W912DW19Q0077R0001_Friday_Harbor.pdf
PDF 382 KB Posted
- Attached to
- Friday Harbor Breakwater Repair Federal contract opportunity
- Solicitation number
- W912DW19Q0077
About this file
Amendment R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW19Q0077_Friday_Harbor_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The due date for receipt of quotes is not extended and is 4 September 2019 at 2:00 P.M. PST.
The purpose of this amendment is to answ er the attached quesions and make the associated changes in the solicitation. See the follow ing changes on continuation sheet:
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW19Q0077
X 9B. DATED (SEE ITEM 11)
15-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2019
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Gregory.Cook@usace.army.milEMAIL:206 764-6692TEL:
GREGORY COOK / CONTRACT SPECIALIST
W912DW19Q0077
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Q&A
1. Part 5, table 2 "safety Ladders" has a quantity of 17 total new ladders. CLIN #0003 Replace ladders = 7ea and CLIN 0004 install new = 1ea (total of 8 new ladders). Please clarify.
Answer: Please see revised quantities in CLIN 0003 and CLIN 0004. New quanitites are as follows:
ITEM NO SUPPLIES QUANTITY UNIT
0003 Replace Existing Safety Ladders 14 Each
0004 Install New Safety Ladders 3 Each
2. Part 5 Table 1 "Concrete Repair" shows 4 locations with a total of 20sf of repairs needed.
CLIN# 0002 Concrete repair Base Bid = 100sf, plus CLIN# 0006 Concrete repair Option = 10sf with potential to exercise 10 times for possible 100sf option, The two CLINS = 200 sf of concrete repair. Please clarify discrepancy.
Answer: CLIN quantities are both estimates and for quote evaluation purposes. The requirement is for UP to 100 square feet on CLIN 0002 and UP to 100 square feet on CLIN 0006.
Actual quantities are currently unknown. Payment will be made on actual square footage of repairs.
3. Is a bid bond required? If so, is a hard copy due prior to bid time if I plan to email proposal?
Answer: Please refer to clause 52.228-13 Alternative Payment Protections (July 2000) included in the solicitation. This solicitation is not considered a bid as defined in the FAR and the required submittals are detailed in Item 6 of the Instructions to Quoters section.
4. Can the QCM cover as SSHO/superintendent as well provided both certificates are current?
Answer: No. The two roles cannot be filled by the same person on this requirement.
5. Is USL&H insurance a requirement for this project?
Answer: Please refer to the Davis Bacon Wage Determination Number: WA20190038 dated 7/26/2019 included in the solicitation.
6. Is there a specific paint product required? Sherwin Williams’s industrial coatings OK?
Answer: The paint specifications for the handrails are listed in the solicitation under task 003.
No specific brand is required as long as it meets those requirements.
7. Please confirm this is a Buy American contract?
Answer: Please refer to Clause 52.225-9 Buy American—Construction Materials (MAY 2014) included in the solicitation.
End of Q&A.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN extended description has changed from:
Repair concrete in accordance with the attached Performance Work Statement during the period of 15 September 2019 through 14 February 2019 at the Friday Harbor Breakwater location.United States Department of Labor Wage Determination (Davis-Bacon Act Wage Decision WA20190038; published on 07/26/2019) is attached hereto and incorporated herein.
To:
Repair concrete in accordance with the attached Performance Work Statement during the period of 15 September 2019 through 14 February 2019 at the Friday Harbor Breakwater location.Payment will be made on actual square footage of repairs. United States Department of Labor Wage Determination (Davis-Bacon Act Wage Decision WA20190038; published on 07/26/2019) is attached hereto and incorporated herein.
CLIN 0003
The pricing detail quantity has increased by 7.00 from 7.00 to 14.00.
CLIN 0004
The pricing detail quantity has increased by 2.00 from 1.00 to 3.00.
CLIN 0006
The CLIN extended description has changed from:
Repair concrete in accordance with the attached Performance Work Statement during the period of 15 September 2019 through 14 February 2019 at the Friday Harbor Breakwater location. United States Department of Labor Wage Determination (Davis-Bacon Act Wage Decision WA20190038; published on 07/26/2019) is attached hereto and incorporated herein.(Note 3)- Note 3: Option Item 0006 may be exercised up to 10times (not to exceed 100 square feet option total).
Repair concrete in accordance with the attached Performance Work Statement during the period of 15 September 2019 through 14 February 2019 at the Friday Harbor Breakwater location. Payment will be made on actual square footage of repairs. United States Department of Labor Wage Determination (Davis-Bacon Act Wage Decision WA20190038; published on 07/26/2019) is attached hereto and incorporated herein.(Note 3)- Note 3: Option Item 0006 may be exercised up to 10times (not to exceed 100 square feet option total).
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0003 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 15-SEP-2019 TO
14-FEB-2020
N/A US ARMY CORPS OF ENGINEERS
MAIL ROOM
SEATTLE DISTRICT
PO BOX 3755
SEATTLE WA 98124-3755
206-764-3799 FOB: Destination
960506
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 15-SEP-2019 TO
14-FEB-2020
N/A US ARMY CORPS OF ENGINEERS
MAIL ROOM
SEATTLE DISTRICT
PO BOX 3755
SEATTLE WA 98124-3755
206-764-3799
The following Delivery Schedule item for CLIN 0004 has been changed from:
CAGE
POP 15-SEP-2019 TO
14-FEB-2020
N/A US ARMY CORPS OF ENGINEERS
MAIL ROOM
SEATTLE DISTRICT
PO BOX 3755
SEATTLE WA 98124-3755
206-764-3799
CAGE
POP 15-SEP-2019 TO
14-FEB-2020
N/A US ARMY CORPS OF ENGINEERS
MAIL ROOM
SEATTLE DISTRICT
PO BOX 3755
SEATTLE WA 98124-3755
206-764-3799
(End of Summary of Changes)