Amendment_0006__W912DW18B0003.pdf

PDF 570 KB Posted

Attached to
Construction of Barracks and Dining Facility (DFAC), Yakima Training Center, WA
Solicitation number
W912DW18B0003
Issued by

About this file

Amendment 0006 - W912DW18B0003

View the file

Other files

File Type Posted
FBO_Bid_Abstract-_W912DW18B0003.XLS XLS spreadsheet
Amend_0007_W912DW18B0003.pdf PDF
Amendment_0005_W912DW18B0003.pdf PDF
Amendment_0004_W912DW18B0003.pdf PDF
Amendment_0003_W912DW18B0003.pdf PDF
Amend_0002_W912DW18B0003.pdf PDF
Amendment_0001_W912DW18B0003.pdf PDF
Sol_W912DW18B0003_9_Feb_2018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment 0006 is to: 1) Clarify ProjNet question regarding mechanical blinds (E2-103);

2) Provide clarity on intent of the Fire Sprinklers along second f loor atrium (A3-302 and A3-510) See attached draw ing/plans; 3) Update Index of Draw ings NOTE: The Scheduled Bid Opening/Due date remains unchanged: Tuesday, April 3, 2018 at 2:00 PM, Pacif ic Time.

All other terms and conditions remain unchanged.

NOTICE: Bidders must acknow ledge receipt of this Amendment by number and date on the proposal.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18B0003

X 9B. DATED (SEE ITEM 11)

09-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Mar-2018

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW18B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY AMENDMENT 0005

The purpose of this Amendment is:

1. Revised 00 73 00-A Index of Drawings (remove/replace)

2. Clarified ProjNet question regarding mechanical blinds (E2-103)

3. Provided clarity on intent of the Fire Sprinklers along second floor atrium (A3-302 and A3-510)

(See Attached Sections and Drawings)

4. All other terms and conditions remain unchanged.

5. The Scheduled Bid Opening/Due date remains unchanged:

Tuesday, April 3, 2018 at 2:00 PM, Pacific Time.

6. NOTICE TO BIDDERS: Bidders must acknowledge receipt of this Amendment 0006 by number and date on proposal. Please mark outside of the envelope in which your bid is enclosed to show amendment received.

The following have been deleted:

W912DW18B0003

(End of Summary of Changes)

FY16 WAARNG Barracks & DFAC 12050 Yakima Training Center, WA W912DW18B0003

00 73 00-A - 1 R0006

ATTACHMENT 00 73 00-A

INDEX OF DRAWINGS

DRAWING RECORD NO. 24s/721-10-01, DATED: 24 October 2017

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

VOLUME 1 - SITE DRAWINGS

1 G0-001 COVER SHEET

2 G0-002 DRAWING INDEX 1

3 G0-003 DRAWING INDEX 2

4 G0-004 DRAWING INDEX 3

GENERAL

5 G1-001 VOLUME 1 - TITLE

6 G1-002 VOLUME 1 - DRAWING INDEX

GEOTECHNICAL

7 B-101 LOCATIONS FOR EXPLORATION

8 B-301 EXPLORATION LOGS 1

9 B-302 EXPLORATION LOGS 2

CIVIL

10 C-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES

11 C-002 ACCESS & HAUL ROUTE

12 C-003 EXISTING SITE PLAN

13 CD101 DEMOLITION PLAN 1

14 CD102 DEMOLITION PLAN 2

15 CD103 DEMOLITION PLAN 3

16 CS101 GENERAL SITE PLAN

17 CS102 SITE PLAN 1

18 CS103 SITE PLAN 2

19 CS104 SITE PLAN 3

20 CS105 WATER DISTRIBUTION MAIN LOOP - BID OPTION

21 CP101 JOINT LAYOUT OVERALL PLAN

22 CP102 JOINT LAYOUT PLAN 1 - BARRACKS WEST ENTRANCE

23 CP103 JOINT LAYOUT PLAN 2 - BARRACKS EAST ENTRANCE

24 CP104 JOINT LAYOUT PLAN 3 - LOADING DOCK

25 CP105 JOINT LAYOUT PLAN 4 - DUMPSTER AREA

26 CP106 JOINT LAYOUT PLAN 5 - DFAC PATIO - BID OPTION

00 73 00-A - 2 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

27 CG101 OVER-EXCAVATION PLAN

28 CG102 GRADING PLAN 1 R0003 14 MAR 2018

29 CG103 GRADING PLAN 2 R0003 14 MAR 2018

30 CG104 GRADING PLAN 3 R0003 14 MAR 2018

31 CU101 UTILITY PLAN 1

32 CU102 UTILITY PLAN 2

33 CU103 STORMWATER PLAN 1

34 CU104 STORMWATER PLAN 2

35 CU105 STORMWATER PLAN 3

36 C-301 SANITARY SEWER PROFILES 1 - LINE SS-1

37 C-302 SANITARY SEWER PROFILES 2 - LINE SS-2

38 C-303 SANITARY SEWER PROFILES 3 - LINE SS-3

39 C-304 SANITARY SEWER PROFILES 4 - LINE SS-4

40 C-305 STORMWATER PROFILES 1 - LINE SD-1

41 C-306 STORMWATER PROFILES 2 - LINE SD-2

42 C-307 STORMWATER PROFILES 3 - LINE SD-2A

43 C-308 STORMWATER PROFILES 4 - LINE SD-2A & SD-2A1

44 C-309 STORMWATER PROFILES 5 - LINE SD-2B

45 C-310 STORMWATER PROFILES 6 - LINE SD-2B

46 C-311 STORMWATER PROFILES 7 - LINE SD-3

47 C-312 STORMWATER PROFILES 8 - LINE SD-3 & SD-3A

48 C-313 STORMWATER PROFILES 9 - LINE SD-4 & SD-5

49 C-314 STORMWATER PROFILES 10 - LINE SD-5A

50 C-501 DETAILS 1 - PAVING SECTIONS

51 C-502 DETAILS 2 - PAVEMENT JUNCTION DETAILS 1

52 C-503 DETAILS 3 - PAVEMENT JUNCTION DETAILS 2

53 C-504 DETAILS 4 - PAVEMENT JOINT DETAILS

54 C-505 DETAILS 5 - PATIO JOINT DETAILS

55 C-506 DETAILS 6 - SIDEWALK SECTIONS & JOINT DETAILS

56 C-507 DETAILS 7 - PAVEMENT & SLAB REINFORCEMENT DETAILS

57 C-508 DETAILS 8 - UTILITY 1

58 C-509 DETAILS 9 - UTILITY 2

59 C-510 DETAILS 10 - UTILITY 3

00 73 00-A - 3 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

60 C-511 DETAILS 11 - MISCELLANEOUS 1

61 C-512 DETAILS 12 - MISCELLANEOUS 2

62 C-513 DETAILS 13 - SIGNAGE DETAILS

63 C-514 DETAILS 14 - STORM DRAINAGE 1

64 C-515 DETAILS 15 - STORM DRAINAGE 2

LANDSCAPE

65 L-001 LEGEND, ABBREVIATIONS, & GENERAL NOTES

66 LS101 LANDSCAPE SITE PLAN 1

67 LS102 LANDSCAPE SITE PLAN 2

68 LS103 LANDSCAPE SITE PLAN 3

69 L-501 LANDSCAPE DETAILS 1

STRUCTURAL

70 S-101 DUMPSTER ENCLOSURE - FOUNDATION PLAN

71 S-102 DUMPSTER ENCLOSURE - FOUNDATION PLAN

ARCHITECTURAL

72 A-101 DUMPSTER ENCLOSURE - PLANS, ELEVATIONS & SECTIONS

73 A-102 DUMPSTER ENCLOSURE - PLANS, ELEVATIONS & SECTIONS

ELECTRICAL

74 E-001 LEGEND & ABBREVIATIONS

75 ED100 ELECTRICAL DEMOLITION PLAN

76 ES100 ELECTRICAL GENERAL SITE PLAN

77 ES101 ELECTRICAL SITE PLAN 1

78 ES102 ELECTRICAL SITE PLAN 2

79 E-501 ELECTRICAL EXTERIOR DETAILS 1

80 E-502 ELECTRICAL EXTERIOR DETAILS 2

81 E-503 ELECTRICAL EXTERIOR DETAILS 3

TELECOMMUNICATIONS

82 T-001 TELECOMMUNICATIONS LEGEND & ABBREVIATIONS

83 TD100 TELECOMMUNICATIONS DEMOLITION PLAN

84 TS100 TELECOMMUNICATIONS GENERAL SITE PLAN

85 T-501 TELECOMMUNICATIONS DETAILS 1

86 T-502 TELECOMMUNICATIONS DETAILS 2

00 73 00-A - 4 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

VOLUME 2 - DFAC DRAWINGS

GENERAL

87 G2-001 VOLUME 2 - TITLE

88 G2-002 VOLUME 2 - DRAWING INDEX

STRUCTURAL

89 S2-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS, &

ABBREVIATIONS

90 S2-002 GENERAL STRUCTURAL NOTES

91 S2-003 GENERAL STRUCTURAL NOTES

92 S2-101 FOUNDATION PLAN

93 S2-102 SHEARWALL PLAN

94 S2-103 ROOF FRAMING PLAN

95 S2-301 FOUNDATION SECTIONS

96 S2-302 ROOF FRAMING SECTIONS

97 S2-303 FLAT ROOF FRAMING SECTIONS

98 S2-501 TYPICAL STRUCTURAL DETAILS

99 S2-502 TYPICAL STRUCTURAL DETAILS

100 S2-503 TYPICAL WOOD DETAILS

101 S2-504 TYPICAL CMU DETAILS

102 S2-601 WOOD NAILING SCHEDULE

103 S2-602 WIND & SNOW LOAD DIAGRAM

ARCHITECTURAL

104 A2-001 ABBREVIATIONS, SYMBOLS, & GENERAL NOTES

105 A2-002 LIFE SAFETY SUMMARY R0005 22 MAR 2018

106 A2-003 LIFE SAFETY PLAN

107 A2-004 AIR BARRIER PLAN

108 A2-005 AIR BARRIER SECTION/DETAILS

109 A2-006 AIR BARRIER SECTION/DETAILS

110 A2-101 FLOOR PLAN

111 A2-102 REFLECTED CEILING PLAN

112 A2-103 CLEARSTORY & ROOF PLAN

113 A2-201 ELEVATIONS (NORTH & EAST)

114 A2-202 ELEVATIONS (SOUTH & WEST)

115 A2-203 INTERIOR RESTROOM ELEVATIONS

00 73 00-A - 5 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

116 A2-204 INTERIOR ELEVATIONS

117 A2-205 INTERIOR ELEVATIONS

118 A2-301 BUILDING SECTIONS

119 A2-302 BUILDING SECTIONS R0006 30 MAR 2018

120 A2-303 BUILDING SECTIONS

121 A2-310 WALL SECTIONS 1

122 A2-311 WALL SECTIONS 2

123 A2-401 ENLARGED PLANS - RESTROOMS & SCULLERY

124 A2-402 ENLARGED PLAN - RESTROOM

125 A2-403 ENLARGED PLAN - KITCHEN

126 A2-501 FOUNDATION & WALL DETAILS

127 A2-502 ROOF & WALL DETAILS

128 A2-503 DINING HALL ROOF & WALL DETAILS

129 A2-504 ROOF & WALL DETAILS

130 A2-505 ROOF & WALL DETAILS

131 A2-506 EXTERIOR DOOR DETAILS

132 A2-507 INTERIOR DOOR DETAILS

133 A2-508 CEILING & SKYLIGHT DETAILS

134 A2-509 INTERIOR BATHROOM DETAILS

135 A2-510 INTERIOR DETAILS

136 A2-511 CASEWORK

137 A2-601 WALL TYPES

138 A2-602 ROOM FINISH SCHEDULE

139 A2-603 DOOR SCHEDULE

140 A2-604 WINDOW SCHEDULE & EXTERIOR FINISH SCHEDULE R0005 22 MAR 2018

141 A2-605 SIGNAGE SCHEDULE & SIGNAGE PLAN

142 A2-606 SIGNAGE TYPES

143 A2-701 FINISH FLOOR PLAN & FFE FLOOR PLAN

144 A2-702 ENLARGED PLANS - KITCHEN

145 A2-703 KITCHEN EQUIPMENT SCHEDULE

146 A2-704 INTERIOR KITCHEN ELEVATIONS

147 A2-705 KITCHEN EQUIPMENT DETAILS

00 73 00-A - 6 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

PLUMBING

148 P2-101 KITCHEN PLUMBING PLAN

ELECTRICAL

149 E2-001 LEGEND & ABBREVIATIONS

150 E2-101 FLOOR LIGHTING PLAN

151 E2-102 FLOOR POWER PLAN

152 E2-103 ROOF POWER PLAN R0006 28 MAR 2018

153 E2-104 EQUIPMENT PLAN

154 E2-501 LIGHTING DETAILS 1

155 E2-502 LIGHTING DETAILS 2

156 E2-503 LIGHTING DETAILS 3

157 E2-601 ONE-LINE POWER DIAGRAM

TELECOMMUNICATIONS

158 T2-001 LEGEND & ABBREVIATIONS

159 T2-101 FLOOR COMMUNICATION PLAN

VOLUME 3 - BARRACKS DRAWINGS

GENERAL

160 G3-001 VOLUME 3 - TITLE

161 G3-002 VOLUME 3 - DRAWING INDEX

STRUCTURAL

162 S3-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS &

ABBREVIATIONS

163 S3-002 GENERAL STRUCTURAL NOTES, 2 OF 3

164 S3-003 GENERAL STRUCTURAL NOTES, 3 OF 3

165 S3-100 OVERALL FOUNDATION PLAN

166 S3-101 PARTIAL FOUNDATION PLAN SOUTH

167 S3-102 PARTIAL FOUNDATION PLAN NORTH

168 S3-103 PARTIAL SECOND FLOOR FRAMING PLAN SOUTH

169 S3-104 PARTIAL SECOND FLOOR FRAMING PLAN NORTH

170 S3-105 PARTIAL THIRD FLOOR FRAMING PLAN SOUTH

171 S3-106 PARTIAL THIRD FLOOR FRAMING PLAN NORTH

172 S3-107 PARTIAL ROOF FRAMING PLAN SOUTH

00 73 00-A - 7 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

173 S3-108 PARTIAL ROOF FRAMING PLAN NORTH

174 S3-109 ENLARGED SECOND FLOOR CORE PLAN

175 S3-110 ENLARGED THRID FLOOR CORE PLAN

176 S3-111 ENLARGED ROOF CORE PLAN

177 S3-112 ENLARGED UPPER ROOF PLANS

178 S3-113 SHEARWALL PLAN SOUTH END

179 S3-114 SHEARWALL PLAN NORTH END

180 S3-201 METAL SCREEN ELEVATION, SHEET 1 OF 2

181 S3-202 METAL SCREEN ELEVATION, SHEET 2 OF 2

182 S3-301 ELEVATOR PIT SECTIONS

183 S3-302 ROOF FRAMING SECTIONS

184 S3-303 TRUSS FRAMING SECTIONS

185 S3-304 METAL PANEL & METAL SCREEN SECTIONS AND DETAILS

186 S3-401 ENLARGED END STAIR PLANS & SECTIONS

187 S3-402 ENLARGED CENTER STAIR PLAN & SECTION

188 S3-403 ENLARGED CANOPY FRAMING PLAN

189 S3-501 TYPICAL STRUCTURAL DETAILS 1

190 S3-502 TYPICAL STRUCTURAL DETAILS 2

191 S3-503 SHEARWALL DETAILS

192 S3-504 TRELLIS PLAN VIEW

193 S3-505 TRELLIS ELEVATIONS 1

194 S3-506 TRELLIS ELEVATIONS 2

195 S3-507 TRELLIS DETAILS

196 S3-511 FOUNDATION DETAILS

197 S3-521 FLOOR FRAMING DETAILS

198 S3-522 FLOOR FRAMING DETAILS 2

199 S3-523 FLOOR FRAMING DETAILS 3

200 S3-531 ROOF FRAMING DETAILS

201 S3-601 WALL SCHEDULES

202 S3-602 WOOD NAILING SCHEDULE

203 S3-603 WIND LOAD DIAGRAMS

204 S3-604 AT/FP FRAMING & DETAILS

205 S3-605 BEAM SHEAR TAB SCHEDULE

00 73 00-A - 8 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

ARCHITECTURAL

206 A3-001 ABBREVATIONS, SYMBOLS, & GENERAL NOTES

207 A3-002 LIFE SAFETY CODE ANALYSIS

208 A3-003 1ST, 2ND, & 3RD FLOOR LIFE SAFETY PLAN

209 A3-004 AIR BARRIER TYPICAL COMPONENTS

210 A3-101 OVERALL FIRST FLOOR PLAN

211 A3-102 OVERALL SECOND & THIRD FLOOR PLANS

212 A3-103 OVERALL ROOF PLAN

213 A3-104 FIRST FLOOR PLAN - NORTH

214 A3-105 FIRST FLOOR PLAN - SOUTH

215 A3-106 SECOND FLOOR PLAN - NORTH

216 A3-107 SECOND FLOOR PLAN - SOUTH

217 A3-108 THIRD FLOOR PLAN - NORTH

218 A3-109 THIRD FLOOR PLAN - SOUTH

219 A3-110 ROOF PLAN - NORTH

220 A3-111 ROOF PLAN - SOUTH

221 A3-112 ENLARGED CORE PLAN - FIRST FLOOR

222 A3-113 ENLARGED CORE PLAN - SECOND FLOOR

223 A3-114 ENLARGED CORE PLAN - THIRD FLOOR

224 A3-115 OVERALL REFLECTED CEILING PLANS - FIRST & SECOND

FLOORS

225 A3-116 OVERALL REFLECTED CEILING PLANS - THIRD FLOOR

226 A3-117 ENLARGED CORE RCP - FIRST FLOOR

227 A3-118 ENLARGED CORE RCP - SECOND FLOOR

228 A3-119 ENLARGED CORE RCP - THIRD FLOOR

229 A3-201 ELEVATIONS - EAST & SOUTHEAST

230 A3-202 ELEVATIONS - WEST & NORTHWEST

231 A3-203 ELEVATIONS - NORTH & SOUTHWEST

232 A3-210 ENLARGED ELEVATIONS - SOUTHEAST

233 A3-211 ENLARGED ELEVATIONS - EAST

234 A3-212 ENLARGED ELEVATIONS - WEST & NORTHWEST

235 A3-301 BUILDING SECTIONS I

236 A3-302 BUILDING SECTIONS II

00 73 00-A - 9 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

237 A3-303 WALL SECTIONS I

238 A3-304 WALL SECTIONS II

239 A3-401 ENLARGED 1+1 UNIT PLANS - NORTH

240 A3-402 ENLARGED 1+1 UNIT PLANS - SOUTH

241 A3-403 ENLARGED FIRST FLOOR RESTROOM & INTERIOR

ELEVATIONS

242 A3-404 ENLARGED STAIR #1 FLOOR PLANS

243 A3-405 ENLARGED STAIR #1 SECTION

244 A3-406 ENLARGED STAIR #2 FLOOR PLANS

245 A3-407 ENLARGED STAIR #2 SECTION

246 A3-408 ENLARGED STAIR #3 FLOOR PLANS

247 A3-409 ENLARGED STAIR #3 SECTION

248 A3-410 ENLARGED ELEVATOR PLANS & SECTION

249 A3-501 EXTERIOR DETAILS

250 A3-502 METAL ROOF DETAILS I

251 A3-503 METAL ROOF DETAILS II

252 A3-504 LOW SLOPE ROOF DETAILS

253 A3-505 CANOPY & PATIO DETAILS

254 A3-506 WINDOW DETAILS I

255 A3-507 WINDOW & DOOR DETAILS I

256 A3-508 WINDOW & DOOR DETAILS II

257 A3-509 CURTAIN WALL DETAILS

258 A3-510 INTERIOR DETAILS R0006 30 MAR 2018

259 A3-511 CASEWORK DETAILS

260 A3-512 CEILING DETAILS

261 A3-513 ELEVATOR DETAILS

262 A3-514 INTERIOR STAIR DETAILS

263 A3-515 LANDSCAPE MONUMENT

264 A3-601 WALL TYPES

265 A3-602 DOOR, WINDOW, & FINISH SCHEDULE R0003 14 MAR 2018

266 A3-701 EXPANSION PLAN

267 A3-801 ISOMETRIC VIEWS - NORTHWEST & SOUTHEAST

INTERIORS

268 I3-001 ABBREVIATIONS & GENERAL NOTES

00 73 00-A - 10 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

269 I3-101 OVERAL FLOOR FINISH PLANS

270 I3-102 FLOOR FINISH PLAN - TYPICAL UNIT

271 I3-103 FLOOR FINISH PLANS - FIRST FLOOR CORE

272 I3-104 FLOOR FINISH PLANS - SECOND & THIRD FLOOR CORE

273 I3-105 FLOOR FINISH PLANS - FIRST FLOOR STAIRS

274 I3-106 FLOOR FINISH PLANS - SECOND & THIRD FLOOR STAIRS

275 I3-107 SIGNAGE PLAN - TYPICAL UNIT

276 I3-108 SIGNAGE PLAN - FIRST FLOOR CORE

277 I3-109 SIGNAGE PLAN - SECOND & THIRD FLOOR CORE

278 I3-110 SIGNAGE PLANS - FIRST FLOOR STAIRS

279 I3-111 SIGNAGE PLANS - SECOND & THIRD FLOOR STAIRS

280 I3-112 OVERALL FURNITURE PLANS

281 I3-113 FURNITURE PLAN - TYPICAL UNIT

282 I3-114 FURNITURE PLAN - FIRST FLOOR CORE

283 I3-115 FURNITURE PLANS - SECOND & THIRD FLOOR CORE

284 I3-601 INTERIOR FINISH SCHEDULE

285 I3-602 SIGNAGE SCHEDULE

MECHANICAL

286 M3-101 TYPICAL 1+1 UNIT MECHANICAL PLANS R0004 21 MAR 2018

ELECTRICAL

287 E3-001 LEGEND & ABBREVIATIONS

288 E3-101 FIRST FLOOR LIGHTING PLAN

289 E3-102 SECOND & THIRD FLOOR LIGHTING PLAN

290 E3-103 FIRST FLOOR POWER PLAN

291 E3-104 SECOND & THIRD FLOOR POWER PLAN

292 E3-105 ATTIC POWER PLAN

293 E3-401 TYPICAL 1+1 UNIT LIGHTING & POWER PLANS

294 E3-402 FIRST FLOOR CORE LIGHTING PLAN

295 E3-403 SECOND FLOOR CORE LIGHTING PLAN

296 E3-404 THIRD FLOOR CORE LIGHTING PLAN

297 E3-405 FIRST FLOOR CORE POWER PLAN

298 E3-406 SECOND FLOOR CORE POWER PLAN

299 E3-407 THIRD FLOOR CORE POWER PLAN

00 73 00-A - 11 R0006

PAGE# SHEET# SHEET TITLE

REVISION

NUMBER DATE

300 E3-408 ENLARGED STAIRS PLAN

301 E3-409 ENLARGED ELEVATOR PIT

302 E3-501 LIGHTING DETAILS 1

303 E3-502 LIGHTING DETAILS 2

304 E3-503 LIGHTING DETAILS 3

305 E3-601 ONE-LINE DIAGRAM

TELECOMMUNICATIONS

306 T3-001 TELECOMMUNICATIONS LEGEND & ABBREVIATIONS

307 T3-101 FIRST FLOOR TELECOMMUNICATIONS PLAN

308 T3-102 SECOND AND THIRD FLOOR TELECOMMUNICATIONS PLAN

309 T3-401 TYPICAL 1+1 UNIT TELECOMMUNICATIONS PLAN

310 T3-402 FIRST FLOOR CORE TELECOMMUNICATIONS PLAN

311 T3-403 SECOND AND THIRD FLOOR CORE TELECOMMUNICATIONS

PLAN

T.O. 1ST FL. SLAB

0"

T.O. 2ND FL. SLAB

12'-0"

T.O. 3RD FL. SLAB

24'-0"

T.O. PARAPET

36'-8"

T.O. ROOF

45'-9"

D C B A

WAITING AREA

VEST.

STUDY

LOUNGE/

STUDY ROOM

STUDY

LOUNGE/

STUDY ROOM

CORRIDOR

CORRIDOR

CORRIDOR

2" / 12"

2" / 12"

1E

6B

6B

A3-510

A3-509

OPP

28' -6

A3-504 3

A3-503

8 5

A3-503

PROVIDE SPRINKLERS AS

REQUIRED ALONG SECOND

FLOOR ATRIUM GLAZING TO

MEET UL FIRE RESISTANCE

RATING OF MFR'S GLAZING

ASSEMBLY.

T.O. 1ST FL. SLAB

0"

T.O. 2ND FL. SLAB

12'-0"

T.O. 3RD FL. SLAB

24'-0"

T.O. PARAPET

36'-8"

T.O. ROOF

45'-9"

41 2 3 9 10

11 2 A3-301

2'-0" RAKE TYP.

T.O. PLATE

34'-11"

2'-0"

STAIR #1

BEDROOM

201A

BEDROOM

201B

BEDROOM

301B

BEDROOM

301A

BEDROOM

101A

BEDROOM

101B

MECH. ROOM

BEDROOM

207A

BEDROOM

307A

BEDROOM

307B

BEDROOM

207B

MECH. RM.

MECH. RM

ELEC. ROOM

ELEC. ROOM

ELEC. ROOM

STAIR #2

DIRTY LINEN/

JANITOR

CLEAN LINEN

323A

DIRTY LINEN/

JANITOR

CLEAN LINEN

223A

CQ DESK

ENTRY

VESTIBULE

CQ OFFICE

2" / 12"

1B

1B

2C

4C

4A

4A

4B

6B

4B1B 6A

4A

4A

1B

A3-504

A3-303

6B

4B

6B

6B

4B

A3-502

SIM

A3-502

SIM

A3-503

OPP, SIM

SEE DETAIL

7/A3-503

SEE DETAIL

5/A3-504

D R

AW

N

B Y:

D

ES

I G N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E :

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

C

KD

B Y:

US Army Corps of Engineers ®

" x

4"

FI

LE

N U

M

BE

R

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

1 2 3 4 5

D

C

B

A

FY

P N

W

AA

R

N G

Seattle District

SE

AT

TL

E

DI

ST

RI

CT

SE

AT

TL

E, W

AS

HI

NG

TO

N s/

7 2 1-

-0

O

C

TO

BE

R

VO

LU

M

E 3:

P N

B

AR

R

AC

KS

YA

KI

M

A

TR

AI

N

IN

G

C

EN

TE

R

, W

AS

H

IN

G

TO

N

K.

N

. B R

O W

N

SHEET

IDENTIFICATION

SHEET OF 151

W

2 D W

-1 8-

B -

3/

/2

1:

:4

PM

C :\U se rs

\ G 3E

C D

LN

M

\ D oc um en ts \P

N

0 0

_B

AR

K_ Ar ch ite ct ur e_ C

EN

T R

AL

_ r

_ G 3E

C D

LN

M

.rv t

3/

/2

1:

:4

PM

BU

SH

BU

SH

BU

IL

DI

N G

S

EC

TI

O

N S

II

N

EV

IT

T

A3-302

3/16" = 1'-0"A3-302

1 SECTION THROUGH WAITING ROOM

3/16" = 1'-0"A3-302

2 SECTION THROUGH UNITS AND ENTRY 8'8'

SCALE: 3/16"=1'-0"

0"4' 2'6'

SHEET KEYNOTES

KEY

1 SOUND ATTENUATION FIRE BLANKET INSULATION

IN CEILING, THIRD FLOOR ONLY

2 CONTINUOUS GLAZED 1-HR FIRE BARRIER

ASSEMBLY WITH WINDOW SPRINKLERS AND

STANDARD EPDM GASKET SEALED INTERMEDIATE

BUTT JOINTS. TRANSLUCENT WASHINGTON ARMY

NATIONAL GUARD LOGO ON GLASS. VERIFY

GRAPHICS WITH WAARNG PRIOR TO

PROCUREMENT.

3 SEISMIC JOINT AT EDGE OF MEMBRANE ROOF

4 SEISMIC JOINT FOLLOWS SLOPE OF SSMR

5 PROPOSED LOCATION FOR VERTICAL 6" PIPE WITH

METAL NEGATIVE PRESSURE WIND TURBINE AT

ROOF PER ENVIRONMENTAL SPECIFICATION;

EXTEND PIPE 2'-0" ABOVE ROOF LINE.

CONTRACTOR TO VERIFY LOCATION &

COORDINATION WITH MECHANICAL, PLUMBING &

ELECTRICAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

B R

_C

LA

R

IF

Y

SP

R

IN

KL

ER

S

AT

N

D F

LR

A

TR

IU

M F

IR

E

R

AT

ED

G

LA

ZI

N G

A

SS

EM

BL

Y

M

AR

LN

M

B

R0006

WIFI CLOSET

WALL PER SCHEDULE

DOUBLE STUDS, TOP

AND BOTTOM

18" X 24" PRE-

FABRICATED

LOCKING METAL

ACCESS PANEL,

PAINT TO MATCH

ADJACENT WALLS

3'-6" A.F.F.

B.O. PANEL

NOMINAL 2x4 "TOE-BOARD"

ON TOP OF PLYWD DECK,

ALL AROUND

1/2" PLYWOOD DECK

ON 2X4 JOISTS,

PROVIDE BLOCKING

BETWEEN JOISTS

WOOD 2X4 LEDGER,

ALL AROUND

NOTE:

SEE ELECTRICAL AND

TELECOMM FOR POWER

AND DATA WITHIN

CLOSET

SOUND ATTENUATION

INSULATION

CORRIDOR

EX

H

AU

ST

L O

C

AT

IO

N

S

PE

R M

FR

DOUBLE STACK

COMMERCIAL GAS

DRYERS

(N.I.C.)

1'-4"

METAL BRANCH DUCT FROM

COMMERCIAL DOUBLE STACK

DRYER, MATERIAL AND DIAMETER

PER DRYER MFR.

METAL TRUNK DUCT LEADS TO

DIRECT OUTSIDE VENT LOUVER ON

WEST WALL OF LAUNDRY ROOM.

PROVIDE DUCT WITH OFFSET TO

CLEAR SEISMIC JOINT. PROVIDE

LINT TRAP AND DUCT CLEANOUT

ACCESS PANEL ON EACH FLOOR

NEAR END OF LEVEL DUCT RUN.

SIZE PER MANUFACTURER'S

RECOMMENDATION FOR NUMBER

OF DRYERS EXHAUSTING

THROUGH DUCT.

MFR

PER

BLOCKOUT HOLES FOR EXHAUST

DUCTS

PLYWOOD ON INTERIOR OF STUD

CAVITY WALL AT SEISMIC

SEPARATION, SEE STRUCTURAL

TRIM RUBBER BASE AND SEAL AT

EXHAUST BLOCK OUTS

SOUND ATTENUATION BATTS IN

STUD WALLS, SEALL ALL

PENETRATIONS TO ACHIEVE MIN.

STC-50, REFERENCE GA FILE#

WP 3370 & 3812 AS SIMILAR

1 HR FIRE RATED WALL PER

SCHEDULE

FIELD VERIFY DEPTH OF DRYERS AND ADJUST SOFFIT DEPTH TO MATCH

2'-8"

2X4 WD STUD FRAMED SOFFIT

FINISHED WITH GWB

7' -4

AL

IG

N

T.O. 2ND FL. SLAB

12'-0"

C

GWB EDGE BEAD,

TYPICAL

5/8" GWB, PAINT PT-1

5/8" GWB CEILING,

PAINT PT-1

NOMINAL 2x4 LUMBER

ENGINEERED WD GIRDER,

SEE STRUCTURAL

GWB EDGE BEAD

AND SEALANT

PLYWOOD DECK TOPPED

WITH SELF LEVELING

GYPSUM CONCRETE

UNDERLAYMENT, SEE

STRUCTURES

INTERIOR NON-COMBUSTIBLE

FIRE RATED CURTAIN WALL

ASSEMBLY, ANODIZE CLEAR

NOMINAL 2x6

LUMBER SOFFIT

NOMINAL 2x6 WOOD

JOISTS HUNG FROM

GIRDER, SEE STRUCTURAL

8'-8"

B.O. SOFFIT

CORRIDOR

WAITING AREA

CORRIDOR

20'-6"

T.O. CURTAIN WALL

6" 8'

-6

FIRE RATED TRANSPARENT TEMPERED

GLAZING ASSEMBLY, SEE CURTAIN WALL

ELEVATIONS 4/A3-403

SYSTEM HAS NO VERTICAL

MULLIONS, SEAL ALL VERTICAL BUTT

JOINTS WITH STRUCTURAL

STANDARD EPDM RUBBER GASKET

SEAL, SEE DETAIL 9/A3-510

WOOD HEADER

GWB EDGE BEAD

AND SEALANT

SEALANT BETWEEN GWB AND

CURTAIN WALL FRAME

PLYWOOD

SHEATHING ON

2X6 STUD

WALL, SEE

STRUCTURAL

4"

5/8" GYPSUM BOARD,

BOTH SIDES

2X4 WOOD

STUDS @ 16"

O.C. EXTEND TO

STRUCTURE

PROVIDE

SPRINKLERS AS

REQUIRED ALONG

SECOND FLOOR

ATRIUM GLAZING TO

MEET UL FIRE

RESISTANCE RATING

OF MFR'S GLAZING

ASSEMBLY, BOTH

SIDES.

FOR SPRINKLERS

AS REQD

FOR SPRINKLERS

AS REQD

HORIZONTAL

2X4 WOOD

STUDS @ 16"

O.C., BOTH

SIDES

4" 4"

2"

3"

3"

WALL PER SCHEDULE

5/8" GYPSUM WALL BOARD,

PAINT PER INTERIORS

8"x3/4" DIA. EYE-BOLT

GROUTED INTO CONCRETE

SLAB

THICKENED

CONCRETE SLAB,

SEE STRUCTURAL

CL

6"6"

SCALE: 3"=1'-0"

0"4" 2"

1'1'

SCALE: 1 1/2"=1'-0"

0"6" 3"9"

6" 1' 2'1'

SCALE: 1"=1'-0"

0"

6" STUD

TO STUD

PRE-MANUFACTURED CONTINUOUS EXTRUDED

FLEXIBLE GASKET IN ALUMINUM FRAME, COLOR TO

MATCH ADJACENT WALLS

FASTEN TO STUDS PER MFR

RECOMMENDATIONS

MOUNT JOINT COVER FLUSH WITH

GYPSUM WALLBOARD

WALL PER SCHEDULE

G L

1 HR FIRE RATED GASKET

GL

6" STUD

TO STUD

WOOD JOISTS SUPPORTING

PLYWOOD DECK, SEE

STRUCTURAL

PRE-MANUFACTURED CONTINUOUS EXTRUDED

SEISMIC JOINT COVER PLATE, COLOR TO

MATCH FLOOR FINISH

FASTEN TO PLYWOOD DECK PER MFR

RECOMMENDATIONS

MOUNT JOINT COVER FLUSH WITH

FLOOR FINISH

FIRE BARRIER AS REQUIRED

FLOOR FINISH PER INTERIORS

FINISHED WOOD WINDOW SILL,

FACTORY PAINTED

WALL PER SCHEDULE

STEEL SHELF ANGLE,

SEE STRUCT.

THRU-WALL FLASHING

AND WEEP HOLES

SILL PAN FLASHING. SET IN

CONT. BEAD OF SEALANT

EXTERIOR PATIO

PER STRUCT. & CIVIL,

SLOPE AWAY FROM

BUILDING

WINDOW PER SCHEDULE

2X6 PRESERVATIVE TREATED WOOD

STUDS @ 24" O.C. FOR WALLS WITH

WASHER CONNECTIONS, WATER

SUPPLY AND WASTE

THRU-WALL FLASHING

AND WEEP HOLES

2X6 PRESERVATIVE

TREATED WOOD SILL PLATE

GALVANIZED METAL

CLOSURE PLATE

BACKER ROD AND SEALANT

WASHER IS N.I.C.

SHOWN FOR

REFERENCE ONLY

4'-0"

T.O. CMU

ADJ. MASONRY TIE

PROVIDE WATER RESISTANT

GWB AT LAUNDRY ROOM WALLS

C

TO STUD

6" STUD

PRE-MANUFACTURER CONTINUOUS

EXTRUDED FLEXIBLE GASKET IN

ALUMUNUM FRAME, COLOR TO MATCH

ADJACENT WALLS

1 HR FIRE RATED GASKET

WALL PER SCHEDULE

INTERIOR NON-COMBUSTIBLE

CURTAIN WALL ASSEMBLY,

ANODIZE CLEAR

SEALANT ALL AROUND TO

MEET 1-HR FIRE BARRIER

C 135°

MITERED GLASS AT

ANGLED BUTT JOINT

STRUCTURAL STANDARD EPDM RUBBER GASKET

SEAL AT VERTICAL BUTT JOINTS, TYPICAL

G

WALL PER SCHEDULE

INTERIOR NON-COMBUSTIBLE

CURTAIN WALL ASSEMBLY,

ANODIZE CLEAR

SEALANT ALL AROUND TO MEET

AS 1-HR FIRE RATED BARRIER

DRYWALL "J" BEAD AT

EDGE OF GWB

D R

AW

N

B Y:

D

ES

I G N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E :

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

US

A

RM

Y

CO

RP

S O

F

EN

G

IN

EE

RS

C

KD

B Y:

US Army Corps of Engineers ®

" x

4"

FI

LE

N U

M

BE

R

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

1 2 3 4 5

D

C

B

A

FY

P N

W

AA

R

N G

Seattle District

SE

AT

TL

E

DI

ST

RI

CT

SE

AT

TL

E, W

AS

HI

NG

TO

N s/

7 2 1-

-0

O

C

TO

BE

R

VO

LU

M

E 3:

P N

B

AR

R

AC

KS

YA

KI

M

A

TR

AI

N

IN

G

C

EN

TE

R

, W

AS

H

IN

G

TO

N

K.

N

. B R

O W

N

SHEET

IDENTIFICATION

SHEET OF 151

W

2 D W

-1 8-

B -

3/

/2

2:

:5

PM

C :\U se rs

\ G 3E

C D

LN

M

\ D oc um en ts \P

N

0 0

_B

AR

K_ Ar ch ite ct ur e_ C

EN

T R

AL

_ r

_ G 3E

C D

LN

M

.rv t

3/

/2

2:

:5

PM

BU

SH

BU

SH

I N

TE

RI

O

R

DE

TA

IL

S N

EV

IT

T

A3-510

1 1/2" = 1'-0"A3-510

4 WIFI CLOSET

1" = 1'-0"A3-510

5 DRYER CHASE

3" = 1'-0"A3-510

1 LOBBY 1-HR FIRE BARRIER

3" = 1'-0"A3-510

3 SAFE ANCHOR

1 1/2" = 1'-0"A3-510

6 SEISMIC JOINT IN WALL

1 1/2" = 1'-0"A3-510

7 SEISMIC JOINT IN FLOOR

1 1/2" = 1'-0"A3-510

2 PONY WALL @ LAUNDRY

3" = 1'-0"A3-510

8 1 HOUR FIRE RATED JAMB AT SEISMIC JOINT

12" = 1'-0"A3-510

9 LOBBY 1-HR FIRE BARRIER BUTT JOINTS

3" = 1'-0"A3-510

10 LOBBY 1-HR FIRE BARRIER JAMB

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

B R

_C

LA

R

IF

Y

SP

R

IN

KL

ER

S

AT

N

D F

LR

A

TR

IU

M F

IR

E

R

AT

ED

G

LA

ZI

N G

A

SS

EM

BL

Y

M

AR

LN

M

R0006

File details come from the government source that posted it.