AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide revised Performance Work Statement.
2. Provide answ ers to questions received.
3. Extend RFQ due date from 6 October 2016 10:00 AM PST to 13 October 2016 at 10: 00 AM PST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Oct-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-16-Q-0088
X 9B. DATED (SEE ITEM 11)
15-Sep-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Oct-2016
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-16-Q-0088
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 06-Oct-2016 10:00 AM to 13-Oct-2016 10:00 AM.
(End of Summary of Changes)
The following items are applicable to this modification:
REVISED PWS 6 OCT 2016
PERFORMANCE WORK STATEMENT (PWS)
MV PUGET Annual Dry-dock Maintenance Services
Part 1
General Information
1. GENERAL: This is a non-personal services contract to provide USACE, Seattle District, Navigation Section, with M/V PUGET Annual Dry-dock Maintenance Services, at a facility within the Puget Sound area. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and applicable licenses and permits necessary for M/V PUGET Annual Dry-dock Maintenance Services, as defined in this Performance Work Statement, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract. Performance will be at a Contractor provided facility in the Puget Sound area.
1.2 Scope and Services: The contractor shall provide all necessary services required to perform annual dry-dock maintenance on M/V PUGET including:
1. Dry-dock services: docking and un-docking, shore power. Provide temporary ship services.
2. Annual bottom hull cleaning and inspection.
3. Annual sea chest cleaning and inspection.
4. Annual hull, shaft, and rudder zinc anode inspection.
5. Annual propeller shaft and propeller cleaning and inspection.
6. Annual repainting of up to 25% of bottom hull.
7. Shift vessel.
8. Annual inspection, adjustment, and repair of steering gear.
9. Annual inspection and repair of rudder system.
10. Annual Link-Belt HC-218 Crane inspect and torque Rotex bolts (name brand or equivalent.)
11. Remove, inspect, and re-install outer hull 10 inch D-rubber; preserve/paint hull beneath D-rubber.
12. Media blast and repaint forepeak deck.
13. Replace forward deck hatch.
14. Replace three (3) below deck watertight doors with quick acting watertight doors.
15. Perform hull/deck thickness testing of the propeller tunnels, and bow area where concrete is installed.
16. Install anchoring system
17. Dock and Sea Trials.
1.3 Period of Performance:
Base Year 10/1/2016 – 09/30/2017 Option Year I 10/1/2017 – 09/30/2017 Option Year II 10/1/2018 – 09/30/2018 Option Year III 10/1/2019 – 09/30/2019 Option Year IV 10/1/2020 - 09/30/2021
Work shall be performed during the first quarter of the fiscal year (October – December)
1.4 General Information
1.4.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.4.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP.) This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.3 Recognized Holidays: The Government will not perform on the following holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.4 Hours of Operation: Not Applicable.
1.4.5 Place of Performance: The work to be performed under this contract will be performed at the Contractor’s facility.
1.4.6 Type of Contract: The contract will be a firm-fixed price contract.
1.4.7 Security Requirements: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify ) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.4.8 Physical Security: Not Applicable
1.4.9 Key Control: Not Applicable
1.4.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Quality Assurance Representative (QAR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.4.11 Quality Assurance Representative (QAR): The QAR monitors all technical aspects of the contract and assists in contract administration. The QAR is assures that the Contractor performs the technical requirements of the contract, performs inspections necessary in connection with contract performance, maintains written and oral communications with the Contractor concerning technical aspects of the contract, monitors Contractor performance and notifies both the Contracting Officer and Contractor of any deficiencies: coordinate availability of government furnished property, and provide site entry of Contractor personnel. The QAR is not authorized to change any of the terms and conditions of the resulting order.
1.4.12 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.4.13 Identification of Contractor Employees: Not Applicable
1.4.14 Contractor Travel: Not Applicable
1.4.15 Other Direct Costs: Not Applicable
1.4.16 Data Rights: Not Applicable
1.4.17 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.18 PHASE IN /PHASE OUT PERIOD: Not Applicable
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Thursday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer LWSC Lake Washington Ship Canal OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: Deliver and return M/V PUGET to contractor shipyard/facility/dry-dock in Puget Sound.
3.2 Facilities: Not Applicable.
3.3 Utilities: Not Applicable
3.4 Equipment: New propellers if required.
3.5 Materials: Docking Plan.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance: Not Applicable
4.3. Materials: The Contractor shall provide a written one year warranty on all work completed.
4.4. Equipment: The Contractor shall provide needed equipment to meet the requirements under this PWS.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1. Basic Services. The contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and applicable licenses and permits necessary to perform M/V PUGET Annual Dry-dock Maintenance Services. Government personal will transport vessel to ship yard.
5.1.1 Dry-dock services: docking and un-docking, shore power. Provide temporary ship services.
Dry-dock vessel, provide access. Electrically ground ship’s hull. Provide 208VAC 3 phase 100amp power.
Provide temporary fresh water, sewage, fire main, and garbage disposal services. Provide Marine Chemist, gas free, and hot work permit services as required.
5.1.2 Annual bottom hull cleaning and inspection.
Pressure wash the underwater hull to deck cap rail and fittings with fresh water at a minimum of 3,000 PSIG nozzle pressure to remove dirt, slime, marine growth, fouling and other foreign substances. Power tool clean inaccessible areas where washing equipment cannot reach and areas showing excessive corrosion. Accomplish a visual inspection of the entire underwater body, hull, rudders and freeboard surfaces after pressure washer cleaning.
Document all discrepancies and deliver report to QAR or Government Representative prior to hull repainting.
5.1.3 Annual sea chest cleaning and inspection.
Open sea chest valve assembly, clean and repair as needed and re-seal. Accomplish a visual inspection of hull structural openings for structural defects that may be detrimental to the structural and watertight integrity of the vessel. Document all discrepancies and deliver report to QAR or Government Representative prior to hull repainting.
5.1.4 Annual hull, shaft, and rudder zinc anode inspection.
Remove all remaining marine growth and oxide coating from all hull, rudder, shaft hub/strut, sea chest, and thruster tunnel zinc anodes, as applicable, using a light-wire brush. Inspect each zinc anode, replace as necessary (14ea) 6”x12”, (20ea) 3”x12”, (2ea) hub nuts,(2ea) 8”x8” and a small (1ea) on sea chest. Up to 39 total. List and identify corresponding specific measurements, locations, and/or areas in relationship to fixed hull structural members and docking block locations, or with measurements from suitable hull reference points. A sketch of the underwater body and freeboard plating surfaces with appropriate data and measurements is an acceptable alternative. Ensure that new zinc nodes are free from preservation coatings. Submit one legible copy, in approved transferrable media, of a report listing the results of the zinc anode inspection to the QAR no later than two working days prior to undocking.
5.1.5 Annual propeller shaft and propeller cleaning, inspection and replace Shaft seals Clean and inspect external shafting. Clean, inspect, and polish propellers. If replacement of propellers is required, install Government furnished propellers. Replace Shaft seals. Replaced propellers will be returned to the Government. Document all discrepancies and deliver report to QAR or Government Representative no later than two working days prior to undocking.
5.1.6 Annual repainting of up to 25% of bottom hull.
Spot paint bottom up to waterline with an anti-fowl paint-up to 25% allowed for. Repaint from waterline to deck cap rail with a glossy black epoxy paint. Repaint both Puget names on bow, US ARMY Corps of Engineers name on stern and repaint draft marks on four sides/corner of vessel using an gloss white epoxy.
5.1.7 Shift vessel.
Relocate the vessel on the dry dock blocks to permit 100 percent preservation and painting of areas initially covered by the dry dock blocks. Relocation of the vessel shall occur after the proper cure time has elapsed after application of the final coat of hull preservation.
5.1.8 Annual inspection, adjustment, and repair of steering gear.
General function test and inspection of steering for any damage. No checklist is required. Repair and adjust as needed. Grease as needed. Also remove steering pump and reinstall with rubber mounting
5.1.9 Annual inspection and repair of rudder system.
General inspection and function tect of rudder system. No checklist is required.
5.1.10 Annual Link-Belt HC-218 Crane inspect and torque Rotex bolts.
(30ea) Rotex bolts torque up to 1,800 ft lbs with an initial torque of 500ft, lbs
5.1.11 Remove, inspect, and re-install outer hull 10 inch D-rubber; preserve/paint hull beneath D-rubber.
Remove 10” D-rubber and commercial blast behind the D- rubber, inspect hull behind D-rubber for any damage and repaint with international 665 black. Inspect D-rubber for any damage. Re-install D-rubber with (126Ea) 15” long stainless steel bolts, washers and nuts.
5.1.12 Media blast, inspect and repaint forepeak. (None Annual) Commercial blast entire forpeak area approximate 32’x24’x7’. Make sure to get all rusted areas, welds and seams.
Inspect for any damage. Repaint entire forpeak with 2 coats of international 665 primer. Repaint bulge area with 2 coats dark gray international 665 #R807. Repaint Bulkhead and overhead areas with 2 coats of international 665 white.
5.1.13 Replace forward deck hatch.
Replace with 26” x 26” flush deck hatch.
5.1.14 Replace three (3) below deck watertight doors with quick acting watertight doors and repair #2 door frame.
Replace with (3ea) quick acting water doors and repair #2 door frame. Approximate sizes (1ea) 45”x26” and (2ea) 28”x46”.
5.1.15 Perform hull/deck thickness testing of the propeller tunnels, and bow area where concrete is installed.
5.1.16 Reserved.
5.1.17 Reserved.
5.1.18 Dock and Sea Trials.
Accomplish dock and sea trial operational test of equipment repaired or modified during this availability. M/V PUGET crew will operate all equipment to ensure that the vessel is ready for dock and sea trials. Equipment repaired or modified during this dry-dock maintenance period will be operated in accordance with the requirements of applicable manuals and/or procedures.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):
6.1. The Contractor must abide by the requirements set forth in the Corps Safety Manual EM 385-1-1, with changes.
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, fuels, materials, supervision, licenses and permits necessary to provide dry-dock maintenance services under this PWS.
Safely perform assigned missions IAW EM 385-1-1, with changes
Zero deviation from standard. Random inspection by QAR and debris vessel
M/V PUGET
Master.
M/V Puget Site Visit ‐ Questions and Answers
Q1. Can I get a docking plan?
A1. Docking Plan provided in the attachment to this amendment
Q2. What is the Total weight of vessel?
A2. Total weight of the M/V Puget is 172 tons
Q3. What are the number of zincs?
A3. There are up to 39 zincs.
Q4. How much does each zinc weigh?
A4. The weight of the zincs is unknown.
Q5. How are the zincs attached?
A5. The zincs are welded.
Q6. How many bolts are in the D‐rubber?
A6. There are 126 ea 15” long stainless steel.
Q7. What type of rudder inspection is to be performed?
A7. A general inspection and functional test, no special checklist.
Q8. Who will transport the vessel to the shipyard?
A8. Vessel will be transported to the shipyard by government personnel.
Q9. What type of blast is required for the forpeak?
A9. Commercial blast.
Q10. What is the size of the forepeak?
A10. Size of the forepeak is 32’x24’x7’.
Q11. What type of paint, primer and how much for the forepeak?
A11. International primer 665 (2) coats, paint international 665 dark gray (2) coats and international
665 white (2) coats each. This is a 1 time only service for base year.
Q12. Is there a steering gear tech manual?
A12. Steering gear tech manual is provided in the attachment to this amendment.
Q13. Is there a tech manual on the rotex bolts?
A13. Tech manual on rotex bolts is provided in the attachment to this amendment.
Q14. What type of water tight doors?
A14. Quick action, approximate sizes (1ea) 45”x26”, (2ea) 28”x46”.
Q15. Can the old water tight doors just be repaired?
A15. No.
Q16. What type of forward hatch lid?
A16. Flush only.
Q17. Where can a copy of the EM 385‐1 be found?
A17. http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385‐1‐ 1.pdf
Q18. Is a picture of the Sea chest and location available?
A18. Photo of sea chest is provided in the attachment to this amendment.
Q19. In the spec for the Puget 5.1.15 how many UT shot will be required?
A19. Unknown.
Q20. Is there any shaft seal information?
A20. Seal information is provided in the attachment to this amendment.
Q21. Are there any past readings of the shafts available?
A21. There are no past readings of the shafts.
Q22. Are there any past readings of the hull?
A22. There are no past readings of the hull.
Q23. Will the blast and paint of the fore‐peak space be done every year?
A23. This is a onetime service to be performed in the base year.
Q24. If a prop is to be replaced by government furnished material. Will the government be dropping it off and picking up the old prop at the contractors facility?
A24. Yes, if a prop cannot be repaired. The government will drop off a new prop.