Houghtaling Island Sand Harvesting Federal contract opportunity
Solicitation number
W912DS23B0023
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

This amendment modifies solicitation W912DS23B0023 for a federal contract to harvest sand from Houghtaling Island in the Hudson River. The contractor will be required to dredge and remove sand from the island for beneficial reuse. Amendment 0003 provides revised drawings and specifications, including a survey of the island's southwest shore and analytical test results from core samples taken in 2022. The amendment responds to questions from prospective offerors by clarifying that the government has no determination on the suitability of the material for construction aggregates and that registration as a small business is not required to participate. Offerors must acknowledge receipt of the amendment by the specified date and time or risk rejection of their proposal. The solicitation remains open for competitive bidding on the sand harvesting work at Houghtaling Island.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page for the purpose of this amendment.

FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23B0023

X 9B. DATED (SEE ITEM 11)

15-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Sep-2023

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS23B0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

AMENDMENT 03

Sand Harvesting, Hudson River, NY, Federal Navigation Project Houghtaling Island Dredge Material Placement Site

Amendment 0003

Amendment 0003 to DRAWINGS and SPECIFICATIONS

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- None

3. The following DRAWINGS have been ADDED:

- A3_Houghtaling SW Offshore 102A.pdf

SPECIFICATIONS:

1. The following SPECIFICATIONS have been ADDED:

- A3_Houghtaling Is Core Sample Final Results.zip

2. The following SPECIFICATION SECTION has been REVISED but NOT

REISSUED:

- None

3. The following SPECIFICATION SECTIONS has been REVISED and

REISSUED:

- None

4. The following SPECIFICATION SECTIONS have been DELETED in their entirety:

- None

The following are responses to questions received from bidders (FOR

INFORMATIONAL PURPOSES ONLY):

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.)

Question No.1: Can the government provide any source reports or testing to confirm that this material could be suitable for potential fine aggregates for Hot Mixed/Warm Mixed Asphalt, Ready Mix Concrete i.e. (NYSDOT, NJDOT, CDOT, ASTM, AASHTO, etc.)? Without having the certainty that this could be a potential resource for fixed plants – bidders will most likely assume the cost that this material will be landfill bound; effecting the cost of the project as well as the schedule and eliminating a beneficial use.

Response: The Government is only able to provide analytical results and technical reports on sampling and testing of core samples taken from Houghtaling Island in 2022. The full reports are provided in this amendment (A3_Houghtaling Is Core Sample Final Results.zip) and constitute all information that the Government has concerning the suitability of material at Houghtaling Island; it is the responsibility of the bidder to determine the use of material once purchased, and to secure any additional testing and/or reporting.

Question No. 2: Is there a BUD determination for this material?

Response: The Government is only able to provide analytical results and technical reports on sampling and testing of core samples taken from Houghtaling Island in 2022. The full reports are provided in this amendment (A3_Houghtaling Is Core Sample Final Results.zip) and constitute all information that the Government has concerning the suitability of material at Houghtaling Island; it is the responsibility of the bidder to determine the use of material once purchased, and to secure any additional testing and/or reporting.

Question No. 3: Is being registered as a SBE required for participation in this solicitation?

Response: This is an unrestricted contract, being registered as a SBE is not required for participation in this solicitation.

Question No. 4: I do not see the underwater survey or plans you had in the field in the package.

Response: The survey and plans shown in the field during the Pre-Bid Site Visit conducted on 28 August 2023 are available for download on Sam.gov as part of the solicitation (00 00 00_COMBINED_W912DS-22-S- 0023_PLANS (2).pdf). An additional survey of the southwest shore of Houghtaling Island (A3_Houghtaling SW Offshore 102A.pdf) is added with this amendment.

(End of Summary of Changes)