QandA.pdf
PDF 11 KB Posted
- Solicitation number
- W912DW-16-Q-0050
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16Q00500004.pdf | ||
| 16Q00500003.pdf | ||
| 16Q005000021.pdf | ||
| 16Q00500001.pdf | ||
| 16Q0050_Page_1.pdf | ||
| 16Q0050.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Resulting in amendment W912DW-16-Q-0050-0002 changes to specifications
Q. Will the manufacturers (or “contractor(s)”) be able to utilize the plants ladders and or man-lifts to attach the oil supply and return tubing to the transformers oil supply and return valves? If we will not be able to utilize the plants ladders or man-lifts can you give me an approximate height of the transformers top fill valve?
A. Due to liability reasons, the contractor shall provide ladders and man-lifts. The height of the top fill valve is about 17’.
Q. Can you further clarify the following statement within section 1.2 “All required interconnecting cables and leads between the monitor enclosure and the transformer control cabinet shall be provided”. Will the manufacturers (or “contractor(s)”) be required to provide this connection or will this be provided by the plant?
A. The manufacturer (or “contractor(s)”) shall provide the interconnection materials. See updated specs.
Q. Can you further clarify the following statement within section 2.2.1 “drawings showing installation details of the on-line gas monitor and associated equipment on the transformers and how the monitor will interface with the powerhouse (if applicable),”. What type of detail will the plant require for these drawings? Are you looking for a complete rendering of the transformer with dimensions and mounting locations?
A. See updated Specs.
File details come from the government source that posted it. Updated .