W912DS21B0002 0006.pdf
PDF 204 KB Posted
- Attached to
- POV Parking Lot, Brooklyn, NY
- Solicitation number
- W912DS21B0002
About this file
This document is an amendment to a solicitation for a POV parking lot project in Brooklyn, New York. The amendment provides responses to contractor questions to clarify the scope of work. It revises drawings to remove unnecessary details and adds new drawings for wheel stop details and existing parking stripes. Specifications are also revised to specify requirements for a job site field office trailer for government use, including furnishings, utilities, internet access, equipment, and extended service duration. No changes are made to the solicitation response date or contract terms. The federal agency is the Department of the Army Corps of Engineers Engineering District New York, and the opportunity number is W912DS21B0002 for a parking lot at the specified location.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: 1) Provide responses to contractor RFIs, 2) Provide revised but not reissued POV parking sketches and specif ications.
Bidders must acknow ledge receipt of this amendment by the date specif ied in the proposal (or as amended) by one of the follow ing methods in the space provided on SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF BIDS (FAR 14.403).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS21B0002
X 9B. DATED (SEE ITEM 11)
15-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Feb-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS21B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been added by full text:
ADDITIONAL RFIS CON'T
Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the offerors “For Information Only” and do not revise the solicitation, plans or specifications.
Q16. Please confirm type of conduit to be installed underground between light poles, from light poles to power pedestal, and from power pedestal to the building.
A16. Underground Conduit, plastic-coated rigid steel; plastic-coated steel IMC; PVC, Type EPC-40; or fiberglass.
Convert nonmetallic conduit, other than PVC Schedule 40 or 80, to plastic-coated rigid, or IMC, steel conduit before rising through floor slab. Plastic coating: extend minimum 6 inches above floor.
Q17. Drawing E-501, Detail 2 for Parking Lot Pole Bases, shows the electrical pole to be mounted on the base but there are no other reference or details showing the height of the poles. Specification Section 265600, Subsection
2.3.1. describes the steel poles, but it fails to state the height of the poles and a prospective manufacturer for this item.
A17. Please refer to the line on the light fixture schedule on sheet E-501 with the description "site light pole." The manufacturer and part number are provided.
Q18. The Geotechnical Report mentions additional scopes of work outside of the contract drawings such as the need of a firewater tank. Are there any relevant items from this report that will be included in the contract drawings?
A18. No - the Geotechnical report was conducted for multiple projects. The entire report was provided to ensure all relevant information was available.
Q19. Please provide the maximum post spacing for the permanent fence.
A19. Post spacing shall not exceed 10'.
Q20. In reference to C-502, can the owner confirm that the barbed wire fence is to include a top tension wire and bottom rail? This is not typical for barbed wire fences however we want to ensure proper accuracy for the estimate.
A20. The chain link fence detail is correct. Provide a bottom rail and a top tension wire as well as 3 strands of barbed wire above the chain link fence fabric. This is not a barbed wire fence.
Q21. Section 02 41 00 calls for tree protection to be installed but the contract drawings do not show specific locations. Can you provide more information on the drawings in order to quantify the scope?
A21. The trees to be protected are Japanese black pine (Pinus thunbergiana). They could not be located at the time of the survey because of the thickness of the brush. The intent is to protect all of this variety at the perimeter of the POV lot that are not in the construction footprint. They are typically scrubby in nature at this site. Assume ten (10) trees averaging 15' will require protection.
Q22. Are CAD files available for distribution prior to bid date?
A22. No. CAD files will only be made available after award.
Q23. Please confirm the fence end panels adjacent to the gates are to include a diagonal brace rail, truss rod and horizontal brace rail. Please also confirm this detail is typical for all ends and corners for the permanent fence A23. Yes. The detail is correct and is typical for ends, corners, and pull posts.
Q24. What is the procedure if we want to furnish bid security in the form of a certified check, but the solicitation requires all the bid documents to be submitted electronically?
A24. Yes, IAW 52.228-1 BID GUARANTEE (SEP 1996) we do allow alternate forms of bid guarantees. A scanned version of the bid bond (all pages) or alternate form (front and back) will be submitted and evaluated at the time of bid opening. The apparent low bidder will be required to mail the hard copy original of the bid bond or alternate form of bid guarantee to the New York District office at 26 Federal Plaza in New York for further evaluation. No contract award will be made until Government receipt and acceptance of the original bid guarantee.
After award, all pages of the performance and payment bonds will be scanned and submitted by the awarded for evaluation, and the awardee will be required to mail the hard copy originals of the bonds to the New York District office at 26 Federal Plaza in New York for further evaluation. If for any reason the bonds supplied by the awardee are determined to be insufficient, the awardee will be notified and instructed to provide corrected bonds as specified by the Contracting Team. Notice to Proceed will not be issued until Government receipt and acceptance of the original bonds.
Q25. Drawing CS101 calls for wheel stops to be provided at the perimeter stalls, but there's no detail or manufacturer provided in the documents.
A25. See SK-01 for wheel stop detail.
Q26. Can the owner please provide further details on the office trailer that is being requested such as the quantity/specs of the computers as well as the telephone and internet that is required?
A26. Temporary Construction Facility – 01 50 00. A Government office is not specified. Include below requirements for Government Field Office.
"The Contractor shall furnish at the job site, prior to the start of work, a 40 foot by 12 foot field office for the use by the Government representatives for the duration of the contract. Field office and contents remain the property of the Contractor. The exact location will be designated by the Contracting Officer Representative. The field office shall be well constructed and properly ventilated and shall contain a closet and door and windows which shall be capable of being locked, four (4) new ergonomically-designed chairs, one (1) plan rack and drawing board, two (2) desks, one
(1) two drawer filing cabinet and a conference table approximately 5 feet by 5 feet with 4 chairs. The Contractor shall also provide adequate electric lighting, minimum 6 duplex electrical receptacles, drinking water, heat, plumbed functional toilet facilities, air conditioning, janitorial services and maintenance services. In addition the contractor shall make arrangements and pay connection fees and monthly usage for electrical and 2-line telephone service (fax and voice). The Contractor shall also make arrangements and pay all connection costs and fees for either Business DSL or Cable Modem Service to the Field Office for data connection. These services shall be arranged for the contract duration. The Field Office shall be removed from the project site when and as directed by the Contracting Officer Representative. In addition to the above, the Contractor shall provide the following office equipment and other items for use by the Government during the contract:
Hardware:
- Telephone: 2-line phone compatible with phone service
- Telephone Answering Machine: Standard, compatible with standard telephone line and local service.
- DSL or Cable Modem Service: Business DSL or Cable modem service with all required equipment (modems, filters, etc.). DSL service shall be 1.5Mbps downstream/384Kbps upstream. Service shall utilize a Static IP address for the connection. Contractor shall pay all costs associated with this service including any ISP fees, DSL or Cable Modem services shall be a 'dedicated' service, and this line shall not be shared with any other Users (i.e., Contractors Field Office Trailer and USACE Field Office Trailer shall not utilize the same DSL or Cable Modem line via an Ethernet Switch/Hub)
- First Aid Kit: As a minimum the kit will include antiseptic kit, eyewash solution, bandages, inset sting medication, aspirin and acetaminophen and cold pack.
- Fire Extinguisher: Type as required for a trailer the same size as office.
No separate payment will be made for providing the above items and all costs"
Q27. The contract drawings mention the removal of existing striping in the larger lot but does not specify all required locations. Can you provide existing striping drawing or provide clarification of what needs to be removed?
A27. See ESK-01 for existing parking stripes.
Q28. Is the existing parking lot getting every stall re striped or just the stop bars? the note is unclear on that.
A28. See ESK-01 for existing parking stripes.
Q29. The detail on C501. Where does that apply? is there a water utility not called out?
A29. The Water Valve detail is not being used in this project.
Q30. Drawing C-501 contains the detail of a water valve but the drawings do not call out any specific locations for them to be installed. Can you indicate whether this detail needs to be considered, and if so where shall it be installed?
A30. The Water Valve detail is not being used in this project.
Q31. Detail 4 on drawing 501 shows the detail for a gate valve + cast iron cover. However, none of the site plans or drainage plans seem to indicate location or quantities of this work and there does not appear to be a spec section for this item. Please advise where this work is required and provide specs for it.
A31. The Water Valve detail is not being used in this project.
Q32. Extent of concrete pavement for sidewalks as shown on detail 2, drawing C-501 is not clearly shown on any of the site plans. Is it possible to have the Engineer provide description for locations and extent of this work or highlight the areas to receive sidewalk concrete pavement on the contract drawings?
A32. There are no new sidewalks in this scope of work.
DRAWING & SPEC REVISION 2
To Bidders
The purpose of this amendment is to make the following changes to the solicitation.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED: None.
2. The following DRAWINGS have been ADDED:
• Drawing sheet SK-01 ‘Wheel Stop Details’ has been ADDED.
• Drawing sheet ESK-01 ‘Existing Parking Stripes’ has been ADDED.
3. The following DRAWINGS have been DELETED: None
4. The following DRAWINGS have been REVISED but NOT REISSUED:
• Drawing sheet C-501 ‘SITE DETAILS’ has been REVISED to remove detail 2 ‘SIDEWALK JOINT
DETAIL’.
• Drawing sheet C-501 ‘SITE DETAILS’ has been REVISED to remove detail 4 ‘WATER VALVE
DETAIL’.
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety: None
3. The following SPECIFICATION SECTIONS have been REVISED (red strike/green add) and REISSUED: None
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
• Specification section 01 50 00 paragraph 3.6.2 ‘Trailer-Tyle Mobile Office’ REVISED to ” The option is available to, furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer Representative to meet the requirements of the minimum facilities specified above. Securely anchor the trailer to the ground at all four corners to guard against movement during high winds. Coordinate requirements for proper anchoring with EM 385-1-1 Section 04.
The Contractor shall furnish at the job site, prior to the start of work, a 40 foot by 12 foot field office for the use by the Government representatives for the duration of the contract. Field office and contents remain the property of the Contractor. The exact location will be designated by the Contracting Officer Representative.
The field office shall be well constructed and properly ventilated and shall contain a closet and door and windows which shall be capable of being locked, four (4) new ergonomically-designed chairs, one (1) plan rack and drawing board, two (2) desks, one (1) two drawer filing cabinet and a conference table approximately 5 feet by 5 feet with 4 chairs. The Contractor shall also provide adequate electric lighting, minimum 6 duplex electrical receptacles, drinking water, heat, plumbed functional toilet facilities, air conditioning, janitorial services, and maintenance services. In addition, the contractor shall make arrangements and pay connection fees and monthly usage for electrical and 2-line telephone service (fax and voice). The Contractor shall also make arrangements and pay all connection costs and fees for either Business DSL or Cable Modem Service to the Field Office for data connection. These services shall be arranged for the contract duration. The Field Office shall be removed from the project site when and as directed by the Contracting Officer Representative. In addition to the above, the Contractor shall provide the following office equipment and other items for use by the Government during the contract:
Hardware:
- Telephone: 2-line phone compatible with phone service
- Telephone Answering Machine: Standard, compatible with standard telephone line and local service.
- DSL or Cable Modem Service: Business DSL or Cable modem service with all required equipment
(modems, filters, etc.). DSL service shall be 1.5Mbps downstream/384Kbps upstream. Service shall utilize a Static IP address for the connection. Contractor shall pay all costs associated with this service including any ISP fees, DSL or Cable Modem services shall be a 'dedicated' service, and this line shall not be shared with any other Users (i.e., Contractors Field Office Trailer and USACE Field Office Trailer shall not utilize the same DSL or Cable Modem line via an Ethernet Switch/Hub)
- First Aid Kit: As a minimum the kit will include antiseptic kit, eyewash solution, bandages, inset sting medication, aspirin and acetaminophen and cold pack.
- Fire Extinguisher: Type as required for a trailer the same size as office.
No separate payment will be made for providing the above items and all costs. ”
(End of Summary of Changes)
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None