32_05_33_LANDSCAPE_ESTABLISHMENT.pdf

PDF 27 KB Posted

Attached to
FY16 DODEA PN AM0033 Replace Elementary School Federal contract opportunity
Solicitation number
W912DS-16-R-0010
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0006 Spec

View the file

Other files for this federal contract opportunity

Other files attached to FY16 DODEA PN AM0033 Replace Elementary School, newest first.
File Type Posted
DS-16-R-0010-0009.pdf PDF
A-602.pdf PDF
S-104.pdf PDF
A-123.pdf PDF
A-105.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume1C.pdf PDF
A-413.pdf PDF
S-302.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_1B.pdf PDF
W912DS-16-R-0010-0007_(2).pdf PDF
32_31_13_CHAIN_LINK_FENCES_AND_GATE.pdf PDF
27_51_16_PUBLIC_ADDRESS_AND_MISCELLANEOUS_AUDIO_VIDEO_SYSTEMS.pdf PDF
DELETE_Section_09_67_23.13_STANDARD_RESINOUS_FLOORING.pdf PDF
23_05_15_COMMON_PIPING_FOR_HVAC.pdf PDF
06_61_16_SOLID_POLYMER_(SOLID_SURFACING)_FABRICATIONS.pdf PDF
23_52_00_HEATING_BOILERS.pdf PDF
09_67_23.14_CHEMICAL_RESISTANT_RESINOUS_FLOORING.pdf PDF
23_70_03.00_10_HEATING_AND_UTILITIES_SYSTEMS _CENTRAL_STEAM.pdf PDF
32_18_16.13_PLAYGROUND_AND_PROTECTIVE_SURFACING.pdf PDF
23_07_00_THERMAL_INSULATION_FOR_MECHANICAL_SYSTEMS.pdf PDF
23_09_23_LONWORKS_DIRECT_DIGITAL_CONTROL_FOR_HVAC_AND_OTHER_BUILDING_CONTROL_SYSTEMS.pdf PDF
05_40_00_COLD-FORMED_METAL_FRAMING.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_2B.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_1A.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_1B.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume1C.pdf PDF
SWPPP_Final.pdf PDF
Pages_from_New_Elementary_School_-_Geotech_Report.pdf PDF
W912DS-16-R-0010-Amendment_0006.pdf PDF
Amendment_0006_Q A.pdf PDF
W912DS-16-R-0010-0005.pdf PDF
site_visit_Sign_in_Sheet.pdf PDF
J A_Name_Brand_USMA_West_Point_Elem_School_Redacted.pdf PDF
A-107_LEVEL_1_-_UNIT_C_FLOOR_PLAN.pdf PDF
A-812_SIGNAGE_ELEVATIONS_AND_DETAILS.pdf PDF
A-108_LEVEL_1_-_UNIT_D_FLOOR_PLAN.pdf PDF
A-609_ALUMINUM_CURTAINWALL_ELEVATIONS.pdf PDF
A-811_SIGNAGE_ELEVATIONS_AND_DETAILS.pdf PDF
R-0010_Site_Visit_Location.pdf PDF
Amendment_1___A-720_-_ROOM_FINISH_SCHEDULE_-_LEVEL_1.pdf PDF
Amendment_1___Fire_Alarm_Drawings_REV1_-1.pdf PDF
Amendment_1___A-428_-_CASEWORK_PLANS_AND_DETAILS.pdf PDF
Amendment_1___A-421_-_LEVEL_1_-_UNIT_A_EQUIPMENT_PLAN.pdf PDF
W912DS-16-R-0010_SOLICITATION_Amendment_0001.pdf PDF
2016-08-03_WPES_RTA_Submittal_Volume_1.pdf PDF
W912DS-16-R-0010_SOLICITATION.pdf PDF
WPES_Specs_VOL_2.pdf PDF
2016-08-03_WPES_RTA_Submittal_Volume_2.pdf PDF
WPES_Specs_VOL_1_Revised.pdf PDF
2016-08-03_WPES_RTA_Civil_Bid_Option_Sheets.pdf PDF
Show all 50

FY16 DODEA PN AM0033 Replace Elementary School has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST POINT ELEMENTARY SCHOOL REPLACEMENT W91236-15-D-0014

SECTION 32 05 33

LANDSCAPE ESTABLISHMENT

02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D2103 (2015) Standard Specification for Polyethylene Film and Sheeting

TREE CARE INDUSTRY ASSOCIATION (TCIA)

TCIA Z133.1 (2006) American National Standard for Arboricultural Operations - Pruning, Repairing, Maintaining, and Removing Trees, and Cutting Brush - Safety Requirements

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental Design(tm) for Schools New Construction Rating System

1.2 DEFINITIONS

1.2.1 Pesticide

Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides, insecticides, fungicides, nematicides, molluscicides and rodenticides.

1.2.2 Stand of Turf

100 percent ground cover of the established species.

1.2.3 Planter Beds

A planter bed is defined as an area containing one or a combination of the following plant types: shrubs, vines, wildflowers, annuals, perennials, ground cover, and a mulch topdressing excluding turf. Trees may also be found in planter beds.

SECTION 32 05 33 Page 3

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Integrated Pest Management Plan; G

SD-03 Product Data

Local/Regional Materials; (LEED NC)

Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.

Hose; (LEED NC) Mulches Topdressing; (LEED NC)

Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.

Organic Mulch Materials

Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.

Fertilizer; G

SD-07 Certificates

Maintenance inspection report

SD-11 Closeout Submittals

Tree, staking and guying removal

1.4 DELIVERY, STORAGE AND HANDLING

1.4.1 Delivery

Deliver fertilizer, gypsum, iron to the site in original containers bearing manufacturer's chemical analysis, name, trade name, or trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum may be furnished in bulk with a certificate indicating the above information.

SECTION 32 05 33 Page 4

1.4.2 Storage

1.4.2.1 Fertilizer, Lime, Iron, Mulch Storage

Material shall be stored in designated areas. Lime and fertilizer shall be stored in cool, dry locations away from contaminants.

1.4.2.2 Antidessicants Storage

Do not store with fertilizers or other landscape maintenance materials.

1.4.3 Handling

Do not drop or dump materials from vehicles.

1.5 SUSTAINABLE DESIGN REQUIREMENTS

1.5.1 Local/Regional Materials

Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources.

PART 2 PRODUCTS

2.1 POST-PLANT FERTILIZER

2.1.1 Granular Fertilizer

Organic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:

10 percent available nitrogen 10 percent available phosphorus 10 percent available potassium

2.2 WATER

Source of water shall be approved by the Contracting Officer, and be of suitable quality for irrigation.

2.2.1 Hose

Hoses used for watering shall be a minimum of 60 percent post-consumer rubber or plastic.

2.3 MULCHES TOPDRESSING

Free from noxious weeds, mold, or other deleterious materials.

2.3.1 Inert Mulch Materials

crushed pit-run rock granite chips ranging in size from 1/2 to 2 inches.

Provide materials from site and construction waste to the greatest extent possible.

2.3.2 Organic Mulch Materials

Wood cellulose fiber wood chips ground or shredded bark shredded hardwood

SECTION 32 05 33 Page 5 from site when available. Biobased content shall be a minimum of 100 percent. Wood cellulose fiber shall be processed to contain no growth or germination-inhibiting factors, dyed with non-toxic, biodegradable dye to an appropriate color to facilitate visual metering of materials application. Paper-based hydraulic mulch shall contain a minimum of 100 percent post-consumer recycled content. Wood-based hydraulic mulch shall contain a minimum of 100 percent recycled material.

2.3.3 Recycled Organic Mulch

Recycled mulch may include compost, tree trimmings, or pine needles with a gradation that passes through a 2-1/2 by 2-1/2 inch screen. It shall be cleaned of all sticks a minimum 1 inch in diameter and plastic materials a minimum 3 inch length. The material shall be treated to retard the growth of mold and fungi.

2.4 PESTICIDES

Use black sheet polyethylene conforming to ASTM D2103, minimum thickness 5/32 inch. Submit an Integrated Pest Management Plan, including weed and pest management strategies proposed alternatives to herbicides and pesticides. Use biological pest controls as approved in the Plan.

PART 3 EXECUTION

3.1 EXTENT OF WORK

Provide landscape construction maintenance to include irrigation equipment cleaning and adjustments, mowing, edging, overseeding, aeration, fertilizing, watering, weeding, pruning, stake and guy adjusting, and for all newly installed landscape areas and existing plant material, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the Contractor's operations.

3.1.1 Policing

The Contractor shall police all landscaped areas. Policing includes removal of leaves, branches and limbs regardless of length or diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks or other debris. Policing shall extend to both sides of fencing or walls. Collected debris shall be promptly removed and disposed of at an approved disposal site.

3.1.2 Drainage System Maintenance

The Contractor shall remove all obstructions from surface and subsurface drain lines to allow water to flow unrestricted in swales, gutters, catch basins, storm drain curb inlets, . Remove grates and clear debris in catch basins. Open drainage channels are to be maintained free of all debris and vegetation at all times. Edges of these channels shall be clear of any encroachment by vegetation.

3.2 GROUNDCOVER ESTABLISHMENT PERIOD

Groundcover establishment period will commence on the date that inspection by the Contracting Officer shows that the new turf furnished under this contract has been satisfactorily installed to a 95 percent stand of coverage. The establishment period shall continue for a period of 365 days.

SECTION 32 05 33 Page 6

Erin.Burdick Highlight

3.2.1 Frequency of Maintenance

Begin maintenance immediately after turf has been installed . Inspect area once a week during the installation and establishment period and perform needed maintenance promptly.

3.2.2 Promotion of Growth

Groundcover shall be maintained in a manner that promotes proper health, growth, natural color.Turf shall have a neat uniform manicured appearance, free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow, remove excess clippings, eradicate weeds, water, fertilize, overseed, aerate, topdress and perform other operations necessary to promote growth, as approved by Contracting Officer and consistent with approved Integrated Pest Management Plan. Remove noxious weeds common to the area from planting areas by mechanical means.

3.2.3 Mowing

3.2.3.1 Turf

Turf shall be mowed at a uniform finished height. Mow turfed areas to a minimum average height of 3 inches when average height of grass becomes 5 inches for spring/summer maintenance and to a minimum average height of 4 inches when the average height of grass reaches 6 inches for fall winter maintenance. The height of turf is measured from the soil. Mowing of turf shall be performed in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Prior to mowing, all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on a turf area shall be picked up and disposed. Adjacent paved areas shall be swept/vacuumed clean.

3.2.3.2 Native Grasses

Mow above height of native grass seedlings (approximately 3.5 to 4 inches ). Mow during spring or early summer. Do not mow after early summer during the second growing season.

3.2.3.3 Wildflowers

Mow three times per season above height of the wildflowers (approximately 12 to 15 inches).

3.2.4 Turf Edging and Trimming

Perimeter of planter bed edges, sidewalks, driveways, curbs, and other paved surfaces shall be edged. Uniformly edge these areas to prevent encroachment of vegetation onto paved surfaces and to provide a clear cut division line between planter beds, turf, and ground cover. Edging is to be accomplished in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Edging shall be performed on the same day that turf is mowed. Use of string line trimmers is permitted in "soft" areas such as an edge between turfgrass and a planter bed. Care shall be exercised to avoid damage to any plant materials, structures, and other landscape features.

Trimming around trees, fences, poles, walls, irrigation valve boxes and other similar objects is to be accomplished to match the height and appearance of surrounding mowed turf growth. Trimming shall be performed

SECTION 32 05 33 Page 7 on the same day the turf's mowed. Care shall be exercised to avoid "Girdling" trees located in turf areas. The use of protective tree collars on trees in turf areas may be utilized as a temporary means to avoid injury to tree trunks. At the end of the plant establishment period Contractor will be responsible for removing all protective tree collars.

3.2.5 Post-Fertilizer Application

Apply turf fertilizer in a manner that promotes health, growth, vigor, color and appearance of cultivated turf areas. The method of application, fertilizer type and frequencies shall be determined by the laboratory soil analysis results the requirements of the particular turf species.

Fertilizer shall be applied by approved methods in accordance with the manufacturer's recommendations.

3.2.6 Turf Watering

The Contractor shall perform irrigation in a manner that promotes the health, growth, color and appearance of cultivated vegetation and that complies with all Federal, State, and local water agencies and authorities directives. The Contractor shall be responsible to prevent over watering, water run-off, erosion, and ponding due to excessive quantities or rate of application. The Contractor shall abide by state, local or other water conservation regulations or restrictions in force during the establishment period. .

3.2.7 Turf Aeration

Upon completion of weed eradication operations and Contracting Officer's approval to proceed, aerate turf areas by approved device. Core, by pulling soil plugs, to a minimum depth of 3 inches. Leave all soil plugs that are produced in the turf area. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean all soil plugs off of other paving when work is complete.

This work shall commence 21 days prior final acceptance of the maintenance establishment period.

3.2.8 Turf Clearance Area

Trees located in turf areas shall be maintained with a growth free clearance of 18 inches from the tree trunk base. The use of mechanical weed whips to accomplish the turf growth free bed area is prohibited.

3.2.9 Replanting

Replant in accordance w within specified planting dates areas which do not have a satisfactory stand of turf.

3.2.10 Final Inspection and Acceptance

Final inspection will be make upon written request from the Contractor at least 10 days prior to the last day of the turf establishment period.

Final turf acceptance will be based upon a satisfactory stand of turf.

3.3 EXTERIOR PLANT ESTABLISHMENT PERIOD

The exterior plant establishment period will commence on the date that inspection by the Contracting Officer shows that the new plants furnished under this contract have been satisfactorily installed and shall continue

SECTION 32 05 33 Page 8 for a period of 365 days.

3.3.1 Frequency of Maintenance

Begin maintenance immediately after plants have been installed. Inspect exterior plants at least once a week during the installation and establishment period and perform needed maintenance promptly.

3.3.2 Promotion of Plant Growth and Vigor

Water, prune, fertilize, mulch, adjust stakes, guys and turnbuckles, eradicate weeds and perform other operations necessary to promote plant growth, and vigor.

3.3.3 Planter Bed Maintenance

Planter beds shall be weeded, fertilized, irrigated, kept pest free, turf free, pruned, and mulch levels maintained. Planter beds will not be allowed to encroach into turf areas. A definite break shall be maintained between turf areas and planter beds.

3.3.3.1 Shrub Selective Maintenance

In addition to the above requirements, shrubs shall be selectively pruned, and shaped for health and safety when the following conditions exist:

Remove growth in front of windows, over entrance ways or walks, and any growth which will obstruct vision at street intersections or of security personnel; Remove dead, damaged or diseased branches or limbs; where shrub growth obstructs pedestrian walkways; where shrub growth is found growing against or over structures; where shrub growth permits concealment of unauthorized persons. All pruning debris shall be disposed of in a proper manner.

3.3.3.2 Tree Maintenance

Tree maintenance shall include adjustment of stakes, ties, guy supports and turnbuckles, watering, fertilizing, pest control, mulching, pruning for health and safety and fall leaf cleanup. Stakes, ties, guy supports and turnbuckles shall be inspected and adjusted to avoid girdling and promote natural development. All trees within the project boundaries, regardless of caliper, shall be selectively pruned for safety and health reasons.

These include but are not limited to removal of dead and broken branches and correction of structural defects. Prune trees according to their natural growth characteristics leaving trees well shaped and balanced.

Pruning of all trees including palm trees shall be accomplished by or in the presence of a certified member of the International Society of Arboriculture and in accordance with TCIA Z133.1. All pruning debris generated shall be disposed of in a proper manner.

3.3.4 Slope Erosion Control Maintenance

The Contractor shall provide slope erosion control maintenance to prevent undermining of all slopes in newly landscaped and natural growth areas.

Maintenance tasks include immediate repairs to weak spots in sloped areas, and maintaining clean, clear culverts, and graded berms, and terraces to intercept and direct water flow to prevent development of large gullies and slope erosion and during periods of extended rainfall, irrigation systems shall be secured. Eroded areas shall be filled with amended topsoil and replanted with the same plant species. Erosion control netting blankets

SECTION 32 05 33 Page 9 damaged due to slope erosion shall be reinstalled.

3.3.5 Removal of Dying or Dead Plants

Remove dead and dying plants and provide new plants immediately upon commencement of the specified planting season, and replace stakes, guys, mulch and eroded earth mound water basins. No additional plant establishment period will be required for replacement plants beyond the original warranty period. A tree shall be considered dying or dead when the main leader has died back, or a minimum of 20 percent of the crown has died. A shrub or ground cover shall be considered dying or dead when a minimum of 20 percent of the plant has died. This condition shall be determined by scraping on a branch an area 1/16 inch square, maximum, to determine the cause for dying plant material and shall provide recommendations for replacement. The Contractor shall determine the cause for dying plant material and provide recommendations for replacement.

3.3.6 Tracking of Unhealthy Plants

Note plants not in healthy growing condition, as determined by the Contracting Officer, and as soon as seasonal conditions permit, remove and replace with plants of the same species and sizes as originally specified.

Install replacement plantings in accordance with Section 32 93 00 EXTERIOR

PLANTS.

3.3.7 Final Inspection

Final inspection will be made upon written request from the Contractor at least 10 days prior to the last day of the establishment period. Final inspection will be based upon satisfactory health and growth of plants and on the following:

3.3.7.1 Total Plants on Site

Plants have been accepted and required number of replacements have been installed.

3.3.7.2 Mulching and Weeding

Planter beds and earth mound water basins are properly mulched and free of weeds.

3.3.7.3 Tree Supports

Stakes guys guys and turnbuckles are in good condition.

3.3.7.4 Remedial Work

Remedial measures directed by the Contracting Officer to ensure plant material survival and promote healthy growth have been completed.

3.4 FIELD QUALITY CONTROL

3.4.1 Maintenance Inspection Report

Provide maintenance inspection report to assure that landscape maintenance is being performed in accordance with the specifications and in the best interest of plant growth and survivability. Site observations shall be documented at the start of the establishment period, then quarterly

SECTION 32 05 33 Page 10 following the start, and at the end of establishment period. Results of site observation visits shall be submitted to the Contracting Officer within 7 calendar days of each site observation visit.

3.4.2 Tree Staking and Guying Removal

The Contractor shall provide a certified letter that all stakes and guys are removed from all project trees at the end of the establishment period.

-- End of Section --

SECTION 32 05 33 Page 11

File details come from the government source that posted it. Updated .