This is Standard Form 30 Amendment 0003 to solicitation W912DS26BA004, issued by the U.S. Army Corps of Engineers (USACE) New York District on January 22, 2026. The amendment extends the bid due date from 2:00 PM EST on January 26, 2026 to 2:00 PM EST on January 28, 2026. The amendment provides final responses to six contractor Requests for Information (RFIs), posts a Site Visit Sign-in Sheet, adds a bid schedule for contractor use, and clarifies that no further RFIs will be reviewed or responded to. The contracting officer is Adrian Stafford-Browne, located at KO Contracting Division, 26 Federal Plaza Room 16-300, New York, NY 10278-0004.

The RFI responses address key project clarifications: (1) the RTA drawing set is to scale and contractors should verify their measurement tools; (2) a completed geotechnical report has been attached to the amendment; (3) contractors are responsible for performing all bid quantity takeoffs; (4) drawings are accurate and dimensions should be followed rather than relying on measurement techniques; (5) item 17 of the Bid Form 1442 should be filled numerically with the total of the base bid and options; and (6) the contractor is responsible for hiring the special inspection person/agency, not the Contracting Officer. An important note clarifies that work under the eliminated Optional CLIN 0003 is not required to be performed. Offerors must acknowledge receipt of this amendment prior to the extended bid deadline by completing and returning amendment copies, acknowledging receipt on offer copies, or submitting separate written communication referencing the solicitation and amendment numbers.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 5

0003 22 JAN 2026 222281

W912DS

W2SD ENDIST NEW YORK

KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300

NEW YORK, NY 10278-0004

UNITED STATES

ADRIAN STAFFORD-BROWNE, EMAIL: ADRIAN.J.STAFFORD-BROWNE@USACE.

ARMY.MIL TELEPHONE: 917-790-8087

SCD: PAS:

W912DS26BA004

12 DEC 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

The purpose of this amendment is to 1) provide final responses to contractor RFIs, 2) post the Site Visit Sign in sheet, 3) add a bid schedule for contractor use, and 4) extend the bid due date from 2PM EST on 26 January 2026 to 2PM EST on 28 January 2026. No further RFIs are being reviewed or responded to.

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

To:

The following contract documents were added:

The following contract documents Page Counts were changed:

Section 00 73 00 - Supplementary Conditions

Miscellaneous text in this section has been modified to:

RFIs as of 07 January 2026:

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.

Q1. The drawings for the subject project are not to scale. Kindly provide us with the scaled drawings.

A1. The RTA drawing (.pdf) set is to scale. We advise you verify the scale set on your measurement tool or print setting.

Q2. Please advise if a geotechnical report and/or soil borings are available for the subject project, particularly for the areas with drilled caissons. We did not find any soil or rock information in the drawings or specifications. If a Geotech report exists, please provide it or advise where it can be accessed.

A2.A Geotech report was completed and attached to this amendment.

Q3. In your documents for this project, do you happen to have quantity workups or a civil takeoff?

A3. It should be the contractor's responsibility to perform all bid take offs.

NOTE:

** The work under eliminated Optional CLIN 0003 is not required to be performed. **

RFIs as of 12 January 2026:

Q4. Note the Scale of Drawing A-100 is set out at 1'=30' as called on the drawing. Measured distance is 13'-7", which is way off from 43'-2 3/4" shown on the drawing. Causes of scaling issues include incorrect plotting configurations (e.g., "Fit to paper"), the way the original CAD file was exported, or the file containing raster (image) data instead of vector lines.

A4. Drawings are accurate and to scale. The contractor should follow the dimensions on the drawings to ensure accuracy as the measuring technique being used may be flawed.

Q5. Would you please clarify what bid price to write in item 17 of the Bid Form 1442? Is it the Base Bid price only? In words or numbers?

A5. Item 17 should be filled out numerically and is the total of the Bid and Options.

Q6. There seems to be a conflict in the requirements for a special inspection person/agency.

Note 13 in dwg. S-001 implies that the Contracting Officer will engage a testing/inspection agency but Section 014535 paragraph 1.3.4 of the specifications states that the Prime Contractor will hire the inspector directly. Please advise.

A6. The Contracting Officer will not be hiring the inspector. This will be the responsibility of the contractor.