Amendment 0004.pdf

PDF 295 KB Posted

Attached to
AFO Barge Sandblasting and Repainting
Solicitation number
W912DS24Q0019
Issued by

About this file

This document is an amendment to solicitation W912DS24Q0019 for the AFO Barge Sandblasting and Repainting project. The purpose of the amendment is to clarify the certification requirements for the contractor's employees and to confirm that the plans outlined in the solicitation are not required to be submitted with the bid, but will be required as submittals prior to the start of work.

The solicitation is a request for quotes (RFQ) for commercial items, with a 100% small business set-aside under NAICS code 336611. The award will be a firm-fixed-price contract, and the period of performance is not to exceed 60 calendar days. Quotes must be submitted electronically by June 19, 2024, at 4:00 PM. The government will evaluate the quotes based on best value, considering the total price and the contractor's qualifications, licenses, and certifications.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
W912DS24Q0019.pdf PDF
Attachment B Leak Test Procedure.pdf PDF
Attachment A PoseidonBarge specs.pdf PDF
AFO Barge Sandblasting Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0004 is:

1) Response date remains 25-Jun-2024 2:00 P.M EST

2) Respond ot offers request for information. For information Only.

NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods. In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE

WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS24Q0019

X 9B. DATED (SEE ITEM 11)

05-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jun-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24Q0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0004

Amendment 0004

W912DS24Q0019

AFO Barge Sandblasting and Repainting

The purpose of this Amendment 0004 is to answer the following questions posed by potential offerers.

Question 1 - Do we need all of these certifications? Can we hire a third party if we don't have some of the certifications in place?

1. Certified Welding Procedure Specifications (WPS)

2. Certified Procedure Qualification Records (PQR)

3. Certified Welder Performance Qualifications (WPQ)

4. Certified Welding Inspector

5. Nondestructive Testing Personnel 6.

Certified EHS Professional SSPC QP 1 Certificate; G Coating Thickness Gage Qualification Qualified Coating Applicator; G

Answer 1 - Yes, the certifications are required for the employees conducting the associated work. Yes, they can hire as sub contractor but it is the primary contractors responsibility to ensure employees of the subcontractor that are performing the work are properly certified according to the specifications.

Question 2 - Do we need to submit all these plans into the solicitation bid?

SD-01 Preconstruction Submittals Safety, Health, and Environmental Requirements; G Accident Prevention Plan; G Respiratory Protection Plan; G Airborne Sampling Plan; G Ventilation Assessment Plan; G Medical Surveillance Plan; G Environmental Protection Plan; G Waste Manifest Waste Disposal Plan; G

SD-03 Product Data Manufacturer's Safety Data Sheet; G SD-04 Samples Product Samples; G Solvent and Thinners; G

Answer 2 - The plans outlined above are not required to be submitted with the bid but will be required as a submittal prior to the commencement of work.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .