This document is an amendment to a bid schedule for a federal contract solicitation to provide beach erosion control services along the Atlantic Coast of New Jersey. The solicitation involves hydraulic beach fill services from Sea Bright to Manasquan totaling approximately 2.3 million cubic yards, as well as optional additional fill quantities, beach tilling, final record drawings, vibration monitoring, re-mobilization, and junction box riser construction. The solicitation was issued by the Department of the Army Corps of Engineers New York District for the Sandy Hook to Barnegat Inlet Beach Erosion Control Project. The bid schedule lays out nine contract line items with estimated quantities, units of measure, and notes for total base and optional contract values.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS22B0024

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization & Demobilization

FFP

FOB: Destination

PSC CD: C1KF

NET AMT

Hydraulic Beach Fill

FFP

ESTIMATED QUANTITIES

0002AA 874,300 Cubic

Yard

Hydraulic Beach Fill

ESTIMATED QUANTITIES

0002AB 25 Acre Beach Tilling

0003 1 Job Final Record Drawings

FFP

PRE-PRICED $100,000.00

0004 1 Job Vibration Monitoring

FFP

0005 641,200 Cubic

OPTION Option 1

ESTIMATED QUANTITIES

Hydraulic Beach Fill Monmouth Beach (STA238+00 to STA281+00)

0006 263,000 Cubic

OPTION Option 2

ESTIMATED QUANTITIES

Hydraulic Beach Fill Elberon (STA445+00 to STA464+00)

0007 380,000 Cubic

OPTION Option 3

ESTIMATED QUANTITIES

Hydraulic Beach Fill Sea Girt/Manasquan ((STA1003+00 to STA1062+00)

0008 1 Job OPTION Option 4

FFP

ESTIMATED QUANTITIES

Re-mobilization & Demobilization for Hydraulic Beach Fill

0009 1 Job OPTION Option 5

FFP

Junction Box Riser

TOTALS/NOTES

Total Base CLINS (0001 – 0004) ___________________

Total Optional CLINS (0005 – 0009) ___________________

Total Base & Optinal CLINS (0001 – 0009) ___________________