The purpose of Amendment R0005 is to revise sections, drawings and clauses. Please see continuation page for more details.

View the file

Other files

File Type Posted
R0004.pdf PDF
R0003.pdf PDF
R0002.pdf PDF
R0001.pdf PDF
Part_2_of_6_-_Technical_Specifications.pdf PDF
Part_1_of_6_-_RFP.pdf PDF
Part_4_of_6_-_Plans.pdf PDF
Part_6_of_6_-_Plans.pdf PDF
Part_3_of_6_-_Plans.pdf PDF
Part_5_of_6_-_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68MD962857873

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Request for Proposal (RFP) W912DW18R0010 VA American Lake Seismic Upgrades Phase 1 Building 18 Renovations at Tacoma, WA Amendment R0005

(Please see continuation page for details)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-18-R-0010

X 9B. DATED (SEE ITEM 11)

22-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Jan-2018

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-18-R-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 72 00 - CONTACT CLAUSES

The following included by reference have been revised:

252.225-7012

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text: R0005

1. This amendment five (0005) provides for the following:

• Section 05 12 00, Structural Steel Framing is revised.

• Section 07 54 23, Thermoplastic Polyolefin Roofing is revised.

• Section 08 33 13, Coiling Counter Doors is DELETED.

• Section 08 80 00, Glazing is revised.

• Section 09 06 00, Schedule for Finishes is revised.

• Section 09 29 00, Gypsum Board is revised.

• Section 09 51 00, Acoustical Ceilings is revised.

• Section 22 05 11, Common Work Results for Plumbing is revised.

• Section 22 13 00, Facility Sanitary and Vent Piping is revised.

• Section 28 05 00, Common Work Results Electronic Safety Security is revised.

• Revision to Drawing AS701 – Door Schedule.

• Revision to Drawing AS703 – Details.

• Revision to Drawing GI002 – Codes General Notes.

• Revision to Drawing MH500 - Details.

• Revision to Drawing MH501 – Details.

• Revision to Drawing MM001 – Legends Abbreviation General Notes.

• Revision to Drawing PP100 – Found Plumbing Plan East.

• Revision to Drawing PP101 – Found Plumbing Plan West.

• Revision to Drawing SS001 – General Structural Notes.

• Revision to Attachment 00 73 00-A, Index of Drawings.

• Attachment 02 82 11, HazBldgMat Report is revised.

• Clause 252.225-7012, Preference for Certain Domestic Commodities is revised.

2. The bid submittal time and date of 1:00:00 PM LOCAL TIME, 7 February 2018 remains the same.

3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments, including this amendment, by number and date on SF1442.

Encl:

Section 05 12 00 (Revised) Section 07 54 23 (Revised) Section 08 33 13 (DELETED) Section 08 80 00 (Revised)

W912DW-18-R-0010

Section 09 06 00 (Revised) Section 09 29 00 (Revised) Section 09 51 00 (Revised) Section 22 05 11 (Revised) Section 22 13 00 (Revised) Section 28 05 00 (Revised) Drawing AS701 (Revised) Drawing AS703 (Revised) Drawing GI002 (Revised) Drawing MH500 (Revised) Drawing MH501 (Revised) Drawing MM001 (Revised) Drawing PP100 (Revised) Drawing PP101 (Revised) Drawing SS001 (Revised) Attachment 00 73 00-A (Revised) Attachment 02 82 11 (Revised)

(End of Summary of Changes)

This page was intentionally left blank for duplex printing.

05 12 00 - 1 R0005

SECTION 05 12 00

STRUCTURAL STEEL FRAMING

PART 1 - GENERAL

1.1. DESCRIPTION:

This section specifies structural steel shown and classified by section 2, code of standard practice for steel buildings and bridges.

1.2. RELATED WORK:

A. Materials testing and inspection during construction: section 01 45 29, TESTING

LABORATORY SERVICES.

B. Painting: Section 09 91 00, PAINTING.

1.3. SUMMARY:

1. 01 33 29, SUSTAINABILITY REPORTING.

1.4. QUALITY ASSURANCE:

A. Fabricator and erector shall maintain a program of quality assurance in conformance with

Section 8, Code of Standard Practice for Steel Buildings and Bridges. Work shall be fabricated in an AISC certified Category Std fabrication plant. Fabricator shall have a minimum of 5-years of experience and have fabricated a minimum of five projects of similar size or complexity per structural general notes section 5.1.3B on sheet SS011.

B. Before authorizing the commencement of steel erection, the controlling contractor shall ensure that the steel erector is provided with the written notification required by 29 CFR 1926.752.

Provide copy of this notification to the Resident Engineer.

1.5. LEED REQUIREMENTS:

A. General: This is a LEED affected Specification Section. Comply with all applicable LEED requirements as specified in this Project Manual, including the following.

1. 01 33 29, SUSTAINABILITY REPORTING

B. Required LEED Credits: As specified in Division 1 – 01 33 29, SUSTAINABILITY

REPORTING and as indicated in the "LEED Credit Matrix" in this Specification Section.

C. Submittals:

1. Product data: submit product data highlighting LEED specific data applicable to the LEED credits required for this specification section. Clearly distinguish or fully separate LEED data from other general product data required for each specification section.

05 12 00 - 2 R0005

2. LEED product information form: submit the completed LEED product information form in accordance with the template provided in specification Section 01 33 29, SUSTAINABILITY REPORTING.

1.6. TOLERANCES:

Fabrication tolerances for structural steel shall be held within limits established by ASTM A6, by AISC 303, sections 6 and 7, code of standard practice for buildings and bridges, except as follows:

A. Elevation tolerance for closure plates at the building perimeter and at slab openings prior to concrete placement is 6 mm (1/4 inch).

1.7. DESIGN:

A. Connections: Design and detail all connections for each member size, steel grade and connection type to resist the loads and reactions indicated on the drawings or specified herein.

Use details consistent with the details shown on the Drawings, supplementing where necessary.

The details shown on the Drawings are conceptual and do not indicate the required weld sizes or number of bolts unless specifically noted. Use rational engineering design and standard practice in detailing, accounting for all loads and eccentricities in both the connection and the members. Promptly notify the Resident Engineer of any location where the connection design criteria is not clearly indicated. The design of all connections is subject to the review and acceptance of the Resident Engineer. Submit structural calculations prepared and sealed by a qualified engineer registered in the state where the project is located. Submit calculations for review before preparation of detail drawings.

1.8. REGULATORY REQUIREMENTS:

A. AISC 360: Specification for Structural Steel Buildings

B. AISC 303: Code of Standard Practice for Steel Buildings and Bridges.

1.9. SUBMITTALS:

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES.

B. Shop and Erection Drawings: Complete

C. Certificates:

1. Structural steel.

2. Steel for all connections.

3. Welding materials.

4. Shop coat primer paint.

D. Test Reports:

05 12 00 - 3 R0005

1. Welders' qualifying tests.

E. Record Surveys.

1.10. APPLICABLE PUBLICATIONS:

A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.

B. American Institute of Steel Construction (AISC):

1. AISC 360-10 Specification for Structural Steel Buildings

2. AISC 303-10 Code of Standard Practice for Steel Buildings and Bridges

C. American National Standards Institute (ANSI):

B18.22.1-65(R2008) Plain Washers

B18.22M-81(R2000) Metric Plain Washers

D. American Society for Testing and Materials (ASTM):

A6/A6M-11 Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling

A36/A36M-08 Standard Specification for Carbon Structural Steel

A53/A53M-10 Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless

A123/A123M-09 Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

A242/A242M-04(R2009) Standard Specification for High-Strength Low-Alloy Structural Steel

A283/A283M-03(R2007) Standard Specification for Low and Intermediate Tensile Strength Carbon Steel Plates

A307-10 Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

A325-10 Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

A490-12 Standard Specification for Heat-Treated Steel Structural Bolts 150 ksi Minimum Tensile Strength

A500/A500M-10a Standard Specification for Cold Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

A501-07 Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing

A572/A572M-07 Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel

A992/A992M-11 Standard Specification for Structural Steel Shapes

E. American Welding Society (AWS):

D1.1/D1.1M-10 Structural Welding Code-Steel

05 12 00 - 4 R0005

F. Research Council on Structural Connections (RCSC) of The Engineering Foundation:

Specification for Structural Joints Using ASTM A325 or A490 Bolts

G. Military Specifications (Mil. Spec.):

MIL-P-21035 Paint, High Zinc Dust Content, Galvanizing, Repair

H. Occupational Safety and Health Administration (OSHA):

29 CFR Part 1926-2001 Safety Standards for Steel Erection

PART 2 - PRODUCTS

2.1. MATERIALS:

A. Structural Steel: ASTM A36.

B. Structural Tubing: ASTM A500, Grade B.

C. Bolts, Nuts and Washers:

1. High-strength bolts, including nuts and washers: ASTM A325.

2. Bolts and nuts, other than high-strength: ASTM A307, Grade A.

3. Plain washers, other than those in contact with high-strength bolt heads and nuts: ANSI

Standard B18.22.1.

D. Zinc Coating: ASTM A123.

E. Galvanizing Repair Paint: Mil. Spec. MIL-P-21035.

PART 3 - EXECUTION

3.1. CONNECTIONS (SHOP AND FIELD):

A. Welding: Welding in accordance with AWS D1.1. Welds shall be made only by welders and welding operators who have been previously qualified by tests as prescribed in AWS D1.1 to perform type of work required.

B. High-Strength Bolts: High-strength bolts tightened to a bolt tension not less than 70% of their minimum tensile strength. Tightening done with properly calibrated wrenches, by turn-of-nut method or by use of direct tension indicators (bolts or washers). Tighten bolts in connections identified as slip-critical using Direct Tension Indicators. Twist-off torque bolts are not an acceptable alternate fastener for slip critical connections.

3.2. FABRICATION:

Fabrication in accordance with Chapter M, AISC 360.

3.3. SHOP PAINTING:

A. General: Shop paint steel with primer in accordance with AISC 303, Section 6.

B. Shop paint for steel surfaces is specified in Section 09 91 00, PAINTING.

C. Do not apply paint to following:

1. Surfaces within 50 mm (2 inches) of joints to be welded in field.

05 12 00 - 5 R0005

2. Surfaces which will be encased in concrete.

3. Surfaces which will receive sprayed on fireproofing.

4. Top flange of members which will have shear connector studs applied.

D. Zinc Coated (Hot Dip Galvanized) per ASTM A123 (after fabrication): Touch-up after erection: Clean and wire brush any abraded and other spots worn through zinc coating, including threaded portions of bolts and welds and touch-up with galvanizing repair paint.

3.4. ERECTION:

A. General: Erection in accordance with AISC 303, Section 7B. Temporary Supports:

Temporary support of structural steel frames during erection in accordance with AISC 303, Section 7

3.5. FIELD PAINTING:

A. After erection, touch-up steel surfaces specified to be shop painted. After welding is completed, clean and prime areas not painted due to field welding.

B. Finish painting of steel surfaces is specified in Section 09 91 00, PAINTING.

3.6. SURVEY:

Upon completion of finish bolting or welding on any part of the work, and prior to start of work by other trades that may be supported, attached, or applied to the structural steel work, submit a certified report of survey to Resident Engineer for approval. Reports shall be prepared by

Registered Land Surveyor or Registered Civil Engineer as specified in Section 01 00 00, GENERAL REQUIREMENTS. Report shall specify that location of structural steel is acceptable for plumbness, level and alignment within specified tolerances specified in the AISC Manual.

- - - E N D - - -

07 54 23 - 1 R0005

SECTION 07 54 23

THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

BASE BID

PART 1 GENERAL

1.1 DESCRIPTION

A. Thermoplastic Polyolefin (TPO) sheet roofing mechanically fastened to roof deck.

1.2 RELATED WORK

A. General sustainable design documentation requirements: Section 01 33 29, SUSTAINABILITY

REPORTING.

B. Treated wood framing, blocking, and nailers: Section 06 10 00, ROUGH CARPENTRY

C. Roof Insulation: Section 07 22 00, ROOF AND DECK INSULATION.

D. Sheet metal components and wind uplift requirements for roof-edge design: Section 07 60 00, FLASHING AND SHEET METAL.

E. Equipment supports,: Section 07 72 00, ROOF ACCESSORIES

F. Pedestrian Traffic Coatings: Section 07 18 13

1.3 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only. Editions of applicable publications current on date of issue of bidding documents apply unless otherwise indicated.

B. American National Standards Institute/Single-Ply Roofing Institute (ANSI/SPRI):

ANSI/SPRI ES-1-03 .................. Wind Design Standard for Edge Systems Used with Low Slope

Roofing Systems.

C. American Society of Civil Engineers/Structural Engineering Institute (ASCE/SEI):

ASCE/SEI-7-10 ......................... Minimum Design Loads for Buildings and Other Structures

D. ASTM International (ASTM):

C67-09 ....................................... Standard Test Methods for Sampling and Testing Brick and

Structural Clay Tile

C140-09 ..................................... Standard Test Methods for Sampling and Testing Concrete

Masonry Units and Related Units

C1371-04 ................................... Standard Test Method for Determination of Emittance of

Materials Near Room Temperature Using Portable Emissometers

07 54 23 - 2 R0005

C1549-04 ................................... Standard Test Method for Determination of Solar Reflectance

Near Ambient Temperature Using a Portable Solar

Reflectometer

D4263......................................... Standard Test Method for Indicating Moisture in Concrete by the

Plastic Sheet Method

D4434-06 ................................... Standard Specification for Poly (Vinyl Chloride) Sheet Roofing

D6878-08 ................................... Standard Specification for Thermoplastic Polyolefin Based Sheet

Roofing

E108-10 ...................................... Standard Test Methods for Fire Tests of Roof Coverings

E408-71(R2008) ........................ Standard Test Methods for Total Normal Emittance of Surfaces

Using Inspection-Meter Techniques

E1918-06 .................................... Standard Test Method for Measuring Solar Reflectance of

Horizontal and Low-Sloped Surfaces in the Field

E1980-01 .................................... Standard Test Method for Measuring Solar Reflectance of

Horizontal and Low-Sloped Surfaces in the Field

E. American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE)

ASHRAE 90.1-2007 .................. Energy Standard for Buildings Except Low-Rise Residential

Buildings, Appendix f.

F. Cool Roof Rating Council:

CRRC-1 ..................................... Product Rating Program, www.coolroofs.org

G. FM Approvals: RoofNav Approved Roofing Assemblies and Products.

4450-89 ...................................... Approved Standard for Class 1 Insulated Steel Deck Roofs

4470-10 ...................................... Approved Standard for Class 1 Roof Coverings

1-28-09 ....................................... Loss Prevention Data Sheet: Design Wind Loads.

1-29-09 ....................................... Loss Prevention Data Sheet: Above-Deck Roof Components

1-49-09 ....................................... Loss Prevention Data Sheet: Perimeter Flashing

H. National Roofing Contractors Association: Roofing and Waterproofing Manual

I. U.S. Department of Agriculture (USDA): USDA BioPreferred Catalog, www.biopreferred.gov

J. U.S. Department of Energy (DoE): Roof Products Qualified Product List, www.energystar.gov

1.4 PERFORMANCE REQUIREMENTS

A. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by membrane roofing manufacturer based on testing and field experience.

07 54 23 - 3 R0005

B. Roofing System Energy Performance Requirements: Provide a roofing system identical to components that that have been successfully tested by a qualified independent testing and inspecting agency to meet the following requirements:

1. Energy Performance, Energy Star: Provide roofing system that is listed on DOE's ENERGY

STAR "Roof Products Qualified Product List" for low-slope roof products.

2. Solar Reflectance Index: Not less than 78 when calculated according to ASTM E1980 based on testing identical products by a qualified testing agency.

3. Energy Performance, CRRC-1: Provide roofing system with initial solar reflectance not less than 0.70 and emissivity not less than 0.75 when tested according to CRRC-1.

4. Energy Performance, Aged: Provide roofing system with minimum three-year aged solar reflectance not less than 0.55 when tested in accordance with ASTM C1549 or ASTM E1918, and in addition, a minimum three-year-aged thermal emittance of 0.75 when tested in accordance with ASTM C1371 or ASTM E408.

a. Where tested aged values are not available for proposed product, submit calculations to adjust initial solar reflectance to demonstrate compliance as indicated in ASHRAE 90.1-

2007 Addendum f.

b. Alternatively, provide roofing system with minimum three-year aged Solar Reflectance

Index of not less than 64 when determined in accordance with the Solar Reflectance

Index method in ASTM E1980 using a convection coefficient of 2.1 BTU/h-ft2 (12

W/m2K).

1.5 QUALITY CONTROL

A. Installer Qualifications:

1. Licensed or approved in writing by manufacturer to perform work under warranty requirements of this Section.

2. Employ full-time supervisors knowledgeable and experienced in roofing of similar types and scopes, and able to communicate with owner and workers.

B. Inspector Qualifications: Inspection of work by third-party technical inspector or technical representative of manufacturer experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality

Control Article, to determine Installer’s compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be one of the following:

1. An authorized full-time technical employee of the manufacturer, not engaged in the sale of products.

07 54 23 - 4 R0005

2. An independent party certified as a Registered Roof Observer by the Roof Consultants

Institute (RCI), retained by the Contractor or the Manufacturer and approved by the

Manufacturer.

C. Product/Material Requirements:

1. Obtain products from single manufacturer or from sources recommended by manufacturer for use with roofing system and incorporated in manufacturer's warranty.

2. Bio-Based Materials: For Products designated by the USDA’s Bio Preferred program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-Preferred program, visit http://www.biopreferred.gov

D. Roofing system design standard requirements:

1. Recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to modified bituminous sheet roofing for storage, handling and application.

2. Recommendations of FM Approvals 1-49 Loss Prevention Data Sheet for Perimeter

Flashings.

3. Recommendations of ANSI/SPRI ES-1 for roof edge design.

4. Roofing System Design: Provide roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE/SEI 7.

a. Corner Uplift Pressure: As indicated on construction documents in the structural notes.

b. Perimeter Uplift Pressure: As indicated on construction documents in the structural notes.

c. Field-of-Roof Uplift Pressure: As indicated on construction documents in the structural notes.

5. FM Approvals Listing: Provide roofing membrane, base flashing, and component materials that comply with requirements in FM Approvals 4450 and FM Approvals 4470 as part of a roofing system and that are listed in FM Approvals "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Approvals markings.

a. Fire/Windstorm Classification: As indicated on construction documents in the structural notes.

b. Hail Resistance: As indicated on construction documents in the structural notes.

6. High Wind Zone Design Requirement: Contractor Option: In lieu of FM Approval Listing windstorm classification, provide roofing membrane, base flashing, and component materials that comply with Miami-Dade County requirements.

07 54 23 - 5 R0005

E. Pre-Roofing Meeting:

1. Upon completion of roof deck installation and prior to any roofing application, hold a pre-roofing meeting arranged by the Contractor and attended by the Roofing Inspector, Material Manufacturers Technical Representative, Roofing Applicator, Contractor, and

Resident Engineer.

2. Discuss specific expectations and responsibilities, construction procedures, specification requirements, application, environmental conditions, job and surface readiness, material storage, and protection.

3. Inspect roof deck at this time to:

a. Verify that work of other trades which penetrates roof deck is completed.

b. Determine adequacy of deck anchorage, presence of foreign material, moisture and unlevel surfaces, or other conditions that would prevent application of roofing system from commencing or cause a roof failure.

c. Examine samples and installation instructions of manufacturer.

1.6 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, SAMPLES.

B. Product Data:

1. Adhesive materials.

2. Membrane sheet roofing and flashing membrane.

3. Roofing cement.

4. Roof walkway.

5. Fastening requirements.

6. Application instructions.

C. LEED and Federal Sustainable Design Submittals:

1. Product Test Reports for Credit SS 7.2: For roof materials, indicating that roof materials comply with Solar Reflectance Index requirement.

2. Product Data for Credit IEQ 4.1: For adhesives and sealants used inside the weatherproofing system, documentation including printed statement of VOC content.

3. Product Data for Federally-Mandated Bio-Based Materials: For roof materials, indicating

USDA designation and compliance with definitions for bio-based products, Rapidly

Renewable Materials, and certified sustainable wood content.

D. Samples:

1. Nails and fasteners, each type.

07 54 23 - 6 R0005

E. Shop Drawings: Include plans, sections, details, and attachments.

1. Base flashings and terminations.

F. Certificates:

1. Indicating materials and method of application of roofing system meets requirements of FM

Approvals "RoofNav" for specified fire/windstorm classification.

2. Indicating compliance with Miami-Dade County requirements.

3. Indicating compliance with energy performance requirement.

G. Warranty: As specified.

H. Documentation of supervisors' and inspectors' qualifications.

I. Field reports of roofing inspector.

J. Temporary protection plan. Include list of proposed temporary materials.

K. Contract Close-out Submittals:

1. Maintenance Manuals.

2. Warranty signed by installer and manufacturer.

1.7 DELIVERY, STORAGE AND HANDLING

A. Comply with the recommendations of the NRCA “Roofing and Waterproofing Manual” applicable to single ply membrane roofing for storage, handling and installation.

1.8 ENVIRONMENTAL REQUIREMENTS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

B. Environmental Controls: Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL

CONTROLS.

C. Protection of interior spaces: Refer to Section 01 00 00, GENERAL REQUIREMENTS.

1.9 WARRANTY

Roofing work subject to the terms of the Article "Warranty of Construction," FAR clause 52.246-

21, except extend the warranty period to 10 years.

07 54 23 - 7 R0005

PART 2 - PRODUCTS

2.1 TPO MEMBRANE ROOFING

A. TPO Sheet: ASTM D6878, internally fabric or scrim reinforced, 1.5 mm (60 mils) thick, with fabric backing.

1. Color: White.

2.2 ACCESSORIES:

A. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as TPO sheet membrane.

B. Bonding Adhesive: Manufacturer's standard, water based.

C. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 25 by 3 mm (1 by 1/8 inch) thick; with anchors.

D. Metal Battens: Manufacturer's standard, aluminum-zinc-alloy-coated or zinc-coated steel sheet, approximately 25 mm wide by 1.3 mm (1 inch wide by 0.05 inch) thick, prepunched.

E. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with FM

Approvals 4470, designed for fastening membrane to substrate.

F. Flexible Walkways: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads or rolls, approximately 5 mm (3/16 inch) thick, and acceptable to membrane roofing system manufacturer.

G. Miscellaneous Accessories: Provide sealers, preformed flashings, preformed inside and outside corner sheet flashings, T-joint covers, lap sealants, termination reglets, and other accessories acceptable to manufacturer.

2.3 ADHESIVE AND SEALANT MATERIALS:

A. General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.

1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D

(EPA Method 24):

a. Plastic Foam Adhesives: 50 g/L.

b. Gypsum Board and Panel Adhesives: 50 g/L.

c. Multipurpose Construction Adhesives: 70 g/L.

d. Fiberglass Adhesives: 80 g/L.

07 54 23 - 8 R0005

e. Single-Ply Roof Membrane Adhesives: 250 g/L.

f. Other Adhesives: 250 g/L.

g. PVC Welding Compounds: 510 g/L.

h. Adhesive Primer for Plastic: 650 g/L.

i. Single-Ply Roof Membrane Sealants: 450 g/L.

j. Nonmembrane Roof Sealants: 300 g/L.

k. Sealant Primers for Nonporous Substrates: 250 g/L.

l. Sealant Primers for Porous Substrates: 775 g/L.

PART 3 - EXECUTION

3.1 EXAMINATION:

A. Examine substrates and conditions with roofing Installer and roofing inspector to verify compliance with project requirements and suitability to accept subsequent roofing work. Correct unsatisfactory conditions before proceeding with roofing work.

B. Do not apply roofing if roof surface will be used for subsequent work platform, storage of materials, or staging or scaffolding will be erected thereon unless system is protected.

3.2 PREPARATION

A. Complete roof deck construction prior to commencing roofing work:

1. Install curbs, blocking, edge strips, nailers, cants, and other components where insulation, roofing, and base flashing is attached to, in place ready to receive insulation and roofing.

2. Complete deck and insulation to provide designed drainage to working roof drains.

3. Document installation of related materials to be concealed prior to installing roofing work.

B. Dry out surfaces, including the flutes of metal deck that become wet from any cause during progress of the work before roofing work is resumed. Apply materials to dry substrates.

C. Sweep decks to broom clean condition. Remove all dust, dirt or debris.

D. Remove projections that might damage materials.

3.3 TEMPORARY PROTECTION

A. Install temporary protection at the end of day's work and when work is halted for an indefinite period or work is stopped when precipitation is imminent. Comply with approved temporary protection plan.

B. Install temporary cap flashing over the top of base flashings where permanent flashings are not in place to provide protection against moisture entering the roof system through or behind the base flashing. Securely anchor in place to prevent blow off and damage by construction activities.

C. Provide for removal of water or drainage of water away from the work.

07 54 23 - 9 R0005

D. Provide temporary protection over installed roofing by means of duckboard walkways, plywood platforms, or other materials, as approved by Resident Engineer, for roof areas that are to remain intact, and that are subject to foot traffic and damage. Provide notches in sleepers to permit free drainage.

3.4 INSTALLATION, GENERAL

A. FM Approvals Installation Standard: Install roofing membrane, base flashings, wood cants, blocking, curbs, and nailers, and component materials in compliance with requirements in FMG

4450 and FMG 4470 as part of a membrane roofing system as listed in FM Approval's "RoofNav" for fire/windstorm classification indicated. Comply with recommendations in FM Approvals'

Loss Prevention Data Sheet 1-49, including requirements for wood nailers and cants.

B. NRCA Installation Standard: Install roofing system in accordance with applicable NRCA

Manual Plates and NRCA recommendations.

C. Manufacturer Recommendations: Comply with roofing system manufacturer's written installation recommendations.

D. Coordination with related work: Coordinate roof operations with roof insulation and sheet metal work so that insulation and flashings are installed concurrently to permit continuous roofing operations.

E. Installation Conditions:

1. Apply dry roofing materials. Apply roofing work over dry substrates and materials.

2. Apply materials within temperature range and surface and ambient conditions recommended by manufacturer.

3. Except for temporary protection, do not apply materials during damp or rainy weather, during excessive wind conditions, nor while moisture (dew, snow, ice, fog or frost) is present in any amount in or on the materials to be covered or installed:

a. Do not apply materials when the temperature is below 4 deg. C (40 deg. F).

b. Do not apply materials to substrate having temperature of 4 deg. C (40 deg. F) or less.

3.5 INSTALLATION OF TPO ROOFING

A. Do not allow the membrane to come in contact with surfaces contaminated with asphalt, coal tar, oil, grease, or other substances which are not compatible with TPO.

B. Install the membrane so the sheets run perpendicular to the long dimension of the insulation boards.

C. Commence installation at the low point of the roof and work towards the high point. Lap the sheets so the flow of water is not against the edges of the sheet.

D. Position the membrane so it is free of buckles and wrinkles.

07 54 23 - 10 R0005

E. Roll sheet out on deck; inspect for defects as being rolled out and remove defective areas. Allow for relaxing before proceeding.

1. Lap edges and ends of sheets 50 mm (two inches) or more as recommended by the manufacturer.

2. Heat weld laps. Apply pressure as required. Seam strength of laps as required by ASTM

D4434.

3. Check seams to ensure continuous adhesion and correct defects.

4. Finish edges of laps with a continuous beveled bead of sealant to sheet edges to provide smooth transition.

5. Finish seams as the membrane is being installed (same day).

6. Anchor perimeter to deck or wall as specified.

F. Repair areas of welded seams where samples have been taken or marginal welds, bond voids, or skips occurs.

G. Repair fishmouths and wrinkles by cutting to lay flat and installing patch over cut area extending

100 mm (four-inches) beyond cut.

H. Membrane Perimeter Anchorage:

1. Install metal fastening strip at the perimeter of each roof level, curb flashing, expansion joints and similar penetrations as indicated and in accordance with membrane manufacturer's instructions on top of roof membrane to deck or wall.

2. Mechanically Fastened Metal Fastening Strip:

a. Set top of mechanical fastener set flush with top surface of the metal fastening strip.

Space mechanical fasteners a maximum 300 mm (12 inches) on center starting 25 mm

(one inch) from the end of the nailing strip.

b. When strips are cut round corners and eliminate sharp corners.

c. After mechanically fastening strip cover and seal strip with a six-inch wide roof membrane strip; heat weld to roof membrane and seal edges.

d. At roof edge metal, turn the membrane down over the front edge of the blocking or the nailer to below blocking. Secure the membrane to the vertical portion of the nailer; or, if required by the membrane manufacturer with fasteners spaced not over 300 mm (12 inches) on centers.

e. At parapet walls, intersecting building walls and curbs, secure the membrane to the structural deck with fasteners 300 mm (12 inches) on centers or as shown on NRCA manual.

I. Fully Adhered System:

07 54 23 - 11 R0005

1. Adhere roofing over area to receive roofing according to roofing system manufacturer's written instructions. Unroll roofing and allow to relax before retaining.

2. Start installation of roofing in presence of roofing system manufacturer's technical personnel.

3. Accurately align roofing, and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.

4. Bonding Adhesive: Apply to substrate and underside of roofing at rate and method required by manufacturer, before installing roofing. Do not apply to splice area of roofing.

5. In addition to adhering, mechanically fasten roofing securely at terminations, penetrations, and perimeter of roofing.

6. Apply roofing with side laps shingled with slope of roof deck where possible.

7. Seams: Clean seam areas, overlap roofing, and hot-air weld side and end laps of roofing and sheet flashings according to manufacturer's written instructions, to ensure a watertight seam installation.

a. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of sheet.

8. Verify field strength of seams a minimum of once daily, and repair seam sample areas.

9. Repair tears, voids, and lapped seams in roofing that do not comply with requirements.

10. Spread sealant bed over deck-drain flange at roof drains, and securely seal roofing in place with clamping ring.

07 54 23 - 12 R0005

IJ. Mechanically-Attached System:

1. Secure the membrane to the structural deck with fasteners through stress plate or batten strips spaced and patterned in accordance with the membrane manufacturer's instructions to achieve specified wind uplift performance.

2. When fasteners are installed within the laps of adjoining sheets, position the fastener so that the stress plates are a minimum 13 mm (1/2)inch) from the edge of the sheets.

3. Where fasteners are installed over the membrane after the seams have been welded, cover the fasteners with a minimum 175 mm (seven inch) wide round TPO membrane cap centered over the fasteners. If batten strips are used cover the strip with a minimum 175 mm (seven inch) wide TPO strip centered over the batten. Heat weld to the roof membrane and finish edges with sealant as specified. Finish edges with sealant as specified.

4. Before installing fasteners into cast in place concrete, pre-drill the correct size hole into the deck. Drill the hole 9 mm (3/8 inch) deeper than the fastener penetration.

3.6 INSTALLATION OF FLASHING

A. Install flashings as the membrane is being installed. If the flashing cannot be completely installed in one day, complete the installation until the flashing is in a watertight condition and provide temporary covers or seals.

B. Installing TPO Base Flashing and Pipe Flashing:

1. Install TPO flashing membranes to pipes, wall or curbs to a height not less than eight-inches above roof surfaces and 100 mm (four inches) on roof membrane.

a. Adhere flashing to pipe, wall or curb with adhesive.

b. Form inside and outside corners of TPO flashing membrane in accordance with NRCA manual. Form pipe flashing in accordance with NRCA manual use pipe boot.

c. Lap ends not less than 100 mm (four inches).

d. Heat weld flashing membranes together and flashing membranes to roof membranes.

Finish exposed edges with sealant as specified.

e. Install flashing membranes in accordance with NRCA manual.

2. Anchor top of flashing to walls or curbs with fasteners spaced not over 200 mm (eight inches) on centers. Use fastening strip on ducts. Use pipe clamps on pipes or other round penetrations.

3. Apply sealant to top edge of flashing.

C. Installing Building Expansion Joints:

1. Install base flashing on curbs as specified.

07 54 23 - 13 R0005

2. Coordinate installation with metal expansion joint cover or roof expansion joint system.

2. Install flexible tubing 1-1/2 times width of joint over joint. Cover tubing with TPO flashing strip adhered to base flashing and lapping base flashing 100 mm (four inches). Finish edges of laps with sealants as specified.

D. Repairs to membrane and flashings:

1. Remove sections of TPO sheet roofing or flashing that is creased wrinkled or fishmouthed.

2. Cover removed areas, cuts and damaged areas with a patch extending 100 mm (four inches) beyond damaged, cut, or removed area. Heat weld to roof membrane or flashing. Finish edge of lap with sealant as specified.

3.7 FLEXIBLE WALKWAYS – SEE SECTION 07 18 13 PEDESTRIAN TRAFFIC COATING

3.8 FIELD QUALITY CONTROL:

A. Roofing Inspector: Owner will engage a qualified roofing inspector to perform roof tests and inspections and to prepare test reports.

B. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion.

1. Notify Architect and Owner 48 hours in advance of date and time of inspection.

C. Repair or remove and replace components of roofing work where test results or inspections indicate that they do not comply with specified requirements.

1. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements.

3.9 PROTECTING AND CLEANING

A. Protect membrane roofing system from damage and wear during remainder of construction period.

B. Correct deficiencies in or remove membrane roofing system that does not comply with requirements; repair substrates; and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of acceptance by Owner.

C. Clean overspray and spillage from adjacent construction. Clean membrane and restore surface to like-new condition meeting solar reflectance requirements.

08 33 13 R0005

SECTION 08 33 13

COILING COUNTER DOORS

THIS SECTION HAS BEEN DELETED

08 80 00 - 1 R0005

SECTION 08 80 00

GLAZING

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section specifies the following:

1. Glass.

2. Plastic glazing.

3. Glazing materials and accessories for both factory and field glazed assemblies.

1.2 RELATED WORK:

A. Sustainable Design Requirements: Section 01 33 29, SUSTAINABILITY REPORTING.

B. Factory glazed by manufacturer in following units:

1. Sound resistant doors: Section 08 11 13, HOLLOW METAL DOORS AND FRAMES, and

Section 08 14 00, INTERIOR WOOD DOORS.

2. Mirrors: Section 10 28 00, TOILET, BATH, AND LAUNDRY ACCESSORIES.

3. Steel Windows: Section 08 51 23, ALUMINUM WINDOWS.

4. 5. Wiring (120 V AC, 15A or 20A): Section 26 05 19, LOW VOLTAGE ELECTRICAL

POWER AND CONDUCTORS AND CABLES.

6. Junction and Switch Boxes: Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL

SYSTEMS.

1.3 LABELS:

A. Temporary labels:

1. Provide temporary label on each light of glass and plastic material identifying manufacturer or brand and glass type, quality and nominal thickness.

2. Label in accordance with NFRC label requirements.

3. Temporary labels are to remain intact until glass // and plastic material // is approved by

Contracting Officer Representative (COR).

B. Permanent labels:

1. Locate in corner for each pane.

2. Label in accordance with ANSI Z97.1 and SGCC label requirements.

a. Tempered glass.

b. Laminated glass or have certificate for panes without permanent label.

08 80 00 - 2 R0005

1.4 PERFORMANCE REQUIREMENTS:

A. General: Design glazing system consistent with guidance and practices presented in the GANA

Glazing Manual, GANA Laminated Glazing Manual, and GANA Sealant Manual, as applicable to project. Installed glazing is to withstand applied loads, thermal stresses, thermal movements, building movements, permitted tolerances, and combinations of these conditions without failure, including loss or glass breakage attributable to defective manufacture, fabrication, or installation;

failure of sealants or gaskets to remain watertight and airtight; deterioration of glazing materials;

unsafe engagement of the framing system; deflections beyond specified limits; or other defects in construction.

B. Glazing Unit Design: Design glass, including engineering analysis meeting requirements of authorities having jurisdiction. Thicknesses listed are minimum. Coordinate thicknesses with framing system manufacturers.

1. Design glass in accordance with ASTM E1300, and for conditions beyond the scope of

ASTM E1300, by a properly substantiated structural analysis.

2. Design Wind Pressures: As indicated on construction documents in the structural notes.

3. Wind Design Data: As indicated on construction documents in the structural notes.

4. Maximum Lateral Deflection: For glass supported on all four edges, limit center-of-glass deflection at design wind pressure to not more than the structural capacity of the glazing unit, the threshold at which frame engagement is no longer safely assured, 1/100 times the short-side length, or 19 mm (0.75 inch) , whichever is less.

C. Building Enclosure Vapor Retarder and Air Barrier:

1. Utilize the inner pane of multiple pane sealed units for the continuity of the air barrier and vapor retarder seal.

2. Maintain a continuous air barrier and vapor retarder throughout the glazed assembly from glass pane to heel bead of glazing sealant.

D. “U” Value:

1. Minimum “U” value for glazing: Center of Glass U-Factor, minimum 0.28

1.5 SUBMITTALS:

A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Sustainable Design Submittals, as described below:

1. Volatile organic compounds per volume as specified in PART 2 - PRODUCTS.

C. Manufacturer's Certificates:

1. Certificate stating that fire-protection and fire-resistive glazing units meet code requirements for fire-resistance-rated assembly and applicable safety glazing requirements.

08 80 00 - 3 R0005

2. Certificate on solar heat gain coefficient when value is specified.

3. Certificate on "R" value when value is specified.

4. Certificate test reports confirming compliance with specified bullet resistive rating.

5. Certificate that blast resistant glass meets the specified requirements.

D. Manufacturer Warranty.

E. Manufacturer's Literature and Data:

1. Glass, each kind required.

2. Insulating glass units.

3. Transparent (one-way vision glass) mirrors.

4. Elastic compound for metal sash glazing.

5. Glazing cushion.

6. Sealing compound.

F. Samples:

1. Size: 305 mm by 305 mm (12 inches by 12 inches).

2. Tinted glass.

3. Transparent (one-way vision glass) mirrors.

G. Preconstruction Adhesion and Compatibility Test Report: Submit glazing sealant manufacturer’s test report indicating glazing sealants were tested for adhesion to glass and glazing channel substrates and for compatibility with glass and other glazing materials.

1.6 DELIVERY, STORAGE AND HANDLING:

A. Delivery: Schedule delivery to coincide with glazing schedules so minimum handling of crates is required. Do not open crates except as required for inspection for shipping damage.

B. Storage: Store cases according to printed instructions on case, in areas least subject to traffic or falling objects. Keep storage area clean and dry.

C. Handling: Unpack cases following printed instructions on case. Stack individual windows on edge leaned slightly against upright supports with separators between each.

D. Protect laminated security glazing units against face and edge damage during entire sequence of fabrication, handling, and delivery to installation location. Provide protective covering on exposed faces of glazing plastics, and mark inside as "INTERIOR FACE" or "PROTECTED

FACE":

1. Treat security glazing as fragile merchandise, and packaged and shipped in export wood cases with width end in upright position and blocked together in a mass.

08 80 00 - 4 R0005

Storage and handling to comply with manufacturer's directions and as required to prevent edge damage or other damage to glazing resulting from effects of moisture, condensation, temperature changes, direct exposure to sun, other environmental conditions, and contact with chemical solvents.

2. Protect sealed-air-space insulating glazing units from exposure to abnormal pressure changes, as could result from substantial changes in altitude during delivery by air freight. Provide temporary breather tubes which do not nullify applicable warranties on hermetic seals.

3. Temporary protections: The glass front and polycarbonate back of glazing are to be temporarily protected with compatible, peelable, heat-resistant film which will be peeled for inspections and re-applied and finally removed after doors and windows are installed at destination. Since many adhesives will attack polycarbonate, the film used on exposed polycarbonate surfaces is to be approved and applied by manufacturer.

4. Edge protection: To cushion and protect glass clad, and polycarbonate edges from contamination or foreign matter, the four (4) edges are to be sealed the depth of glazing with continuous standard-thickness thermoplastic rubber tape. Alternatively, continuous channel shaped extrusion of thermoplastic rubber are to be used, with flanges extending into face sides of glazing.

5. Protect "Constant Temperature" units including every unit where glass sheet is directly laminated to or directly sealed with metal-tube type spacer bar to polycarbonate sheet, from exposures to ambient temperatures outside the range of 16 to 24 degrees C (60 to 75 degrees

F), during the fabricating, handling, shipping, storing, installation, and subsequent protection of glazing.

1.7 PROJECT CONDITIONS:

Field Measurements: Field measure openings before ordering tempered glass products to assume for proper fit of field measured products.

1.8 WARRANTY:

A. Construction Warranty: Comply with the FAR clause 52.246-21 “Warranty of Construction”.

B. Manufacturer Warranty: Manufacturer shall warranty their glazing from the date of installation and final acceptance by the Government as follows. Submit manufacturer warranty.

1. Bullet resistive plastic material to remain visibly clear without discoloration for 10 years.

2. Insulating glass units to remain sealed for ten (10) years.

3. Laminated glass units to remain…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.