W912DS-16-R-0010-0008.pdf
PDF 44 KB Posted
- Attached to
- FY16 DODEA PN AM0033 Replace Elementary School Federal contract opportunity
- Solicitation number
- W912DS-16-R-0010
About this file
Amendment 0008
View the file
Other files for this federal contract opportunity
Show all 50
FY16 DODEA PN AM0033 Replace Elementary School has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Answ er questions for informational purposes only
2) Revise section 00 73 00
3) Revise and reissue draw ings
Proposal due date remains 15 Nov 2016 at 2:00 P.M. EST
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-R-0010
X 9B. DATED (SEE ITEM 11)
23-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Oct-2016
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-16-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0008
NOTE: Offerors must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the following methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below. FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND
TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL IN ACCORDANCE WITH
THE LATE PROPOSAL, LATE MODIFICATION OF PROPOSAL, OR LATE WITHDRAWAL OF
PROPOSAL (FAR 15.208).
AMENDMENT 0008 to DRAWINGS and SPECIFICATIONS for W912DS-16-R-0010.
TO OFFERERS
The following changes shall be made to the drawings and specifications.
SECTION 00 73 00 SPECIAL CONTRACT REQUIREMENTS
Paragraph 1: FAR 52.211‐10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK:
Delete Subparagraph a in its entirety and replace with the following:
“The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than 1080 calendar days after award of the contract, except in the case that the Contracting Officer determines that seeding is not feasible during the construction period, the Contractor shall accomplish such seeding in the first planting period following the contract completion date, (iv) the work is a multi‐phased project as shown in the solicitation. This action will not operate to extend the performance time for the balance of the work. The time stated for completion shall include final cleanup and punch list.”
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)
Q:1 RE: RFI #130. CL 101 was referenced, but no change was made to the drawing.
A: 1 Drawing CL101 shall be removed from the list of drawings THAT HAVE BEEN REVISED.
Q:2 RE: RFI #2: In the response to the RFI the seatwall reference was called to be on sheet CL105. This reference is actually on sheet CL201.
W912DS-16-R-0010
A:2 Drawing CL105 shall be removed from the list of drawings THAT HAVE BEEN REVISED.
Q:3 RE: RFI’s #31 and #204. The cloud showing the deleted concrete and brick construction did not show up on S-104.
A:3 This has been corrected. ON sheet S-302, Detail B3/S-302 has been marked as deleted and referenced in the revision box.
Q:4. Drawing A105 indicates that the #143 Panel Partition is a "Folding Panel Partition", but detail C1 on drawing A123 and section A1 on drawing A521 classify that same partition as an "Electrically Operated Sliding Panel Partition." Please verify if this partition is folding or sliding.
A:4. The note on sheet A-105 refers to the electrically operated folding panel partition between the MP Room and the Commons. The note on A-123 refers specifically to the sliding partitions at the learning studios and says there is a similar BULKHEAD condition for the folding partition between the Commons and the MP Room.
Q:5. Drawing A109 shows that there are lockers in Rm. 1E02C. However, in drawing A413, it shows that there are no lockers in that same room. Please verify that there are no lockers in this room.
A:5. RFI#35. The employee lockers are shown on Sheet A-109. These six lockers have been added to Sheet A-413.
Q:6. A602 – Door #1C19A has no frame type or material listed – please provide A:6. The Detail references have been added to Sheet A-602.
Q:7. Drawings ES100 and E601: The medium voltage service to the new school is shown connected to circuit AC-1 at 13.8KV substation C (North Primary switch house B.715) It shows splicing to existing conductors in Manhole 3 but the manhole location isn't shown - the drawing just says 'verify length of pull with DPW' Please advise what should be estimated for the cable length from Manhole 3 to Manhole 4E shown on the plans.
A:7. The information about the manhole is from DPW. The length will be provided by the DPW subsequent to award. The amount of cable length to be estimated is 1,834 feet
8. Here is the revised list of Drawings THAT HAVE BEEN REVISED (and reissued).
The following DRAWINGS have been REVISED and REISSUED: ‐ CA101, BG101, BG102, BG103, CD101, CS100, CS101, CS200, CS215, CS216, CS501, CS503, CS506, CG502, CL103, CL201, CL203, S‐001, S‐102, S‐104, S‐109, S‐302, S‐310, S‐313, S‐330, S‐335, S‐515 , A‐104, A‐105, A‐107, A‐108, A‐109, A‐123, A‐201, A‐202, A‐203, A‐204, A‐205, A‐206, A‐326, A‐413, A‐421, A‐428, A‐514, A‐602, A‐608, A‐609, A‐701, A‐702, A‐703, A‐704, A‐705, A‐706, A‐707, A‐708, A‐709, A‐717, A‐718, A‐719, A‐720, A‐811, A‐812, P‐117, P‐600, M‐507, M‐509, E002, EL101, EL102, EL103, EL104, EL105, EL106, EL107, EL108, EL109, TS001, TS101, TS102, TS104
(End of Summary of Changes)