This document is an amendment to Solicitation W912DS24B0018 for the Maintenance Dredging of Saugerties Harbor Federal Navigation Project in Esopus Creek, New York. The amendment primarily revises the drawings and specifications, including updating the timeframe for the contractor's remobilization to complete remaining site work from 2024 to 2025. Key details include:

The amendment revises several drawings, adds new drawings, and updates specifications. Notable changes include revising the date for contractor remobilization from "spring/summer 2023" to "spring/summer 2025" and correcting the timeframe in the specifications from "late spring to early summer 2024" to "spring/summer 2025." The amendment also provides responses to bidder questions, including clarifying the scope of work under CLIN 3 - Placement Site Work and the placement of Class A and Class B PCB-contaminated dredged materials in separate containment areas. Additionally, the latest survey data for the Houghtaling Island placement site is referenced.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page for the purpose of this amendment.

Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0018

X 9B. DATED (SEE ITEM 11)

03-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jul-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24B0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

AMENDMENT 02

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

-Saugerties Harbor Maint Dredging Plans.pdf – Sheet 109 (RFI 1_W912DS24B0018_FY24 Saugerties Harbor Maint Dredging Plans_Sheet 109.pdf).

2. The following DRAWINGS have been ADDED:

-RFI 1_Saugerties-Esopus PCB Type B Core Sample Locations-Sheet1-2-000R.pdf.

3. The following DRAWINGS have been REVISED but NOT REISSUED:

-None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

-None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

REVISED PLANS & SPECIFICATIONS:

1- Specifications

a. Section 01 20 00 - Technical Specifications – Para 7.21.2 – Paragraph revised to correct the date from “late spring to early summer 2024” to “spring/summer 2025.”

2- Plans

a. Note updated on Sheet 109 Note 9 – Date of remobilization changed from “spring/summer 2023” to “spring/summer 2025.”

ATTACHMENTS:

1. RFI 1_PreBid Site Visit Attendance 2024.pdf – Attendance list from 18 July 2024 Pre-Bid site visit.

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

1. Spec section 01 20 00 7.21.2 indicates that if certain "site conditions" prevent contractor from finishing work, contractor will be required to re-mobilize in late spring/summer of 2024 to complete work. Please elaborate what environmental and/or site conditions should contractors be aware of, that may jeopardize contractors' completion of the work on time. Additionally, please clarify time frames, as they seem incorrect.

There are no specific environmental and/or site conditions of which the contractor should be aware of.

Several conditions may prevent the contractor from performing final cleanup and stabilization of the site as described in section 01 20 0 0 part 7.18. These may include the loss of access to the site due to weather conditions, seasonal changes preventing/slowing dewatering in the cells and the securing of weirs, river conditions delaying demobilization, etc.

Section 01 20 00 7.21.2 – The text should read “…the Contractor shall be required to return in the late spring to early summer of 2025 to complete the remaining placement site work.” Mobilization to the Houghtaling Island upland placement site may take place as early as spring 2025, once seasonal conditions allow for access to the placement site (e.g. once snow blocking the trail access road melts).

2. Note 9 on Sheet 9 talks about contractors re-mobilizing in 2023 to complete work. Please correct and clarify.

Corrections have been made to Sheet 9, Note 9 of the contract plans. Re-mobilizing to complete work will take place in 2025.

3. Please clarify scope of work under CLIN 3 - Placement Site Work. Please provide more detail in regards to which dike sections will need work to bring them to the lines and grades indicated on the typical cross sections and provide estimated quantities for the same. It appears that any one of the B dikes, B.1, B.2, and B.3 all have the capacity to receive the entirety of the projected dredged material volume. As such, will only one dike need to be dressed?

Section 01 20 00 7.8 – 7.18 detail the typical activities required for placement site work on Houghtaling Island.

A pre-bid site visit was scheduled for 18 July 2024 at 1000 which allowed for potential bidders to examine the current condition of the site and determine for themselves what work may be required for the project.

Based on observations made during the site visit, the need for major repairs to the site are not immediately apparent, however such repairs may be required if issues are discovered during necessary site preparations and/or through the course of the project.

Area B is used exclusively for the placement of Class B PCB contaminated material (0.1 – 1.0 PPM). The majority of material to be dredged from Saugerties Harbor will be Class A material (< 0.1) and will require placement in Area A.

Any dike walls showing washouts, erosion, damage, etc., which may affect the integrity of the placement site and the ability place material within containment cells, will need to be addressed.

4. Please provide latest survey data of the houghtailing island placement site.

The topographic survey supplied in the plans is our latest survey of Houghtaling Island.

5. The plans state that Containment Area B is to be used exclusively for Type B dredged materials. Is all dredged material anticipated to be removed from the dredge prism expected to be Type B? If not, what other types are there and where do they go?

See Section 00 90 01 I – The table shows aroclor (PCB) contamination test results of core samples taken from the Saugerties Harbor Federal Navigation Channel.

Houghtaling Island is segregated into two (2) areas: Area A (cells A.1-A.4), and Area B (cells B.1-B.3).

Area B is used exclusively for the placement of Class B PCB contaminated material (0.1 – 1.0 PPM).

For the Saugerties Harbor dredging, any shoaling within proximity of Class B core samples will need to be dredged and placed in Area B first (See map: “Saugerties-Esopus PCB Type B Core Sample Locations- Sheet1-2-000R.pdf”).

The majority of material to dredge from the federal channel should be Class A PCB contaminated material (< 0.1 PPM), which will be placed in Area A.

(End of Summary of Changes)