Amendment 0003 Attachment - Bid Schedule.pdf
PDF 83 KB Posted
- Attached to
- COVERED PARKING ARRAY AT FARMINGDALE AFRC
- Solicitation number
- W912DS26BA004
About this file
This is a pricing template for a federal construction contract consisting of two contract line item numbers (CLINs) on a firm fixed price basis. CLIN 0001 is the base contract covering all work associated with the construction of four dual port car charging stations with supporting infrastructure and components, including underground utility connections to a panel in the main electric room at the Main Building, and a prefabricated utility building to house equipment and batteries. The quantity for this line item is one job. CLIN 0002 is an optional line item for all work associated with the construction of an East Parking Canopy, photovoltaic array, and associated infrastructure per plans and specifications, also priced as one job on a firm fixed price basis. The option may be exercised at any time within 120 calendar days following issuance of the Notice to Proceed (NTP).
The template provides spaces for contractors to enter unit prices and amounts for each CLIN, with summary total fields for the base CLIN (0001), optional CLINs (0002), and the combined base plus optional CLINs. All pricing is structured as firm fixed price arrangements, with both line items representing complete construction jobs rather than unit-based deliverables.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL BASE CLIN (0001) $
TOTAL OPTIONAL CLINS (0002) $
TOTAL BASE PLUS OPTIONAL CLINS (0001-0002) $
Item Supplies/Service Quantity Unit Unit Price Amount
All work associated with the construction of (4) dual port car charging stations and supporting infrastructure and components per plans and specifications including underground utility connected to a panel in the main electric room at Main Building, and a prefabricated utility building to house equipment and batteries.
Pricing Arrangement: Firm Fixed Price
Job
Option Line Item 0002
All work associated with the construction of the East Parking Canopy, photovoltaic array, and all associated infrastructure per plans and specifications. Option may be exercised at any time within 120 calendar days following issuance of NTP.
Pricing Arrangement: Firm Fixed Price
Job
File details come from the government source that posted it. Updated .