This document is an amendment to a solicitation for a POV parking lot project at the Brooklyn, New York Reserve Center. The amendment provides responses to additional contractor questions for clarification purposes only and does not revise the original solicitation. Key details include: the groundcover establishment period is 365 days after 100% turf stand coverage requiring maintenance such as watering, mowing, fertilizing, and trash removal; an on-site water source will be provided at no cost to the contractor for watering during this period; and the drawings specify the conduit path from the second floor panel to the parking lot, which the contractor must follow in connecting new conductors.

View the file

Other files

File Type Posted
Bid Abstract_final.pdf PDF
Bid Abstract_signed.pdf PDF
Bid Abstract.pdf PDF
W912DS21B0002 0008.pdf PDF
C-502.pdf PDF
G-002.pdf PDF
CD-102.pdf PDF
W912DS21B0002 0007.pdf PDF
C-503.pdf PDF
C-501.pdf PDF
CS-101.pdf PDF
W912DS21B0002 0006.pdf PDF
2021.02.16_Amendment 0006_ESK-01_Existing Parking Stripes.pdf PDF
2021.02.16_Amendment 0006_SK-01_Wheel Stop Details.pdf PDF
W912DS21B0002 0005.pdf PDF
2021.02.02_Bidder Site Visit 27 JAN Attendees.docx DOCX document
2012.02.03_Bidder Site Visit 03 FEB Attendees.jpg JPG image
W912DS21B0002 0002.pdf PDF
W912DS21B0002 0001.pdf PDF
W912DS21B0002.pdf PDF
MCRC_POV Parking_IFC Drawings.pdf PDF
COVID Screening Questionnaire JUL 2020.pdf PDF
2021.01.12_MRCR_BROOKLYN_POV_PARKING_LOT_ISSUED_FOR_CONSTRUCTION_SPECS.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to post responses to additional contractor RFIs.

Bidders must acknow ledge receipt of this amendment by the date specif ied in the proposal (or as amended) by one of the follow ing methods in the space provided on SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF BIDS (FAR 14.403).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS21B0002

X 9B. DATED (SEE ITEM 11)

15-Jan-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Feb-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS21B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

ADDITIONAL RFIS

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.

Q5. 32 02 33 para 3.2 describes the groundcover establishment period as 365 days after the turf achieves 100 percent stand coverage. The subsequent paragraphs describe maintenance, watering, mowing, trimming, fertilizing, leaf and trash cleanup, etc for the full 365 day establishment period. Please confirm the described services will be required for the full 365 day establishment period as this is different that providing a typical 1 year warranty of construction.

A5. The contractor shall provide the aforementioned services for the full 365 day establishment period, as determined by the contracting officer. This is not equivalent to providing a typical 1 year warranty of construction.

Q6. 32 05 33 para 3.2.6 requires turf watering during the 365 day establishment period. Is there a water source available on site? Will the water be provided at no cost to the contractor or will the contractor be required to pay for the water for the full 1 year establishment period?

A6. Water source is available on site at the existing water sources located west/south-west of the Reserve Center.

Water will be available at no cost to the contractor

Q7. Is any environmental analysis available for the excess soil to be disposed? For purposes of this bid should we assume the soil is clean and safe for disposal?

A7. Please refer to the geotechnical report for specifics about the soils in the area.

Q8. Drawings ES102 shows 2.5 inch underground conduit (Power and Comm. data) fed from main building through Duty Hut at first floor. Drawing G003 détails 2 and 3 shows existing conduit from Duty Hut and existing chase.

Can we use existing conduit and existing chase available to use for 2.5 inch conduite ? If no, What path, govt. Want to bring conduite from second floor to first floor to parking lot (Through grass or concrete sidewalk) ? Please advise.

A8. The path is provided in the drawings. The contractor will be responsible for connecting conductors to the indicated panel, running conductor in conduit above ceiling through the existing chase, and through the existing installed empty conduit under slab.

The existing empty conduit exits the building in a grassed area. The path to the POV Lot will include crossing existing asphalt.

Please refer to the provided survey for the location of paving and landscaped areas. The existing conduit location was selected to provide the simplest route to the POV Lot. The specific path is at the discretion of the Contractor.

Per section 01 11 00 Summary of Work, all existing work - the building and all pavements and landscaping - are to be repaired / replaced where affected by the installation of new work.

Q9. Drawing shows light pole base type B – typical of 2. Drawing ES 101 shows 5 pole bases. Please advise.

A9. The note refers to the two light poles located on the concrete island between the existing lot and the new lot and that these two light poles are to be equally distant from the edges of both the lots. The note is not an indication of the number of type B poles.

W912DS21B0002

Q10. Para 3.2 states to excavate unsatisfactory material encountered within the limits of work below grade and replace with satisfactory material. Looking to bore reports within limits of work, all bore reports says poorly graded sand with silt. We do not anticipate any unsatisfacory material to be replaced. Please advise.

A10. The referenced clause in paragraph 3.2 section 31 00 00 only applies if unsatisfactory materials are encountered.

Pursuant to FAR Clause 52.236-2 The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of subsurface or latent physical conditions at the site which differ materially from those indicated in this contract.

Q11. Is ground contaminated ?

A11. Please refer to the geotechnical report for specifics about the soils in the area.

Q12. Please confirm penetration location into the building and passage to second floor panel?

A12. Please refer to the floor plans provided on G-003 indicating the entry penetration and vertical chase.

The contractor will be responsible for connecting conductors to the indicated panel, running conductor in conduit above ceiling, through the existing chase, and through the existing installed empty conduit under slab.

(End of Summary of Changes)