W16ROE81412883
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise Draw ings
2. Revise Specifications
3. Respond to solicitaion question received by Contractor
Bid opening date remains 18-SEP-2018 at 3:00 PM EST
Bidders must acknow ledge receipt of this amendment by the date specified or as amended in the bid by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATIOM OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0015
X 9B. DATED (SEE ITEM 11)
13-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2018
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS18B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
AMENDMENT 0004 to DRAWINGS and SPECIFICATIONS for AGE Storage, Joint Base McGuire-Dix- Lakehurst, New Jersey.
TO OFFORERS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- Drawing C-101
- Drawing C-104
- Drawing C-106
- Drawing A104
- Drawing E602
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- Section 31 00 00 – Earthwork
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 01 45 00.00 10 Quality Control – add the following to paragraph 3.10 “If the RESIDENT MANAGEMENT SYSTEM CONTRACTOR MO`DE (RMS CM) is required for CQC as indicated elsewhere in this contract, generate all reports in the RMS CM System. Attached forms will serve as guidance only. Otherwise forms contained herein will be used by the CQC Staff for CQC System reporting).
a. The 2-page form at the end of the section will be used for the basic CQC Report. CQC personnel shall attach continuation sheets as required for any entries which cannot fit on the basic form. Preparatory and Initial Inspections, when performed, shall be indicated on the basic CQC report and minutes for each inspection shall be attached. Minutes will consist of a list of specific requirements for materials, procedures or equipment to be employed and shall also include any understandings reached or items of special importance discussed.
b. In addition, outstanding deficiencies shall be listed on the form "List of Outstanding Deficiencies" at the end of this section and shall be attached to each CQC report. As deficiencies are corrected, they are to be acknowledged on the basic CQC report and shall be deleted from the list.
c. Form at the end of this section entitled "CQC Test Report List" shall be used by the Contractor to track testing to be done as the project progresses, and also to summarize the Contractor's Quality Control testing to be reported on the CQC Plan.
d. Form "Record of Preparatory and Initial Inspections" at the end of this section shall be used by the Contractor to track Preparatory and Initial inspections as the project progresses and also to summarize these required inspections as part of the CQC Plan.
e. Additional reporting forms pertaining to specialized activities may be included herein or elsewhere in the contract, and shall be used for reporting as indicated”-
- Section 01 45 00.00 10 Quality Control – add the following to end of paragraph 3.11 “Deficiencies cited and verbal instructions given to the Contractor by the Government Representative shall be entered into that day's CQC Report.”
- Section 07 61 14.00 20 Steel Standing Seam Roofing – revise part of Paragraph 1.7 that read “Repairs that become necessary because of defective materials and workmanship while roofing is under warranty must be performed within 24 hrs (not 7 days), after notification, unless additional time is approved by the Contracting Officer.”
- Section 13 34 19.00 Metal Building Systems – Delete the following paragraphs: 1.10.2 and
1.10.3 in their entirety and replace with “NOT USED”.
- Section 26 12 19.10 – Three-Phase Pad-Mounted Transformers o Delete all of paragraph 2.2.1.2 High Voltage, Live-Front.
o Revise paragraph 3.2 Grounding to read “NFPA 70 and IEEE C2, except provide grounding systems with a resistance to solid earth ground not exceeding 10 ohms.”
o Revise paragraph 3.6.1 Cast-in-Place Concrete to read “Provide cast-in-place concrete work in accordance with the requirements of Section 03 30 53 Miscellaneous Can-in- Place Concrete ACI 318/ACI 318M.
- Section 26 20 00 Interior Disruption System o Revise paragraph 2.7.i to read “Device plates ivory finish nylon-device plates rated for high abuse. Test device plates for compliance with UL 514A and UL 514C for physical strength.”
o Delete paragraph 2.9.1 Switched Duplex Receptacles.
o Delete the note at the end of paragraph 2.10.2 Panelboard Buses.
o Revise note a. in paragraph 2.13 Motors to read “NEMA MG 1.”
o Delete paragraph 3.1.5.6 Conduit Interior to Buildings for 400 Hz Circuits.
o Delete paragraph 3.1.9.1 Splices of Aluminum Conductors.
o Delete Title 3.1.10 Terminating Aluminum Conductors.
o Delete paragraph 3.1.10.1 Termination to Copper Bus.
o Delete the following sentence from paragraph 3.4 “Painting: as specified in Section 09 90
00 Paints and Coatings.”
- Section 26 41 00 Lightning Protection System – Delete the last sentence in paragraph 3.2.1.2 that reads “Use adhesive shoes with adhesive approved by the roof manufacturer when installing roof conductors on “rubber” (EPDM) type roofs.”
- Section 26 51 00 Interior Lightning – Delete the last sentence in paragraph 3.2 that reads “Provide painting as specified in Section 09 90 00 PAINTS AND COATINGS.”
- Section 33 71 02 Underground Electrical Distribution o Delete paragraph 2.8 o Delete reference to Section 31 23 00.00 20 Excavation in paragraph 2.10.2.
o Delete reference to Section 03 30 00 Cast-In-Place Concrete in paragraph 2.13 and replace with Section 03 30 53 Miscellaneous Cast-In-Place Concrete.
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. Are the Pre-Engineered Metal components such as the columns, rafters & bar joists to be finished painted with something other than the standard red primer? Not clearly specified in the contract documents. Can the joist bars be bolts to the column rafters?
Response: The Pre-Engineered Metal components are to match the color of the roof, which is Federal Standard 595B #20040. The joist bars may be bolted to the column rafters so long as the design requirements are m
(End of Summary of Changes)