FBO_Bid_Abstract-_W912DW18B0003.XLS

XLS spreadsheet 66 KB Posted

Attached to
Construction of Barracks and Dining Facility (DFAC), Yakima Training Center, WA
Solicitation number
W912DW18B0003
Issued by

About this file

Abstract from Bid Opening April 5, 2018 for Barracks/DFAC Construction project at Yakima Training Center, WA.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

front page

ABSTRACT OF OFFERS - CONSTRUCTION
1. Solicitation No. W912DW18B0003
2. Date Issued: 09 Feb 2018
3. Date Opened: 05 Apr 2018
4. Issuing Office:
Department of the Army
Corps of Engineers, Seattle District
P.O. Box 3755
Seattle, WA 98124-2255
5. Project Title:
WAARNG Barracks and Dining Facility (DFAC) Yakima Training Center (YTC), WA
Competitive 8(a) Firms
6. Number of Amendments Issued: 7
1st Apparent low = TDX Quality LLC
% Difference From IGE: 8.2
2nd Apparent low = Goldbelt Operation Support Services
% Difference From GE: 19.3
3rd Apparent low = WHH Nisqually-Garco JV
% Difference From GE: 22.8
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE:Bid Opening Officer: Debbie Knickerbocker

&CPage 1

Gov't Est (2)

8. GOVERNMENT ESTIMATE
(Check A, B or C and Complete D, E F)
A. Hired Labor
B. Reasonable Contract (w/out profit) XX
C. Reasonable Contract (w/ profit)
7A. ITEM7B. DESCRIPTION OF OFFERED ITEM7C. EST7D. UNIT7E. UNIT7F. AMOUNT
NUMBERQTYPRICE
BASE ITEMS
0001Construction of Barracks and associated site work within 5-feet of the building.1JOB$ 14,155,000.00
0002Site preparation and construction of site work and site utilities from the construction limits to 5-feet from the Barracks building.1JOB$ 3,263,000.00
0003Over-excavation of undocumented fill and placement of compacted backfill associated with foundation subgrade for Barracks and dumpster enclosure.4,221CY$ 23.00$ 97,083.00
0004All work for Barracks O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval1JOB$ 75,000.00
0005All work for Barracks as-built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval1JOB$ 30,000.00
TOTAL BASE$ 17,620,083.00
OPTIONAL ITEMS
0006All work associated with providing a water line, adjacent to 8th Avenue, connecting existing water lines between Evergreen and Reserve Streets.1JOB$ 52,000.00
0007Construction of DFAC and associated site work and utilities as delineated in the drawings.1JOB$ 2,975,000.00
0008Over-excavation of undocumented fill and placement of compacted backfill associated with foundation subgrade for DFAC.1,785CY$ 23.00$ 41,055.00
0009All work for DFAC O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.1JOB$ 50,000.00
0010All work for DFAC as-built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.1JOB$ 20,000.00
TOTAL OPTIONAL ITEMS$ 3,138,055.00
TOTAL BASE & OPTIONAL$ 20,758,138.00

&CPage 2 ktr page 1

12. OFFERS
NO. 1NO. 2NO. 3
A. Company: TDX Quality LLCA. Company: Koman ConstructionA. Company: Alpha General Contracting
Address: 3601 C Street, Suite 1000-21Address: 3129 Hwy. 83 Unit #7Address: 1100 E. 34th Street
City, State: Anchorage, AK 99503City, State: Sonita, AZ 85637City, State: Kansas City, MO 64109
emailemailemail:
B. Bid SecurityType/Amt :20% Bid BondB. Bid SecurityType/Amt :20% Bid BondB. Bid SecurityType/Amt :20% Bid Bond
Business Size:Size hereBusiness Size:Size hereBusiness Size:Size here
C. Amendments Acknowledged: 7C. Amendments Acknowledged: 7C. Amendments Acknowledged: 7
D. ITEM7C. ESTE. UNITF. AMOUNTD. ITEM7C. ESTE. UNITF. AMOUNTD. ITEM7C. ESTE. UNITF. AMOUNT
NO.QTYPRICENO.QTYPRICENO.QTYPRICE
BASE ITEMSBASE ITEMSBASE ITEMS
00011$ 15,995,946.0000011$ 25,500,000.0000011$ 20,800,000.00
00021$ 2,977,248.0000021$ 6,922,850.0000021$ 2,360,000.00
00034221$ 39.29$ 165,843.0000034221$ 70.00$ 295,470.0000034221$ 28.43$ 120,000.00
00041$ 75,000.0000041$ 75,000.0000041$ 75,000.00
00051$ 30,000.0000051$ 30,000.0000051$ 30,000.00
TOTAL BASE ITEMS$ 19,244,037.00TOTAL BASE ITEMS$ 32,823,320.00TOTAL BASE ITEMS$ 23,385,000.00
OPTION ITEMSOPTION ITEMSOPTION ITEMS
00061$ 69,330.0000061$ 247,000.0000061$ 47,180.00
00071$ 3,003,914.0000071$ 6,386,721.0000071$ 3,710,000.00
00081785$ 42.65$ 76,130.0000081785$ 70.00$ 124,950.0000081785$ 32.78$ 58,500.00
00091$ 50,000.0000091$ 50,000.0000091$ 50,000.00
00101$ 20,000.0000101$ 20,000.0000101$ 20,000.00
TOTAL OPTION ITEMS$ 3,219,374.00TOTAL OPTION ITEMS$ 6,828,671.00TOTAL OPTION ITEMS$ 3,885,680.00
TOTAL BASE & OPTION$ 22,463,411.00TOTAL BASE & OPTION$ 39,651,991.00TOTAL BASE & OPTION$ 27,270,680.00
NO. 4NO. 5NO. 6
A. Company: WHH Nisqually-Garco JVA. Company: Goldbelt Operation Support Services, LLCA. Company: Devine Professional Consulting Group
Address: 950 Pacific Ave. Suite 620Address: 15 Oregon Ave., Suite 203Address:
City, State: Tacoma, WA 98402City, State: Tacoma, WA 98409City, State:
emailemailemail:
B. Bid SecurityType/Amt :20% Bid BondB. Bid SecurityType/Amt :20% Bid BondB. Bid SecurityType/Amt :None received
Business Size:Size hereBusiness Size:Size hereBusiness Size:Size here
NOTE: We received acknowledgement of amendments via e-mail, but the overall bid is unresponsive. We did not receive any bonds, reps and certs section 00 45 00 or bid schedule from the contractor before date/time expired.
C. Amendments Acknowledged: 7C. Amendments Acknowledged: 7C. Amendments Acknowledged: 7
D. ITEM7C. ESTE. UNITF. AMOUNTD. ITEM7C. ESTE. UNITF. AMOUNTD. ITEM7C. ESTE. UNITF. AMOUNT
NO.QTYPRICENO.QTYPRICENO.QTYPRICE
BASE ITEMSBASE ITEMSBASE ITEMS
00011$ 18,600,000.0000011$ 18,421,370.0000011$ - 0
00021$ 3,030,000.0000021$ 2,995,000.0000021$ - 0
00034221$ 40.00$ 168,840.0000034221$ 30.00$ 126,630.0000034221$ - 0
00041$ 75,000.0000041$ 75,000.0000041$ 75,000.00
00051$ 30,000.0000051$ 30,000.0000051$ 30,000.00
TOTAL BASE ITEMS$ 21,903,840.00TOTAL BASE ITEMS$ 21,648,000.00TOTAL BASE ITEMS$ 105,000.00
OPTION ITEMSOPTION ITEMSOPTION ITEMS
00061$ 100,000.0000061$ 78,000.0000061$ - 0
00071$ 3,342,000.0000071$ 2,923,450.0000071$ - 0
00081785$ 40.00$ 71,400.0000081785$ 30.00$ 53,550.0000081785$ - 0
00091$ 50,000.0000091$ 50,000.0000091$ 50,000.00
00101$ 20,000.0000101$ 20,000.0000101$ 20,000.00
TOTAL OPTION ITEMS$ 3,583,400.00TOTAL OPTION ITEMS$ 3,125,000.00TOTAL OPTION ITEMS$ 70,000.00
TOTAL BASE & OPTION$ 25,487,240.00TOTAL BASE & OPTION$ 24,773,000.00TOTAL BASE & OPTION$ 175,000.00
Standard Form 1419 (2001)
COE SEATTLE DISTRICT (VERSION 3/01)

&CPage 3

File details come from the government source that posted it.