This document is an amendment to a solicitation for maintenance dredging of the Shrewsbury River Federal Navigation Project in New Jersey. The amendment provides answers to bidder questions to clarify requirements. The dredging window opens after September 30th to protect nesting birds and dredging is prohibited in the river from January 15 to May 31 to protect winter flounder spawning. The amendment includes maps of subaquatic vegetation and shellfish beds that dredging must avoid. Sediment sampling test results and locations are also attached. The minimum percentage of work to be self-performed by the contractor using its own organization and equipment is forty percent. The solicitation number is W912DS23B0018 and bids are being solicited by the Department of the Army Corps of Engineers Engineering District New York for maintenance dredging of the Shrewsbury River Federal Navigation Project in New Jersey.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Answ er questions to prospective bidders for informational purposes only.
2. Revise FAR Clause 52.236-1
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE DATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23B0018
X 9B. DATED (SEE ITEM 11)
16-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jul-2023
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS23B0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation. This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.
Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted on
SAM.Gov.
Q1. Please clarify question 1 from amendment 1. The amendment says the dredging window opens as early as 01 July 2023; however, the specifications state in two locations that the dredging window doesn’t open until after 30 September for protection of nesting birds. The date is referenced in the specifications at section 01 57 20.00 page 10 sub section 1.14.1.b and section 01 11 00 page 3 subsection 1.2.1. Please confirm on which date the dredge window opens.
A1. Per the NJDEP WQC, dredging is prohibited in the river from 15 January through 31 May, in order to protect spawning and early life stages of winter flounder. Beach placement is prohibited from 01 April to 31 August to protect beach nesting bird species (e.g. Piping Plovers).
Q2. Amendment 0001 revised Section 01 57 20.00 10 and states, “The NJDEP SAV habitat map can be found attached to this amendment.” The map was not attached to the amendment. Can the Corps please provide the SAV habitat map?
A2. The NJDEP SAV map can be found attached to this amendment.
Q3. Amendment 0001 revised Section 01 57 20.00 10 and states, “The contractor must take all necessary precautions to avoid impacts to shellfish beds and Sub Aquatic Vegetation within the channel limits and outside of dredging footprint.”
Can the Corps please provide a map showing all the shellfish beds and Sub Aquatic Vegetation within the channel and outside the dredging footprint?
A3. The NJDEP SAV map can be found attached to this amendment.
Q4. Section 01 11 00 paragraph 1.2.1 states, “Sampling and testing were conducted by the Government in 2023, and the grain size test results are included
W912DS23B0018
in the specifications in Section 00 90 01 as Attachment L. The complete sampling and testing results can be found as attachments to this solicitation on SAM.gov.”
Currently, the specifications only provide a table of the grain size distribution for the sediment samples. Can the Corps provide the full report and/or the sediment sample state plane coordinate locations and sample depths?
A4. The full report for the entire Shrewsbury River, NJ can be found attached to this amendment.
Q5. Clause 52.236-1 states, “The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty percent of the total amount of work to be performed under the contract,” and Section 01 11 00 paragraph 1.3 states “The Contractor shall perform on the site, and with its own organization and equipment, work equivalent to at least forty (40) percent of the total amount of work to be performed under the contract.” Which is the correct amount?
A5. The Contractor shall perform on the site, and with its own organization and equipment, work equivalent to at least forty (40) percent of the total amount of work to be performed under the contract.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least forty percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of clause)