This document is an amendment to a solicitation for a federal contract to Repair Fire Suppression B1837 at JBMDL, NJ. The amendment addresses proposer questions and provides government replies, as well as revises and reissues Drawings F401 and FA102. Key details include:

The amendment revises two drawings but does not add or delete any drawings, nor does it add, delete, or revise any specification sections. The amendment clarifies the scope of work, including that heat tracing is limited to areas identified on the drawings, insulation is only required for heat traced piping, and filling the underground AFFF tanks is not required. It confirms that electrical devices must be explosion-proof per the drawings, that painting of sprinkler pipe and insulation is required per the specifications, and that a contractor field office and project sign are required. The amendment also states there will be minimal downtime between hangar bay phasing and the 316,000-gallon AFFF wastewater storage tank will be abandoned in place. Bids must be delivered physically and will not be accepted electronically.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

1) Address propposer's questions and provide the government's reply.

2) Revision and Reissue Draw ing F401 and Draw ing FA102

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0020

X 9B. DATED (SEE ITEM 11)

09-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24B0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

JBMDL, NJ

Repair Fire Suppression B1837

Amendment 0002

AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for Repair Fire Suppression B1837, JBMDL, NJ.

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- Drawing F401

- Drawing FA102

3. The following DRAWINGS have been ADDED:

- None

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

PROPOSER’S QUESTIONS AND GOVERNMENT REPLY

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.

1. Is heat tracing of the new and old sprinkler piping part of the scope of work. If yes, please provide heart trace scope and spec. Please provide electrical design for the heat trace.

RESPONSE: Heat tracing is limited in scope to the areas identified on sheet F401.

This sheet and FA102 have been amended to further clarify this work.

2. Is insulation of sprinkler piping part of the scope of work? If yes, please provide specs.

RESPONSE: Only heat traced piping is to be insulated. See amended sheets F401 and FA102 for further clarification.

3. After removal and disposal of existing AFFF contaminants from underground tank, is filling the tanks part of scope of work? If yes, please provide scope and specs. RESPONSE: No.

Filling is not required.

4. Please confirm all devises installed in hanger bays are explosion proof material.

RESPONSE: Bid as shown. Refer to Sheets FA001 and FA002 for electrical classification areas. Existing raceways comply with these classifications.

5. The specs. call for contractors to hand deliver bids to 26 Federal Plaza, NY. Is bid submission electronically acceptable? If electronic submission is allowed, please provide the link or email address for submission. RESPONSE: Bids will not be accepted electronically.

Only original bids delivered on time to this office will be considered.

6. Is painting of the sprinkler pipe and insulation part of scope of work? Please provide painting spec. RESPONSE: Please refer to the Specifications package, section 09 90 00 and 21 13 13 par. 3.7.

7. Is a contractors field office required? RESPONSE: Yes, contractor is required to have their own field office as noted in the specs.

8. Is a project sign required? RESPONSE: Yes, project sign is required as noted in the specs.

9. Will there be down time between phasing? RESPONSE: Down time between hangar bay phasing will be minimal and demobilization/remobilization will not be required.

10. Will the 316,000-gallon AFFF wastewater storage tank be abandoned in place?

RESPONSE: Correct.