FBO_Bid_Abstract-_W912DW18B0003.XLS
XLS spreadsheet 66 KB Posted
- Solicitation number
- W912DW18B0003
About this file
Abstract from Bid Opening April 5, 2018 for Barracks/DFAC Construction project at Yakima Training Center, WA.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
front page
| ABSTRACT OF OFFERS - CONSTRUCTION | ||
| 1. Solicitation No. W912DW18B0003 | ||
| 2. Date Issued: 09 Feb 2018 | ||
| 3. Date Opened: 05 Apr 2018 | ||
| 4. Issuing Office: | ||
| Department of the Army | ||
| Corps of Engineers, Seattle District | ||
| P.O. Box 3755 | ||
| Seattle, WA 98124-2255 | ||
| 5. Project Title: | ||
| WAARNG Barracks and Dining Facility (DFAC) Yakima Training Center (YTC), WA | ||
| Competitive 8(a) Firms | ||
| 6. Number of Amendments Issued: 7 | ||
| 1st Apparent low = TDX Quality LLC | ||
| % Difference From IGE: 8.2 | ||
| 2nd Apparent low = Goldbelt Operation Support Services | ||
| % Difference From GE: 19.3 | ||
| 3rd Apparent low = WHH Nisqually-Garco JV | ||
| % Difference From GE: 22.8 | ||
| I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. | ||
| SIGNATURE: | Bid Opening Officer: Debbie Knickerbocker |
&CPage 1
Gov't Est (2)
| 8. GOVERNMENT ESTIMATE | |||||
| (Check A, B or C and Complete D, E F) | |||||
| A. Hired Labor | |||||
| B. Reasonable Contract (w/out profit) XX | |||||
| C. Reasonable Contract (w/ profit) | |||||
| 7A. ITEM | 7B. DESCRIPTION OF OFFERED ITEM | 7C. EST | 7D. UNIT | 7E. UNIT | 7F. AMOUNT |
| NUMBER | QTY | PRICE | |||
| BASE ITEMS | |||||
| 0001 | Construction of Barracks and associated site work within 5-feet of the building. | 1 | JOB | $ 14,155,000.00 | |
| 0002 | Site preparation and construction of site work and site utilities from the construction limits to 5-feet from the Barracks building. | 1 | JOB | $ 3,263,000.00 | |
| 0003 | Over-excavation of undocumented fill and placement of compacted backfill associated with foundation subgrade for Barracks and dumpster enclosure. | 4,221 | CY | $ 23.00 | $ 97,083.00 |
| 0004 | All work for Barracks O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval | 1 | JOB | $ 75,000.00 | |
| 0005 | All work for Barracks as-built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval | 1 | JOB | $ 30,000.00 | |
| TOTAL BASE | $ 17,620,083.00 | ||||
| OPTIONAL ITEMS | |||||
| 0006 | All work associated with providing a water line, adjacent to 8th Avenue, connecting existing water lines between Evergreen and Reserve Streets. | 1 | JOB | $ 52,000.00 | |
| 0007 | Construction of DFAC and associated site work and utilities as delineated in the drawings. | 1 | JOB | $ 2,975,000.00 | |
| 0008 | Over-excavation of undocumented fill and placement of compacted backfill associated with foundation subgrade for DFAC. | 1,785 | CY | $ 23.00 | $ 41,055.00 |
| 0009 | All work for DFAC O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval. | 1 | JOB | $ 50,000.00 | |
| 0010 | All work for DFAC as-built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval. | 1 | JOB | $ 20,000.00 | |
| TOTAL OPTIONAL ITEMS | $ 3,138,055.00 | ||||
| TOTAL BASE & OPTIONAL | $ 20,758,138.00 |
&CPage 2 ktr page 1
| 12. OFFERS | |||||||||||
| NO. 1 | NO. 2 | NO. 3 | |||||||||
| A. Company: TDX Quality LLC | A. Company: Koman Construction | A. Company: Alpha General Contracting | |||||||||
| Address: 3601 C Street, Suite 1000-21 | Address: 3129 Hwy. 83 Unit #7 | Address: 1100 E. 34th Street | |||||||||
| City, State: Anchorage, AK 99503 | City, State: Sonita, AZ 85637 | City, State: Kansas City, MO 64109 | |||||||||
| email: | |||||||||||
| B. Bid Security | Type/Amt : | 20% Bid Bond | B. Bid Security | Type/Amt : | 20% Bid Bond | B. Bid Security | Type/Amt : | 20% Bid Bond | |||
| Business Size: | Size here | Business Size: | Size here | Business Size: | Size here | ||||||
| C. Amendments Acknowledged: 7 | C. Amendments Acknowledged: 7 | C. Amendments Acknowledged: 7 | |||||||||
| D. ITEM | 7C. EST | E. UNIT | F. AMOUNT | D. ITEM | 7C. EST | E. UNIT | F. AMOUNT | D. ITEM | 7C. EST | E. UNIT | F. AMOUNT |
| NO. | QTY | PRICE | NO. | QTY | PRICE | NO. | QTY | PRICE | |||
| BASE ITEMS | BASE ITEMS | BASE ITEMS | |||||||||
| 0001 | 1 | $ 15,995,946.00 | 0001 | 1 | $ 25,500,000.00 | 0001 | 1 | $ 20,800,000.00 | |||
| 0002 | 1 | $ 2,977,248.00 | 0002 | 1 | $ 6,922,850.00 | 0002 | 1 | $ 2,360,000.00 | |||
| 0003 | 4221 | $ 39.29 | $ 165,843.00 | 0003 | 4221 | $ 70.00 | $ 295,470.00 | 0003 | 4221 | $ 28.43 | $ 120,000.00 |
| 0004 | 1 | $ 75,000.00 | 0004 | 1 | $ 75,000.00 | 0004 | 1 | $ 75,000.00 | |||
| 0005 | 1 | $ 30,000.00 | 0005 | 1 | $ 30,000.00 | 0005 | 1 | $ 30,000.00 | |||
| TOTAL BASE ITEMS | $ 19,244,037.00 | TOTAL BASE ITEMS | $ 32,823,320.00 | TOTAL BASE ITEMS | $ 23,385,000.00 | ||||||
| OPTION ITEMS | OPTION ITEMS | OPTION ITEMS | |||||||||
| 0006 | 1 | $ 69,330.00 | 0006 | 1 | $ 247,000.00 | 0006 | 1 | $ 47,180.00 | |||
| 0007 | 1 | $ 3,003,914.00 | 0007 | 1 | $ 6,386,721.00 | 0007 | 1 | $ 3,710,000.00 | |||
| 0008 | 1785 | $ 42.65 | $ 76,130.00 | 0008 | 1785 | $ 70.00 | $ 124,950.00 | 0008 | 1785 | $ 32.78 | $ 58,500.00 |
| 0009 | 1 | $ 50,000.00 | 0009 | 1 | $ 50,000.00 | 0009 | 1 | $ 50,000.00 | |||
| 0010 | 1 | $ 20,000.00 | 0010 | 1 | $ 20,000.00 | 0010 | 1 | $ 20,000.00 | |||
| TOTAL OPTION ITEMS | $ 3,219,374.00 | TOTAL OPTION ITEMS | $ 6,828,671.00 | TOTAL OPTION ITEMS | $ 3,885,680.00 | ||||||
| TOTAL BASE & OPTION | $ 22,463,411.00 | TOTAL BASE & OPTION | $ 39,651,991.00 | TOTAL BASE & OPTION | $ 27,270,680.00 | ||||||
| NO. 4 | NO. 5 | NO. 6 | |||||||||
| A. Company: WHH Nisqually-Garco JV | A. Company: Goldbelt Operation Support Services, LLC | A. Company: Devine Professional Consulting Group | |||||||||
| Address: 950 Pacific Ave. Suite 620 | Address: 15 Oregon Ave., Suite 203 | Address: | |||||||||
| City, State: Tacoma, WA 98402 | City, State: Tacoma, WA 98409 | City, State: | |||||||||
| email: | |||||||||||
| B. Bid Security | Type/Amt : | 20% Bid Bond | B. Bid Security | Type/Amt : | 20% Bid Bond | B. Bid Security | Type/Amt : | None received | |||
| Business Size: | Size here | Business Size: | Size here | Business Size: | Size here | ||||||
| NOTE: We received acknowledgement of amendments via e-mail, but the overall bid is unresponsive. We did not receive any bonds, reps and certs section 00 45 00 or bid schedule from the contractor before date/time expired. | |||||||||||
| C. Amendments Acknowledged: 7 | C. Amendments Acknowledged: 7 | C. Amendments Acknowledged: 7 | |||||||||
| D. ITEM | 7C. EST | E. UNIT | F. AMOUNT | D. ITEM | 7C. EST | E. UNIT | F. AMOUNT | D. ITEM | 7C. EST | E. UNIT | F. AMOUNT |
| NO. | QTY | PRICE | NO. | QTY | PRICE | NO. | QTY | PRICE | |||
| BASE ITEMS | BASE ITEMS | BASE ITEMS | |||||||||
| 0001 | 1 | $ 18,600,000.00 | 0001 | 1 | $ 18,421,370.00 | 0001 | 1 | $ - 0 | |||
| 0002 | 1 | $ 3,030,000.00 | 0002 | 1 | $ 2,995,000.00 | 0002 | 1 | $ - 0 | |||
| 0003 | 4221 | $ 40.00 | $ 168,840.00 | 0003 | 4221 | $ 30.00 | $ 126,630.00 | 0003 | 4221 | $ - 0 | |
| 0004 | 1 | $ 75,000.00 | 0004 | 1 | $ 75,000.00 | 0004 | 1 | $ 75,000.00 | |||
| 0005 | 1 | $ 30,000.00 | 0005 | 1 | $ 30,000.00 | 0005 | 1 | $ 30,000.00 | |||
| TOTAL BASE ITEMS | $ 21,903,840.00 | TOTAL BASE ITEMS | $ 21,648,000.00 | TOTAL BASE ITEMS | $ 105,000.00 | ||||||
| OPTION ITEMS | OPTION ITEMS | OPTION ITEMS | |||||||||
| 0006 | 1 | $ 100,000.00 | 0006 | 1 | $ 78,000.00 | 0006 | 1 | $ - 0 | |||
| 0007 | 1 | $ 3,342,000.00 | 0007 | 1 | $ 2,923,450.00 | 0007 | 1 | $ - 0 | |||
| 0008 | 1785 | $ 40.00 | $ 71,400.00 | 0008 | 1785 | $ 30.00 | $ 53,550.00 | 0008 | 1785 | $ - 0 | |
| 0009 | 1 | $ 50,000.00 | 0009 | 1 | $ 50,000.00 | 0009 | 1 | $ 50,000.00 | |||
| 0010 | 1 | $ 20,000.00 | 0010 | 1 | $ 20,000.00 | 0010 | 1 | $ 20,000.00 | |||
| TOTAL OPTION ITEMS | $ 3,583,400.00 | TOTAL OPTION ITEMS | $ 3,125,000.00 | TOTAL OPTION ITEMS | $ 70,000.00 | ||||||
| TOTAL BASE & OPTION | $ 25,487,240.00 | TOTAL BASE & OPTION | $ 24,773,000.00 | TOTAL BASE & OPTION | $ 175,000.00 | ||||||
| Standard Form 1419 (2001) | |||||||||||
| COE SEATTLE DISTRICT (VERSION 3/01) |
&CPage 3