load-out Unit

3.1.6 Warning Signs and Labels

3.1.6.1 Warning Sign

3.1.6.2 Warning Labels

3.1.7 Local Exhaust System

SECTION 02 82 00 Page 2

3.1.8 Tools

3.1.9 Rental Equipment

3.1.10 Glovebags

3.1.11 Single Stage Decontamination Area

3.1.12 Decontamination Area Exit Procedures

3.2 WORK PROCEDURE

3.2.1 Building Ventilation System and Critical Barriers

3.2.2 Protection of Existing Work to Remain

3.2.3 Precleaning

3.2.4 Asbestos Regulated Area Requirements

3.2.4.1 Negative Pressure Enclosure

3.2.4.2 Glovebag

3.2.4.3 Regulated Area for Class II Removal

3.2.5 Removal Procedures

3.2.5.1 Sealing Contaminated Items Designated for Disposal

3.2.5.2 Exposed Pipe Insulation Edges

3.2.6 Methods of Compliance

3.2.6.1 Mandated Practices

3.2.6.2 Control Methods

3.2.6.3 Unacceptable Practices

3.2.7 Class I Work Procedures

3.2.8 Specific Control Methods for Class I Work

3.2.8.1 Negative Pressure Enclosure (NPE) System

3.2.8.2 Glovebag Systems

3.2.8.3 Mini-Enclosure

3.2.8.4 Wrap and Cut Operation

3.2.8.5 Class I Removal Method

3.2.9 Class II Work Procedures

3.2.10 Specific Control Methods for Class II Work

3.2.10.1 Sealants and Mastic

3.2.10.2 Gaskets

3.2.11 Abatement of Asbestos Contaminated Soil

3.2.12 Air Sampling

3.2.12.1 Sampling Prior to Asbestos Work

3.2.12.2 Sampling During Asbestos Work

3.2.12.3 Final Clearance Requirements, NIOSH PCM Method

3.2.12.4 Final Clearance Requirements, EPA TEM Method

3.2.12.5 Sampling After Final Clean-Up (Clearance Sampling)

3.2.12.6 Air Clearance Failure

3.2.13 Lock-Down

3.2.14 Site Inspection

3.3 CLEAN-UP AND DISPOSAL

3.3.1 Housekeeping

3.3.2 Title to Materials

3.3.3 Disposal of Asbestos

3.3.3.1 Procedure for Disposal

3.3.3.2 Asbestos Disposal Quantity Report

-- End of Section Table of Contents --

SECTION 02 82 00 Page 3

SECTION 02 82 00

ASBESTOS REMEDIATION

11/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems

ASTM INTERNATIONAL (ASTM)

ASTM C732 (2006; R 2012) Aging Effects of Artificial Weathering on Latex Sealants

ASTM D2794 (1993; R 2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)

ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications

ASTM D522/D522M (2014) Mandrel Bend Test of Attached Organic Coatings

ASTM E119 (2018) Standard Test Methods for Fire Tests of Building Construction and Materials

ASTM E1368 (2014) Visual Inspection of Asbestos Abatement Projects

ASTM E736/E736M (2017) Standard Test Method for Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members

ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

COMPRESSED GAS ASSOCIATION (CGA)

CGA G-7 (2014) Compressed Air for Human

SECTION 02 82 00 Page 4

Respiration; 6th Edition

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

ANSI/ISEA Z87.1 (2015) Occupational and Educational Personal Eye and Face Protection Devices

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH NMAM (2016; 5th Ed) NIOSH Manual of Analytical Methods

REVISED CODE OF WASHINGTON (RCW)

RCW 49.26 Health and Safety - Asbestos

SPOKANE REGIONAL CLEAN AIR AGENCY (SRCAA)

SRCAA Regulation Article IX Asbestos Control Standards

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1926.103 Respiratory Protection

29 CFR 1926.1101 Asbestos

29 CFR 1926.200 Accident Prevention Signs and Tags

29 CFR 1926.51 Sanitation

29 CFR 1926.59 Hazard Communication

40 CFR 61-SUBPART A General Provisions

40 CFR 61-SUBPART M National Emission Standard for Asbestos

40 CFR 763 Asbestos

42 CFR 84 Approval of Respiratory Protective Devices

49 CFR 107 Hazardous Materials Program Procedures

SECTION 02 82 00 Page 5

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

UNDERWRITERS LABORATORIES (UL)

UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units

WASHINGTON STATE ADMINISTRATIVE CODE (WAC)

WAC-296-62 Safety Standards for General Occupational Health Standards, PART I—1—Asbestos, Tremolite, Anthophyllite, and Actinolite

WAC-296-65 Safety Standards for Asbestos Removal and Encapsulation

WAC-296-155 (2016) Safety Standards for Construction Work

1.2 DEFINITIONS

1.2.1 ACM

Asbestos Containing Materials: Any materials containing more than one percent asbestos.

1.2.2 Amended Water

Water containing a wetting agent or surfactant with a maximum surface tension of 0.00042 psi.

1.2.3 Area Sampling

Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.

1.2.4 Asbestos

The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be at least 1 percent.

1.2.5 Asbestos Regulated Area

That area where asbestos removal operations are performed which is isolated

SECTION 02 82 00 Page 6 by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris.

1.2.6 Asbestos Fibers

Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.

1.2.7 Asbestos Permissible Exposure Limit

0.1 fibers per cubic centimeter (f/cc) of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other Federal legislation having legal jurisdiction for the protection of workers health.

1.2.8 Authorized Person

Any person authorized by the Contractor and required by work duties to be present in the regulated areas.

1.2.9 Background

The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.

1.2.10 Competent Person (CP)

A person meeting the requirements for competent person as specified in 29 CFR 1926.1101 including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan ( 40 CFR 763 ) for Project designer or supervisor, or its equivalent. The competent person must have a current State of Washington Asbestos Abatement, Contractors or supervisors license.

1.2.11 Contractor

The Contractor is that individual, or entity under Contract to perform the herein listed work. Contractor may hire a Subcontractor asbestos abatement firm.

1.2.12 Disposal Bag

A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101 , used for transporting asbestos waste from containment to disposal site.

1.2.13 Disturbance

Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in one standard sized glovebag or waste bag, not larger than 60 inches in length and width in order to access a building component.

SECTION 02 82 00 Page 7

1.2.14 Encapsulation

The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.

1.2.15 Encapsulants

Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.

a. Removal Encapsulant (can be used as a wetting agent).

b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material).

c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage).

d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).

1.2.16 Friable Asbestos Material

A term defined in 40 CFR 61-SUBPART M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763 , Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

1.2.17 Glovebag Technique

Those asbestos removal and control techniques put forth in 29 CFR 1926.1101 .

1.2.18 Government Consultant (GC)

That qualified person employed directly by the Government to monitor, sample, inspect the work or in some other way advise the Contracting Officer. The GC is normally a private consultant, but can be an employee of the Government.

1.2.19 HEPA Filter Equipment

High efficiency particulate air (HEPA) filtered vacuum and exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters must retain 99.97 percent of particles

0.3 microns or larger as indicated in UL 586 .

1.2.20 Model Accreditation Plan (MAP)

USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763 .

SECTION 02 82 00 Page 8

1.2.21 Negative Pressure Enclosure (NPE)

That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101 .

1.2.22 NESHAP

National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61-SUBPART M .

1.2.23 Non-Friable Asbestos Material

ACM in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.

1.2.24 Permissible Exposure Limits (PELs)

1.2.24.1 PEL-Time Weighted Average(TWA)

Concentration of asbestos not in excess of 0.1 f/cc of air as an 8-hour time weighted average (TWA).

1.2.24.2 PEL-Excursion Limit

An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.

1.2.25 Personal Sampling

Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101 .

1.2.26 Private Qualified Person (PQP)

That qualified person hired by the Contractor to perform the herein listed tasks. The PQP shall not be hired by or report directly to the asbestos abatement firm.

1.2.27 Qualified Person (QP)

A registered architect, professional engineer, certified industrial hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State Model Accreditation Plan as described in 40 CFR 763 as a building inspector, contractor/supervisor abatement worker, and asbestos project designer; and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent professional qualification. The QP must be qualified to perform visual inspections as indicated in ASTM E1368.

1.2.28 TEM

Refers to Transmission Electron Microscopy.

SECTION 02 82 00 Page 9

1.2.29 Time Weighted Average (TWA)

The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.

1.2.30 Transite

A generic name for asbestos cement wallboard and pipe.

1.2.31 Wetting Agent

A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at most

0.00042 psi.

1.2.32 Worker

Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101 , to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation, if required by the OSHA Class of work to be performed or by the State where the work is to be performed. The worker must be appropriately licensed in the State of Washington.

1.3 REQUIREMENTS

1.3.1 Description of Work

This project will repair pavement, intrusion detection and fueling systems serving aircraft parking spots 25-28 to make them fully functional to support KC-135 aircraft. This project consists of the following components:

a. Airfield Pavement Repair - This component includes demolition, removal and replacement of approximately 400,000 square feet of pavement from spots 25-28, including replacement of base and subbase layers and striping.

b. Intrusion Detection System (IDS) Repair - This component includes installation of an in-ground intrusion detection to incorporate spots 25-28 back into the flight line security system. It includes airfield pavement cutting, excavation, backfill, compaction, and paving replacement outside spots 25-28, as well as conduit, electrical, communications, and head end work that is required for repair of the

IDS.

c. Fuel Hydrant System (FHS) Repair - This component involves replacing the 18 inch non-circulating fuel line serving aircraft parking spots 25-28 with a 12 inch circulating system that would be part of the current Area A fueling system. It includes replacing approximately 3,200 LF of 18 inch fuel line with 12 inch carbon steel line from pump house B2028 to spot 28, installing new 12 inch carbon steel line to create a looped system, replacing existing fuel hydrants and vaults for spots 25-28, and all appurtenances (spur lines, high point vents, low point drains, valve pits, etc.) required for complete repairs to the system, as well as updating the existing impressed current cathodic protection system. It includes airfield pavement cutting, removal and replacement, excavation, backfill and compaction outside spots 25-28 as well as conduit, electrical, communications, and interconnection work

SECTION 02 82 00 Page 10 incidental to repair of the FHS system.

d. Petroleum Contaminated Soil (PCS) Remediation - This component includes additional work required to address PCS disturbed by work under other project components. This includes testing, handling, proper disposal of PCS and import of new, clean materials. It includes PCS sampling along excavation boundaries and construction of impermeable barriers between clean import and in situ PCS as may be required to comply with Federal and Washington State environmental regulations. Remediation of PCS beyond soil disturbance required for Airfield Paving, IDS or FHS repairs is outside the scope of this project.

The Contractor shall request existing reports regarding previous asbestos sampling and sample suspect ACM prior to the disturbance of suspect materials. If ACM is identified, the procedures and techniques outlined in this Specification shall be followed.

Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material may release airborne asbestos fibers during demolition and removal and therefore must be handled in accordance with the removal and disposal procedures as specified herein. Provide techniques as outlined in this Specification. A competent person must supervise asbestos removal work as specified herein.

1.3.2 Unexpected Discovery of Asbestos

Notify the Contracting Officer within 24 hours if any previously untested building components suspected to contain asbestos are impacted by the work.

1.3.3 Medical Requirements

Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101 .

1.3.3.1 Medical Examinations

Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 or other pertinent State or local directives. This requirement must have been satisfied within the 12 months prior to the start of work on this Contract. The same medical examination must be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation. Specifically identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets with the word

"ASBESTOS."

1.3.3.2 Medical Records

Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of 50 years after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to:

The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.

SECTION 02 82 00 Page 11

1.3.4 Employee Training

Submit certificates, prior to the start of work but after the main abatement submittal, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with 40 CFR 763 ; understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis.

Organize certificates by individual worker, not grouped by type of certification. Train personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent. Document the training by providing: Dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the Contracting Officer. Furnish each employee with respirator training and fit testing administered by the PQP or designer as required by 29 CFR 1926.1101 and 29 CFR 1926.103 . Fully cover engineering and other hazard control techniques and procedures.

1.3.5 Permits and Notifications

Prior to the start of work, obtain necessary permits in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities. Notify the SRCAA and the Contracting Officer in writing 10 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M . Notify the Contracting Officer and other appropriate Government agencies in writing 20 working days prior to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations. Submit copies of all Notifications to the Contracting Officer.

1.3.6 Environment, Safety and Health Compliance

In addition to detailed requirements of this Specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of EM 385-1-1 , 29 CFR 1926.1101 , 40 CFR 61-SUBPART A , 40 CFR 61-SUBPART M , and 40 CFR 763 .

Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this Specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government apply. The following laws, ordinances, criteria, rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials apply:

a. 29 CFR 1926.1101 .

b. RCW 49.26 .

c. WAC-296-62 .

d. WAC-296-65 .

SECTION 02 82 00 Page 12

e. WAC-296-155 .

f. SRCAA Regulation Article IX Asbestos Control Standards.

1.3.7 Respiratory Protection Program

Establish and implement a respirator program as required by 29 CFR 1926.1101 and 29 CFR 1926.103 . Submit a written description of the program to the Contracting Officer. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.

1.3.7.1 Respirator Program Records

Submit records of the respirator program as required by 29 CFR 1926.103 and

29 CFR 1926.1101 .

1.3.7.2 Respirator Fit Testing

The Contractor's PQP or designee must conduct a qualitative or quantitative fit test conforming to 29 CFR 1926.103 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test must be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that will affect the fit, a new fit test must be performed. Functional fit checks must be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.

1.3.7.3 Respirator Selection and Use Requirements

Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with CGA G-7 and the manufacturer's recommendations. Respirators must be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84 , for use in environments containing airborne asbestos fibers. For air-purifying respirators, the particulate filter must be high-efficiency particulate air (HEPA)/(N-,R-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type must be made by the Contractor's Designated IH based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.

1.3.8 Asbestos Hazard Control Supervisor

The Contractor must be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.

1.3.9 Hazard Communication

Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Safety Data Sheets (SDS) for all materials brought to the Site.

1.3.10 Asbestos Hazard Abatement Plan

Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the removal and demolition of materials

SECTION 02 82 00 Page 13 containing asbestos. The plan, not to be combined with other hazard abatement plans, must be prepared, signed, and sealed by the PQP. Provide a Table of Contents for each abatement submittal, which follows the sequence of requirements in the Contract. The plan must include but not be limited to the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection, the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms, removal method, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan must also include (both fire and medical emergency) response plans and an Activity Hazard Analyses (AHAs) in accordance with EM 385-1-1 . The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos Hazard Control Supervisor, CP, and PQP must meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the Specification. Any changes required in the Specification as a result of the plan must be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work.

1.3.11 Testing Laboratory

Submit the name, address, and telephone number of each testing laboratory selected for the analysis, and reporting of airborne concentrations of asbestos fibers along with evidence that each laboratory selected holds the appropriate State license and permits and certification that each laboratory is American Industrial Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis. The testing laboratory firm must be independent of the asbestos contractor and must have no employee or employer relationship which could constitute a conflict of interest.

1.3.12 Landfill Approval

Submit written evidence that the landfill is approved for asbestos disposal by the U.S. Environmental Protection Agency, Region 10, Air Enforcement Section, SCRAA, and local regulatory agencies. Within three working days after delivery, submit detailed delivery tickets, prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill. Submit a copy of the waste shipment records within one day of the shipment leaving the Project Site.

1.3.13 Transporter Certification

Submit written evidence that the transporter is approved to transport asbestos waste in accordance with the DOT requirements of 49 CFR 171 , 49 CFR 172 , and 49 CFR 173 , as well as registration requirements of 49 CFR 107 and all other State and local regulatory agency requirements.

SECTION 02 82 00 Page 14

1.3.14 Medical Certification

Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR 1926.1101 and 29 CFR 1926.103 as prescribed by law. Submit certificates prior to the start of work but after the main abatement submittal.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Amended Water

Safety Data Sheets (SDS) for All Materials; G

Encapsulants; G

Respirators

Local Exhaust Equipment; G

Pressure Differential Automatic Recording Instrument; G

Vacuums; G

Glovebags; G

SD-06 Test Reports

Air Sampling Results; G

Pressure Differential Recordings for Local Exhaust System; G

Clearance Sampling; G

Asbestos Disposal Quantity Report; G

SD-07 Certificates

Employee Training; G

Notifications; G

Respiratory Protection Program; G

Asbestos Hazard Abatement Plan; G

Testing Laboratory; G

Landfill Approval; G

SECTION 02 82 00 Page 15

Delivery Tickets; G

Waste Shipment Records; G

Transporter Certification; G

Medical Certification; G

Private Qualified Person Documentation; G

Competent Person; G

Worker's License; G

Contractor's License; G

Federal, State or Local Citations on Previous Projects; G

Encapsulants; G

Equipment Used to Contain Airborne Asbestos Fibers

Water Filtration Equipment; G

Vacuums; G

Ventilation Systems

SD-11 Closeout Submittals

Permits; G

Notifications; G

Respirator Program Records; G

Rental Equipment; G

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The PQP must be appropriately licensed in the State of Washington as a Certified Asbestos Project Monitor. The PQP and the asbestos contractor must not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP must be a first tier Subcontractor.

SECTION 02 82 00 Page 16

1.5.2 Competent Person Documentation

The Competent Person must be experienced in the administration and supervision of asbestos abatement projects including exposure assessment and monitoring, work practices, abatement methods, protective measures for personnel, setting up and inspecting asbestos abatement work areas, evaluating the integrity of containment barriers, placement and operation of local exhaust systems, ACM generated waste containment and disposal procedures, decontamination units installation and maintenance requirements, Site safety and health requirements, notification of other employees on-site. The Competent Person must be on-site at all times when asbestos abatement activities are underway. Submit training certification and a current State of Washington Asbestos Contractor's/Supervisor's License. Submit evidence that the Competent Person has a minimum of 5 years of on-the-job asbestos abatement experience relevant to OSHA competent person requirements.

1.5.3 Worker's License

Submit documentation that workers meet the requirements of 29 CFR 1926.1101 , 40 CFR 61-SUBPART M , and have a current State of Washington Asbestos Workers License.

1.5.4 Contractor's License

Submit a copy of the Asbestos Contractor's license issued by the State of Washington. Submit the following certification along with the license: "I certify that the personnel I am responsible for during the course of this Project fully understand the contents of 29 CFR 1926.1101 , 40 CFR 61-SUBPART M , EM 385-1-1 , and the Federal, State and local requirements for those asbestos abatement activities that they will be involved in." This certification statement must be signed by the Company's President or Executive Officer.

1.5.5 Air Sampling Results

Complete fiber counting and provide results to the PQP for review within 24 hours of the "time off" of the sample pump. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits. Submit sampling results to the Contracting Officer and the affected Contractor employees where required by law within three working days, signed by the testing laboratory employee performing air sampling, the employee that analyzed the sample, and the PQP. Notify the Contractor and the Contracting Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to have asbestos fiber concentrations in excess of 0.01 f/cc or background whichever is higher. In no circumstance must levels exceed 0.1 f/cc.

1.5.6 Pressure Differential Recordings for Local Exhaust System

Provide a local exhaust system that creates a negative pressure of at least

0.02 inches of water relative to the pressure external to the enclosure and operate it continuously, 24 hours a day, until the temporary enclosure of the asbestos control area is removed. Submit pressure differential recordings for each work day to the PQP for review and to the Contracting Officer within 24 hours from the end of each work day.

SECTION 02 82 00 Page 17

1.5.7 Federal, State or Local Citations on Previous Projects

Submit a statement, signed by an officer of the company, containing a record of any citations issued by Federal, State, or local regulatory agencies relating to asbestos activities within the last 5 years (including projects, dates, and resolutions); a list of penalties incurred through non-compliance with Asbestos Project Specifications, including liquidated damages, overruns in scheduled time limitations and resolutions; and situations in which an asbestos-related contract has been terminated (including projects, dates, and reasons for terminations). If there are none, a negative declaration signed by an officer of the company must be provided.

1.5.8 Preconstruction Conference

Conduct a safety preconstruction conference to discuss the details of the Asbestos Hazard Abatement Plan, Accident Prevention Plan (APP) including the AHAs required in Specification Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. The safety preconstruction conference must include the Contractor and their Designated Competent Person, Designated IH and Project Supervisor and the Contracting Officer. Deficiencies in the APP will be discussed. On-site work must not begin until the APP has been accepted.

1.6 SECURITY

A log book must be kept documenting entry into and out of the regulated area. Entry into regulated areas must only be by personnel authorized by the Contractor and the Contracting Officer. Personnel authorized to enter regulated areas must be trained, medically evaluated, and wear the required personal protective equipment.

1.7 EQUIPMENT

1.7.1 Rental Equipment

Provide a copy of the written notification to the rental company concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.

PART 2 PRODUCTS

2.1 ENCAPSULANTS

Encapsulants must conform to current USEPA requirements, contain no toxic or hazardous substances as defined in 29 CFR 1926.59 , and conform to the following performance requirements.

2.1.1 Removal Encapsulants

Requirement Test Standard

Flame Spread - 25, Smoke Emission - 50 ASTM E84

Life Expectancy - 20 years ASTM C732 Accelerated Aging Test

SECTION 02 82 00 Page 18

Requirement Test Standard

Permeability - Minimum 0.4 perms ASTM E96/E96M

Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)

ASTM E119

Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test

Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test

2.1.2 Bridging Encapsulant

Requirement Test Standard

Flame Spread - 25, Smoke Emission - 50 ASTM E84

Life Expectancy - 20 years ASTM C732 Accelerated Aging Test

Permeability - Minimum 0.4 perms ASTM E96/E96M

Fire Resistance - Negligible affect on fire resistance rating over 3-hour test (Clas sified by UL for use over fibrous and cementitious sprayed fireproofing)

ASTM E119

Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test

Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test

2.1.3 Penetrating Encapsulant

Requirement Test Standard

Flame Spread - 25, Smoke Emission - 50 ASTM E84

Life Expectancy - 20 years ASTM C732 Accelerated Aging Test

Permeability - Minimum 0.4 perms ASTM E96/E96M

SECTION 02 82 00 Page 19

Requirement Test Standard

Cohesion/Adhesion Test - 50 pounds of force/foot

ASTM E119

Fire Resistance - Negligible affect on fire resistance rating over 3-hour test (Clas sified by UL for use over fibrous and cementitious sprayed fireproofing)

ASTM E119

Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test

Flexibility - no rupture or cracking ASTM D522/D522M Mandrel Bend Test

2.1.4 Lock-down Encapsulant

Requirement Test Standard

Flame Spread - 25, Smoke Emission - 50 ASTM E84

Life Expectancy - 20 years ASTM C732 Accelerated Aging Test

Permeability - Minimum 0.4 perms ASTM E96/E96M

Fire Resistance - Negligible affect on fire resistance rating over 3-hour test (Tested with fireproofing…