This document summarizes an invitation for bids for a federal construction contract. The U.S. Army Corps of Engineers, New York District is seeking to replace two hot cargo loading area fueling loops and pits at an airfield to enable safe and efficient fueling of aircraft carrying hazardous cargo. The scope of work includes installing new underground jet fuel hydrant loop piping, connections to an existing pressurized hydrant fueling system, and new hydrant fueling pits. Additional work comprises emergency stops, pipe cathodic protection, isolation valves, crossover piping, demolition and replacement of concrete and asphalt, demolition of existing hydrant pits and above-ground valves, and soil remediation as required. Bids are due 30 days following issuance of the solicitation on or about January 10, 2020. The contract period of performance is 540 calendar days from notice to proceed. The procurement will be conducted as a 100% small business set-aside with a value between $5-10 million.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER:
W912DS-20-B-00032. DATE ISSUED:
15-JAN-20203. DATE OPENED:

20-APR-2020

4. ISSUING OFFICE:

U.S. Army Corps of Engineering, NY District 26 Federal Plaza, Room 16-300 New York N.Y. 10278-0090 I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. NAME AND TITLE OF CERTIFYING OFFICIAL:

Ivan Damaso

Signature:
Ivan Damaso
5. PROJECT TITLE:

Hot Cargo Hydrant System Replacement

Date Signed:
20-Apr-20
Bid Opening 4/20/2020 2:30 PM
BIDDER #1BIDDER #2BIDDER #3BIDDER #4BIDDER #5
ITEM NO.DESCRIPTION OF ITEMIGEAnselmi & DeCiccoBrennan Brothers ContractingStructural AssociatesTDX QualityUSA Environmental
0001All work complete to replace existing hydrant loop fuel piping with 14-inch stainless steel piping, excluding Other Basic Items and Option Items listed below.$ 6,230,500.00$ 5,000,000.00$ 4,300,000.00$ 11,104,100.00$ 10,107,697.00$ 7,656,000.00
0002All work complete to provide 900-gpm hydrant outlet pit, high/low vent pits and drain pits and associated valves, excluding Other Basic Items and the Option Items listed below.

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

$ 951,000.00$ 60,000.00$ 1,200,000.00$ 545,200.00$ 1,416,927.00$ 690,200.00
0003All work complete for remainder of work (other utilities, pavements and demolition), excluding Other Basic Items and the Option Items listed below$ 2,473,400.00$ 5,520,000.00$ 7,430,985.00$ 2,298,350.00$ 4,179,451.00$ 1,102,000.00
0004Record Drawing$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00
0005 (Opt 1)Additional cost to utilize trenchless methods for installation of the fuel piping underneath Taxilane Uniform and the aircraft parking apron in lieu of open trench method$ 665,700.00$ 1,950,000.00$ 595,450.00$ 2,059,400.00$ 2,295,283.00$ 1,676,200.00
0006 (Opt 2)Additional cost to reconfigure piping and install a crossover valve at the DLA Pumphouse. (SRM Funded)

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

$ 192,300.00$ 25,000.00$ 300,000.00$ 318,600.00$ 358,387.00$ 381,640.00
0007 (Opt 3)Additional Cost to remove unsuitable contaminated soil not suitable for backfill in Basic work.

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

$ 55,600.00$ 20,000.00$ 53,000.00$ 27,250.00$ 22,279.00$ 22,000.00
0008 (Opt 4)Additional Cost to remove contaminated liquid collected from excavations and stockpiles offsite tltat cannot be disposed on-site.in Basic work.$ 9,900.00$ 25,000.00$ 97,500.00$ 5,000.00$ 11,140.00$ 4,500.00
0009 (Opt 5)FEP Additional Cost for removal and disposal of unsuitable soil cement, and replacement with suitable structural fill material THis IS ESTL.'vfATED QUANTITY$ 217,900.00$ 62,500.00$ 125,000.00$ 85,700.00$ 55,699.00$ 55,000.00
0010 (Opt 6)Replacement of existing high point/low point valves and gaskets and hydrant outlet pit pipe flange gaskets on the DLA hydrant loop, as well as removal of pressure gage ball valves$ 67,000.00$ 9,000.00$ 150,000.00$ 61,650.00$ 323,910.00$ 125,280.00
TOTAL BASE CLINS 0001-0004$ 9,679,900.00$ 10,605,000.00$ 12,955,985.00$ 13,972,650.00$ 15,729,075.00$ 9,473,200.00
TOTAL OPTIONAL CLINS 0005-0010$ 1,208,400.00$ 2,091,500.00$ 1,320,950.00$ 2,557,600.00$ 3,066,698.00$ 2,264,620.00
TOTAL BASE & OPTIONAL CLINS 0001-0010$ 10,888,300.00$ 12,696,500.00$ 14,276,935.00$ 16,530,250.00$ 18,795,773.00$ 11,737,820.00