W912DS22B0023 Amendment 00003.pdf

PDF 696 KB Posted

Attached to
Maintenance Dredging of Shoal Harbor and Compton Creek, New Jersey Federal Navigation Project
Solicitation number
W912DS22B0023
Issued by

About this file

This amendment to the solicitation provides answers to questions from prospective bidders for the maintenance dredging of Shoal Harbor and Compton Creek in New Jersey. The U.S. Army Corps of Engineers Engineering District New York seeks bids to dredge these areas and place material in an existing confined disposal facility and at a beach site. Dredging is permitted between July 1, 2023 and June 30, 2024, with beach placement prohibited between April 1 and August 31. The bid opening remains September 12, 2022 and payment will be determined by pre- and post-dredging surveys conducted by the government. Fifteen questions from bidders are answered regarding permit requirements, dredging schedules and windows, plan details, and contract duration.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
SHCC22 Plan Sheet 13 CDF Stockpile and handling areas.pdf PDF
Amendment 0002.pdf PDF
SHCC22 Belford N-61 CDF xyz.pdf PDF
SHCC14 Bid Abstract.pdf PDF
SHCC22 Channel Survey 5185.pdf PDF
SHCC22 Beach 35 sort navd88 elevation.pdf PDF
SHCC14 QC Reports redacted.pdf PDF
W912DS22B0023 Amendment 1.pdf PDF
SHCC14 Production Reports.pdf PDF
W912DS22B0023.pdf PDF
SHCC22 Plans 220805.pdf PDF
SHCC22 Specs 220805.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS22B0023

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amedment is to:

1. Answ er questions to prospective bidders for informational purposes only.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE DATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Sep-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS22B0023

X 9B. DATED (SEE ITEM 11)

11-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION

NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Sep-2022

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation. This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted on SAM.Gov.

Q1. There are no cross sections provided and it is next to impossible to use sheet 13 to quantify cuts and fills. Could a CAD file for Sheets 13 and 17 be provided to estimate cut and fill volumes?

A1. Provided (FTP by request). The XYZ data was issued by Amendment 1

Q2. In the NJ DEP permit there are multiple, conflicting and overlapping windows where material can be placed on the beach and when dredging can occur. Can the USACE clearly state when dredging is to occur and when beach placement is to occur on this project?

A2. As stated in the NJDEP Water Quality Certificate 0000-13-0016.2 CDT 220001 conditions, issued 4 August 2022, the following restrictions apply: 1.

channel dredging is prohibited between 1 January and 30 Jun to protect marine fisheries and 2. beach placement is prohibited between 1 April and 31 August to protect nesting shorebirds.

Specifications Section 01 11 00, Paragraph 1.2.1 clarifies that work on rehabilitating the Belford N-61 Confined Disposal Facility (CDF) shall commence by approximately 1 November 2022, without restriction. Dredging of Compton Creek with placement silty material to the CDF shall commence 1 July 2023.

Further dredging of Shoal Harbor with sandy material to the Bayshore Waterfront Park shall commence as possible after 1 September 2023.

A further restriction on beach placement between 15 May and 30 November to protect Sea Beach Amaranth will be addressed by having a USACE biologist conduct the WQC required survey with protective fencing measures installed as needed, such zones to be avoided during the beach placement activities.

Q3. The NJ DEP permit states that “water must be retained for a min 24-hrs prior to discharge back to Raritan Bay”. Please explain if we are to abide by this and how we would do so if we are going to dredge 24/7 or even on a 12-hr per day dredging schedule.

A3. The 24 hour retention time is built into the design of the Confined Disposal Facility, as approved by the NJDEP.

Q4. The plan sheets do not show on an aerial map where the beach nourishment is to start and end nor are there any reference points on the drawings. Could this map and information be provided?

A4. The anticipated placement site for the >70% sand and gravel is at Bayshore Waterfront Park, commencing at approximate location Sta 23+25 and extending westward as dredge material is available, as shown on Sheet 6 of the Plans.

Q5. Due to the lack of information regarding the CDF, regarding quantities of cut and fill as well as quantities of stone, could the government respond accordingly and push the bid due date back by 2 weeks?

A5. The Bid Opening date remains 12 September 2022 at 2pm EDT.

Q6. Is there bedrock or rock expected in any areas of dredging, if so, could you indicate where?

A6. There is no bedrock in the dredging footprint.

Q7. Please confirm that payment of dredge quantities is by pre- and post-dredge survey and not of any surveys done on the beach.

A7. Payment is made based solely upon pre- and post-dredge surveys.

Q8. Existing conditions Shown on Sheet 17 vs. Sheet 13 differ. Which sheet are we to follow for existing conditions?

A8. Existing conditions of the CDF are depicted on Sheet 17, survey conducted 1 March 2022. The XYZ data was issued by Amendment 1.

Q9. Please clarify that if we are running 24/7, we need only need one SSHO and a CDSO can be used for the second shift.

A9. A second SSHO is required to cover the second shift.

Q10. Please clarify that if we are running 24/7 in two-shifts, we need two QC managers, one per each shift. Can alternate QC manager be utilized for the second shift?

A10. A second QC Manager is required to cover the second shift.

Q11. Armor stone extents are not clear. There are 2 details for the same stationing one with armor stone and the other without. Please clarify extents of armor stone. We need to know where the stone is being placed from station to station.

A11. No stone armoring is required under this contract. All such work between Sta. 10+50 and Sta. 13+00 was completed under previous contract.

Q12. What size and type of pipe for weir, also is there a detail of the weir box?

A12. The CDF outflow weir box of timber and batten construction with concrete reinforcing remains onsite for re-use and as a template for an additional weir box between CDF Cell 2 and Cell 3. The CDF weir box outflow piping of the previous dredging cycle, accomplishing similar work was two 12 inch ID PVC drainage pipe.

Q13. In Section 01 11 00 Page 3, it shows completion time for days that do not total up to the 364 total days given for contract completion. Additionally, the completion days on Form 1442 of 68 days conflict with this as well. Please advise on what the completion time frame is along with associated anticipated start dates that the government requires. A13. The Period of Performance (POP) of 364 days is based upon an anticipated Notice to Proceed date of 1 November 2022 to rehabilitate the CDF, thru the anticipated completion of dredging date of 30 October 2023. These dates include 30 days of field work to mobilize and rehabilitate the Confined Disposal Facility to +21 feet MSL, stop work and return to site, remobilize to prepare dredge and pipeline, ready to dredge on 1 July 2023. 58 days work are anticipated to complete dredging of the <70% sand and gravel shoals to 12+2 feet over-depth MLLW, whereafter on 1 September 2023, 46 days work are anticipated to complete dredging of the >70% sand and gravel shoals to 12+1 foot over-depth

MLLW.

With time allotted for demobilization, the POP totals 364 days.

Q14. Could a staging area for pipeline construction be shown on the plans?

A14. Provided (see attached).

Q15. Will the government provide the pre- and post- dredge surveys or is the contractor to provide that?

A15. The government performs and provides the pre- and post-dredge surveys.

This amendment does not change any other parts of the solicitation.

(End of Summary of Changes)