About this file

This document provides details for an upcoming federal construction contract opportunity to replace two hot cargo loading area fueling loops and pits at Joint Base McGuire-Dix-Lakehurst in New Jersey. The scope of work includes installing new underground jet fuel hydrant loop piping, connections to an existing type III pressurized hydrant fueling system, and new hydrant-fueling pits located on the hot cargo loading area. Additional work includes emergency stops, pipe cathodic protection, isolation valves, crossover piping, demolition and replacement of concrete apron and asphalt shoulders, demolition of existing hydrant pits and above-ground valves, and soil remediation as required. The U.S. Army Corps of Engineers, New York District plans to issue an invitation for bids on or about January 10, 2020, with bids due approximately 30 days later. The contract will be a 100% small business set-aside with a period of performance of 540 calendar days from notice to proceed. The estimated value is between $5 million and $10 million. The NAICS code is 237120 and small business size standard is $36.5 million. The point of contact is provided for any questions.

View the file

Other files for this federal contract opportunity

Other files attached to Hot Cargo Hydrant System Replacement, newest first.
File Type Posted
Copy of Bid Abstract W912DS20B0003 Hot Cargo20042020.xlsx XLSX spreadsheet
W912DS20B0003-0006.pdf PDF
Amendment 0005 - Hot Cargo JBMDL - Plans.pdf PDF
Appendix A - Hot Cargo Site Visit - Amendment 0005.pdf PDF
Amendment 0005 - Hot Cargo JBMDL - Specifications.pdf PDF
W912DS20B0003-0005.pdf PDF
W912DS20B0003-Amendment0004.pdf PDF
W912DS20B0003-0003.pdf PDF
W912DS20B0003-P00002.pdf PDF
W912DS20B0003-0001.pdf PDF
Package 1 - Replace Hot Cargo - Plans.pdf PDF
W912DS20B0003.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. W912DS20B0006

SPECIFICATIONS FOR

CONSTRUCTION

HOT CARGO HYDRANT SYSTEM

REPLACEMENT

DESC 1806

FY 2019

JOINT BASE MCGUIRE-DIX-LAKEHURST, NJ

MARCH 2019

Prepared by U.S. Army Corps of Engineers, Omaha District

DEFENSE LOGISTICS AGENCY PROJECT

IN PARTNERSHIP WITH THE U.S. ARMY CORPS OF

ENGINEERS AND THE UNITED STATES AIR FORCE

This page was intentionally left blank for duplex printing.

00 01 10 - 1

SPECIFICATIONS FOR CONSTRUCTION OF

HOT CARGO HYDRANT SYSTEM REPLACEMENT

PROJECT NO. DESC1806

JOINT BASE MCGUIRE-DIX-LAKEHURST, NJ

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 01 14 00

01 14 00AT1

01 14 00AT2

01 14 00AT3

01 32 01.00 10 01 33 00

REGISTER

01 33 29

01 33 29AT

01 35 26 01 42 00 01 45 00.00 10 01 45 00.15 10

01 50 00 01 57 19 01 58 00

01 58 00AT

01 74 19 01 78 00

DD1354

01 78 23

SUMMARY OF WORK

WORK RESTRICTIONS

VISIT REQUEST FOR JOINT BASE MCGUIRE-DIX-LAKEHURST FORM

(EAL)

RESTRICTED AREA ACCESS BADGING REQUIREMENTS

CONTRACTOR'S FREE ZONE REQUIREMENTS AND PROCEDURES PROJECT

ADMINISTRATIVE REQUIREMENTS

SCHEDULE

SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS

SUSTAINABILITY REPORTING

2017 US AIR FORCE SUSTAINABILITY REQUIREMENTS SCORE SHEET

SPECIAL PROJECT PROCEDURES

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM) TESTING FOR

MECHANICAL AND ELECTRICAL SYSTEMS

SPECIAL INSPECTIONS

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

PROJECT IDENTIFICATION

PROJECT SIGNAGE

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

CLOSEOUT SUBMITTALS

DRAFT DD1354 - REAL PROPERTY RECORD

OPERATION AND MAINTENANCE DATA

OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL

SYSTEMS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 01 00 00 02

COVER SHEET

CHECK LIST FOR BIDDERS

01 78 23.33

01 45 35 01 45 20.00 18

01 35 13

01 33 23.33

01 30 00

00 01 10 - 2

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 17 23 PAVEMENT MARKINGS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 05 23.19 TRENCHLESS EXCAVATION USING MICROTUNNELING

33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP

33 08 53AT1 EQUIPMENT TESTS

33 00 53AT2 PERFORMANCE TESTING

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT

33 52 43.13 AVIATION FUEL PIPING

33 52 43.14 AVIATION FUEL CONTROL VALVES

33 52 43.23 AVIATION FUEL PUMPS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

SECTION 00 00 01

COVER SHEET

01/18

PART 1 GENERAL

NEW YORK DISTRICT

CORPS OF ENGINEERS

NEW YORK, NEW YORK 10278-0090

REQUEST FOR PROPOSAL

FOR

DESC 1806

HOT CARGO HYDRANT SYSTEM REPLACEMENT

JB MCGUIRE-DIX-LAKEHURST, MCGUIRE AFB, NEW JERSEY

1. Attached is INVITATION FOR BIDS (IFB)

2. BIDS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United States Code, Section 1001.

3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16 ).

4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 21 16 of this IFB).

5. REPRESENTATIONS AND CERTIFICATIONS - SECTION 00 45 00 Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.

Within Section 00 45 00 , note in particular the PROHIBITION SEGREGATED FACILITIES. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause

(1984 APR).

6. THIS PROJECT IS A MILTARY PROGRAM PROCUREMENT AND IS FUNDED BY THE

DEPARTMENT OF DEFENSE. BUY AMERICAN ACT - CONSTRUCTION MATERIALS (MAY

1993) IN ACCORDANCE WITH FAR 52.225-5 APPLIES.

7. Please review all bonds and accompanying documents required to be submitted. Bonds, Powers of Attorney, statements of authenticity and continuing validity, and all related documents MUST NOT bear computer printer-generated signatures and/or seals. Documents bearing signatures and/or seals generated as part of a document, as opposed to

DOCUMENT 00 00 01 Page 2 being affixed to the document after its generation, will not be accepted. Submission of such documents may render the bid or offer non-responsive and ineligible for award.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

DOCUMENT 00 00 01 Page 3

SECTION 00 00 02

CHECK LIST FOR OFFERROR

01/18

PART 1 GENERAL

ATTACHED IS IFB

DESC 1806

HOT CARGO HYDRANT SYSTEM REPLACEMENT

JB MCGUIRE-DIX-LAKEHURST, MCGUIRE AFB, NEW JERSEY

ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE

FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR OFFER INELIGIBLE FOR

AWARD. IMPORTANT ITEMS FOR YOU TO CHECK ARE INCLUDED IN BUT NOT LIMITED

TO THOSE LISTED BELOW. THIS INFORMATION IS FURNISHED ONLY TO ASSIST YOU

IN SUBMITTING A PROPER BID

____HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?

____HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION

00 45 00) PORTION OF THE SOLICITATION?

____IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?

____IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY

AND ARE ALL SEALS AFFIXED?

____DO THE BID BOND AND ACCOMPANYING DOCUMENTS BEAR SIGNATURES AND SEALS

AFFIXED AFTER THE DOCUMENT WAS GENERATED, AS OPPOSED TO COMPUTER

PRINTER-GENERATED SIGNATURES AND/OR SEALS?

____HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR OFFER BY ALTERING

THE PROVISIONS OF THE SOLICITATION?

____WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH PRICE ITEM?

(THE SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)

____ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES

LEGIBLE?

____IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY

INITIALED BY THE PERSON SIGNING THE BID?

____DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT ISA

SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID

OPENING TIME?

____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE

INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF

THE SOLICITATION.)

____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE

INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF

DOCUMENT 00 00 02 Page 2

THE SOLICITATION.)

NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K. JAVITS

FEDERAL BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE TIME IT TAKES

TO ENTER THE BUILDING. BIDDERS IS RESPONSIBLE TO ENSURE THAT ITS BID

IS SUBMITTED TIMELY.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 00 02 Page 3

Hot Cargo Hydant System Replacement, JB-McGuire-Dix-Lakehurst, NJ MN23

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

1.1.2 Location

1.2 OCCUPANCY OF PREMISES

1.3 EXISTING WORK

1.4 LOCATION OF UNDERGROUND UTILITIES

1.4.1 Notification Prior to Excavation

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes replacing the existing fuel piping and hydrant pits located on the Hot Cargo Loading Area; providing a new fuel piping loop connected to the existing DLA hydrant loop; providing new isolation and crossover valves will be provided to direct fuel to or bypass the HCLA system; providing a single hydrant fueling outlet on HCLA and incidental related work.

1.1.2 Location

The work is located at the Joint Base McGuire-Dix Lakehurst, New Jersey approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 OCCUPANCY OF PREMISES

The existing pumphouse and control building will not be changed during this contract. The existing pumphouse and control building will be occupied during performance of work under this Contract.

1.3 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.4 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during

SECTION 01 11 00 Page 2 scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.4.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting excavation work.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 11 00 Page 3

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

1.2 SPECIAL SCHEDULING REQUIREMENTS

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

1.3.1.1 Subcontractors and Personnel Contacts

1.3.1.2 Site And Building Security And Vehicle Identification

1.3.1.3 Identification Badges and Installation Access

1.3.1.4 No Smoking Policy

1.3.2 Working Hours

1.3.3 Work Outside Regular Hours

1.3.4 Occupied Buildings

1.3.5 Utility Cutovers and Interruptions

1.3.6 Working Conditions

1.4 SECURITY REQUIREMENTS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 14 00 Page 1

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

See the attachment 1 to this specification for the Visit Request for Joint Base McGuire-Dix-Lakehurst Form (EAL). See attachment 2 to this specification for Restricted Area access badging requirements.

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Visit Request for Joint Base McGuire-Dix-Lakehurst Form (EAL); G, RO

List of Contact Personnel; G, RO

1.2 SPECIAL SCHEDULING REQUIREMENTS

See Drawing Sheet GC105 for Construction Area Zone Notes and phasing.

The intention of the phasing plan is to minimize disruption and maintain aircraft operational capability and access to Air Force facilities during construction. Coordination with JBMDL and COR Is required for all work.

a. Note order of work activities for Construction Area Zones CAZ1, CAZ2, CAZ3 and CAZ4, airfield work limitations, airfield safety requirements, permitted free-zones and when taxiway may be closed as is noted on the drawings along with any other work restrictions. Access to be ccordinated with and approved by the airfiled manager, Base Operations and the Security Police through the Contracting Officer before work is started.

b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work. Specific items of work to which this requirement applies include:

(1) Major Components (Piping, Cathodic Protection, Hydrant Pits, Hydrant Pit Lids, Etc.) necessary for each work zone shown on drawings.

(2) Hot-Mix Asphalt Formula and PCC Mix design is approved by the Contracting Officer before any airfield pavement demolition is allowed.

SECTION 01 14 00 Page 2

c. The required Air Force Aircraft Operations will remain in operation during the entire construction period, except for designated fueling system outage for piping modifications and installation of the new crossover valve during CAZ4 work. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

d. Permission to interrupt any airfield or utility service must be requested in writing a minimum of 21 calendar days prior to the desired date of interruption, subject to requirements identified on the drawings.

e. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Site And Building Security And Vehicle Identification

a. The Contractor shall be responsible for the security of the areas within the contract limits. When the Government takes possession of certain areas, the Contractor shall be responsible for the areas remaining under Contractor control.

b. The Contractor must maintain continual base security with personnel security guard and temporary fences. Wherever there are fence disruptions due to the construction of this project, the Contractor shall continually monitor and maintain the fence.

c. The Contractor shall be responsible for furnishing an identification required by JB MDL to each employee in accordance with paragraph titled IDENTIFICATION OF EMPLOYEES.

d. The Contractor shall be responsible for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon release of any employees. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project.

e. The Contractor and subcontractors shall register all company and

SECTION 01 14 00 Page 3 private vehicles that will be used in the execution of this contract with the Installation Provost Marshall's office prior to start of work by the Contractor/subcontractor. Entry to the installation requires the following prior coordination with the Contracting Officer or designated representative; current vehicle registration, proof of insurance, valid driver's license for the vehicle driver, and procure identification for other personnel. Contractors/Subcontractors and their employees requiring access to the installation will be required to comply with the installation access control policy/procedures. The government will not be responsible for damages due to delay/stoppages caused by failure to comply.

f. All vehicles and personnel are subject to search and seizure of contraband and/or unauthorized government property. Contractor vehicles (Contractor-owned and personal), contractor personnel, and their personal property shall be subject to searches upon entering of leaving the installation.

1.3.1.3 Identification Badges and Installation Access

Application for and use of badges will be as directed. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge. Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.

1.3.1.4 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours must consist of an 10 hour period between 7 a.m. and 5 p.m., Monday through Friday, and 7 a.m. to 5 p.m. on Saturday if approved by the Contracting Officer or his Representative excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

SECTION 01 14 00 Page 4

1.3.4 Occupied Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to four hours. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.3.6 Working Conditions

(1) Open trenches or road restrictions will not be permitted without the approval of the Contracting Officer.

(2) Access ways shall be fully usable.

(3) All cost for conformance with the above stated requirements shall be included with the lump sum contract amount and no claim for extra cost shall be considered.

1.4 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II, "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply:

See Attachment to this specification. The process for Contractor's free zone Requirements and Procedures as noted in Attachment 3 to Appendix 4 to Annex C to JB MDL JIDP takes approximately 90 days to complete.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 5

FOR OFFICIAL USE ONLY

HQ 87 ABW (AMC)

JB MDL, NJ 08641-5002

4 FEB 18

APPENDIX 4 TO ANNEX C TO JB MDL JIDP

CONTRACTOR SECURITY APPENDIX

1. SITUATION. This annex provides the 87th Security Forces Squadron (SFS) appendix to all statements of work for JB MDL.

1.1. Enemy. Refer to Basic Plan.

1.2. Friendly. Refer to Basic Plan.

1.3. Assumptions. Refer to Annex C of this plan.

1.4. Limiting Factors. Not all members listed below will be monitoring the radio.

2. MISSION. To provide Installation entry control procedures for all contractors. The following appendix provides information from Air Force Instruction 31-101, AFMAN 31-113 and local supplements on requirements for entering and conducting business while on Joint Base McGuire-Dix-Lakehurst (JB MDL), New Jersey.

3. EXECUTION

3.1. Contract Award. JB MDL requires all visitors/contractors/vendors to conduct a criminal history background check and Wants/Warrants check prior to being issued an Installation Access Pass/Card. This check is done at no expense to the contractor and will be accomplished at the Welcome Center or Commercial Vehicle Inspection Area. This will be completed prior to any access credential for JB MDL being issued to the contractor personnel.

3.1.1 All personnel requesting an installation visitor pass must complete the JB MDL request for criminal history form at the Welcome Center or Commercial Vehicle Inspection facility. Failure to provide all required information may result in access to the installation being denied.

3.1.2 If the contractor requires access to the installation for more than 60 days and up to one year, Welcome Center personnel will conduct a QWA Person Inquiry and criminal record check prior to issuing a card. Prior to issuing another Pass/Card another QWA Person Inquiry and criminal record check will be conducted.

3.1.3 If the contractor requires access for less than a 60 day period, a QWA Person Inquiry and criminal history check will be conducted prior to the contractor/vendor being issued an Installation Access Pass.

Any subsequent request for entry will require another QWA Person Inquiry and criminal history background check to be accomplished.

3.1.4. The Welcome Center will conduct the required background checks, review the results and determine whether personnel will be authorized to enter JB MDL. The Welcome Center will forward any derogatory/disqualifying information to 87 SFS/S5R for debarment initiation. If no derogatory/disqualifying information is identified, any printed QWA Person Inquiries or criminal background checks will be destroyed immediately.

01 14 00AT1 - 1

JB MDL, NJ 08641-5002

3.1.5. The Welcome Center will also notify the appropriate Administrative Contracting Office or unit POC of those personnel who are being denied access to the installation due to derogatory information identified in the individual’s criminal background investigation. The disposition date (date the charges were finalized in court) is the date used to determine time frames. The below criminal history findings will automatically disqualify the person in question from being granted access to the installation:

3.1.5.1. There is a reasonable basis to believe based on an individual's criminal or dishonest history, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.2. Wanted by Federal or civil law enforcement authorities, regardless of offense or violation.

3.1.5.3. Immigration status is in question or cannot be verified.

3.1.5.4. US Citizenship or Social Security Account Number cannot be verified.

3.1.5.5. There is a reasonable basis to believe the individual has submitted fraudulent information concerning his or her identity.

3.1.5.6. There is a reasonable basis to believe the individual will attempt to gain unauthorized access to classified documents, information protected by the Privacy Act, information that is proprietary in nature, or other sensitive or protected information.

3.1.5.7. There is a reasonable basis to believe the individual will unlawfully or inappropriately use an access credential outside the workplace.

3.1.5.8. Barred from entry/access to any Federal installation or facility.

3.1.5.9. Wanted by federal or civil law enforcement authorities, regardless offense/violation.

3.1.5.10. Any conviction of firearms or explosives violation within the last 10 years.

3.1.5.11. Incarcerated for 12 months or longer within the past three years, regardless of the offense/violation. This can be a single incarceration or several combined which total 12 months.

3.1.5.12. Any conviction of espionage, sabotage, treason, terrorism or murder.

3.1.5.13. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.

3.1.5.14. The individual’s name appears on any Federal or State agency’s “watch list” or “hit list" for criminal behavior or terrorist activity.

3.1.5.15. The individual has been convicted of DUI manslaughter, involuntary manslaughter in the past 10 years or serious bodily harm due to alcohol related incident.

3.1.5.16. The individual has been convicted of sexual assault, armed robbery, rape, child molestation, 01 14 00AT1 - 2

JB MDL, NJ 08641-5002

child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

3.1.5.17. Any Felony conviction within the last 10 years

3.1.5.18. Any conviction of drug possession, or drug manufacture within the past 5 years, reviewable by NCOIC or Supervisor on a case-by-case basis.

3.1.5.19. There is a reasonable basis to believe, based on the individual's material, intentional false statement, deception, or fraud in connection with Federal or contract employment, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.20. There is a reasonable basis to believe, based on the nature or duration of the individual's alcohol abuse without evidence of substantial rehabilitation, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.21. There is a reasonable basis to believe, based on the nature or duration of the individual's illegal use of narcotics, drugs, or other controlled substances without evidence of substantial rehabilitation, that issuance of an access credential poses an unacceptable risk to the installation/mission.

3.1.5.22. A statutory or regulatory bar prevents the individual's contract employment; or would prevent Federal employment under circumstances that furnish a reasonable basis to believe that issuance of a access credential poses an unacceptable risk to the installation/mission.

3.1.5.23. The individual has knowingly and willfully engaged in acts or activities designed to overthrow the U.S. Government by force.

3.1.5.24. Any person with a pending court resolution will be denied access for any offense listed above.

The disposition date (defined as the date the charges were finalized in court) is used to determine the d e barment period.

3.1.5.25. Any person with a pending court resolution for an offense not listed above will be issued a pass for two weeks at a time until the case is finalized in court. If the charges are dismissed the person will be considered to have a favorable criminal history.

3.1.6. The contractor will provide an Entry Authority List (EAL) (see attachment 2 for EAL requirements) to the administrative contracting office or installation Point of Contact (POC) (i.e. 87 CONUS, US Army Corps of Engineers (USACE), 87 CES, etc.). The contracting office will provide a copy of the initial EAL to the 87 SFS/Welcome Center. The contracting office will maintain any required documentation until the contract has been completed or terminated for any reason.

3.1.6.1. The administrative contracting office or installation POC will authenticate and forward the EAL to the 87 SFS Welcome Center, NLT 72 hours prior to contract start date.

3.1.6.2. If EALs are not accurate or contain fraudulent information, contractor identification badges will not be issued.

3.1.6.3. Pen and ink changes for deletion purposes may be made to an EAL.

01 14 00AT1 - 3

JB MDL, NJ 08641-5002

3.1.6.4. Pen and ink additions to an EAL will not be accepted. All additions must be made by initiating a new EAL.

3.1.6.5. The Master EAL will be resubmitted with the additions included. Individual letters for long term employees will not be accepted if the contract exceeds 60 days.

3.1.6.6. The Welcome Center will maintain a copy of the documents for 90 days after expiration for future reference.

3.1.6.7. Contractor/vendor Criminal History Record and Background Checks will be valid for a period not to exceed 3 years.

3.1.6.8. At the one year mark, the contractor/vendor is required to complete a new check for each individual still employed and working at JB MDL.

3.1.6.9. Background checks older than one year will be updated by accomplishing a new JB MDL Criminal History Request Form. Records older than three years on file will be destroyed.

3.1.6.10. Holders of other federal credentials must have a validated need for installation access and will not be granted unlimited or unrestrained access to JB MDL. Therefore, identification credentials/tokens issued by other Federal departments, such as the Transportation Workers Identification Credential (TWIC) [produced in accordance with the Maritime Transportation Security Act of 2002 and Security and Accountability for Every (SAFE) Port Act of 2006] or other Federal credentials, may be used as identity proofing only and the person must be vetted and issued an Installation Access Pass/Card. .

3.1.7. Contractor Visitor Passes for Entry to JB MDL. Contractors and vendors will be issued a computer generated Visitor Pass, or Defense Biometrics Identification System (DBIDS) card identifying them as a contractor authorized access to JB MDL. Vendors cannot receive a pass for more than one day.

3.1.7.1. A criminal history check will be conducted prior to issuing any pass or card.

3.1.7.2. Contractor visitor passes will be issued at a Welcome Center or the Commercial Vehicle Inspection facility for all contractors who require access to the installation for less than 60 days in a year.

3.1.7.3. Visitor passes will be issued to contractors who do not access the installation at least three days per week.

3.1.7.4. Contractors and vendors who access the installation less than three days per week, but will access the installation for longer than one month will be included on an EAL with the date the contract expires. These personnel must stop at the Welcome Center each time they are needed to perform work.

They will be issued a Visitor Pass each time they need to enter the installation. These personnel will be identified on the EAL as requiring periodic access.

3.1.7.5. DBIDS Installation Access Cards will be only be issued to contractors requiring access at least 3 days a week for more than 30 days in a year. Personnel will only be issued an Installation Access Card after all required Criminal History Checks are completed. Installation Access Passes will only be issued at

01 14 00AT1 - 4

JB MDL, NJ 08641-5002

any of the Welcome Centers or Commercial Vehicle Inspection facilities for the entire JB MDL. These personnel will be identified on the EAL as requiring daily access.

3.1.7.5.1. Contractor passes will be updated annually at the Welcome Center or Checkpoint 9 for contracts lasting 1 year.

3.1.7.5.2. Contractor passes will be issued for the duration of the contract, or the length of the option period not to exceed 1 year.

3.1.7.5.3. NON U.S. CITIZENS: All non-U.S. citizens must provide a Work Permit Visa, Passport or Alien Registration Card with immigration number when requesting entry onto JB MDL. Upon completion of an approved Alien Immigration background check, the foreign national will be permitted to be sponsored onto the installation.

3.1.7.5.4. Foreign nationals requesting access onto Lakehurst must be initially authorize access and then be escorted to and from the required location.

3.1.7.5.5. Sponsors must meet their Foreign National visitor at the Lakehurst Welcome Center.

3.1.7.5.6. Non US citizens will not be issued an Installation Access Card for longer than their Work Permit Visa is valid.

3.1.7.5.7. Those contractors working under the AF Industrial Security program will provide an EAL to the Welcome Center.

3.1.7.5.8. Those contractors under the AF Industrial Security program requiring access to the AF computer network may be issued a Common Access Card (CAC) in lieu of the normal contractor visitor pass.

3.1.7.5.9. Those contractors under the AF Industrial Security program who have not been issued a CAC will be issued a contractor visitor pass if they will be on the installation less than 60 days. These Contractors will be issued an Installation Access Card if they will be on the installation longer than 60 days.

3.1.7.5.10. Those contractors under the AF Industrial Security Program who maintain an active DoD security clearance shall provide a Joint Personnel Adjudication System (JPAS) printout in lieu of the required background checks.

3.1.7.6. Installation Access Cards or temporary visitor / vehicle passes are issued for a specific purpose. It is not intended to allow unrestricted installation access and is to be used only when access is required for the stated purpose. Access Cards are the property of the government and must be returned to the issuing office when no longer authorized (termination, retirement, end of contract, expired, etc) or required. The misuse of an Access Card or a temporary pass may be cause for confiscation and barment from the installation. All visitors and contractors will be advised that the acceptance of an Access Card and or temporary pass will be considered implied consent to inspect passenger(s) and vehicle at any time while on the installation. When an Access Card, visitor or vehicle pass has expired, renewal is not automatic. The sponsor or requesting individual must resubmit required information.

01 14 00AT1 - 5

JB MDL, NJ 08641-5002

3.2. Contractor Vehicle Passes for Entry to JB MDL. Contractor vehicle passes will be issued at any Welcome Center or Commercial Vehicle Inspection Area.

3.2.1. All vehicles and drivers must have the following documentation prior to being issued a Visitor Pass/Card and being granted access to JB MDL:

3.2.1.1. Valid state driver's license with photo.

3.2.1.2. Valid state driver’s license without photo with another government/state issued form of identification with photo.

3.2.1.3. Valid vehicle insurance.

3.2.1.4. Valid vehicle registration.

3.2.1.5. Bill of Lading (if available).

3.2.1.6. A JB MDL point of contact with a phone number.

3.2.1.7. Contractors will be issued Visitor Pass/Card for entry to JB MDL provided the required documentation listed in 3.2 is valid.

3.2.1.8. Commercial vehicles identified in Appendix 4 and issued a Visitor Pass/Card must enter the installation through a Commercial Vehicle Inspection Area unless identified on the Installation Commercial Vehicle Access list. Checkpoints, Entry Points, and Welcome Centers will maintain an up to date copy of the approved vehicles list and redirect any vehicles not on the list to the appropriate commercial screening area.

3.3. Contractor, Commercial and Oversized Vehicles. All contractors, commercial, and oversized vehicles not on the Installation Commercial Vehicle Access list must enter JB MDL Main Base through Checkpoint-9 located on Saylor’s Pond Road or through Lakehurst via the Commercial Vehicle Inspection (CVI) gate located on CR 547. The Installation Commercial Vehicle Access list is for Government sponsored organizations (United Communities, PRIDE, etc) and the vehicles must be registered on the access list in order to be exempt from Commercial Checkpoint screening. The Installation Commercial Vehicle Access list will be maintained by 87 SFS/S3 and posted at the gates/checkpoints.

3.3.1. The following are considered “commercial and oversized” vehicles at JB MDL and these vehicles can only enter the installation IAW paragraph 3.3.1. & 3.3.2..

3.3.3. All vehicles registered and licensed for commercial purposes with “commercial” license plates, regardless of state of issue.

3.3.4. All vehicles, regardless of type, license plate, or size, having more than two (2) axles.

3.3.5. All commercially licensed vehicles used to carry tools, machinery, equipment, or other commercial

01 14 00AT1 - 6

JB MDL, NJ 08641-5002

related equipment onto the installation must go through Checkpoint 9

3.3.6. All commercially licensed vehicles displaying a commercial plaque, logo or emblem carrying tools, machinery, equipment, or other commercial related equipment onto the installation must go through Checkpoint 9.

3.3.7. Pick-up trucks, without commercial plates, which have not been equipped with storage containers and are not loaded with material in the bed of truck may enter JB MDL through any gate.

3.4. Contractor vehicle and personnel processing requirements. Checkpoint - 9 is open for personnel and vehicle processing from 0600-1600 hours Monday through Friday and 0600-1400 hours Saturday, Closed on Sunday and some Holidays.

3.4.1. Contractor/Commercial vehicles requesting JB MDL Main Base entry from 1600- 0600 will not be allowed entry. Unusual circumstances will be handled on a case by case basis. Contact the Emergency Communication Center (ECC) at (609) 754-6001.

3.5. Lakehurst CVI is open for personnel and vehicle processing from 0630-1500 hours Monday through Friday.

3.5.1. Contractor/Commercial vehicles requesting JB MDL Lakehurst entry from 1500- 0630 or on weekends must be coordinated with the Operations Emergency Communication Center (ECC and BDOC) at (609) 754-6001/1730/1731.

3.6. Sub-Contractors. All subcontractors are required to follow the same instructions listed above for their subcontractor personnel.

3.6.1. Contractors with an immediate access requirement for a short-term subcontractor must coordinate with their Contracting Officer prior to authorization of access without following the normal procedures.

3.6.2. Short term Subcontractors will be issued a pass not to exceed 1 week.

3.7. Contractors. Contractors working in USAF Restricted Areas will comply with the following:

3.7.1. All contractors meeting the standard of visitor groups IAW AFI 31-501 will be issued line badges for working on the flight line and restricted areas. Those contractors must be working 90 or more consecutive days. All other contractors will require escort.

3.7.2. Each individual contractor (person) will be required to complete a Standard Form 85P - Questionnaire for Public Trust Position before accessing the Restricted Area. This is an investigation to determine the trustworthiness of the individual requiring access to the Restricted Area.

This is not the same type of investigation as the NJ or other state background checks required to be conducted to access JB MDL.

3.7.3. Each individual will work with the unit security manager the contractor is supporting to complete the SF 85P.

01 14 00AT1 - 7

JB MDL, NJ 08641-5002

3.7.4. Upon completion, the contractor will submit to the unit security manager for review.

3.7.4.1. If the 85P package contains errors, the individual will work with the security manager to correct.

3.7.4.2. If unable to correct, the individual will not be allowed access to the restricted area and may be asked to leave the installation.

3.7.5. If the SF 85P package contains no errors, the unit security manager will complete an AF Form 2586 - Unescorted Entry Authorization Certificate for accessing the restricted area.

3.7.6. The unit security manager will make an appointment with 87 ABW/IPP Personnel Security office for contractor processing and turn-in AF Form 2586.

3.7.7. The contractor will meet 87 ABW/IPP personnel and submit the completed SF 85P. 87 ABW/IPP will review SF 85P for accuracy and completion. If the 85P package contains errors, the individual will work with the personnel security office to correct.

3.7.7.1. If unable to correct, the individual will not be allowed access to the restricted area and may be asked to leave the installation.

3.7.7.2. If no issues with 85P, the 87 SFS Reports and Analysis will conduct a local files check on the individual.

3.7.8. Upon local files check completion (no issues), contractor will be directed to the Pass & Registration (Dix Welcome Center) where a restricted area badge can be issued on an interim basis based on submission of the 2586 to S-5B.

3.7.8.1. S-5B will review AF Form 2586 for accuracy and completion.

3.7.8.2. If there are no errors, then an AF Form 1199 - Restricted Area Badge will be produced for the contractor.

3.7.8.3. If there are errors on the AF Form 2586, the contractor will be directed to return to the unit security manager for re-accomplishment of the form.

3.7.9. If potential disqualifying information is discovered the file is forwarded to the 87th ABW IPP office. The IPP office will coordinate with the unit and appropriate wing to determine an appropriate status for the contractor. If the determination is unfavorable the IPP office will notify the 87th SFS and unescorted entry privileges to restricted areas and the flightline will be withdrawn automatically.

3.8. Any work on or near the flightline will be coordinated through the 87 SFS/S5 office. The S-5 Resource Protection section (Bldg. 6049 / Room 8) and Plans Manager (Bldg. 6049 / Room 7) must review prior to start of any work in or around a Controlled/Restricted Area.

3.8.1. The S5 Resource Protection section will verify the need to access the restricted area and determine if a Free Zone must be established.

01 14 00AT1 - 8

JB MDL, NJ 08641-5002

3.8.2. The S5 Plans Manager needs to review all Statements of Work, Blueprints, and Contracts to ensure all JB MDL Force Protection needs are met and any police support is identified.

3.9. Flightline Driving. Only authorized contracted or privately owned vehicles with colored cones/placards are authorized on the flightline and/or flightline road unless driving a government vehicle or under authorized escort.

3.9.1. Contractor personnel who are authorized to drive on the flightline will be issued a colored cone/placard from Airfield Management.

3.9.2. Cones/placards must be visible during operations of the vehicle when driving on the flightline and when parked on the flightline.

3.9.3. The cone/placard must be secured (put away) upon departure from the flightline.

3.10. Restricted Areas: Defined as an area delineated by ropes, red lines or barriers that contain Protection Level resources (i.e. aircraft or equipment).

3.10.1. These areas require a certain level of protection, and entry is only allowed by authorized personnel wearing a restricted area badge or personnel under authorized escort.

3.10.2. Aircraft hangars are restricted areas when aircraft are present.

3.10.3. Signs are posted every 100 feet on the exterior of restricted area boundaries stating; "Deadly Force is Authorized."

3.10.4. Contractors will never enter restricted areas unless properly escorted or authorized by the installation commander or designee through the issuance of a restricted area badge.

3.10.5. If the Security Forces or a military member detains a contractor or contract employee at any time or for any reason, the contractor will comply with their request and will not become combative or argumentative.

3.10.6. Project Managers or Long Term Contractors requesting to control entry/exit through a gated/ secured flight line ECP for a construction project where a Free zone may prove to be too immense, the person controlling the gate must be in possession of a CAC for Controlled areas and must possess a RAB if project/access is near/adjacent to a Restricted Area. The CAC holder must remain at the ECP while the area is open and are responsible for returning the key to the ECC at the end of the day/project. Entry and exit to restricted areas and free zones are covered in Appendix 8 to Annex C. All contractor controlled or mission partner controlled entry concerns must be pre-approved and coordinated with 305th AMW/ Airfield Management and Security Forces (87 SFS/S5) prior to the contract being awarded.

3.11. Miscellaneous Requirements. All requests for additional contractor personnel must meet the same requirements listed in para A1 above before Installation Access Passes will be issued.

01 14 00AT1 - 9

JB MDL, NJ 08641-5002

3.11.1. The administrative contracting office will be notified when personnel leave the contractor company for any reason and provide that information to the Welcome Center.

3.11.2. The contractor company is responsible for the return of all contractor identification badges at the end of the contract or when personnel depart for any reason. All badges and passes will be returned to the Welcome Center.

3.11.3. During increased Force Protection Conditions (FPCONs) there may be limited entry to the installation.

3.11.4. Retired military or government personnel may be allowed to enter the installation through any gate providing the vehicle operator has a current and valid base entry ID card.

3.11.5. Retired military or government personnel must be listed on the company EAL.

3.11.6. All retired military or government personnel will complete all Criminal History Record Information/Background Check regardless of their military/government retired status.

3.11.7. All contractor vehicles entering must be registered at the Welcome Center or Commercial Vehicle Inspection Facility.

3.11.8. Personnel authorized to receive a long term Access Pass will not be issued a vehicle pass. The vehicle information will be included in the bar code of the pass. Personnel entering JB MDL who do not qualify for a long term pass or are using a vehicle temporarily, will be issued an AF Form 75, Vehicle Pass.

3.12. Contractors are NOT normally authorized to Sponsor any personnel to enter JB MDL.

3.12.1. Exceptions to this rule will be addressed on an as needed basis through the Contracting Officer and the 87 SFS Welcome Center Supervisor.

3.12.1.1. The contractor must work through the Contracting Officer who in turn will contact the Welcome Center Supervisor.

3.12.1.2. In the event the Welcome Center Supervisor is unavailable, the following personnel in the order listed may approve the contractor sponsorship authority:

3.12.1.2.1. 87 SFS Deputy Air Provost, Operations Officer, Operations Superintendent, or the on- duty flight chief as necessary.

3.12.1.2.2. Sponsoring personnel onto the installation is a limited privilege for emergent requirements only and cannot be used as a routine method to get subcontractors onto the installation.

3.12.1.2.3. Contractors granted sponsorship privileges may only sponsor a visitor pass a maximum of 7 calendar days. If the person being sponsored onto the installation requires a longer pass, the responsible contracting officer or base POC must submit the person on an EAL.

01 14 00AT1 - 10

JB MDL, NJ 08641-5002

3.12.1.2.4. Contractors with Installation Access Sponsoring authority must contact the Welcome Center Supervisor or Senior Clerk to coordinate each emergent requirement.

3.12.1.2.5. The sponsoring Contractor will be responsible for all individuals they sponsor onto the installation.

3.12.1.2.6. Contractor sponsorship privileges will be revoked if is determined the contractor is attempting to supersede normal installation access requirements.

3.12.1.2.7. No more than three personnel per prime contract EAL will be granted sponsorship privileges.

3.12.1.2.8. The Contracting Office or JB MDL point of contact will ensure this privilege is only granted to prime contractors who will not know in advance which personnel will be reporting for work.

3.12.1.2.9. Personnel granted sponsorship authority must have a criminal history background check completed prior to them authorized to be a sponsor.

3.12.2. Any contractor found in violation of these requirements will be escorted off the installation.

They will be removed from the company entry authority list and will not be allowed to reenter JB MDL without the express written permission of the Installation Commander.

3.12.3. Contractors are required to obey all entry requirements, traffic rules and requirements of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .