About this file

This solicitation is for a design-bid-build construction contract to repair the Security Forces Assistance Brigade at Joint Base Lewis-McChord in Washington. Solicitation number W912DW20B0009 will utilize two-step sealed bidding procedures to ultimately award a firm fixed-price contract. This is step one of the solicitation process, which only requires submission of an acceptable technical proposal. An amendment incorporating step two and an invitation for bid will be issued to offerors with acceptable step one proposals. The project magnitude is between $25,000,000 and $100,000,000. This opportunity is a 100% small business set-aside for NAICS code 236220, commercial and institutional building construction, with a small business size standard of $39.5 million. The Department of the Army Corps of Engineers Engineering District Seattle is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F G H L M N O Q R S

J

TEAM ROOM

TEAM ROOM

TEAM ROOM

TELECOM

CATV

LATRINES

LATRINES

PRINT/COPY

SUPPLIES

TEAM ROOM

STAIR

S201

STAIR

S202

MISSION

PLANNING

JAN.

JAN.

KITCHENETTE

SUPPLIES

201C

CO OFFICE

1st SGT OFFICE

OPS OFFICE

TB8

(10) CG9

(6)

(6)

TV1

CG9

(6) CG6

CH1

CG4

CG6

CH1

WS2

CH3

(2)

CG4

CG6

CH1

WS2

CH3

(4)

TB2

TB1

(23)

CH2

(63)

(6)

CG11 (3)

CG11

(3)

CG11

(3)

(3)

CH3

TV1

CG9

TV1TV1

TV1

TV1

TV1

(20)

CG11

CG9

TB8

(10)

CH3

(20)

CH3CH3

(20) TB8

(10)

(20)

CH3 TB8

(10)(20)

T V

WS2

(2)

(2)

CORRIDOR

UP UPDN DN

FF&E LEGEND

NOTE*: SEE SHEET I-604 - FF&E LEGEND FOR SYMBOLS

CG1 4' LOCKER ROOM BENCH

CG2 8' LOCKER ROOM BENCH

CG3 DESK W/ PENCIL DRAWER

CG4 WARDROBE LOCKER

CG5 PRINTER STORAGE CABINET

CG6 4-DRAWER LATERAL FILE

CG7 INDUSTRIAL SHELVING

CG8 METAL STORAGE CABINET

CG9 TWO-TIERED WARDROBE LOCKER

CG10 HEAVY-DUTY METAL DESK

CG11 60"W HEAVY-DUTY STORAGE LOCKER

CH1 TASK CHAIR

CH2 SLED-BASED STACKING CHAIR

CH3 SIDE CHAIR

CH4 SHOP STOOL

MR1 FULL-LENGTH MIRROR

PG1 PEGBOARD - 48"W X 24"H

TB1 FLIP-TOP TRAINING TABLE

TB2 36" ROUND TABLE

TB3 SMALL CONFERENCE TABLE

TB4 LARGE CONFERENCE TABLE

TB5 RECTANGULAR TABLE - 24" X 60"

TB6 RECTANGULAR TABLE - 30" X 60"

TB7 36" X 48" INDUSTRIAL SHOP TABLE

TB8 RECTANGULAR TABLE W/ CASTERS - 24" X 60"

TV1 55" TV

TV2 77" TV

WS1 L-SHAPED WORKSTATION

WS2 L-SHAPED EXECUTIVE WORKSTATION

TV1 FURNITURE TAG

(5) QUANITY (PER ROOM)

BLACK DASHED LINE, (GFCI)

GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GRAY SOLID LINE, (CFCI)

CONTRACTOR FURNISHED CONTRACTOR INSTALLED

GRAY DASHED LINE, (GFGI)

GOVERNMENT FURNISHED GOVERNMENT INSTALLED

FF&E GENERAL NOTES

1. REFER TO FURNITURE, FIXTURES & EQUIPMENT (FF&E)

BINDER FOR FURTHER INFORMATION INCLUDING BUT NOT

LIMITED TO DIMENSIONS, QUANTITIES, WEIGHT AND SPECIAL

INSTALLATION INSTRUCTIONS.

2. FURNITURE MAY BE PROCURED AND/OR INSTALLED FROM A

VARIETY OF SOURCES. REFER TO THE DIFFERENT LINE

TYPES NOTED AT THE END OF THE FF&E LEGEND.

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

O R

C

N S

TR

U C

TIO

N

6/15/2020 10:37:14 AM

I-104

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

S E

C O

N D

F L O

O R

F F

E

P L

A N

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

8'4' 16'0

SCALE: 1/8"=1'-0"

1/8" = 1'-0"C1

SECOND FLOOR FF&E PLAN

3RD FLOOR

2ND FLOOR

1ST FLOOR

BASEMENT

PLAN NORTHNOT FOR CONSTRUCTION

100% DESIGN

FOR IN

FORMATION ONLY

F G H L M N O Q R S

J

CG6

CH1

WS2

CG4

CG6

CH1

WS2

CH3

(2)

CG4

CG6

CH1

WS2

CH3

(4)

TB2

TB1

(23)

CH2

(63)

TEAM ROOM

TEAM ROOM

TEAM ROOM

TELECOM

CATV

LATRINES

LATRINES

PRINT/COPY

SUPPLIES

TEAM ROOM

CORRIDOR

STAIR

S301

STAIR

S302

MISSION

PLANNING

JAN.

JAN.

KITCHENETTE

SUPPLIES

301b

CO OFFICE

1st SGT OFFICE

OPS OFFICE

TV1

TV1

CG11

CH3

TB8

CG9

(10)

(6)

(20)

(3)

TV1

CG11

(3)

CG9

(6)

CH3

TB8

(10)

(20)

TV1TV1

CG11

(20)

CH3

TB8

(10)

(20)

CG9

(6)

CG11

TV1 TV1

CG9

(3)

CH3 TB8

(20) (10)T V

(2)

(2)

DN DN

FF&E LEGEND

NOTE*: SEE SHEET I-604 - FF&E LEGEND FOR SYMBOLS

CG1 4' LOCKER ROOM BENCH

CG2 8' LOCKER ROOM BENCH

CG3 DESK W/ PENCIL DRAWER

CG4 WARDROBE LOCKER

CG5 PRINTER STORAGE CABINET

CG6 4-DRAWER LATERAL FILE

CG7 INDUSTRIAL SHELVING

CG8 METAL STORAGE CABINET

CG9 TWO-TIERED WARDROBE LOCKER

CG10 HEAVY-DUTY METAL DESK

CG11 60"W HEAVY-DUTY STORAGE LOCKER

CH1 TASK CHAIR

CH2 SLED-BASED STACKING CHAIR

CH3 SIDE CHAIR

CH4 SHOP STOOL

MR1 FULL-LENGTH MIRROR

PG1 PEGBOARD - 48"W X 24"H

TB1 FLIP-TOP TRAINING TABLE

TB2 36" ROUND TABLE

TB3 SMALL CONFERENCE TABLE

TB4 LARGE CONFERENCE TABLE

TB5 RECTANGULAR TABLE - 24" X 60"

TB6 RECTANGULAR TABLE - 30" X 60"

TB7 36" X 48" INDUSTRIAL SHOP TABLE

TB8 RECTANGULAR TABLE W/ CASTERS - 24" X 60"

TV1 55" TV

TV2 77" TV

WS1 L-SHAPED WORKSTATION

WS2 L-SHAPED EXECUTIVE WORKSTATION

TV1 FURNITURE TAG

(5) QUANITY (PER ROOM)

BLACK DASHED LINE, (GFCI)

GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GRAY SOLID LINE, (CFCI)

CONTRACTOR FURNISHED CONTRACTOR INSTALLED

GRAY DASHED LINE, (GFGI)

GOVERNMENT FURNISHED GOVERNMENT INSTALLED

FF&E GENERAL NOTES

1. REFER TO FURNITURE, FIXTURES & EQUIPMENT (FF&E)

BINDER FOR FURTHER INFORMATION INCLUDING BUT NOT

LIMITED TO DIMENSIONS, QUANTITIES, WEIGHT AND SPECIAL

INSTALLATION INSTRUCTIONS.

2. FURNITURE MAY BE PROCURED AND/OR INSTALLED FROM A

VARIETY OF SOURCES. REFER TO THE DIFFERENT LINE

TYPES NOTED AT THE END OF THE FF&E LEGEND.

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:18 AM

I-105

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

T H

IR

D

F L

O O

R F

F

E P

L A

N

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

1/8" = 1'-0"C1

THIRD FLOOR FF&E PLAN

8'4' 16'0

SCALE: 1/8"=1'-0"

3RD FLOOR

2ND FLOOR

1ST FLOOR

BASEMENT

PLAN NORTHNOT FOR CONSTRUCTION

100% DESIGN

823 SF

MECH

B09

504 SF

VAULT

B01

186 SF

STORAGE

B04

201 SF

STORAGE

B02

545 SF

STORAGE

B05

46 SF

ELEC

B07

(CRAWL SPACE)

(CRAWL SPACE)

274 SF

CORRIDOR

BOO

CG

SIGN M

UP

UP

SIGN K

SIGN G

CG CG

CGCG

CG

CARPET TILE

RUBBER STAIR TREADS

FINISH PLAN LEGEND

CONCRETE, SEALED CLEAR

CORNER GUARD

FLOOR TRANSITION, TYP

MARBLE THRESHOLD (DESIGNATED)

CPT-1

CG

RST-1

CONC-1

CG-1

FT-1

MT-1

CARPET TILECPT-2

PORCELAIN TILEPT-1

PORCELAIN TILE (EXISTING)EXIST

CONCRETE, POLISHED, SEALED CLEAR CONC-2

WELDED DIAMOND PLATE STEEL,

REFERENCE STRUCTURAL FA-2

SIGNAGE - SEE SCHEDULE FOR ALL OTHER SIGNAGESGN-1SIGN X

SEE E8/A-511

FINISH PLAN GENERAL NOTES

1. SEE SHEET A-001 FOR SYMBOL LEGENDS, ABBREVIATIONS

AND GENERAL NOTES.

2. PLAN VIEWS ARE CUT AT 4'-0" AFF.

3. REFERENCE SHEET I-601 FOR FINISH LEGEND.

4. REFERENCE SHEETS I-602 AND I-603 FOR FINISH SCHEDULES.

5. REFERENCE STRUCTURAL INTERIOR DESIGN (SID) BINDER

FOR COLOR BOARDS OF EXTERIOR AND INTERIOR FINISH

MATERIALS AND COLORS.

6. INSTALL WINDOW TREATMENTS AT ALL WINDOWS, UNLESS

NOTED OTHERWISE. SEE FINISH LEGEND, SHEET I-601, FOR

FURTHER INFORMATION.

7. ALL CEILINGS AND WALL SURFACES TO BE PAINTED IPT-1

UNLESS NOTED OTHERWISE.

8. REMOVE PAINT FINISH FROM ALL INTERIOR

HANDRAILS/GUARD RAILS AND SAND DOWN TO A SMOOTH

UNIFORM FINISH. PAINT ALL HANDRAILS/GUARDRAILS IPT-2.

9. REFERENCE SHEETS A-512 AND A-513 FOR SIGN TYPES.

REFERENCE SHEET A-605 FOR SIGNAGE SCHEDULE. SEE

F1/1-513 FOR TYPICAL SIGN MOUNTING DETAIL.

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:20 AM

I-106

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

B A

S E

M E

N T

F

IN

IS

H

P L

A N

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

8'4' 16'0

SCALE: 1/8"=1'-0"

3RD FLOOR

2ND FLOOR

1ST FLOOR

BASEMENT

PLAN NORTH

1/8" = 1'-0"B2

BASEMENT FINISH PLAN

NOT FOR CONSTRUCTION

100% DESIGN

FINISH PLAN GENERAL NOTES

1. SEE SHEET A-001 FOR SYMBOL LEGENDS, ABBREVIATIONS

AND GENERAL NOTES.

2. PLAN VIEWS ARE CUT AT 4'-0" AFF.

3. REFERENCE SHEET I-601 FOR FINISH LEGEND.

4. REFERENCE SHEETS I-602 AND I-603 FOR FINISH SCHEDULES.

5. REFERENCE STRUCTURAL INTERIOR DESIGN (SID) BINDER

FOR COLOR BOARDS OF EXTERIOR AND INTERIOR FINISH

MATERIALS AND COLORS.

6. INSTALL WINDOW TREATMENTS AT ALL WINDOWS, UNLESS

NOTED OTHERWISE. SEE FINISH LEGEND, SHEET I-601, FOR

FURTHER INFORMATION.

7. ALL CEILINGS AND WALL SURFACES TO BE PAINTED IPT-1

UNLESS NOTED OTHERWISE.

8. REMOVE PAINT FINISH FROM ALL INTERIOR

HANDRAILS/GUARD RAILS AND SAND DOWN TO A SMOOTH

UNIFORM FINISH. PAINT ALL HANDRAILS/GUARDRAILS IPT-2.

9. REFERENCE SHEETS A-512 AND A-513 FOR SIGN TYPES.

REFERENCE SHEET A-605 FOR SIGNAGE SCHEDULE. SEE

F1/1-513 FOR TYPICAL SIGN MOUNTING DETAIL.

CARPET TILE

RUBBER STAIR TREADS

FINISH PLAN LEGEND

CONCRETE, SEALED CLEAR

CORNER GUARD

FLOOR TRANSITION, TYP

MARBLE THRESHOLD (DESIGNATED)

CPT-1

CG

RST-1

CONC-1

CG-1

FT-1

MT-1

CARPET TILECPT-2

PORCELAIN TILEPT-1

PORCELAIN TILE (EXISTING)EXIST

CONCRETE, POLISHED, SEALED CLEAR CONC-2

WELDED DIAMOND PLATE STEEL,

REFERENCE STRUCTURAL FA-2

SIGNAGE - SEE SCHEDULE FOR ALL OTHER SIGNAGESGN-1SIGN X

SEE E8/A-511

783 SF

CLASS/ASSEMBLY

838 SF

CLASS/ASSEMBLY

293 SF

S3 MEDICAL

WMN RESTROOM

MEN'S

RESTROOM

SUPPLIES

CG

CG

CG

CG CGCG

CGCG

CG

CG

CG

M A

T C

H L

IN

E

S E

E C

/I

-1

CORRIDOR

100B

DN

DN

SIGN P

MT-1

MT-1

FOR SHOWER

CURB DETAIL,

TYP.

SEE E3/A-511

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:23 AM

I-107

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

F

IR

S T

F L

O O

R F

IN

IS

H P

L A

N

A R

E A

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

8'4' 16'0

SCALE: 1/8"=1'-0"

3RD FLOOR

2ND FLOOR

1ST FLOOR

BASEMENT

PLAN NORTH

1/8" = 1'-0"B2

FIRST FLOOR FINISH PLAN - HQ - AREA 1

NOT FOR CONSTRUCTION

100% DESIGN

FINISH PLAN GENERAL NOTES

1. SEE SHEET A-001 FOR SYMBOL LEGENDS, ABBREVIATIONS

AND GENERAL NOTES.

2. PLAN VIEWS ARE CUT AT 4'-0" AFF.

3. REFERENCE SHEET I-601 FOR FINISH LEGEND.

4. REFERENCE SHEETS I-602 AND I-603 FOR FINISH SCHEDULES.

5. REFERENCE STRUCTURAL INTERIOR DESIGN (SID) BINDER

FOR COLOR BOARDS OF EXTERIOR AND INTERIOR FINISH

MATERIALS AND COLORS.

6. INSTALL WINDOW TREATMENTS AT ALL WINDOWS, UNLESS

NOTED OTHERWISE. SEE FINISH LEGEND, SHEET I-601, FOR

FURTHER INFORMATION.

7. ALL CEILINGS AND WALL SURFACES TO BE PAINTED IPT-1

UNLESS NOTED OTHERWISE.

8. REMOVE PAINT FINISH FROM ALL INTERIOR

HANDRAILS/GUARD RAILS AND SAND DOWN TO A SMOOTH

UNIFORM FINISH. PAINT ALL HANDRAILS/GUARDRAILS IPT-2.

9. REFERENCE SHEETS A-512 AND A-513 FOR SIGN TYPES.

REFERENCE SHEET A-605 FOR SIGNAGE SCHEDULE. SEE

F1/1-513 FOR TYPICAL SIGN MOUNTING DETAIL.

CARPET TILE

RUBBER STAIR TREADS

FINISH PLAN LEGEND

CONCRETE, SEALED CLEAR

CORNER GUARD

FLOOR TRANSITION, TYP

MARBLE THRESHOLD (DESIGNATED)

CPT-1

CG

RST-1

CONC-1

CG-1

FT-1

MT-1

CARPET TILECPT-2

PORCELAIN TILEPT-1

PORCELAIN TILE (EXISTING)EXIST

CONCRETE, POLISHED, SEALED CLEAR CONC-2

WELDED DIAMOND PLATE STEEL,

REFERENCE STRUCTURAL FA-2

SIGNAGE - SEE SCHEDULE FOR ALL OTHER SIGNAGESGN-1SIGN X

SEE E8/A-511

CDR - BN

COMMANDER

OFFICE

XO - BN

EXECUTIVE

OFFICE

SGM - COMMAND

SGT MAJ

SUPPLY

114a

S4 OIC OFFICE

S4 OPEN OFFICE

130 S6 INFORMATION

MGMT OFFICE

120a

S6 COMMON

WORK AREA

S6 SUPPLIES

PRINT/COPY

BREAK/KITCH

TELECOM

WMN RESTROOM

MEN RESTROOM

HHC-1

HHC-2

SIPRNET CAFE

S2 OFFICE

S2 OPEN OFFICE

S2 SUPPLY

S3 CONF

S3 OPS SGT

S3 OFFICE

S3 OPEN OFFICE

S3 TEAM ROOM

S1 OPEN OFFICE

S1 OFFICE

COMMAND

CONFERENCE

JAN.

CORRIDOR

100B

STAIR

S102

STAIR

S101

TLT/SHR

CATV

CG

CG

CG

CG

CG CG

CG

CG CG

CG

CG

CG

CG CG CG CG

CG

C G

C G

CG CG

CG

M A

T C

H L

IN

E

S E

E B

/I

-1

CORRIDOR

100A

FOR SHOWER

CURB DETAIL

SEE E3/A-511

SIGN K

SIGN M

SIGN GSIGN H

SIGN M

SIGN HSIGN G

SIGN K

UP UP

DN DN

DN

DN DN

S

IG

N N

S

IG

N N

SIGN P SIGN P

SIGN P SIGN P

S

IG

N L

S

IG

N L

S

IG

N L

S

IG

N L

S

IG

N P

MT-1

CG

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:27 AM

I-108

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

F

IR

S T

F L

O O

R F

IN

IS

H P

L A

N

A R

E A

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

1/8" = 1'-0"C1

FIRST FLOOR FINISH PLAN - HQ - AREA 2

3RD FLOOR

2ND FLOOR

1ST FLOOR

BASEMENT

8'4' 16'0

SCALE: 1/8"=1'-0"

PLAN NORTHNOT FOR CONSTRUCTION

100% DESIGN

741 SF

TEAM ROOM

217 763 SF

TEAM ROOM

706 SF

TEAM ROOM

137 SF

TELECOM

16 SF

CATV

295 SF

LATRINES

297 SF

LATRINES

93 SF

SUPPLIES

222 157 SF

1st SGT OFFICE

205 SF

CO OFFICE

721 SF

TEAM ROOM

786 SF

CORRIDOR

119 SF

STAIR

S201

119 SF

STAIR

S202

1488 SF

MISSION

PLANNING

201157 SF

OPS OFFICE

16 SF

JAN.

16 SF

JAN.

CG

CG

CG

CG CG

CG CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

FOR SHOWER CURB

DETAIL, TYP.

CG

CG CG

CG CG

CG CG

PRINT/COPY

KITCHENETTE

SUPPLIES

201C

SEE E3/A-511

SIGN M

SIGN G SIGN H

SIGN K

SIGN M

SIGN G SIGN H

SIGN K

UP

UP

DN

DN

S

IG

N L

S

IG

N L

CG

CG

CG

CG

MT-1MT-1

CARPET TILE

RUBBER STAIR TREADS

FINISH PLAN LEGEND

CONCRETE, SEALED CLEAR

CORNER GUARD

FLOOR TRANSITION, TYP

MARBLE THRESHOLD (DESIGNATED)

CPT-1

CG

RST-1

CONC-1

CG-1

FT-1

MT-1

CARPET TILECPT-2

PORCELAIN TILEPT-1

PORCELAIN TILE (EXISTING)EXIST

CONCRETE, POLISHED, SEALED CLEAR CONC-2

WELDED DIAMOND PLATE STEEL,

REFERENCE STRUCTURAL FA-2

SIGNAGE - SEE SCHEDULE FOR ALL OTHER SIGNAGESGN-1SIGN X

SEE E8/A-511

FINISH PLAN GENERAL NOTES

1. SEE SHEET A-001 FOR SYMBOL LEGENDS, ABBREVIATIONS

AND GENERAL NOTES.

2. PLAN VIEWS ARE CUT AT 4'-0" AFF.

3. REFERENCE SHEET I-601 FOR FINISH LEGEND.

4. REFERENCE SHEETS I-602 AND I-603 FOR FINISH SCHEDULES.

5. REFERENCE STRUCTURAL INTERIOR DESIGN (SID) BINDER

FOR COLOR BOARDS OF EXTERIOR AND INTERIOR FINISH

MATERIALS AND COLORS.

6. INSTALL WINDOW TREATMENTS AT ALL WINDOWS, UNLESS

NOTED OTHERWISE. SEE FINISH LEGEND, SHEET I-601, FOR

FURTHER INFORMATION.

7. ALL CEILINGS AND WALL SURFACES TO BE PAINTED IPT-1

UNLESS NOTED OTHERWISE.

8. REMOVE PAINT FINISH FROM ALL INTERIOR

HANDRAILS/GUARD RAILS AND SAND DOWN TO A SMOOTH

UNIFORM FINISH. PAINT ALL HANDRAILS/GUARDRAILS IPT-2.

9. REFERENCE SHEETS A-512 AND A-513 FOR SIGN TYPES.

REFERENCE SHEET A-605 FOR SIGNAGE SCHEDULE. SEE

F1/1-513 FOR TYPICAL SIGN MOUNTING DETAIL. STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:30 AM

I-109

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

S E

C O

N D

F L O

O R

F

IN

IS

H

P L

A N

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

8'4' 16'0

SCALE: 1/8"=1'-0"

3RD FLOOR

2ND FLOOR

1ST FLOOR

BASEMENT

PLAN NORTH

1/8" = 1'-0"C1

SECOND FLOOR FINISH PLANNOT FOR CONSTRUCTION

100% DESIGN

TELECOM

CATV

SUPPLIES

TEAM ROOM

JAN.

JAN.

CO OFFICE

1st SGT OFFICE

CG

CG

CG

CG CG

CG CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG CGCG CG

CGCG CG

OPS OFFICE

TEAM ROOM

TEAM ROOM

PRINT/COPY

LATRINES

TEAM ROOM

LATRINES

MISSION

PLANNING

STAIR

S301

STAIR

S302

SUPPLIES

301b

KITCHENETTE

CORRIDOR

FOR SHOWER

CURB DETAIL, TYP.

SEE E3/A-511

SIGN M

SIGN G SIGN H

SIGN K

SIGN M

SIGN G SIGN H

SIGN K

DN DN

S

IG

N P

S

IG

N P

CG

MT-1 MT-1

INTERIOR FINISHES GENERAL NOTES

1. REFERENCE SHEET A-001 FOR ABBREVIATIONS, SYMBOL LEGENDS,

ADDITIONAL DRAWING CONVENTIONS AND GENERAL NOTES.

2. REFERENCE FINISH PLANS AND INTERIOR ELEVATIONS FOR

INTERIOR FINISH LOCATIONS.

3. REFERENCE SHEETS I-60X FOR FINISH SCHEDULE.

4. REFERENCE STRUCTURAL INTERIOR DESIGN (SID) BINDER FOR

COLOR BOARDS OF EXTERIOR AND INTERIOR FINISH MATERIALS AND

COLORS.

5. REFERENCE FLOOR FINISH PLANS FOR EXTENT OF ACCENTS,

WAINSCOTS, FLOOR TRANSITIONS AND FLOOR FINISH PATTERNS.

6. MANUFACTURERS LISTED ARE NOT INTENDED TO LIMIT THE

SELECTION OF EQUIVALENT MATERIALS, PATTERNS AND COLORS

FROM OTHER MANUFACTURERS. EQUIVALENT MATERIALS MUST

MEET THE REQUIREMENTS OF THE SPECIFICATIONS AND

DRAWINGS.

7. ALL MATERIALS MUST COMPLY WITH THE BUY AMERICAN ACT.

CARPET TILE

RUBBER STAIR TREADS

FINISH PLAN LEGEND

CONCRETE, SEALED CLEAR

CORNER GUARD

FLOOR TRANSITION, TYP

MARBLE THRESHOLD (DESIGNATED)

CPT-1

CG

RST-1

CONC-1

CG-1

FT-1

MT-1

CARPET TILECPT-2

PORCELAIN TILEPT-1

PORCELAIN TILE (EXISTING)EXIST

CONCRETE, POLISHED, SEALED CLEAR CONC-2

WELDED DIAMOND PLATE STEEL,

REFERENCE STRUCTURAL FA-2

SIGNAGE - SEE SCHEDULE FOR ALL OTHER SIGNAGESGN-1SIGN X

SEE E8/A-511

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:33 AM

I-110

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

T H

IR

D

F L

O O

R F

IN

IS

H P

L A

N

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

8'4' 16'0

SCALE: 1/8"=1'-0"

3RD FLOOR

2ND FLOOR

1ST FLOOR

BASEMENT

PLAN NORTH

1/8" = 1'-0"C1

THIRD FLOOR FINISH PLAN NOT FOR CONSTRUCTION

100% DESIGN

INTERIOR FINISHES GENERAL NOTES

1. REFERENCE SHEET A-001 FOR ABBREVIATIONS, SYMBOL LEGENDS,

ADDITIONAL DRAWING CONVENTIONS AND GENERAL NOTES.

2. REFERENCE FINISH PLANS AND INTERIOR ELEVATIONS FOR

INTERIOR FINISH LOCATIONS.

3. REFERENCE SHEETS I-60X FOR FINISH SCHEDULE.

4. REFERENCE STRUCTURAL INTERIOR DESIGN (SID) BINDER FOR

COLOR BOARDS OF EXTERIOR AND INTERIOR FINISH MATERIALS AND

COLORS.

5. REFERENCE FLOOR FINISH PLANS FOR EXTENT OF ACCENTS,

WAINSCOTS, FLOOR TRANSITIONS AND FLOOR FINISH PATTERNS.

6. MANUFACTURERS LISTED ARE NOT INTENDED TO LIMIT THE

SELECTION OF EQUIVALENT MATERIALS, PATTERNS AND COLORS

FROM OTHER MANUFACTURERS. EQUIVALENT MATERIALS MUST

MEET THE REQUIREMENTS OF THE SPECIFICATIONS AND

DRAWINGS.

7. ALL MATERIALS MUST COMPLY WITH THE BUY AMERICAN ACT.

LEGEND: INTERIOR FINISHES

ACT-1 ACOUSTICAL CEILING TILE

MFR: ARMSTRONG

STYLE: FINE FISSURED

COLOR: WHITE (WH)

SIZE: 24" x 48", 15/16" THICK, SQUARE LAY-IN

ACT-2 ACOUSTICAL CEILING TILE

MFR: ARMSTRONG

STYLE: LYRA PLANT PB DIRECT APPLY

COLOR: 8403PB WHITE (WH)

SIZE: 24" x 48", 1" THICK, SQUARE

ACT-3 ACOUSTICAL CEILING TILE

MFR: ARMSTRONG

STYLE: CLEAN ROOM FL

COLOR: WHITE (WH)

SIZE: 24" x 48", 15/16" THICK, SQUARE LAY-IN

AWP-1 ACOUSTIC WALL PANEL COVERING

MFR: CARNEGIE XOREL

STYLE: NEXUS

COLOR: 6425 914

SIZE: 52" TO 56" WIDTH

CG-1 CORNER GUARD

MFR: INPRO

STYLE: SURFACE MOUNTED CORNER GUARD

MAT: STAINLESS STEEL, 16 GAUGE

SIZE: 1 1/2" WING X 4'-0" HIGH

CONC-1 CONCRETE WITH HARDENER AND CLEAR

SURFACE SEALED

MFR: TENNANT COATINGS

SYSTEM: ECO-HARD-N-SEAL

CONC-2 POLISHED CONCRETE WITH HARDENER AND

CLEAR SURFACE SEALED

MFR: TENNANT COATINGS

SYSTEM: ECO-HARD-N-SEAL

CPT-1 CARPET TILE

MFR: SHAW CONTRACT

STYLE: INGRAIN TILE 59339

COLOR: BURL 39713

SIZE: 24" x 24"

CPT-2 CARPET TILE

MFR: SHAW CONTRACT

STYLE: INGRAIN TILE 59339

COLOR: SPRUCE 39322

SIZE: 24" x 24"

CT-1 CERAMIC TILE - WALL FIELD TILE

MFR: DALTILE

STYLE: COLOR WHEEL

COLOR: 0190 ARCTIC WHITE

SIZE: 4" x 4"

CT-2 CERAMIC TILE - COVE BASE TILE

MFR: DALTILE

STYLE: MATTE, BULLNOSE

COLOR: 0766 MATTE ELEMENTAL TAN

SIZE: 4" x 6"

CT-3 CERAMIC TILE - ACCENT TILE

MFR: DALTILE

STYLE: COLOR WHEEL COLLECTION

COLOR: 0766 MATTE ELEMENTAL TAN

SIZE: 4" x 4"

FB-1 FURNITURE SYSTEMS FABRIC

MFR: MAYER FABRICS

STYLE: FAB6600

COLOR: BRYCE CANYON COPA

SIZE: 66" WIDTH

FF FACTORY FINISH

FT-1 FLOOR TRIM - RESILIENT

MFR: ROPPE

STYLE: #60, APPROPRIATE FOR

ADJACENT FLOOR FINISHES

COLOR: 193 BLACK BROWN

GL GLAZING PER SPECIFICATIONS

GT-1 GROUT

MFR: CUSTOM

TYPE: PER SPEC

COLOR: 386 OYSTER GRAY

GWB GYPSUM BOARD

PAINT COLOR AS SCHEDULED

IIPT-1 INTERIOR PAINT - GENERAL WALLS AND

CEILING

MFR: SHERWIN WILLIAMS

COLOR: SW 7011 NATURAL CHOICE

FINISH: EGGSHELL LATEX, SEMI-GLOSS TO BE

USED AT RESTROOMS

IPT-2 INTERIOR PAINT - DOORS, FRAMES, STAIR

RAILINGS AND STAIRS

MFR: SHERWIN WILLIAMS

COLOR: SW 7038 TONY TAUPE

FINISH: SEMI-GLOSS ENAMEL

IPT-3 INTERIOR PAINT - ACCENT

MFR: SHERWIN WILLIAMS

COLOR: SW 7044 AMAZING GRAY

FINISH: EGGSHELL LATEX

IPT-4 INTERIOR PAINT - ACCENT

MFR: SHERWIN WILLIAMS

COLOR: SW 6163 GRASSLAND

FINISH: EGGSHELL LATEX

IPT-5 INTERIOR PAINT - ACCENT

MFR: SHERWIN WILLIAMS

COLOR: SW 7065 ARGOS

FINISH: EGGSHELL LATEX

IPT-6 INTERIOR PAINT - ACCENT

MFR: SHERWIN WILLIAMS

COLOR: SW 9177 SALTY DOG

FINISH: EGGSHELL LATEX

MT-1 MARBLE THRESHOLD

PLAM-1 PLASTIC LAMINATE - CABINETRY

MFR: WILSONART

STYLE: STANDARD LAMINATE

COLOR: 7925-38 MONTICELLO MAPLE

FINISH: FINE VELVET FINISH

PLAM-2 PLASTIC LAMINATE - TABLE FINISH

MFR: WILSONART

STYLE: STANDARD LAMINATE

COLOR: 7039K-78 WINDSOR MAHOGANY

FINISH: FINEGRAIN FINISH

OTS OPEN TO STRUCTURE

PT-1 PORCELAIN TILE - RESTROOM FLOOR

MFR: DALTILE

STYLE: HAUT MONDE

COLOR: GLITTERATI GRNT HM03

SIZE: 2"x2" MOSAIC

RB-1 RESILIENT RUBBER BASE

MFR: ROPPE

STYLE: 700 SERIES

COLOR: 193 BLACK BROWN

SIZE: 4" HIGH, CONTINUOUS COIL ONLY,

MFR TO NOT CUT INTO 4'-0" SECTIONS

RST-1 RUBBER STAIR TREADS - NOISING @LANDING

MFR:ROPPE

STYLE: 30 DIAMOND (W/ ABRASIVE

EDGE/SAFETY STRIP), #1 COMMERCIAL STAIR

NOISING

COLOR: 193 BLACK BROWN

SGN-1 INTERIOR SIGNAGE

MFR: INDEPENDENT SPECIALTY

STYLE: NON-GLARE ACRYLIC

COLOR: PMS 287C

TEXT: WHITE APPLIED

SS-1 SOLID SURFACE - COUNTERTOPS

MFR: VENDURA

PRODUCT: SOLID SURFACE COUNTERTOP

COLOR: RIVERBED

SS-2 SOLID SURFACE - COUNTERTOPS

MFR: VENDURA

PRODUCT: SOLID SURFACE COUNTERTOP

COLOR: ALMODINE

STL-1 HARDWARE FINISH

BHMA 630

STAINLESS STEEL

FINISH: SATIN

TP-1 TOILET & SHOWER PARTITION

MFR: BRADLEY CORP

MAT: STAINLESS STEEL

TH-1 THRESHOLD

MFR: PEMCO

MAT: EXTRUDED ALUMINUM

COLOR: MILL FINISH ALUMINUM

SIZE: PER DOOR SCHEDULE

WB-1 WINDOW BLINDS

MFR: HUNTER DOUGLAS ARCHITECTURAL

STYLE: CL62 - 1" MODEL

MAT: 065 BRUSHED ALUMINUM

COLOR: MILL FINISH ALUMINUM

SIZE: PER WINDOW SCHEDULE

WD-1 WOOD DOOR

LEGEND: EXTERIOR FINISHES

EPT-1 EXTERIOR PAINT - FIELD COLOR

MFR: SHERWIN WILLIAMS

COLOR: SW 7037 BALANCED BEIGE

FINISH: MATTE FINISH

EPT-2 EXTERIOR PAINT - ACCENT COLOR, STAIRS

AND GUARDRAILS

MFR: SHERWIN WILLIAMS

COLOR: SW 7015 REPOSE GRAY

FINISH: GLOSS

EPT-3 EXTERIOR PAINT - ACCENT COLOR

(DOORS, SILLS)

MFR: SHERWIN WILLIAMS

COLOR: SW 7039 VIRTUAL TAUPE

FINISH: SEMI-GLOSS

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:34 AM

I-601

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

F

IN

IS

H

L E

G E

N D

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

NOT FOR CONSTRUCTION

100% DESIGN

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:36 AM

I-602

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

F

IN

IS

H

S C

H E

D U

L E

B

A S

E M

E N

T

F

IR

S T

F L

O O

R

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

FINISH SCHEDULE - BASEMENT

NO. ROOM FLOOR FINISH BASE FINISH

WALL FINISH

CEILING FINISH NOTESNORTH EAST SOUTH WEST

B01 VAULT SEE FA-2/A-607 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 SEE CEILING TYPES FOR METAL LINED CEILING

B02 STORAGE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

B04 STORAGE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

B05 STORAGE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

B07 ELEC CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

B09 MECH CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

BOO CORRIDOR CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

FINISH SCHEDULE - FIRST FLOOR

NO. ROOM FLOOR FINISH BASE FINISH

WALL FINISH

CEILING FINISH NOTESNORTH EAST SOUTH WEST

100A CORRIDOR CPT-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

100B CORRIDOR CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

101 CDR - BN COMMANDER OFFICE CPT-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

102 SGM - COMMAND SGT MAJ CPT-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

103 COMMAND CONFERENCE CPT-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1 ADD ACOUSTICAL BATT INSULATION ABOVE CEILING TO MAINTAIN STC-50

104 XO - BN EXECUTIVE OFFICE CPT-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

105 S1 OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1; GWB/IPT-1

106 TLT/SHR PT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 GWB/IPT-1

107 S1 OPEN OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1; GWB/IPT-1

108 WMN RESTROOM EXISTING RB-1 IPT-1 IPT-1 IPT-1 IPT-1 EXISTING ACT

110 MEN RESTROOM EXISTING RB-1 IPT-1 IPT-1 IPT-1 IPT-1 EXISTING ACT

111 S3 TEAM ROOM CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; GWB/IPT-1 ADD ACOUSTICAL BATT INSULATION ABOVE CEILING TO MAINTAIN STC-50

112 JAN. PT-1 CT-2 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 LOCATE ONE MOP BROOM HOLDER W/SHELF AT WALL ADJACENT TO SIDE OF DOOR LATCH. SEE SHEET A-401 FOR

MOUNTING HEIGHT.

113 S3 OPEN OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

114 PRINT/COPY CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

114a SUPPLY CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

116 BREAK/KITCH CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

117 S3 OFFICE CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

119 S3 OPS SGT CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

120 S6 COMMON WORK AREA CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

120a S6 INFORMATION MGMT OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

121 S3 CONF CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1 ADD ACOUSTICAL BATT INSULATION ABOVE CEILING TO MAINTAIN STC-50

122 S6 SUPPLIES CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

123 TELECOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

124 HHC-1 CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

125 CATV CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

126 HHC-2 CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

127 SIPRNET CAFE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

128 S4 OIC OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

129 S2 OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

130 S4 OPEN OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

131 S2 OPEN OFFICE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

132 VESTIBULE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

133 S2 SUPPLY CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

135 CLASS/ASSEMBLY CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1 ADD ACOUSTICAL BATT INSULATION ABOVE CEILING TO MAINTAIN STC-50

136 CLASS/ASSEMBLY CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1 ADD ACOUSTICAL BATT INSULATION ABOVE CEILING TO MAINTAIN STC-50

137 SUPPLIES CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

138 WMN RESTROOM PT-1 CT-2 IPT-1 IPT-1 IPT-1 IPT-1 GWB/IPT-1

141 S3 MEDICAL CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1 ADD ACOUSTICAL BATT INSULATION ABOVE CEILING TO MAINTAIN STC-50

142 JAN. PT-1 CT-2 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 LOCATE ONE MOP BROOM HOLDER W/SHELF AT WALL ADJACENT TO SIDE OF DOOR LATCH. SEE SHEET A-401 FOR

MOUNTING HEIGHT.

143 MEN'S RESTROOM PT-1 CT-2 IPT-1 IPT-1 IPT-1 IPT-1 GWB/IPT-1

S101 STAIR CONC-1, RST-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

S102 STAIR CONC-1, RST-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

NOT FOR CONSTRUCTION

100% DESIGN

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:39 AM

I-603

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

F

IN

IS

H

S C

H E

D U

L E

S

E C

O N

D

T H

IR

D

F L

O O

R

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

FINISH SCHEDULE - SECOND FLOOR

NO. ROOM FLOOR FINISH BASE FINISH

WALL FINISH

CEILING FINISH NOTESNORTH EAST SOUTH WEST

200 CORRIDOR CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

201 MISSION PLANNING CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1; GWB/IPT-1

201C SUPPLIES CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

204 LATRINES PT-1 CT-2 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 NEW FLOOR TILE AND WALL BASE AT SHOWER AREAS ONLY

205 CO OFFICE CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

206 JAN. PT-1 CT-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 LOCATE ONE MOP BROOM HOLDER W/SHELF AT WALL ADJACENT TO SIDE OF DOOR LATCH. SEE SHEET A-401 FOR

MOUNTING HEIGHT.

207 1st SGT OFFICE CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 GWB/IPT-1

209 OPS OFFICE CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

210 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

211 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

212 LATRINES PT-1 CT-2 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 NEW FLOOR TILE AND WALL BASE AT SHOWER AREAS ONLY

213 TELECOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

214 JAN. PT-1 CT-2 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 LOCATE ONE MOP BROOM HOLDER W/SHELF AT WALL ADJACENT TO SIDE OF DOOR LATCH. SEE SHEET A-401 FOR

MOUNTING HEIGHT.

215 CATV CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

216 KITCHENETTE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

217 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

218 PRINT/COPY CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

220 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

222 SUPPLIES CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

S201 STAIR CONC-1, RST-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 REFERENCE DETAIL C3/A-511 FOR STAIR NOISING AND TREAD

S202 STAIR CONC-1, RST-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 REFERENCE DETAIL C3/A-511 FOR STAIR NOISING AND TREAD

FINISH SCHEDULE - THIRD FLOOR

NO. ROOM FLOOR FINISH BASE FINISH

WALL FINISH

CEILING FINISH NOTESNORTH EAST SOUTH WEST

300 CORRIDOR CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

301 MISSION PLANNING CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1; GWB/IPT-1

301b SUPPLIES CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

304 LATRINES PT-1 PT-1B IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 NEW FLOOR TILE AND WALL BASE AT SHOWER AREAS ONLY

305 CO OFFICE CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

306 JAN. PT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 LOCATE ONE MOP BROOM HOLDER W/SHELF AT WALL ADJACENT TO SIDE OF DOOR LATCH. SEE SHEET A-401 FOR

MOUNTING HEIGHT.

307 1st SGT OFFICE CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

309 OPS OFFICE CPT-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 ACT-1

310 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

311 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

312 LATRINES PT-1 PT-1B IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 NEW FLOOR TILE AND WALL BASE AT SHOWER AREAS ONLY

313 TELECOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

314 JAN. CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1 LOCATE ONE MOP BROOM HOLDER W/SHELF AT WALL ADJACENT TO SIDE OF DOOR LATCH. SEE SHEET A-401 FOR

MOUNTING HEIGHT.

315 CATV CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

316 KITCHENETTE CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

317 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

318 PRINT/COPY CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

320 TEAM ROOM CONC-2 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1; ACT-2 SEE REFLECTED CEILING PLAN FOR ACT-2 QUANTITIES AND LAYOUT

322 SUPPLIES CONC-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

S301 STAIR CONC-1, RST-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

S302 STAIR CONC-1, RST-1 RB-1 IPT-1 IPT-1 IPT-1 IPT-1 OTS/IPT-1

NOT FOR CONSTRUCTION

100% DESIGN

FF&E LEGEND

CG1 4' LOCKER ROOM BENCH

FOR BENCH FLOOR ANCHOR

CG2 8' LOCKER ROOM BENCH

FOR BENCH FLOOR ANCHOR

CG3 DESK W/ PENCIL DRAWER

CG4 WARDROBE LOCKER

CG5 PRINTER STORAGE CABINET

CG6 4-DRAWER LATERAL FILE

CG7 INDUSTRIAL SHELVING

CG8 METAL STORAGE CABINET

CG9 TWO-TIERED WARDROBE LOCKER

CG10 HEAVY-DUTY METAL DESK

CH1 TASK CHAIR

CH2 SLED-BASED STACKING CHAIR

CH3 SIDE CHAIR

CH4 SHOP STOOL

TB1 FLIP-TOP TRAINING TABLE

TB2 36" ROUND TABLE

TB3 SMALL CONFERENCE TABLE

TB4 LARGE CONFERENCE TABLE

TB5 RECTANGULAR TABLE - 24" X 60"

TB7 36" X 60" INDUSTRIAL SHOP TABLE

TB8 RECTANGULAR TABLE W/ CASTERS - 24" X 60"

TV1 55" TV WITH MOUNTING HARDWARE

WS1 L-SHAPED WORKSTATION

(GFGI) GOVERNMENT FURNISHED GOVERNMENT INSTALLED -

COPY / PRINTER

WS2 L-SHAPED EXECUTIVE WORKSTATION

TB6 RECTANGULAR TABLE - 30" X 60"

MR1 FULL-LENGTH MIRROR

(GFGI) GOVERNMENT FURNISHED GOVERNMENT INSTALLED -

DESK PRINTER

(GFCI) GOVERNMENT FURNISHED CONTRACTOR INSTALLED -

CEILING MOUNTED PROJECTOR AND WALL MOUNTED

SCREEN

FOR PROJECTION SCREEN MOUNTING

(GFGI) GOVERNMENT FURNISHED GOVERNMENT INSTALLED -

REFRIGERATOR

(GFGI) GOVERNMENT FURNISHED GOVERNMENT INSTALLED -

RECYCLING / TRASH

CG11 60"W HEAVY-DUTY STORAGE LOCKER

TV1 77" TV WITH MOUNTING HARDWARE

PB1

PEGBOARD - 48"W X 24"H

FOR PEGBOARD MOUNTING

BLACK DASHED LINE, (GFCI)

GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GRAY SOLID LINE, (CFCI)

CONTRACTOR FURNISHED CONTRACTOR INSTALLED

GRAY DASHED LINE, (GFGI)

GOVERNMENT FURNISHED GOVERNMENT INSTALLED

NOTE LINE WEIGHTS DENOTED IN FURNITURE PLAN:

SEE C8/A-511

REFER TO FURNITURE, FIXTURES & EQUIPMENT (FF&E)

BINDER FOR FURTHER INFORMATION INCLUDING BUT

NOT LIMITED TO DIMENSIONS, QUANTITIES, WEIGHT

AND SPECIAL INSTALLATION INSTRUCTIONS.

SEE A6/A-511

SEE A6/A-511

SEE C6/A-511

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:40 AM

I-604

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

F F

E

L E

G E

N D

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

NOT FOR CONSTRUCTION

100% DESIGN

INTERIOR SIGNAGE GENERAL NOTES

1. REFERENCE FINISH PLANS FOR ALL OTHER INTERIOR INTERIOR

SIGNAGE LOCATIONS. REFERENCE SHEETS A-512 AND A-513 FOR

SIGNAGE DETAILS.

2. SEE F1/A-513 FOR TYPICAL SIGN MOUNTING DETAIL.

3. ALL MATERIALS MUST COMPLY WITH THE BUY AMERICAN ACT.

STATE OF WASHINGTON

GREGORY J. NESPOR

ARCHITECT

REGISTERED6431

design collaborative

W S P U

S A I n c.

S u it e

F e d e ra l W a y W

A

-2

T E L

(2

-2

F A X

(2

-2 th A v e n u e S o u th

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

S E

A T

T L

E D

IS

T

R

IC

T S

E A

T T

L E

W

A S

H

IN

G T

O N

BLDG 3281

N O T F

N S

TR

U C

TIO

N

6/15/2020 10:37:43 AM

I-605

W J A

J B

D M

M

M

/1

/2

W D

W D

W D

W F

T A

S K

O R

D E

R N

O

FINAL DESIGN 06/18/2020

S

IG

N A

G E

S C

H E

D U

L E

B

A S

E M

E N

T

F

IR

S T

S

E C

O N

D

T H

IR

D

F L

O O

R

J O

IN

T

B A

S E

L E

W

IS

-M c C

H O

R D

W

A S

H

IN

G T

O N

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

SIGNAGE SCHEDULE - BASEMENT

NAME

ROOM

NO. SIGN TYPE

SIGNAGE ROOM

NUMBER SIGNAGE TEXT CONTENT SIGN NOTES

VAULT B01 SIGN TYPE D B01 VAULT

STORAGE B02 SIGN TYPE D B02 STORAGE

STORAGE B04 SIGN TYPE D B04 STORAGE

STORAGE B05 SIGN TYPE D B05 STORAGE

ELEC B07 SIGN TYPE D B07 ELECTRICAL

SIGNAGE SCHEDULE - FIRST FLOOR

NAME

ROOM

NO. SIGN TYPE

SIGNAGE ROOM

NUMBER SIGNAGE TEXT CONTENT SIGN NOTES

CDR - BN COMMANDER

OFFICE

101 SIGN TYPE E 101 CDR - BN COMMANDER OFFICE

SGM - COMMAND SGT

MAJ

102 SIGN TYPE E 102 SGM - COMMAND SGT MAJ

COMMAND

CONFERENCE

103 SIGN TYPE F 103 COMMAND CONFERENCE

XO - BN EXECUTIVE

OFFICE

104 SIGN TYPE E 104 XO - BN EXECUTIVE OFFICE

S1 OFFICE 105 SIGN TYPE E 105 S1 OFFICE

TLT/SHR 106 SIGN TYPE C 106 TOILET/SHOWER SHOWER SYMBOL

S1 OPEN OFFICE 107 SIGN TYPE E 107 S1 OPEN OFFICE

WMN RESTROOM 108 SIGN TYPE A 108 WOMEN'S

MEN RESTROOM 110 SIGN TYPE B 110 MEN'S

S3 TEAM ROOM 111 SIGN TYPE F 111 S3 TEAM ROOM

JAN. 112 SIGN TYPE D 112 JANITOR'S CLOSET

S3 OPEN OFFICE 113 SIGN TYPE E 113 S3 OPEN OFFICE

PRINT/COPY 114 SIGN TYPE D 114 PRINT/COPY

SUPPLY 114a SIGN TYPE D 114A SUPPLY

BREAK/KITCH 116 SIGN TYPE D 116 BREAK/KITCHEN

S3 OFFICE 117 SIGN TYPE E 117 S3 OFFICE

S3 OPS SGT 119 SIGN TYPE E 119 S3 OPS SGT

S6 COMMON WORK

AREA

120 SIGN TYPE E 120 S6 COMMON WORK AREA

S6 INFORMATION MGMT

OFFICE

120a SIGN TYPE E 120A S6 INFORMATION MGMT OFFICE

S3 CONF 121 SIGN TYPE F 121 S3 CONFERENCE

S6 SUPPLIES 122 SIGN TYPE D 122 S6 SUPPLIES

TELECOM 123 SIGN TYPE D 123 TELECOM

HHC-1 124 SIGN TYPE E 124 HHC-1

CATV 125 SIGN TYPE D 125 CATV

HHC-2 126 SIGN TYPE E 126 HHC-2

SIPRNET CAFE 127 SIGN TYPE D 127 SIPRNET CAFE

S4 OIC OFFICE 128 SIGN TYPE E 128 S4 OIC OFFICE

S2 OFFICE 129 SIGN TYPE E 129 S2 OFFICE

S4 OPEN OFFICE 130 SIGN TYPE E 130 S4 OPEN OFFICE

S2 OPEN OFFICE 131 SIGN TYPE E 131 S2 OPEN OFFICE

VESTIBULE 132 --- ---

S2 SUPPLY 133 SIGN TYPE D 133 S2 SUPPLY

CLASS/ASSEMBLY 135 SIGN TYPE E 135 CLASS/ASSEMBLY

CLASS/ASSEMBLY 136 SIGN TYPE E 136 CLASS/ASSEMBLY

SUPPLIES 137 SIGN TYPE D 137 SUPPLIES

WMN RESTROOM 138 SIGN TYPE A 138 WOMEN'S SHOWER SYMBOL

S3 MEDICAL 141 SIGN TYPE E 141 S3 MEDICAL

JAN. 142 SIGN TYPE D 142 JANITOR'S CLOSET

MEN'S RESTROOM 143 SIGN TYPE B 143 MEN'S

SIGNAGE SCHEDULE - SECOND FLOOR

NAME

ROOM

NO. SIGN TYPE

SIGNAGE ROOM

NUMBER SIGNAGE TEXT CONTENT SIGN NOTES

MISSION PLANNING 201 SIGN TYPE F 201 MISSION PLANNING

PLANNING SUPPLIES 201a SIGN TYPE E 201A PLANNING SUPPLIES

SUPPLIES 201C SIGN TYPE D 201C SUPPLIES

LATRINES 204 SIGN TYPE C 204 LATRINES SHOWER SYMBOL

CO OFFICE 205 SIGN TYPE E 205 CO OFFICE

JAN. 206 SIGN TYPE D 206 JANITOR'S CLOSET

1st SGT OFFICE 207 SIGN TYPE E 207 1ST SGT OFFICE

OPS OFFICE 209 SIGN TYPE E 209 OPS OFFICE

TEAM ROOM 210 SIGN TYPE E 210 TEAM ROOM

TEAM ROOM 211 SIGN TYPE E 211 TEAM ROOM

LATRINES 212 SIGN TYPE C 212 LATRINES SHOWER SYMBOL

TELECOM 213 SIGN TYPE D 213 TELECOM

JAN. 214 SIGN TYPE D 214 JANITOR'S CLOSET

CATV 215 SIGN TYPE D 215 CATV

KITCHENETTE 216 SIGN TYPE D 216 KITCHENETTE

TEAM ROOM 217 SIGN TYPE E 217 TEAM ROOM

PRINT/COPY 218 SIGN TYPE D 218 PRINT/COPY

TEAM ROOM 220 SIGN TYPE E 220 TEAM ROOM

MISSION PLANNING 220 SIGN TYPE F 220 MISSION PLANNING

SUPPLIES 222 SIGN TYPE D 222 SUPPLIES

SIGNAGE SCHEDULE - THIRD FLOOR

NAME

ROOM

NO. SIGN TYPE

SIGNAGE ROOM

NUMBER SIGNAGE TEXT CONTENT SIGN NOTES

MISSION PLANNING 301 SIGN TYPE F 301 MISSION PLANNING

SUPPLIES 301b SIGN TYPE D 301B SUPPLIES

LATRINES 304 SIGN TYPE C 304 LATRINES SHOWER SYMBOL

CO OFFICE 305 SIGN TYPE E 305 CO OFFICE

JAN. 306 SIGN TYPE D 306 JANITOR'S CLOSET

1st SGT OFFICE 307 SIGN TYPE E 307 1ST SGT OFFICE

OPS OFFICE 309 SIGN TYPE E 309 OPS OFFICE

TEAM ROOM 310 SIGN TYPE E 310 TEAM ROOM

TEAM ROOM 311 SIGN TYPE E 311 TEAM ROOM

LATRINES 312 SIGN TYPE C 312 LATRINES SHOWER SYMBOL

TELECOM 313 SIGN TYPE D 313 TELECOM

JAN. 314 SIGN TYPE D 314 JANITOR'S CLOSET

CATV 315 SIGN TYPE D 315 CATV

KITCHENETTE 316 SIGN TYPE D 316 KITCHENETTE

TEAM ROOM 317 SIGN TYPE E 317 TEAM ROOM

PRINT/COPY 318 SIGN TYPE D 318 PRINT/COPY

TEAM ROOM 320 SIGN TYPE D 320 TEAM ROOM

SUPPLIES 322 SIGN TYPE D 322 SUPPLIES

NOT FOR CONSTRUCTION

100% DESIGN

o p y ri g h t

W

S P

U S

A I n c

A ll

R ig h ts

R e s e rv e d

L a s t

S a v e d b y

T o m .c u m m in g s n J u n

:0 A

M

F ile R d w g s \2

\2

-1

D ra w in g s \B

\F ir e

P ro te c ti o n \2

F

A .d w g

S O

LI

C

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W S

P U

S A

In c.

S ui te

F ed er al

W ay

, W A

-2

T E

L:

6)

-2

F A

X

6)

-2

9t h A ve nu e S ou th

D E

S C

R

IP

T

IO

N M

A R

K

SHEET ID

S E

A T

T L

E D

IS

T

R

IC

T

S E

A T

T L

E

W A

S H

IN

G

T O

N

W

2D W

D

T A

S K

O R

D E

R N

O

W

2D W

F

FINAL DESIGN 06/18/2020

BLDG. 3281

R E

P A

IR

A

N D

C O

N V

E R

T S

F A

B B

U

IL

D

IN

G S

JO

IN

T B

A S

E L

E W

IS

-M cC O

R D

, W A

S H

IN

G

T O

N 6/

/2

A N

S I D

B N

/B S

B H

Q

B

LD

G

F

IR

E A

L A

R M

M

A S

S N

O T

IF

IC

A T

IO

N

S Y

S T

E M

L E

G E

N D

A N

D N

O T

E S

FA001

T C

T C

F A

B

A N

S I D

N O T F

O R

C O N S T R U C T

IO

N

PIV

GMAP

LOC

XMTR

BAT

FMCP

S

B

SPRINKLER SYSTEM POST INDICATOR VALVE

SPRINKLER SYSTEM ALARM BELL (24 VOLTS D.C.)

GRAPHIC MAP

LOCAL OPERATORS CONSOLE (FOR MASS NOTIFICATION SYSTEM) WALL MOUNTED WITH TOP MESSAGE BUTTON A

MAXIMUM OF 44" ABOVE THE FINISHED FLOOR

TRANSMITTER CONTROL PANEL ENCLOSURE

TRANSMITTER ANTENNA

BATTERY CABINET

COMBINATION FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL PANEL

CONSTRUCTION NOTES

S INDICATES SURFACE MOUNT BACK BOX

FIRE ALARM / MASS NOTIFICATION SYSTEM LEGEND

SYMBOL DESCRIPTION

ALL NEW DEVICES INDICATED WITH A DARK CONTINUOUS LINE TYPE

MISCELLANEOUS

SYMBOL DESCRIPTION

FMPS FIRE ALARM / MASS NOTIFICATION SYSTEM COMBINATION POWER SUPPLY FOR NOTIFICATION DEVICES

PRIORITY OF MASS NOTIFICATION SYSTEM MESSAGING

1. THE FIRE ALARM / MASS NOTIFICATION SYSTEM CONTRACTOR SHALL PERFORM AUDIBILITY TESTING IN EACH

SPACE OF THE BUILDING PRIOR TO PRELIMINARY ACCEPTANCE TESTING. DOCUMENTATION OF DECIBEL (dB)

VALUES RECORDED IN ALL SPACES SHALL BE PROVIDED TO THE QFPE AND USACE REPRESENTATIVE A MINIMUM

OF (14) DAYS PRIOR TO PRELIMINARY ACCEPTANCE TESTING.

A. DECIBEL READINGS SHALL BE TAKEN AT A POINT 10'-0" FROM THE APPLIANCE AT AN ELEVATION OF 5'-0"

ABOVE FINISHED FLOOR.

B. THE SOUND LEVEL SHALL BE A MINIMUM OF 15 DECIBELS (dBs) ABOVE THE AVERAGE AMBIENT SOUND

LEVEL.

C. THE SOUND LEVEL SHALL BE A MINIMUM OF 5 DECIBELS (dBs) ABOVE THE MAXIMUM SOUND LEVEL HAVING

A MINIMUM DURATION OF 60 SECONDS.

D. IN SPACES THAT DO NOT MEET THE MINIMUM AUDIBLE (dB) VALUES, THE FIRE ALARM / MASS NOTIFICATION

SYSTEM CONTRACTOR SHALL PROVIDE ADDITIONAL AUDIBLE NOTIFICATION APPLIANCES UNTIL THE

MINIMUM DECIBEL (dB) VALUES ARE OBTAINED.

2. THE FIRE ALARM / MASS NOTIFICATION SYSTEM CONTRACTOR SHALL PERFORM INTELLIGIBILITY TESTING IN

EACH SPACE OF THE BUILDING PRIOR TO PRELIMINARY ACCEPTANCE TESTING. DOCUMENTATION OF C.I.S.

VALUES RECORDED IN ALL SPACES SHALL BE PROVIDED TO THE QFPE AND USACE REPRESENTATIVE A MINIMUM

OF (14) DAYS PRIOR TO PRELIMINARY ACCEPTANCE TESTING.

A. WHERE BUILDING OCCUPANTS TYPICALLY COULD BE FOUND: THE COMMON INTELLIGIBILITY SCALE (C.I.S.)

VALUES SHALL MEET OR EXCEED (0.8) FOR ARMY PROJECTS.

B. WHERE BUILDING OCCUPANTS TYPICALLY COULD BE FOUND WITHIN AREAS OF BUILDINGS WITH HARD

WALLS AND CEILING SURFACES: THE COMMON INTELLIGIBILITY SCALE (C.I.S.) VALUES CAN BE LESS THAN

(0.8) FOR ARMY PROJECTS PROVIDED THAT BUILDING OCCUPANTS CAN DETERMINE THAT A VOICE SIGNAL

IS BEING BROADCAST AND THAT THEY MUST WALK NO FURTHER THAN 33'-0" WITHOUT TRAVELING TO AN

ADJACENT SPACE TO FIND A LOCATION THAT MEETS OR EXCEED (0.8) FOR ARMY PROJECTS.

C. WHERE BUILDING OCCUPANTS ARE NOT TYPICALLY FOUND: THE COMMON INTELLIGIBILITY SCALE (C.I.S.)

VALUES CAN BE LESS THAN (0.8) FOR ARMY PROJECTS PROVIDED THAT BUILDING OCCUPANTS CAN

DETERMINE THAT A VOICE SIGNAL IS BEING BROADCAST AND THAT THEY MUST WALK NO FURTHER THAN

50'-0" WITHOUT TRAVELING TO AN ADJACENT SPACE TO FIND A LOCATION THAT MEETS OR EXCEED (0.8)

FOR ARMY PROJECTS.

D. LARGE CAVERNOUS TYPE OPEN AREAS OF BUILDINGS WITH HARD WALLS AND CEILING SURFACES: THE

COMMON INTELLIGIBILITY SCALE (C.I.S.) VALUES CAN BE LESS THAN (0.8) FOR ARMY PROJECTS PROVIDED

THAT BUILDING OCCUPANTS CAN DETERMINE THAT A VOICE SIGNAL IS BEING BROADCAST AND THAT THEY

MUST WALK NO FURTHER THAN 98'-0" WITHOUT TRAVELING TO AN ADJACENT SPACE TO FIND A LOCATION

THAT MEETS OR EXCEED (0.8) FOR ARMY PROJECTS AND ALL OF THE FOLLOWING ARE MET:

a. THE REQUIREMENT TO DEVIATE IS IDENTIFIED IN THE DESIGN PHASE OF THE PROJECT.

b. JUSTIFICATION FOR DEVIATIONS PROVIDED TO THE APPROVING AUTHORITY FOR APPROVAL.

c. DEVIATION SHALL NOT APPLY TO PERMANENT DOD BUILDINGS SUCH AS DINING HALLS, THEATERS, AND

GYMNASIUMS.

d. THE MINIMUM COMMON INTELLIGIBILITY SCALE (C.I.S.) VALUE AT ANY LOCATION WITHIN THE LARGE

CAVERNOUS AREA IS 0.6.

3. AUDIBILITY AND INTELLIGIBILITY TESTING OF THE FIRE ALARM / MASS NOTIFICATION SYSTEM SHALL BE

ACCOMPLISHED IN ACCORDANCE WITH UNIFIED FACILITIES CRITERIA (U.F.C.) 4-021-01. UNIFIED FACILITIES

CRITERIA (U.F.C.) 4-021-01 REQUIRES AN AVERAGE OF 3 READINGS OF EACH ROOM TO DETERMINE COMMON

INTELLIGIBILITY SCALE (C.I.S.) VALUES. READINGS SHALL BE RECORDED ON AN 11X17 PLAN OF THE BUILDING

WITH COMMON INTELLIGIBILITY SCALE (C.I.S.) VALUES IDENTIFIED ON THE DRAWING. THE 3 READING SHALL BE

TAKEN AS FOLLOWS:

A. THE MOST REMOTE POINT FROM THE SPEAKER IN THE ROOM.

B. A MIDDLE POINT BETWEEN SPEAKER TO BE FIELD DETERMINED BASED ON WALL OR CEILING MOUNTED

SPEAKER.

C. A POINT CLOSE TO THE SPEAKER.

4. IN SPACES THAT DO NOT MEET THE MINIMUM COMMON INTELLIGIBILITY SCALE (C.I.S.) VALUES, THE FIRE ALARM /

MASS NOTIFICATION SYSTEM CONTRACTOR SHALL PROVIDE ADDITIONAL AUDIBLE NOTIFICATION APPLIANCES

OR ADJUST THE LOCATION AND/OR TAP SETTINGS OF AUDIBLE NOTIFICATION APPLIANCES UNTIL THE MINIMUM

C.I.S. VALUES ARE OBTAINED.

LOW TEMPERATURE SENSORT

TEXT LED TEXT SIGN

1. LIVE VOICE ANNOUNCEMENTS OR ACTIVATION OF A PRE-RECORDED MESSAGE SHALL HAVE THE ABILITY TO BE

ACTIVATED BY:

A. THE 911 CALL CENTER LOCATED IN BUILDING #4101

B. THE BUILDING'S FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL PANEL

C. THE BUILDING LOCAL OPERATOR CONSOLE(S) (LOC)

2. LIVE VOICE ANNOUNCEMENTS OR ACTIVATION OF A PRE-RECORDED MESSAGE SHALL HAVE THE FOLLOWING

PRIORITIES:

A. PRIORITY #1: THE BUILDING'S FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL PANEL LIVE VOICE

ANNOUNCEMENT. OPERATION OF THE LIVE VOICE MICROPHONE FROM THE FIRE ALARM / MASS

NOTIFICATION SYSTEM CONTROL PANEL SHALL IMMEDIATELY OVERRIDE A LIVE VOICE ANNOUNCEMENT

INITIATED FROM ANY LOCAL OPERATOR CONSOLE (LOC), A LIVE VOICE ANNOUNCEMENT INITIATED FROM

THE 911 CALL CENTER LOCATED IN BUILDING #4101, ANY PRE-RECODED MESSAGE ACTIVATED FROM THE

FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL PANEL, ANY PRE-RECODED MESSAGE ACTIVATED

FROM A LOCAL OPERATOR CONSOLE (LOC), ANY PRE-RECORDED MESSAGE ACTIVATED FROM THE 911

CALL CENTER LOCATED IN BUILDING #4101, THE FIRE ALARM SYSTEM PRE-RECORDED MESSAGE, AND

THE CARBON MONOXIDE PRE-RECORDED MESSAGE.

B. PRIORITY #2: THE BUILDING LOCAL OPERATOR CONSOLE(S) (LOC) LIVE VOICE ANNOUNCEMENT.

OPERATION OF THE LIVE VOICE MICROPHONE FROM THE LOCAL OPERATOR CONSOLE (LOC) SHALL

IMMEDIATELY OVERRIDE A LIVE VOICE ANNOUNCEMENT INITIATED FROM THE 911 CALL CENTER LOCATED

IN BUILDING #4101, ANY PRE-RECODED MESSAGE ACTIVATED FROM THE FIRE ALARM / MASS

NOTIFICATION SYSTEM CONTROL PANEL, ANY PRE-RECODED MESSAGE ACTIVATED FROM A LOCAL

OPERATOR CONSOLE (LOC), ANY PRE-RECORDED MESSAGE ACTIVATED FROM THE 911 CALL CENTER

LOCATED IN BUILDING #4101, THE FIRE ALARM SYSTEM PRE-RECORDED MESSAGE, AND THE CARBON

MONOXIDE PRE-RECORDED MESSAGE.

C. PRIORITY #3: THE 911 CALL CENTER LOCATED IN BUILDING #4101 LIVE VOICE ANNOUNCEMENT.

OPERATION OF THE LIVE VOICE FROM THE LOCAL OPERATOR CONSOLE (LOC) SHALL IMMEDIATELY

OVERRIDE ANY PRE-RECODED MESSAGE ACTIVATED FROM THE FIRE ALARM / MASS NOTIFICATION

SYSTEM CONTROL PANEL, ANY PRE-RECODED MESSAGE ACTIVATED FROM A LOCAL OPERATOR

CONSOLE (LOC), ANY PRE-RECORDED MESSAGE ACTIVATED FROM THE 911 CALL CENTER LOCATED IN

BUILDING #4101, THE FIRE ALARM SYSTEM PRE-RECORDED MESSAGE, AND THE CARBON MONOXIDE

PRE-RECORDED MESSAGE.

D. PRIORITY #4: THE BUILDING'S FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL PANEL ACTIVATION

OF ONE OF THE EIGHT PRE-RECORDED MESSAGES. OPERATION OF A PRE-RECORDED MESSAGE FROM

THE FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL PANEL SHALL IMMEDIATELY OVERRIDE ANY

PRE-RECODED MESSAGE ACTIVATED FROM A LOCAL OPERATOR CONSOLE (LOC), ANY PRE-RECORDED

MESSAGE ACTIVATED FROM THE 911 CALL CENTER LOCATED IN BUILDING #4101, THE FIRE ALARM

SYSTEM PRE-RECORDED MESSAGE, AND THE CARBON MONOXIDE PRE-RECORDED MESSAGE.

E. PRIORITY #5: THE BUILDING LOCAL OPERATOR CONSOLE(S) (LOC) ACTIVATION OF ONE OF THE EIGHT

PRE-RECORDED MESSAGES. OPERATION OF A PRE-RECORDED MESSAGE FROM THE LOCAL OPERATOR

CONSOLE (LOC) SHALL IMMEDIATELY OVERRIDE ANY PRE-RECORDED MESSAGE ACTIVATED FROM THE

911 CALL CENTER LOCATED IN BUILDING #4101, THE FIRE ALARM SYSTEM PRE-RECORDED MESSAGE, AND

THE CARBON MONOXIDE PRE-RECORDED MESSAGE.

F. PRIORITY #6: THE 911 CALL CENTER LOCATED IN BUILDING #4100 ACTIVATION OF ONE OF THE EIGHT

PRE-RECORDED MESSAGES. OPERATION OF A PRE-RECORDED MESSAGE FROM THE 911 CALL CENTER

LOCATED IN BUILDING #4101 SHALL IMMEDIATELY OVERRIDE THE FIRE ALARM SYSTEM PRE-RECORDED

MESSAGE AND THE CARBON MONOXIDE PRE-RECORDED MESSAGE.

G. PRIORITY #7: THE FIRE ALARM SYSTEM PRE-RECORDED MESSAGE. OPERATION OF THE FIRE ALARM

PRE-RECORDED MESSAGE SHALL IMMEDIATELY OVERRODE THE CARBON MONOXIDE PRE-RECORDED

MESSAGE.

H. PRIORITY #8: CARBON MONOXIDE PRE-RECORDED MESSAGE.

I. LOWER PRIORITY ITEMS SHALL NOT OVERRIDE HIGHER PRIORITY ITEMS.

3. PROGRAMMING OF THE FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL PANEL.

A. DEPRESSING ONE OF THE EIGHT PRE-RECORDED MESSAGES FROM THE FIRE ALARM / MASS

NOTIFICATION SYSTEM CONTROL PANEL SHALL IMMEDIATELY AND WITHOUT A TIME DELAY ACTIVATE THE

APPROPRIATE MESSAGE.

B. WHEN A SECOND PRE-RECORDED MESSAGE BUTTON IS DEPRESSED FROM THE FIRE ALARM / MASS

NOTIFICATION SYSTEM CONTROL PANEL, THE NEW PRE-RECORDED MESSAGE SHALL INSTANTANEOUSLY

AND WITHOUT A TIME DELAY TAKE PRECEDENCE OVER THE INITIAL PRE-RECORDED MESSAGE.

C. WHEN THE SECOND PRE-RECORDED MESSAGE IS TERMINATED, THE FIRST PRE-RECORDED MESSAGE

SHALL INSTANTANEOUSLY AND WITHOUT DELAY BECOME ACTIVE ONCE AGAIN.

D. AT NO TIME SHALL DEPRESSING MULTIPLE PRE-RECORDED MESSAGE BUTTONS FROM THE FIRE ALARM /

MASS NOTIFICATION SYSTEM CONTROL PANEL DEFAULT TO A STANDARD PRE-RECORDED MESSAGE.

E. THE ACTIVE PRE-RECORDED MESSAGE AT THE FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL

PANEL SHALL BE THAT WHICH CORRESPONDS TO THE LAST BUTTON DEPRESSED.

F. IT SHALL BE POSSIBLE TO OVERRIDE OR LOCKOUT THE LOC'S FROM THE MASTER COMMAND PANEL (IN

ACCORDANCE WITH N.F.P.A. #72.).

H. OPERATION OF THE LIVE MICROPHONE FROM THE FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL

PANEL SHALL IMMEDIATELY OVERRIDE ANY PRE-RECODED MESSAGE ACTIVATED FROM A LOCAL

OPERATOR CONSOLE (LOC) OR FROM THE FIRE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .