This document contains an amendment to a solicitation for maintenance dredging of Cheesequake Creek in New Jersey. The U.S. Army Corps of Engineers, New York District, is seeking to dredge approximately 9,000 cubic yards of material from the creek to a depth of -5 feet MLLW plus 2 feet overdepth. Dredged material will be processed and transported to an approved upland placement site. Work must be performed using a mechanical dredge with an environmental bucket and multiple scows and tugs for dredging, dewatering, and unloading operations. The apparent low bidder must provide permits within 35 days and commence work within 5 days of notice to proceed, maintaining a production rate of 1,000 cubic yards per day. Work is anticipated from July to October 2020 and is estimated to cost between $1,000,000 to $5,000,000, with liquidated damages of $2,020 per day for delays. The amendment provides responses to bidder questions and adds an attachment on regulatory approvals.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Answ er questions from prospective bidders for informational purposes only.
2. Add Attachment L, Cheesequake Creek Federal Consistency Determination (FC), and Water Quality Certification (WQC) - to be incorporated to SECTION 00 90 01.
NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS20B0009
X 9B. DATED (SEE ITEM 11)
17-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-May-2020
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS20B0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
AMENDMENT 0002
SPECIFICATIONS:
1. The following specificaton has been revised, but not reissued: SECTION 00 90 01, Attachment L has been added: Cheesequake Creek Federal Consistency Determination (FC), and Water Quality Certification (WQC).
BIDDER’S QUESTIONS AND GOVERNMENT REPLY:
Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Bidders “for information only” and do not revise the solicitation, plans or specifications.
QUESTION 1: The specifications require a completion period of 30 days in order to lessen the impact to recreational boaters. Our dredging equipment is portable and will not take up the entire channel, allowing boats a means of passage continuously. The project can be completed at a lower cost if allowed more time to offload and transport the material to disposal. Can the completion period be extended to 60 days from notice to proceed?
GOVERNMENT RESPONSE: Responses to the sources sought indicate there are companies that can complete the work in the performance period listed in the specifications. Due to constraints within the project schedule and sources sought responses the completion period will not be extended.
QUESTION 2: The specifications mention that the solicitation is based on a production rate of 1,000 CY per day. This is a tremendous amount of material to transport in one day and will be more expensive than hauling over a more realistic, longer time period. Can the production rate requirement be lowered to 300 CY per day to reduce project costs?
GOVERNMENT RESPONSE: Other dredging projects in the area have met a similar or higher production rate. Due to the responses to sources sought and the successful completion of projects with similar parameters the production rate will remain at 1,000 CY/day.
W912DS20B0009
QUESTION 3: The specifications state the project is anticipated to start in July, August, September or October 2020. The COVID crisis has pushed a lot of our work into the summer.
Could a more specific estimated timeframe be stated?
GOVERNMENT RESPONSE: The current project schedule indicates the work is estimated to begin late July or Early August.
QUESTION 4: Is the beach to the North of Rte 35, to the East of the channel, available as an offload/dewatering area? Is the bulkhead/dock underneath Rte 35 to the South available as an offload/dewatering area?
GOVERNMENT RESPONSE: Coordination for all offloading, dewatering, and processing locations are the responsibility of the Contractor. Local municipality and/or state agency coordination may be required.
(End of Summary of Changes)