This document appears to be Amendment 02 for a set of plans and drawings related to a federal contract opportunity for maintenance dredging of Saugerties Harbor in Esopus Creek, New York. The key details are:

The contract opportunity is for the Maintenance Dredging of the Saugerties Harbor Federal Navigation Project, with a solicitation number of W912DS24B0018. The work includes raising, rehabilitating, and reinforcing existing dikes in containment areas A and B, as well as placing and dewatering dredged materials from the Saugerties Harbor. The contractor will be responsible for providing and installing pipelines and connections to transport effluent from the weir boxes to the Hudson River. Material for dike work is to be excavated from the designated sub-area A.1. The contract is being managed by the U.S. Army Corps of Engineers, New York District. The deadline for this contract opportunity is July 3, 2024.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

F

E

D

C

B

A

1 2

DIKE SECTION NOTES

1. Containment area A.1 shall be the sole source of material for the raising, rehabilitation or reinforcement of existing dikes in containment areas A and B. The excavation of the existing fill materials shall start approximately 1400' south of the north of the northern exteriror containment dike in Area B and progress in a southerly direction.

2. Minimum top width of all containment area dikes shall be 15 feet.

Maximum height of all containment area dikes shall be elevation 50 feet

AVD88. Maximum slope of dikes is 1V:3H

3. Other than work in designated pipeline ingress or egress corridors, no work shall be beyond the exterior toe of any new exterior containment dike.

3 4 5

GANGWAY, BERM

AND WEIR NOTES

1. The contractor shall install and secure the Government furnished gangways from the top of the berm to the top of the weir box.

2. An existing flange is provided on the river side end of the discharge pipeline connected to the B.3 weir box. This connection may be used to connect the contractor provided pipe to extend the effluent discharge pipeline to the Hudson River as required by these plans and specifications. Re-install existing cover plate upon project completion.

3. At completion of project; the contractor shall remove gangways from the weir boxes and place and secure in a location on site as identified by USAGE.

4. Behind interior berm weir boxes; contractor shall place supplemental fill on the weir box side of the berm to construct an extension of the top of the berm towards the weir box to accommodate and support the installation of the gangway. The slope of the supplemental fill will match the slope of the raised and/or reconstructed berms. This supplemental fill shall extend 20 feet on either side of the weir box.

PLACEMENT SITE NOTES

1. Containment Area B shall be used exclusively for the placement of type "B"dredged materials from the contract designated dredging area.

2. Construction and operation of the dredged material placement site shall be the responsibility of the Contractor and subject to the review and approval of the Contracting Officer. There are approximately 27 acres in Containment Area A and 26 acres in

Containment Area B available for the placement of dredged materials. The applicable containment Areas are partitioned to provide three sub-areas (A.2-A.4 and B.1-B.3) as shown on the drawings. The Contractor shall not modify the existing dike alignment in either Containment Area. The Contractor shall not alter the existing flow pattern of the placement site. The existing dikes may require minor repair/rehabilitation/reinforcement prior to the start of dredged material placement

3. Sub-areas A.2 and B.3 are equipped with a government furnished weir that will be used by the Contractor to discharge effluent to the receiving water of the Hudson River, if necessary. The Contractor shall provide and install all pipelines and connections required to transport effluent from each weir to its point of discharge in the Hudson River. The Contractor shall conduct placement site operations and take actions necessary to ensure effluent meets the water quality standards as prescribed in the New York State DEC Water Quality Certification (WQC).

4. The sources of material that are approved to be used for the raising, reinforcement or rehabilitation of dikes shall be: the designated area identified and described in sub-area A.1. If dike rehabilitation work is necessary; the restored dike cross-sectional dimensions shall conform to the lines and grades specified in Dike Section Note 2.

5. Each containment sub-area has a government furnished weir installed at the outlet to control the discharge from one area to the next. These weirs are located as far as practicable from the influent pipes or successive weirs to maximize effective retention time. Any existing weir that needs to be removed during the raising of the interior dikes, shall be reinstalled in accordance the plans and specifications. There are timber stoplogs stacked in each weir, and available for use by the Contractor, for controlling the adjacent pool elevation. The Contractor shall inspect all stoplogs for soundness and fit prior to use and shall replace any stoplog that is deemed to be defective. A staff gauge shall be installed at each weir to measure the depth of water above the crest of the fixed weir box and shall be easily read from a safe vantage point. The Contractor shall provide full illumination of the work area (including the weir structure(s), accessways and adjacent dike area) while nighttime work is in progress at the weir. Minimum light intensities shall be at least that specified in EM 385-1-1, table 7.1, Minimum Lighting Requirements, Construction Areas-general outdoor.

6. If required, the Contractor shall be responsible for clearing and disposal of any vegetation required for the preparation and operation of the site. The contractor shall utilize the designated primary tree/brush management area for placement of any tree/brush material cleared from within the containment area.

7. Borrow material required for the raising, rehabilitation or reinforcement of existing dikes may be excavated from the locations designated above in Note 4, and as shown on Sheet 3. The depth of the excavation shall be no deeper than elevation 35 feet NAVD 88 in sub-area A.1. Excavation of the available material in sub-area A.1 shall start at the north end of the existing fill above elevation 35 feet NAVD 88 and proceed in a northerly direction; sand-harvesting activities will be taking place cell A.1 simultaneous with dredging placement; coordination will be required with existing contractors on site. Material may be removed from the existing designated sub-area A.1 down to a point that is a minimum of 2 feet above the existing bottom surface. Upon completion of excavation, all excavated slopes shall be properly graded to a slope no greater than 1V:3H. The Contractor SHALL NOT excavate material from the existing bottom or the side slopes of dikes in Containment Area B and shall insure that his placement operations do not cause scouring of the existing material in the bottom or side slopes of Containment Area B.

8. The contractor may use the Interior area of the Houghtaling Island site adjacent to the existing Influent pipeline corridor for the staging of plant, equipment and materials.

9. Due to seasonal cold weather conditions, the Contractor may not be able to complete the final dewatering and stabilization of the dredge material placement site until the spring/summer of calendar year 2025 (weather permitting).

10.Contracting Officer's approval of the Contractor's Dredged Material Placement and Mitigation Plan is required prior to commencing any work on the Houghtaling Island dredged material placement site.

11.The Hudson River near shore hydrographic data shown on Sheets 105 & 106 is provided for general information only. This data is based on a survey performed between Sep. Nov. 2019 and represents conditions present at the time of the survey.

Soundings are expressed in feet and refer to the plane of Corps of Engineers Mean Low Water (COE MLW). The plane of COE MLW is 2.54 feet below NAVD88.

12. The locations of existing influent and effluent pipeline corridors are shown on Sheet 3. The contractor shall use these corridors for installation of discharge pipelines lo and from the placement site. The pipeline(s) shall be installed in accordance with the plans and specifications, and the contractors approved Dredged Material Placement and Mitigation Plan.

7 8 9

See Dike Section Note #2

2 feet minimum freeboard 2 feet minimum freeboard

Fill/Pond side of dike

Fill/Pond side of dike

1V:3H c HAN �l..L.1.1:lJ:i

ALLOWABLE OVERDEPTH, 1ft

Fill/Pond side of dike

Maximum slope: 1V:3H

INTERIOR CONTAINMENT DIKE AND SPUR DIKE (TYP)

- NOT TO SCALE-

See Dike Section Note #2

Existing ground;

Elevation varies

Top of existing dike and exterior slope

TYPICAL EXTERIOR CONTAINMENT DIKE

- NOT TO SCALE-

r

�t:I.N.a.�

1V:3H

SAUGERTIES HARBOR DREDGING AREA

TYPICAL CROSS SECTION FOR DREDGING & PAYMENT

NOTTO SCALE

0' MLLW

1' MLLW

12' MLLW

13' MLLW

US Army Corps of Engineers• New York District w ' ' z - z u_

D z

D D w w D 0 � � a_ a_ a_ a_ w z t-z ci': >-w t- z � �0 c::

CJ) � 0

c:: c:: >-

0 0 �>- w � >- zw c:: z u C, ► Ill z z ., - 0 C, ft a::

Q ! a.

111111Z a:: a:: 0 Q cc - Ill :Z: � u U) C, Z111-cc - > z Ii: cc Ill Ill Z ... C, ..I ! :::, = cc cc ::&: U) Ill

Ill z -

D w D � a_ a_

C>

N

D w N

D .. � a_ a_ « « D z w 0 Ii el 2c is <f

DO

(/) --" I z wz 0 Li:: � � �w a:

rli () a_

.. 0

U) ..I cc Ill Q

Q z cc U) Ill z

SHEET

IDENTIFICATION

SHEET 9 OF9

No te

Da te c or re ct ed to

D.

Hi nd s 7/

/2