Sample_Project_2_Template_CPFF_R0005.xlsx
XLSX spreadsheet 35 KB Posted
- Solicitation number
- W912DW-17-R-0003
About this file
Sample Project 2 Template CPFF_R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R0006.pdf | ||
| R0005.pdf | ||
| Sample_Project_1_Template_FFP_R0005.xlsx | XLSX spreadsheet | |
| R0004.pdf | ||
| R0003.pdf | ||
| R0002.pdf | ||
| Pre-Award_Information.pdf | ||
| R0001.pdf | ||
| RFP_W912DW-17-R-0003.pdf | ||
| Sample_Project_2_Template_CPFF.xlsx | XLSX spreadsheet | |
| Sample_Project_1_Template_FFP.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample Project 2 SAMPLE PROJECT 2 (See Section J, Att 2 in Solicitation) - for PCB-contaminated soil excavation (cost reimbursable; cost plus fixed fee)
INSTRUCTIONS
1. Red = example information for the offeror to write over.
2. Fill in your direct and marked-up unit costs; some cells are pre-populated with information from the RFP.
3. Below the table, provide examples of how markups are applied to direct costs
4. Insert hours or qty for each line item as appropriate for each bid item.
5. Add rows as necessary. Please double check the formulas if you do so.
6. Enter your profit or fee in Cell Y8.
| 7. Please double check all calculations before submitting your proposal! | Bid Item 1 | Bid Item 2 | Bid Item 3 | Bid Item 4 | Bid Item 5 | Bid Item 6 | Bid Item 7 | Bid Item 8 | Bid Item 9 | Bid Item 10 | Bid Item 11 | TOTAL | |||||||
| Pre-Construction Submittals (PRE-DETERMINED) | General Conditions | ||||||||||||||||||
| (9 months) | Mobilization and Demobilization (LS) | Soil Excavation, Sampling and Stockpiling (includes stripped topsoil); BCY = 65,300 | Load Out, Transportation & Disposal of TSCA Material (Subtitle C facility; 14,500 tons | ||||||||||||||||
| Load Out, Transportation & Disposal of non-TSCA Material (Subtitle D facility); 28,000 tons | Sample Collection (LS) | Backfill, Place and Compact; 60,400 BCY | Place Topsoil (4900 BCY) and seeding; 6 acres | Closeout Report (PRE-DETERMINED) | Fixed Fee | ||||||||||||||
| Labor: | $ - 0 | $ 6,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Labor: | $ 6,000 | |||||||
| Other costs: | $ 75,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 75,000 | Other costs: | $ 150,000 | |||||||
| Sub-total | $ 75,000 | $ 6,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 75,000 | Sub-total: | $ 156,000 | |||||||
| Travel: | $ - 0 | $ 2,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Travel: | $ 2,000 | |||||||
| Fixed Fee% - use max fee proposed in RFP Section B, Table 3: | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a | 1% | $ 1,560 | Fixed Fee | $ 1,560 | |||||
| BID ITEM TOTAL | $ 75,000 | $ 8,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 75,000 | $ 1,560 | Bid Total | $ 159,560 |
| Labor Category | Base Rate | Burdened | ||||||||||||||||||||||||||||
| Rate | Unit | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Marked-Up Cost | Hours | Cost | Total Hours | Marked-Up Cost | |||||
| ---Use Your Section B Professional Rates | ||||||||||||||||||||||||||||||
| Pro Labor 1 | $1.00 | $1,000.00 | HR | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| Pro Labor 2 | $1.00 | $1,000.00 | HR | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| Pro Labor 3 | $1.00 | $1,000.00 | HR | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| ---Use Davis-Bacon rates from Sample Project in RFP, as necessary | ||||||||||||||||||||||||||||||
| DBA Labor 1 | $1.00 | $1,000.00 | HR | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| DBA Labor 2 | $1.00 | $1,000.00 | HR | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| DBA Labor 3 | $1.00 | $1,000.00 | HR | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| 0 | $ - 0 | |||||||||||||||||||||||||||||
| SUBTOTAL Labor | 0 | $ - 0 | 6 | $ 6,000 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6 | $ 6,000 | $6,000.00 | Sum is OK |
| Other Costs (Materials, Equipment, Subs, Incidentals) - list items | Direct Unit Cost | Marked-Up | ||||||||||||||||||||||||||||
| Unit Cost | Unit | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Total Qty | Total Marked-Up Cost | |||||
| Costs provided in RFP | ||||||||||||||||||||||||||||||
| Pre-Work Submittals | N/A | $75,000.00 | LS | 1 | $ 75,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 75,000 | |||||||||||||||
| Closeout Report | N/A | $75,000.00 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 75,000 | 1 | $ 75,000 | |||||||||||||||
| Materials | ||||||||||||||||||||||||||||||
| XXXX | $1.00 | $1.00 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||
| Add rows as necessary… | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | ||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| Equipment | ||||||||||||||||||||||||||||||
| XXXX | $1.00 | $1.00 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||
| XXXX | $1.00 | $1.00 | HR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||
| Add rows as necessary… | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | ||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| Subcontractors | ||||||||||||||||||||||||||||||
| T&D: Subtitle C (Provided in RFP) | $380.00 | $1.00 | TON | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||
| T&D: Subtitle D (Provided in RFP) | $120.00 | $1.00 | TON | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||
| Imported Backfill (Provided in RFP) | $15.00 | $1.00 | TON | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||
| Add rows as necessary… | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | ||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| Incidentals | ||||||||||||||||||||||||||||||
| XXXX | mo | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||
| XXXX | mo | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||
| Add rows as necessary… | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | ||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| 0 | $ - 0 | |||||||||||||||||||||||||||||
| SUBTOTAL Other Costs | $ 75,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 75,000 | $ - 0 | 0 | $ 150,000 | $150,000.00 | Sum is OK |
| Travel Costs | Direct Unit Cost | Marked-Up | ||||||||||||||||||||||||||||
| Unit Cost | Unit | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Qty | Marked-Up Cost | Total Qty | Total Marked-Up Cost | |||||
| Airfare | $1.00 | $1,000.00 | ea | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| Per Diem | $1.00 | $1,000.00 | day | 1 | $ 1,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1 | $ 1,000 | ||||||||||||||||
| Add rows as necessary… | $1.00 | $1.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | ||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | |||||||||||||||||||||
| SUBTOTAL Travel Costs | $ - 0 | $ 2,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ 2,000 | $2,000.00 | Sum is OK |
Example Calculations of Indirect Costs
&D