Attachment B Leak Test Procedure.pdf
PDF 263 KB Posted
- Attached to
- AFO Barge Sandblasting and Repainting
- Solicitation number
- W912DS24Q0019
About this file
This document is an attachment that describes a pressure testing procedure for a barge. The key steps include removing a coupling, inserting a gauge, mixing soap and water in a spray bottle, filling the barge with no more than 4psi of air, and spraying every welded seam with the soapy water to identify and mark any leaks. After fixing the leaks, the barge must hold 4psi for 4 hours.
The related federal contract opportunity is a solicitation for the sandblasting and repainting of an AFO barge currently located at the Lock and Dam in Troy, NY. This is a 100% small business set-aside under NAICS code 336611, with a period of performance not to exceed 60 calendar days. Quotes must be submitted via email as a PDF document by June 19, 2024 at 4:00 PM. Award will be made to the most qualified contractor that demonstrates the best value to the Government based on the solicitation requirements. The contract type will be firm fixed price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| W912DS24Q0019.pdf | ||
| Attachment A PoseidonBarge specs.pdf | ||
| AFO Barge Sandblasting Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pressure testing
1. Remove a coupling located in the corner of the barge.
2. Insert a gauge/testing fixture.
3. Mix soap (Poseidon uses Dawn dish soap) with water in a weed sprayer type spray bottle.
4. Fill the barge with no more than 4psi of air.
5. Pressure test using 4psi and spraying every welded seam with soapy water. Mark out all leaks. Let the air out, and fix leaks. After leaks are fixed and properly cleaned recheck applying 4psi until leaks are fixed and the barge holds 4psi for 4 hours.
File details come from the government source that posted it. Updated .