Amendment_0004_-_AGE_Storage_-_Plans.pdf

PDF 2 MB Posted

Attached to
Aerospace Ground Equipment Storage Joint Base-MDL (McGuire AFB), New Jersey
Solicitation number
W912DS18B0015
Issued by

About this file

updated plans

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A201

A202

A202

A201

3 5 7

B

A

METAL BUILDING SYSTEM STRUCTURE, TYP.

SEE STRUC. DRAWINGS.

A301

A301

INSTALL BIRD NETTING UNDERSIDE OF ROOF STRUCTURE/LIGHT FIXTURE THROUGHOUT

IN

S

T A

L L

B

IR

D N

E T

T

IN

G U

N D

E R

S

ID

E O

F L

IG

H

T F

IX

T

U E

TRANSFORMER. SEE ELEC DRAWINGS.

LIGHT FIXTUES, SEE ELEC. DRAWINGS.

LIGHT FIXTURES, TYP. SEE ELECTRICAL

DRAWINGS.

E Q

E Q

E Q

EQ EQ EQ EQ EQ EQ EQ EQ13' - 0"

UNISTRUT TO SUPPORT LIGHT FIXTURE

ELECTRICAL BOX IS ATTACHED

TO THE SURFACE

OF THE MAIN STRUCTURE

GENERAL NOTES DRAWING NOTES

1. REFERENCE ELECTRICAL FOR MOUNTING HEIGHTS AND LOCATIONS FOR LIGHT

FIXTURES.

2. BIRD NETTING TO BE INSTALLED UNDER LIGHT FIXTURE, TYP. PROVIDE ZIPPERS

FOR ACCESS TO LIGHT FIXTURES AND OTHER ELECTRICAL EQUIPMENTS. REFER

TO SPECIFICATIONS 10 81 13.00 18 BIRD CONTROL DEVICES.

3. MATCH COLOR OF METAL FRAMING TO ROOF. (FEDERAL STANDARD 595B #20040)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I '

D

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N

O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

DATE:

FILE PATH:

9/13/2018 3:41:51 PM

C:\Users\E3ENDCPP\Documents\AGES-DMMA-CF00_E3ENDCPP.rvt

A104

R E

F

LE

C T

E D

C E

IL

IN

G P

L A N

K C

-4 6A

A E

R O

S P

A C

E G

R O

U N

D E

Q U

IP

M

E N

T S

T O

R A

G E

N E

W Y

O R

K D

IS

T

R

IC

T

F

E D

E R

A L

P

LA

Z A

N E

W Y

O R

K , N

Y

D e si gn e r

A u th o r

C h e ck e r

J U

L Y

W

D S

-1 8-

B

X

X

95% INTERIM SUBMISSION

3/32" = 1'-0"A104

1 REFLECTED CEILING PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

R e vi se d a s pe r R

F I

-S E

P -2

US Army Corps of Engineers ®

SHEET

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

M

AK

R D

ES

C

R

IP

TI

O

E602

PA

N

EL

BO

A R D

S C

H

ED

U

LE

S

JB

M

D L, M C

G U

I R E

AF

B , N

EW

J

ER

SE

Y

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

2 7

D es ig ne r

Au th or

C he ck er

M

AY

W

2D S-

-B

XX

K C -4

6A A

ER

O

SP

AC

E G

R O

U N

D E

Q U

IP

M

EN

T

ST

O

R

AG

E

PT

FL

Notes: ALL OTHER BREAKER POSITIONS NOT IDENTIFIED, SHALL BE BREAKER SPACES.

Total Est. Demand Current: 9 A

Total Conn. Current: 9 A Communications 1000 VA 1000 VA Total Est. Demand: 7506 VA Receptacle 1800 VA 1800 VA Total Conn. Load: 7506 VA Lighting 4826 VA 4826 VA Load Classification Connected Load Estimated Demand Panel Totals

Total Amps: 9 A 9 A 9 A Total Load: 2464 VA 2523 VA 2523 VA

41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20

17 900 VA 18

15 900 VA 16

T-1 30 A 3 1000... 0 VA 1 20 A Spare 14

11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12 9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10 7 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 8 5 Lighting 20 A 1 747 VA 924 VA 1 20 A Exterior Lighting 6 3 Lighting 20 A 1 747 VA 924 VA 1 20 A Exterior Lighting 4 1 Lighting 20 A 1 747 VA 747 VA 1 20 A Lighting 2

CKT Load Name Trip Poles A B C Poles Trip Load Name CKT

Notes:

Enclosure: NEMA 3R Main Rating: 100A Mounting: Surface 4 MCB Rating: 100 A

Supply From: PAD MT TRANS 3 Mains Type: MCB Location: 480/277 Wye A.I.C. Rating: 14 KAIC

Branch Panel: HLP

Notes: ALL OTHER BREAKER POSITIONS NOT IDENTIFIED SHALL BE BREAKER SPACES.

Total Est. Demand Current: 8 A

Total Conn. Current: 8 A Total Est. Demand: 2800 VA

Communications 1000 VA 1000 VA Total Conn. Load: 2800 VA Receptacle 1800 VA 1800 VA Load Classification Connected Load Estimated Demand Panel Totals

Total Amps: 8 A 8 A 8 A Total Load: 1000 VA 900 VA 900 VA

41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 Spare 20 A 1 0 VA 16 13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14 11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12 9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10 7 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 8 5 Receptacle 20 A 1 360 VA 540 VA 1 20 A Receptacle 6 3 Receptacle 20 A 1 360 VA 540 VA 1 20 A Receptacle 4 1 CCTV CAMERA POWER SUPPLY UNITS 20 A 1 500 VA 500 VA 1 20 A CCTV CAMERA POWER SUPPLY UNITS 2

CKT Load Name Trip Poles A B C Poles Trip Load Name CKT

Notes: MAIN BREAKER TRIP AT 50A Enclosure: NEMA 3R

Mains Type: MCB MCB Rating: 50 A Main Rating: 100 A

Mounting: Surface 4 Supply From: T-1 3

Location: 120/208 Wye A.I.C. Rating: 10 KAIC Branch Panel: LP

NOTES:

1. INTERRUPTING RATINGS SHOWN ARE MINIMUM REQUIRED.

/1 2/

AM

EN

D

M

EN

T R

EV

IS

IO

N

S e3enmrt3 Polygon

File details come from the government source that posted it.