23_70_03.00_10_HEATING_AND_UTILITIES_SYSTEMS _CENTRAL_STEAM.pdf
PDF 85 KB Posted
- Attached to
- FY16 DODEA PN AM0033 Replace Elementary School Federal contract opportunity
- Solicitation number
- W912DS-16-R-0010
About this file
Amendment 0006 Spec
View the file
Other files for this federal contract opportunity
Show all 50
FY16 DODEA PN AM0033 Replace Elementary School has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEST POI NT ELEMENTARY SCHOOL REPLACEMENT W91236-15-D-0014
SECTI ON 23 70 03. 00 10
HEATI NG AND UTI LI TI ES SYSTEMS, CENTRAL STEAM
01/08
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN WELDI NG SOCI ETY ( AWS)
AWS D1. 1/ D1. 1M ( 2015; Er r at a 2015) St r uct ur al Wel di ng Code - St eel
ASME I NTERNATI ONAL ( ASME)
ASME B1. 20. 1 ( 2013) Pi pe Thr eads, Gener al Pur pose ( I nch)
ASME B16. 21 ( 2011) Nonmet al l i c Fl at Gasket s f or Pi pe Flanges
ASME B16. 3 ( 2011) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300
ASME B16. 39 ( 2014) St andar d f or Mal l eabl e I r on Thr eaded Pi pe Uni ons; Cl asses 150, 250, and 300
ASME B16. 5 ( 2013) Pi pe Fl anges and Fl anged Fi t t i ngs:
NPS 1/ 2 Thr ough NPS 24 Met r i c/ I nch St andar d
ASME B16. 9 ( 2012) St andar d f or Fact or y- Made Wr ought St eel But t wel di ng Fi t t i ngs
ASME B31. 1 ( 2014; I NT 1- 47) Power Pi pi ng
ASME B40. 100 ( 2013) Pr essur e Gauges and Gauge Attachments
ASME BPVC SEC I X ( 2010) BPVC Sect i on I X- Wel di ng and Br azi ng Qualifications
ASME BPVC SEC VI I I D1 ( 2010) BPVC Sect i on VI I I - Rul es f or Const r uct i on of Pr essur e Vessel s Di v i s i on 1
ASME PTC 19. 3 TW ( 2010) Ther mowel l s Per f or mance Test Codes
ASTM I NTERNATI ONAL ( ASTM)
ASTM A106/ A106M ( 2014) St andar d Speci f i cat i on f or Seaml ess Car bon St eel Pi pe f or Hi gh- Temper at ur e Service
SECTI ON 23 70 03. 00 10 Page 1
ASTM A181/ A181M ( 2014) St andar d Speci f i cat i on f or Car bon St eel For gi ngs, f or Gener al - Pur pose Pi pi ng
ASTM A53/ A53M ( 2012) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess
ASTM A733 ( 2013) St andar d Speci f i cat i on f or Wel ded and Seaml ess Car bon St eel and Aust eni t i c St ai nl ess St eel Pi pe Ni ppl es
ASTM D3308 ( 2012) PTFE Resi n Ski ved Tape
EXPANSI ON JOI NT MANUFACTURERS ASSOCI ATI ON ( EJMA)
EJMA St ds ( 2011) EJMA St andar ds
MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS
I NDUSTRY ( MSS)
MSS SP- 25 ( 2013) St andar d Mar ki ng Syst em f or Val ves, Fi t t i ngs, Fl anges and Uni ons
MSS SP- 58 ( 1993; Reaf f i r med 2010) Pi pe Hanger s and Suppor t s - Mat er i al s, Desi gn and Manuf act ur e, Sel ect i on, Appl i cat i on, and Installation
MSS SP- 69 ( 2003; Not i ce 2012) Pi pe Hanger s and Suppor t s - Sel ect i on and Appl i cat i on ( ANSI Appr oved Amer i can Nat i onal St andar d)
MSS SP- 70 ( 2011) Gr ay I r on Gat e Val ves, Fl anged and Thr eaded Ends
MSS SP- 71 ( 2011; Er r at a 2013) Gr ay I r on Swi ng Check Val ves, Fl anged and Thr eaded Ends
MSS SP- 80 ( 2013) Br onze Gat e, Gl obe, Angl e and Check Valves
MSS SP- 85 ( 2011) Gr ay I r on Gl obe & Angl e Val ves Fl anged and Thr eaded Ends
NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)
NEMA MG 1 ( 2014) Mot or s and Gener at or s
PLUMBI NG- HEATI NG- COOLI NG CONTRACTORS ASSOCI ATI ON ( PHCC)
NAPHCC NSPC ( 2009) Nat i onal St andar d Pl umbi ng Code
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on
SECTI ON 23 70 03. 00 10 Page 2
01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Installation Pi pe Anchor s
SD- 03 Pr oduct Dat a
Welding Syst em Equi pment
SD- 06 Test Repor t s
Adj ust i ng, Bal anci ng, Test i ng and I nspect i ng
SD- 10 Oper at i on and Mai nt enance Dat a
Oper at i ng and Mai nt enance I nst r uct i ons
1. 3 QUALI TY ASSURANCE
1. 3. 1 Welding
Submi t a copy of qual i f i ed pr ocedur es and a l i s t of names and i dent i f i cat i on symbol s of qual i f i ed wel der s and wel di ng oper at or s. Pi pi ng shal l be wel ded i n accor dance wi t h qual i f i ed pr ocedur es usi ng per f or mance- qual i f i ed wel der s and wel di ng oper at or s. Pr ocedur es and wel der s shal l be qual i f i ed i n accor dance wi t h ASME BPVC SEC I X. Wel di ng pr ocedur es qual i f i ed by ot her s, and wel der s and wel di ng oper at or s qual i f i ed by anot her empl oyer may be accept ed as per mi t t ed by ASME B31. 1. The Cont r act i ng Of f i cer shal l be not i f i ed 24 hour s i n advance of t est s and t he t est s shal l be per f or med at t he wor k s i t e i f pr act i cal . The wel der or wel di ng oper at or shal l appl y hi s assi gned symbol near each wel d he makes as a per manent r ecor d. St r uct ur al member s shal l be wel ded i n accor dance wi t h Sect i on 05 05 23. 16 STRUCTURAL WELDI NG.
1. 3. 2 Use of Asbest os Pr oduct s
Pr oduct s whi ch cont ai n asbest os ar e pr ohi bi t ed. Thi s pr ohi bi t i on i ncl udes i t ems such as packi ngs or gasket s, even t hough t he i t em i s encapsul at ed or t he asbest os f i ber s ar e i mpr egnat ed wi t h bi nder mat er i al .
1. 4 DELI VERY, STORAGE, AND HANDLI NG
Pr ot ect al l equi pment del i ver ed and pl aced i n st or age f r om weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s.
PART 2 PRODUCTS
2. 1 MATERI ALS AND EQUI PMENT
2. 1. 1 St andar d Pr oduct s
Pr ovi de mat er i al s and equi pment whi ch ar e t he st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of t he pr oduct s and t hat essent i al l y dupl i cat e i t ems t hat have been i n sat i sf act or y use f or at l east 2 year s pr i or t o bi d openi ng. Equi pment shal l be suppor t ed by a ser vi ce
SECTI ON 23 70 03. 00 10 Page 3 or gani zat i on t hat i s , i n t he opi ni on of t he Cont r act i ng Of f i cer , r easonabl y conveni ent t o t he s i t e.
2. 1. 2 Nameplates
Each maj or i t em of equi pment shal l have t he manuf act ur er ' s name, addr ess, t ype or st y l e, model or ser i al number , and cat al og number on a pl at e secur ed t o t he i t em of equi pment .
2. 1. 3 Pr event i on of Rust
Unl ess ot her wi se speci f i ed, sur f aces of f er r ous met al subj ect t o cor r osi on shal l be f act or y pr i me pai nt ed wi t h a r ust i nhi bi t i ng coat i ng and subsequent l y f act or y f i ni sh pai nt ed i n accor dance wi t h t he manuf act ur er ' s st andar d pr act i ce. Equi pment exposed t o hi gh t emper at ur e when i n ser vi ce shal l be pr i me and f i ni sh pai nt ed wi t h t he manuf act ur er ' s st andar d heat r esi st ant pai nt t o a mi ni mum t hi ckness of 1 mi l .
2. 2 MATERIALS
Submi t spar e par t s dat a f or each i t em of equi pment pr ovi ded, af t er appr oval of t he dr awi ngs and not l at er t han 2 mont hs bef or e t he dat e of benef i c i al occupancy. I ncl ude i n t he dat a a compl et e l i s t of spar e par t s and suppl i es, wi t h cur r ent uni t pr i ces and suppl y sour ces. Mat er i al s shal l conf or m t o t he f ol l owi ng:
2. 2. 1 Pi pe and Pi pe Fi t t i ngs
2. 2. 1. 1 Mal l eabl e I r on Pi pe Fi t t i ngs
ASME B16. 3, t ype r equi r ed t o mat ch adj acent pi pi ng.
2. 2. 1. 2 Nipples
ASTM A733, st andar d wei ght .
2. 2. 1. 3 Pipe
ASTM A53/ A53M or ASTM A106/ A106M, Gr ade A or B, bl ack st eel . Pi pe shal l be st andar d wei ght unl ess ot her wi se speci f i ed.
2. 2. 1. 4 Wel di ng Fi t t i ngs f or Pi pe
ASME B16. 9.
2. 2. 1. 5 Pi pe Fl anges and Fl anged Fi t t i ngs
St eel f l anges, ASTM A181/ A181M and ASME B16. 5. Convol ut ed f l anges shal l mat e wi t h ASME B16. 5, Cl ass 150 f l anges. Fl anges and f i t t i ngs shal l have t he manuf act ur er ' s t r ademar k af f i xed i n accor dance wi t h MSS SP- 25 so as t o per manent l y i dent i f y t he manuf act ur er .
2. 2. 1. 6 Pi pe Hanger s, I nser t s, and Suppor t s
MSS SP- 58.
2. 2. 1. 7 Pi pe Thr eads
ASME B1. 20. 1.
SECTI ON 23 70 03. 00 10 Page 4
2. 2. 1. 8 Unions
ASME B16. 39, t ype t o mat ch adj acent pi pi ng.
2. 2. 1. 9 Gaskets
ASME B16. 21. Appr oved met al l i c sel f - cent er i ng st y l e and r i ng st y l e gasket consi st i ng of met al l i c r et ai ner and seal i ng gl and may be used f or i nt ended service.
2. 2. 2 Valves
2. 2. 2. 1 Check Val ves
a. Si zes 3 i nches and l ess, br onze: MSS SP- 80, Type 3 or 4, Cl ass 125.
b. Si zes 2 i nches t hr ough 24 i nches, cast i r on: MSS SP- 71, Type I I I or I V, Cl ass 125.
2. 2. 2. 2 Gl obe Val ves
a. Si zes 3 i nches and l ess, br onze: MSS SP- 80, Type 1, 2, and 3, Cl ass 125.
b. Si zes 2 i nches t hr ough 12 i nches, cast i r on: MSS SP- 85, Type I I I , Cl ass 125.
2. 2. 2. 3 Angl e Val ves
a. Si zes 3 i nches and l ess, br onze: MSS SP- 80, Type 1, 2, or 3, Cl ass 125.
b. Si zes 2 i nches t hr ough 12 i nches, cast i r on: MSS SP- 85, Type I V, Cl ass 125.
2. 2. 2. 4 Gat e Val ves
a. Si zes 3 i nches and l ess, br onze: MSS SP- 80, Type 1 or 2, Cl ass 125.
b. Si zes 2 i nches t hr ough 48 i nches, cast i r on: MSS SP- 70, Type I , Cl ass 125, Desi gn OT or OF ( OS & Y) , br onze t r i m.
2. 2. 3 El ect r i cal Mot or s
Mot or s shal l be as speci f i ed i n Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON
SYSTEM.
2. 3 ELECTRI CAL WORK
Pr ovi de el ect r i cal mot or dr i ven equi pment speci f i ed compl et e wi t h mot or s, mot or st ar t er s, and cont r ol s. El ect r i cal equi pment and wi r i ng shal l be i n accor dance wi t h Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM. El ect r i cal char act er i st i cs shal l be as speci f i ed or i ndi cat ed. I nt egr al s i ze mot or s shal l be t he pr emi um ef f i c i ency t ype i n accor dance wi t h NEMA MG 1. Pr ovi de mot or st ar t er s compl et e wi t h t her mal over l oad pr ot ect i on and ot her appur t enances necessar y f or t he mot or cont r ol speci f i ed. Each mot or shal l be of suf f i c i ent s i ze t o dr i ve t he equi pment at t he speci f i ed capaci t y wi t hout exceedi ng t he namepl at e r at i ng of t he mot or . Manual or aut omat i c cont r ol and pr ot ect i ve or s i gnal devi ces r equi r ed f or t he oper at i on
SECTI ON 23 70 03. 00 10 Page 5 speci f i ed, and any cont r ol wi r i ng r equi r ed f or cont r ol s and devi ces but not shown, shal l be pr ovi ded.
2. 4 SYSTEM EQUI PMENT
2. 4. 1 Cont r ol Val ves and Cont r ol l er s
2. 4. 1. 1 Pr essur e- Reduci ng Val ves
Val ves desi gned f or a wor ki ng pr essur e of not l ess t han 125 psi g shal l be pr ovi ded wher e i ndi cat ed or ot her wi se r equi r ed. Each r educi ng val ve shal l be adj ust ed t o mai nt ai n t he desi r ed t er mi nal pr essur e wi t hi n 3 psi , r egar dl ess of f l uct uat i ons i n t he i ni t i al pr essur e. Val ves shal l be qui et i n oper at i on. Reduci ng val ves pr ovi ded i n l i nes f or space heat i ng onl y shal l be of t he doubl e di sk and seat t ype or s l i di ng gat e and pl at e t ype.
Reduci ng val ves f or dead- end ser v i ce shal l be s i ngl e- seat ed or s l i di ng gat e and pl at e t ype. Par t s subj ect t o wear shal l be const r uct ed of noncor r odi bl e met al and shal l be easi l y r epl aceabl e.
2. 4. 2 St eam Tr aps
2. 4. 2. 1 Bucket Tr aps
Tr aps shal l be i nver t ed or ver t i cal bucket t ype wi t h aut omat i c ai r di schar ge. Tr aps shal l be desi gned f or a wor ki ng pr essur e of 150 psi g, but shal l oper at e under a st eam suppl y pr essur e of appr oxi mat el y 40 t o 100 psi g.
Each t r ap shal l have a heavy body and cap of f i ne- gr ai ned, gr ay cast i r on.
Bucket shal l be made of br ass; t he mechani sm of har d br onze; t he val ve and seat of st ai nl ess or monel ; or each of equi val ent mat er i al . Tr aps shal l be t est ed hydr ost at i cal l y under a pr essur e of 200 psi g. Tr aps shal l have capaci t i es as i ndi cat ed when oper at i ng under t he speci f i ed wor ki ng condi t i ons. St r ai ner shal l be pr ovi ded on t he i nl et connect i on of each t r ap. I mpact - oper at ed t r aps, i mpul se- oper at ed t r aps, or t her modynami c t r aps wi t h cont i nuous di schar ge may be i nst al l ed i n l i eu of bucket t r aps, subj ect t o appr oval . Ther most at i c t r aps desi gned f or a st eam wor ki ng pr essur e sui t abl e f or t he appl i cat i on may be f ur ni shed i n l i eu of t he t r aps speci f i ed above. Ther most at i c t r aps shal l be equi pped wi t h val ves and seat s of st ai nl ess st eel , or monel met al , and shal l have capaci t i es based on a pr essur e di f f er ent i al not i n excess of t he f ol l owi ng:
St eam Wor ki ng Pr essur e, psi g Di f f er ent i al , psi g
25-50 20
90-100 80
2. 5 SYSTEM ACCESSORI ES
2. 5. 1 Foundat i ons and Anchor age
Foundat i ons and anchor age f or pumpi ng uni t s and f or ot her heat i ng equi pment shal l be i n accor dance wi t h t he manuf act ur er ' s r equi r ement s.
2. 5. 2 Pr essur e Gauges and Ther momet er s
Gauges shal l be pr ovi ded f or pi pi ng as i ndi cat ed. Gauges shal l compl y wi t h ASME B40. 100 and t her momet er s shal l compl y wi t h ASME PTC 19. 3 TW. A
SECTI ON 23 70 03. 00 10 Page 6 t her momet er and pr essur e gauge shal l be pr ovi ded on t he st eam suppl y and r et ur n mai ns. Ther momet er s shal l be separ abl e socket t ype.
2. 5. 3 Vacuum Rel i ef Val ve
An appr oved vacuum r el i ef val ve shal l be i nst al l ed wher e i ndi cat ed. On shut of f of st eam suppl y and condensi ng of st eam, t he vacuum r el i ef val ve shal l aut omat i cal l y admi t ai r t o t he syst em.
2. 5. 4 Saf et y Val ves
Pop saf et y val ves shal l be pr ovi ded on t he l ow si de of each pr essur e r educi ng val ve. The val ves shal l be set t o open aut omat i cal l y and t o r el i eve st eam at 5 psi i n excess of t he set t i ng of t he r educi ng val ve, or as i ndi cat ed. Saf et y val ves shal l conf or m t o t he r equi r ement s of ASME BPVC SEC VI I I D1 and shal l be i nst al l ed as i ndi cat ed.
2. 5. 5 Drains
A dr ai n connect i on wi t h 1 i nch gat e val ve or 3/ 4 i nch hose bi b shal l be i nst al l ed at t he l owest poi nt i n t he r et ur n mai n. I n addi t i on, t hr eaded dr ai n connect i ons wi t h t hr eaded cap or pl ug shal l be i nst al l ed wher ever r equi r ed f or t hor ough dr ai ni ng of t he st eam syst em.
2. 6 PI PI NG AND ACCESSORI ES
2. 6. 1 Pi pe and Fi t t i ngs
2. 6. 1. 1 St eam Pi pi ng and Fi t t i ngs
Pi pi ng shal l be bl ack st eel , conf or mi ng t o ASTM A53/ A53M, Gr ade A.
Fi t t i ngs shal l be bl ack, mal l eabl e i r on or st eel . Fi t t i ngs adj acent t o val ves shal l sui t val ves speci f i ed. Reduci ng f i t t i ngs shal l be used f or changes i n pi pe s i zes. I n hor i zont al st eam l i nes, r educi ng f i t t i ngs shal l be t he eccent r i c t ype t o mai nt ai n t he bot t om of t he l i nes at t he same l evel .
2. 6. 1. 2 Condensat e Ret ur n Pi pi ng and Fi t t i ngs
Pi pi ng shal l be bl ack st eel , ext r a st r ong wei ght , conf or mi ng t o ASTM A53/ A53M, Gr ade A. Fi t t i ngs shal l be cast i r on or mal l eabl e i r on, ext r a heavy.
2. 6. 1. 3 Vent Pi pi ng and Fi t t i ngs
Pi pi ng shal l be bl ack st eel , conf or mi ng t o ASTM A53/ A53M, Gr ade A.
Fi t t i ngs shal l be bl ack mal l eabl e i r on t o sui t pi pi ng. Pl ast i c mat er i al s pol yet her i mi de ( PEI ) and pol yet her sul f one ( PES) ar e f or bi dden t o be used f or vent pi pi ng of combust i on gases.
2. 6. 1. 4 Gauge Pi pi ng
Pi pi ng shal l be copper t ubi ng, Type K or L, f or st eam and condensat e 25 psi g and l ess and st eel f or gr eat er t han 25 psi g.
2. 6. 1. 5 Pr ef abr i cat ed Under gr ound St eam Pi pi ng
I nt er nal pi pi ng shal l be st andar d wei ght bl ack st eel except f or condensat e pi pi ng, whi ch shal l be bl ack st eel , ext r a st r ong wei ght . Al l j oi nt s shal l be but t wel ded f or s i zes 2- 1/ 2 i nches and l ar ger , and socket wel ded f or 2
SECTI ON 23 70 03. 00 10 Page 7 jmitchell Highlight i nches and bel ow.
I nt er nal pi pe i nsul at i on shal l be cel l ul ar gl ass secur ed t o t he pi pe by st ai nl ess st eel bands. Mi ni mum i nsul at i on t hi ckness shal l be as def i ned i n speci f i cat i on Sect i on 23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS.
The st eel condui t shal l be smoot h wal l , wel ded st eel condui t of t hi ckness speci f i ed bel ow:
Condui t Si ze ( i nches) Condui t Thi ckness
6-26 10 Gauge
28-36 6 Gauge
38-42 4 Gauge
Condui t i nsul at i on shal l be spr ay- appl i ed pol yur et hane f oam 0. 18 k- f act or s wi t h R141B bl owi ng agent and havi ng a nomi nal 2l b/ f t ^3 densi t y f or al l s t r ai ght l engt hs and f i t t i ngs. The out er j acket shal l be f i ber gl ass ( FRP) or pol yet hyl ene. FRP j acket shal l be f i l ament wound, di r ect l y on t o t he ur et hane f oam i nsul at i on or at t he pi pi ng manuf act ur er s opt i on f oam i nj ect ed i s al l owed i nt o f i ber gl ass pi pe. Pol yet hyl ene casi ng shal l be a mi ni mum of 175 mi l .
2. 6. 2 Joints
Except as ot her wi se speci f i ed, f i t t i ngs used on st eel pi pe shal l be t hr eaded f or f i t t i ngs 1 i nch and smal l er ; t hr eaded or wel ded f or f i t t i ngs 1- 1/ 4 i nches up t hr ough 2- 1/ 2 i nches; and f l anged or wel ded f or f i t t i ngs 3 i nches and l ar ger . Joi nt s bet ween sect i ons of copper t ubi ng or pi pe shal l be f l ar ed or sweat ed. Pi pe and f i t t i ngs 1- 1/ 4 i nches and l ar ger and i nst al l ed i n i naccessi bl e condui t s or t r enches beneat h concr et e f l oor s l abs shal l be wel ded. Unl ess ot her wi se speci f i ed, connect i ons t o equi pment shal l be made wi t h bl ack mal l eabl e i r on uni ons f or pi pe 2- 1/ 2 i nches or smal l er i n di amet er , and wi t h f l anges f or pi pe 3 i nches or mor e, i n diameter.
2. 6. 2. 1 Bel l ows- Type Joi nt s
Joi nt s shal l be f l exi bl e, gui ded t ype. Expansi on el ement shal l be st ai nl ess st eel . Joi nt s shal l be i n accor dance wi t h t he appl i cabl e r equi r ement s of EJMA St ds and ASME B31. 1 wi t h i nt er nal l i ner s.
2. 6. 2. 2 Fl exi bl e Bal l Joi nt s
Joi nt s shal l be const r uct ed of st ai nl ess st eel , mal l eabl e i r on, duct i l e i r on, car bon st eel , br onze, or ot her al l oys as appr opr i at e f or t he ser vi ce intended.
2. 6. 2. 3 Di el ect r i c Wat er ways and Fl anges
Di el ect r i c wat er ways shal l conf or m t o t he t ensi l e st r engt h and di mensi onal r equi r ement s speci f i ed i n ASME B16. 39. Wat er ways shal l have met al connect i ons on bot h ends sui t ed t o mat ch adj acent pi pi ng. Di el ect r i c wat er ways shal l be i nt er nal l y l i ned wi t h an i nsul at or speci f i cal l y desi gned t o pr event cur r ent f l ow bet ween di ssi mi l ar met al s. Di el ect r i c wat er ways shal l have pr essur e and t emper at ur e r at i ng equal t o or gr eat er t han t hat
SECTI ON 23 70 03. 00 10 Page 8 jmitchell Highlight speci f i ed f or t he connect i ng pi pi ng. Di el ect r i c f l anges shal l meet t he per f or mance r equi r ement s descr i bed her ei n f or di el ect r i c wat er ways.
2. 6. 3 Strainers
Basket or Y- t ype st r ai ner s shal l be t he same si ze as t he pi pel i nes i n whi ch t hey ar e i nst al l ed. The st r ai ner bodi es shal l be cast - i r on r at ed f or 125 pound ser vi ce, wi t h bot t oms dr i l l ed and pl ugged. Bodi es shal l have ar r ows cast on t he s i des t o i ndi cat e t he di r ect i on of f l ow. Each st r ai ner shal l be equi pped wi t h a r emovabl e cover and sedi ment basket . Basket shal l not be l ess t han 22 gauge and shal l have per f or at i ons t o pr ovi de a net f r ee ar ea t hr ough t he basket of at l east f our t i mes t hat of t he ent er i ng pi pe.
PART 3 EXECUTI ON
3. 1 EXAMINATION
Af t er becomi ng f ami l i ar wi t h al l det ai l s of t he wor k, ver i f y al l di mensi ons i n t he f i el d, and advi se t he Cont r act i ng Of f i cer of any di scr epancy bef or e per f or mi ng any wor k.
3. 2 INSTALLATION
Al l wor k shal l be i nst al l ed as i ndi cat ed and i n accor dance wi t h t he manuf act ur er ' s di agr ams and r ecommendat i ons. Submi t det ai l dr awi ngs consi st i ng of schedul es, per f or mance char t s, br ochur es, di agr ams, dr awi ngs, and i nst r uct i ons necessar y f or i nst al l at i on of t he syst ems as speci f i ed.
Submi t det ai l dr awi ngs f or pumpi ng uni t s and appur t enances, i ncl udi ng cont r ol s. I ndi cat e i n t he Dr awi ngs c l ear ances r equi r ed f or mai nt enance and oper at i on and compl et e wi r i ng and schemat i c di agr ams, equi pment l ayout and anchor age, and any ot her det ai l s r equi r ed t o demonst r at e t hat t he syst em has been coor di nat ed and wi l l pr oper l y f unct i on as a uni t .
3. 2. 1 Piping
Unl ess ot her wi se speci f i ed, pi pe and f i t t i ng i nst al l at i on shal l conf or m t o t he r equi r ement s of ASME B31. 1. Pi pe shal l be cut accur at el y t o measur ement s est abl i shed at t he j obsi t e and wor ked i nt o pl ace wi t hout spr i ngi ng or f or c i ng, compl et el y c l ear i ng al l wi ndows, door s, and ot her openi ngs. Cut t i ng or ot her weakeni ng of t he bui l di ng st r uct ur e t o f aci l i t at e pi pi ng i nst al l at i on wi l l not be per mi t t ed wi t hout wr i t t en appr oval . Pi pi ng or t ubi ng shal l be cut squar e, shal l have bur r s r emoved by r eami ng, and shal l be so i nst al l ed as t o per mi t f r ee expansi on and cont r act i on wi t hout causi ng damage t o bui l di ng st r uct ur e, pi pe, j oi nt s, or hanger s. Fi l i ngs, dust , or di r t shal l be wi ped f r om i nt er i or of t he pi pe or t ubi ng bef or e connect i ons ar e made. Changes i n di r ect i on shal l be made wi t h f i t t i ngs, except t hat bendi ng of pi pe up t o 4 i nches s i ze wi l l be per mi t t ed, pr ovi ded a pi pe bender i s used and wi de sweep bends ar e f or med.
The cent er l i ne r adi us of bends shal l not be l ess t han si x di amet er s of t he pi pe. Bent pi pe showi ng k i nks, wr i nkl es, f l at t eni ngs, or ot her mal f or mat i ons wi l l not be accept ed. Vent pi pes shal l be i nst al l ed t hr ough t he r oof as di r ect ed and shal l be f l ashed as speci f i ed. Hor i zont al suppl y mai ns shal l pi t ch up or down i n t he di r ect i on of f l ow as i ndi cat ed. The gr ade shal l be not l ess t han 1 i nch i n 40 f eet . Reduci ng f i t t i ngs shal l be used f or changes i n pi pe s i zes. Open ends of pi pel i nes and equi pment shal l be capped or pl ugged dur i ng i nst al l at i on t o keep di r t or ot her f or ei gn mat er i al s out of t he syst ems. Pi pe not ot her wi se speci f i ed shal l be uncoat ed. Uni ons f or copper pi pe or t ubi ng shal l be br ass or br onze.
Connect i ons bet ween f er r ous pi pi ng and copper pi pi ng shal l be el ect r i cal l y
SECTI ON 23 70 03. 00 10 Page 9 i sol at ed f r om each ot her wi t h di el ect r i c wat er ways.
3. 2. 1. 1 Thr eaded Joi nt s
Thr eaded j oi nt s shal l be made wi t h t aper ed t hr eads pr oper l y cut , and shal l be made t i ght wi t h pol yt et r af l uor oet hyl ene ( PTFE) t ape compl yi ng wi t h ASTM D3308, or equi val ent j oi nt compound appl i ed t o t he mal e t hr eads onl y, and i n no case t o t he f i t t i ngs.
3. 2. 1. 2 Wel ded Joi nt s
Wel ded j oi nt s shal l be f usi on- wel ded unl ess ot her wi se r equi r ed. Changes i n di r ect i on of pi pi ng shal l be made wi t h wel di ng f i t t i ngs onl y. Br anch connect i on may be made wi t h ei t her wel di ng t ees or f or ged br anch out l et f i t t i ngs. Br anch out l et f i t t i ngs shal l be f or ged, f l ar ed f or i mpr ovement of f l ow wher e at t ached t o t he r un, and r ei nf or ced agai nst ext er nal st r ai ns.
Bevel i ng, al i gnment , heat t r eat ment , and i nspect i on of wel d shal l conf or m to ASME B31. 1. Wel d def ect s shal l be r emoved and r epai r s made t o t he wel d, or t he wel d j oi nt s shal l be ent i r el y r emoved and r ewel ded at no addi t i onal cost t o t he Gover nment . El ect r odes shal l be st or ed and dr i ed i n accor dance with AWS D1. 1/ D1. 1M or as r ecommended by t he manuf act ur er . El ect r odes t hat have been wet t ed or t hat have l ost any of t hei r coat i ng shal l not be used.
3. 2. 1. 3 Fl anges and Uni ons
Fl anges and uni ons shal l be f aced t r ue, and made squar e and t i ght . Gasket s shal l be nonasbest os compr essed mat er i al i n accor dance wi t h ASME B16. 21, 1/ 16 i nch t hi ckness, f ul l f ace or sel f - cent er i ng f l at r i ng t ype. The gasket s shal l cont ai n ar ami d f i ber s bonded wi t h st yr ene but adi ene r ubber ( SBR) or ni t r i l e but adi ene r ubber ( NBR) . NBR bi nder shal l be used f or hydr ocar bon ser v i ce. Uni on or f l ange j oi nt s shal l be pr ovi ded i n each l i ne i mmedi at el y pr ecedi ng t he connect i on t o each pi ece of equi pment or mat er i al r equi r i ng mai nt enance such as coi l s, pumps, cont r ol val ves, and ot her s i mi l ar i t ems.
3. 2. 1. 4 Copper Tube Ext r act ed Joi nt
An ext r act ed mechani cal t ee j oi nt may be used i n copper t ube. Joi nt shal l be pr oduced wi t h an appr opr i at e t ool by dr i l l i ng a pi l ot hol e and dr awi ng out t he t ube sur f ace t o f or m a col l ar havi ng a mi ni mum hei ght of t hr ee t i mes t he t hi ckness of t he t ube wal l . To pr event t he br anch t ube f r om bei ng i nser t ed beyond t he dept h of t he ext r act ed j oi nt , di mpl ed dept h st ops shal l be pr ovi ded. The br anch t ube shal l be not ched f or pr oper penet r at i on i nt o f i t t i ng t o ensur e a f r ee f l ow j oi nt . Joi nt s shal l be br azed i n accor dance wi t h t he NAPHCC NSPC. Sol der ed j oi nt s wi l l not be per mi t t ed.
3. 2. 2 Connect i ons t o Equi pment
Suppl y and r et ur n connect i ons shal l be pr ovi ded by t he Cont r act or unl ess ot her wi se i ndi cat ed. Val ves and t r aps shal l be i nst al l ed i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons. Unl ess ot her wi se i ndi cat ed, t he s i ze of t he suppl y and r et ur n pi pes t o each pi ece of equi pment shal l not be smal l er t han t he equi pment connect i ons. St eam and r et ur n connect i ons, unl ess ot her wi se i ndi cat ed, shal l be made wi t h mal l eabl e i r on uni ons f or pi pi ng 2- 1/ 2 i nches or l ess i n di amet er and wi t h f l anges f or pi pe 3 i nches or mor e, i n di amet er .
SECTI ON 23 70 03. 00 10 Page 10
3. 2. 3 Br anch Connect i ons
Br anches shal l pi t ch up or down as i ndi cat ed, unl ess ot her wi se speci f i ed.
Connect i on shal l be made t o ensur e unr est r i c t ed c i r cul at i on; el i mi nat e ai r pocket s; and per mi t dr ai nage of t he syst em. St eam suppl y and condensat e br anches t aken f r om mai ns shal l pi t ch wi t h a gr ade of not l ess t han 1 i nch i n 10 f eet , unl ess ot her wi se i ndi cat ed.
3. 2. 4 Risers
The l ocat i on of r i ser s i s appr oxi mat e. Exact l ocat i ons of t he r i ser s shal l be as appr oved. St eam suppl y downf eed r i ser s shal l t er mi nat e i n a di r t pocket and shal l be dr i p t r apped t o t he r et ur n.
3. 2. 5 Supports
3. 2. 5. 1 General
Hanger s used t o suppor t pi pi ng 2 i nches and l ar ger shal l be f abr i cat ed t o per mi t adequat e adj ust ment af t er er ect i on whi l e st i l l suppor t i ng t he l oad.
Pi pe gui des and anchor s shal l be i nst al l ed t o keep pi pes i n accur at e al i gnment , t o di r ect t he expansi on movement , and t o pr event buckl i ng, swayi ng, and undue st r ai n. Al l pi pi ng subj ect ed t o ver t i cal movement when oper at i ng t emper at ur es exceed ambi ent t emper at ur es, shal l be suppor t ed by var i abl e spr i ng hanger s and suppor t s or by const ant suppor t hanger s. Pi pe hanger l oads suspended f r om st eel j oi st bet ween panel poi nt s shal l not exceed 50 pounds. Loads exceedi ng 50 pounds shal l be suspended f r om panel points.
3. 2. 5. 2 Pi pe Hanger s, I nser t s, and Suppor t s
Pi pe hanger s, i nser t s and suppor t s shal l conf or m t o MSS SP- 58, except as modi f i ed her ei n.
a. Types 5, 12, and 26 shal l not be used.
b. Type 3 shal l not be used on i nsul at ed pi pe.
c. Type 18 i nser t s shal l be secur ed t o concr et e f or ms bef or e concr et e i s pl aced. Cont i nuous i nser t s whi ch al l ow mor e adj ust ment may be used i f t hey ot her wi se meet t he r equi r ement s f or t ype 18 i nser t s.
d. Type 19 and 23 C- cl amps shal l be t or qued i n accor dance wi t h MSS SP- 69 and have bot h l ocknut s and r et ai ni ng devi ces, f ur ni shed by t he manuf act ur er . The C- cl amp body shal l not be const r uct ed f r om bent plate.
e. Type 20 at t achment s used on angl es and channel s shal l be f ur ni shed wi t h an added mal l eabl e i r on heel pl at e or adapt er .
f . Type 24 may be used onl y on t r apeze hanger syst ems or on f abr i cat ed frames.
g. Wher e t ype 39 saddl e or t ype 40 shi el d ar e per mi t t ed f or a par t i cul ar pi pe at t achment appl i cat i on, t he t ype 39 saddl e wel ded t o t he pi pe, shal l be used on al l pi pe 4 i nches and l ar ger when t he t emper at ur e of t he medi um i s 60 degr ees F or hi gher . Type 40 shi el ds shal l be used on al l pi pi ng l ess t han 4 i nches and al l pi pi ng 4 i nches and l ar ger car r y i ng medi um l ess t han 60 degr ees F. A hi gh densi t y i nsul at i on
SECTI ON 23 70 03. 00 10 Page 11 i nser t of a densi t y 8 pcf or gr eat er shal l be used under t he t ype 40 shi el d f or pi pi ng 2 i nches and l ar ger .
h. Hor i zont al pi pe suppor t s shal l be spaced as speci f i ed i n MSS SP- 69 and a suppor t shal l be i nst al l ed not over 1 f oot f r om t he pi pe f i t t i ng j oi nt at each change i n di r ect i on of t he pi pi ng. Pi pe suppor t s shal l be spaced not over 5 f eet apar t at val ves. I n t he suppor t of mul t i pl e pi pe r uns on a common base member , a c l i p or c l amp shal l be used wher e each pi pe cr osses t he base suppor t member . Spaci ng of t he base suppor t member s shal l not exceed t he hanger and suppor t spaci ng r equi r ed f or any of t he i ndi v i dual pi pes i n t he mul t i pl e pi pe r un. The cl i ps or c l amps shal l be r i gi dl y connect ed t o t he common base member . A c l ear ance of 1/ 8 i nch shal l be pr ovi ded bet ween t he pi pe and cl i p or c l amp f or al l pi pi ng whi ch may be subj ect ed t o t her mal expansi on.
i . Ver t i cal pi pe shal l be suppor t ed at each f l oor , except at s l ab- on- gr ade, and at i nt er val s of not mor e t han 15 f eet , not mor e t han 8 f eet f r om end of r i ser s, and at vent t er mi nat i ons.
j . Type 35 gui des usi ng st eel , r ei nf or ced PTFE or gr aphi t e s l i des shal l be pr ovi ded wher e r equi r ed t o al l ow l ongi t udi nal pi pe movement . Lat er al r est r ai nt s shal l be pr ovi ded as r equi r ed. Sl i de mat er i al s shal l be sui t abl e f or t he syst em oper at i ng t emper at ur es, at mospher i c condi t i ons, and bear i ng l oads encount er ed.
( 1) Wher e st eel s l i des do not r equi r e pr ovi s i ons f or r est r ai nt of l at er al movement , an al t er nat e gui de met hod may be used. On pi pi ng 4 i nches and l ar ger car r y i ng medi um 60 degr ees F or hi gher , a t ype 39 saddl e may be wel ded t o t he pi pe and f r eel y r est on t he st eel pl at e. On pi pi ng under 4 i nches and pi pi ng 4 i nches and l ar ger car r y i ng medi um l ess t han 60 degr ees F a t ype 40 pr ot ect i on shi el d may be at t ached t o t he pi pe or i nsul at i on and f r eel y r est on a st eel pl at e. A hi gh densi t y i nsul at i on i nser t of densi t y 8 pcf or gr eat er shal l be used under al l shi el ds on pi pi ng 2 i nches and l ar ger .
( 2) Wher e t her e ar e hi gh syst em t emper at ur es and wel di ng t o pi pi ng i s not desi r abl e, t hen t he t ype 35 gui de shal l i ncl ude a pi pe cr adl e, wel ded t o t he gui de st r uct ur e and st r apped secur el y t o t he pi pe.
The pi pe shal l be separ at ed f r om t he s l i de mat er i al by at l east 4 i nches, or by an amount adequat e f or t he i nsul at i on, whi chever i s greater.
k. Pi pe hanger s on hor i zont al i nsul at ed pi pe shal l be t he s i ze of t he out s i de di amet er of t he i nsul at i on. The i nsul at i on shal l be cont i nuous t hr ough t he hanger on al l pi pe s i zes and appl i cat i ons.
l . Suppor t pi pi ng i n t r enches as i ndi cat ed.
3. 2. 6 Pi pe Sl eeves
Pi pe passi ng t hr ough concr et e or masonr y wal l s or concr et e f l oor s or r oof s shal l be pr ovi ded wi t h pi pe s l eeves f i t t ed i nt o pl ace at t he t i me of const r uct i on. Sl eeves shal l not be i nst al l ed i n st r uct ur al member s except wher e i ndi cat ed or appr oved. Rect angul ar and squar e openi ngs shal l be as det ai l ed on t he dr awi ngs. Each s l eeve shal l ext end t hr ough i t s r espect i ve wal l , f l oor , or r oof , and shal l be cut f l ush wi t h each sur f ace. Unl ess ot her wi se i ndi cat ed, s l eeves shal l be of such s i ze as t o pr ovi de a mi ni mum of 1/ 4 i nch al l ar ound cl ear ance bet ween sl eeve and bar e pi pe or i nsul at i on
SECTI ON 23 70 03. 00 10 Page 12 sur f ace. Sl eeves i n bear i ng wal l s, wat er pr oof i ng membr ane f l oor s, and wet ar eas shal l be st eel pi pe or cast - i r on pi pe. Sl eeves i n nonbear i ng wal l s, f l oor s, or cei l i ngs may be st eel pi pe, cast - i r on pi pe, or gal vani zed sheet met al wi t h l ock- t ype l ongi t udi nal seam and of t he met al t hi ckness i ndi cat ed. Except i n pi pe chases or i nt er i or wal l s, t he annul ar space bet ween pi pe and sl eeve or bet ween j acket over i nsul at i on and sl eeve i n nonf i r e- r at ed wal l s and f l oor s shal l be seal ed as i ndi cat ed and speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS and i n f i r e- r at ed wal l s and f l oor s shal l be as i ndi cat ed and speci f i ed i n Sect i on 07 84 00 FI RESTOPPI NG. Pi pes passi ng t hr ough wal l wat er pr oof i ng membr ane shal l be s l eeved as descr i bed above. I n addi t i on, a wat er pr oof i ng c l ampi ng f l ange shal l be i nst al l ed as indicated.
3. 2. 6. 1 Roof or Fl oor Penet r at i ons of Wat er pr oof i ng Membr ane
Pi pes shal l be i nst al l ed t hr ough a 4 pound l ead- f l ashi ng s l eeve, a 16 ounce copper s l eeve, or a 0. 032 i nch t hi ck al umi num sl eeve, each havi ng an i nt egr al ski r t or f l ange. Fl ashi ng s l eeve shal l be sui t abl y f or med. The ski r t or f l ange shal l ext end 8 i nches or mor e f r om t he pi pe and shal l be set over t he r oof or f l oor membr ane i n a t r owel ed coat i ng of bi t umi nous cement . The f l ashi ng s l eeve shal l ext end up t he pi pe a mi ni mum of 2 i nches above t he hi ghest f l ood l evel of t he r oof or a mi ni mum of 10 i nches above t he f l oor or r oof , whi chever i s gr eat er . The annul ar space bet ween t he f l ashi ng s l eeve and t he bar e pi pe or i nsul at i on sur f ace shal l be seal ed as i ndi cat ed. Pi pes up t o and i ncl udi ng 10 i nches i n di amet er passi ng t hr ough r oof or f l oor wat er pr oof i ng membr ane may be i nst al l ed t hr ough a cast - i r on s l eeve wi t h caul k i ng r ecess, anchor l ugs, f l ashi ng c l amp devi ce, and pr essur e r i ng wi t h br ass bol t s. Wat er pr oof i ng membr ane shal l be c l amped i nt o pl ace and seal ant shal l be pl aced i n t he caul k i ng r ecess.
3. 2. 6. 2 Opt i onal Seal i ng of Uni nsul at ed Pi pes
A modul ar mechani cal t ype seal i ng assembl y may be i nst al l ed. The seal s shal l consi st of i nt er l ocki ng synt het i c r ubber l i nks shaped t o cont i nuousl y f i l l t he annul ar space bet ween t he pi pe/ condui t and s l eeve wi t h cor r osi on- pr ot ect ed car bon st eel bol t s, nut s, and pr essur e pl at es. The l i nks shal l be l oosel y assembl ed wi t h bol t s t o f or m a cont i nuous r ubber bel t ar ound t he pi pe wi t h a pr essur e pl at e under each bol t head and each nut . Af t er t he seal assembl y i s pr oper l y posi t i oned i n t he s l eeve, t i ght eni ng of t he bol t shal l cause t he r ubber seal i ng el ement s t o expand and pr ovi de a wat er t i ght seal bet ween t he pi pe/ condui t and t he s l eeve.
Each seal assembl y shal l be s i zed as r ecommended by t he manuf act ur er t o f i t t he pi pe/ condui t and s l eeve i nvol ved. The Cont r act or el ect i ng t o use t he modul ar mechani cal t ype seal s shal l pr ovi de s l eeves of t he pr oper di amet er s.
3. 2. 6. 3 Opt i onal Count er f l ashi ng
As an al t er nat e t o caul k i ng and seal i ng t he annul ar space bet ween t he f l ashi ng s l eeve and bar e pi pe or i nsul at i on sur f ace, count er f l ashi ng may be by st andar d r oof coupl i ng f or t hr eaded pi pe up t o 6 i nchesi n di amet er ;
l ead- f l ashi ng s l eeve f or dr y vent s, s l eeve t ur ned down i nt o t he pi pe t o f or m a wat er pr oof j oi nt ; or t ack- wel ded or banded- met al r ai n shi el d ar ound t he pi pe, seal ed as i ndi cat ed.
3. 2. 6. 4 Escutcheons
Escut cheons shal l be pr ovi ded at al l f i ni shed sur f aces wher e exposed pi pi ng, bar e or cover ed, passes t hr ough f l oor s, wal l s, or cei l i ngs, except i n boi l er , ut i l i t y , or equi pment r ooms. Escut cheons shal l be f ast ened
SECTI ON 23 70 03. 00 10 Page 13 secur el y t o pi pe s l eeves or t o ext ensi ons of s l eeves wi t hout any par t of s l eeves v i s i bl e. Wher e s l eeves pr oj ect s l i ght l y f r om f l oor s, speci al deep- t ype escut cheons shal l be used. Escut cheons shal l be chr omi um- pl at ed i r on or br ass, ei t her one- pi ece or spl i t - pat t er n, hel d i n pl ace by i nt er nal spr i ng t ensi on or set scr ew.
3. 2. 7 Pi pe Anchor s
Submi t det ai l ed dr awi ngs of pi pe anchor s, bef or e i nst al l at i on. Anchor s shal l be pr ovi ded wher e necessar y or i ndi cat ed t o l ocal i ze expansi on or pr event undue st r ai n on pi pi ng. Anchor s shal l consi st of heavy st eel col l ar s wi t h l ugs and bol t s f or c l ampi ng and at t achi ng anchor br aces, unl ess ot her wi se i ndi cat ed. Anchor br aces shal l be i nst al l ed usi ng t ur nbuckl es wher e r equi r ed. Suppor t s, anchor s, or st ays shal l be l ocat ed t o pr event damage by i nst al l at i on oper at i ons or by t he wei ght or expansi on of t he pi pel i ne.
3. 2. 8 Pi pe Expansi on
The expansi on of suppl y and r et ur n pi pes shal l be pr ovi ded f or by changes i n t he di r ect i on of t he r un of pi pe, by expansi on l oops, or by expansi on j oi nt s as i ndi cat ed. Condensat e and st eam expansi on j oi nt s shal l be one of t he t ypes speci f i ed.
3. 2. 8. 1 Expansi on Loops
Expansi on l oops shal l pr ovi de adequat e expansi on of t he mai n st r ai ght r uns of t he syst em wi t hi n t he st r ess l i mi t s speci f i ed i n ASME B31. 1. Loops shal l be col d- spr ung and i nst al l ed wher e i ndi cat ed. Pi pe gui des shal l be pr ovi ded as i ndi cat ed.
3. 2. 8. 2 Sl i p- Tube Type Expansi on Joi nt s
Sl i p- t ube t ype expansi on j oi nt s shal l be used f or st eam and condensat e syst ems onl y and shal l be i nst al l ed wher e i ndi cat ed. Joi nt s shal l pr ovi de f or ei t her s i ngl e or doubl e s l i p of t he connect ed pi pes and t emper at ur e and pr essur e sui t abl e f or appl i cat i on, i n no case l ess t han psi g. Joi nt s shal l be i n accor dance wi t h appl i cabl e r equi r ement s of EJMA St ds and ASME B31. 1, Type I or I I I . End connect i ons shal l be f l anged. Anchor bases or suppor t bases shal l be pr ovi ded as i ndi cat ed or r equi r ed. I ni t i al set t i ng shal l be made i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons t o al l ow f or ambi ent t emper at ur e at t i me of i nst al l at i on. Pi pe al i gnment gui des shal l be i nst al l ed as r ecommended by t he j oi nt manuf act ur er , but shal l be not mor e t han 5 f eet f r om expansi on j oi nt , except i n l i nes 4 i nches or smal l er wher e gui des shal l be i nst al l ed not mor e t han 2 f eet f r om t he joint.
3. 2. 8. 3 Bel l ows- Type Joi nt
Bel l ows- t ype j oi nt desi gn and i nst al l at i on shal l compl y wi t h EJMA St ds.
The j oi nt s shal l be desi gned f or t he wor ki ng t emper at ur e and pr essur e sui t abl e f or t he appl i cat i on and shal l be not l ess t han 150 psi g i n any case.
3. 2. 8. 4 Fl exi bl e Bal l Joi nt s
Fl exi bl e bal l j oi nt s may be t hr eaded, f l anged, or wel ded end as r equi r ed, and shal l be capabl e of absor bi ng t he nor mal oper at i ng axi al , l at er al , or angul ar movement s or combi nat i on i n accor dance wi t h ASME B31. 1, and
SECTI ON 23 70 03. 00 10 Page 14
ASME BPVC SEC VI I I D1 wher e appl i cabl e. Fl anges shal l conf or m t o t he di amet er and dr i l l i ng of ASME B16. 5. Mol ded gasket s f ur ni shed shal l be sui t abl e f or t he ser vi ce i nt ended.
3. 2. 9 Val ves and Equi pment
Val ves shal l be i nst al l ed at t he l ocat i ons shown, wher e speci f i ed, and wher e r equi r ed f or t he pr oper f unct i oni ng of t he syst em as di r ect ed. Gat e val ves shal l be used unl ess ot her wi se shown, speci f i ed, or di r ect ed.
Val ves shal l be i nst al l ed wi t h t hei r st ems hor i zont al or above. Val ves used wi t h f er r ous pi pi ng shal l have t hr eaded or f l anged ends f or f er r ous pi pi ng and sweat - t ype connect i ons f or copper t ubi ng.
3. 2. 9. 1 Ther momet er Socket
A t her momet er wel l shal l be pr ovi ded i n each r et ur n l i ne c i r cui t i n mul t i c i r cui t syst ems.
3. 2. 9. 2 St eam Ai r Vent s
Vent s shal l be i nst al l ed wher e i ndi cat ed. Di schar ge pi pes f r om t he vent shal l be r un t o a poi nt as i ndi cat ed. Vent shal l be a qui ck- act i ng val ve t hat cont i nuousl y r emoves ai r . Val ve shal l be const r uct ed of cor r osi on- r esi st i ng met al , shal l be desi gned t o wi t hst and t he maxi mum pi pi ng syst em pr essur e, and shal l aut omat i cal l y c l ose t i ght t o pr event escape of st eam and condensat e. Vent shal l be pr ovi ded wi t h a manual i sol at i on val ve.
3. 2. 9. 3 Pr essur e Reduci ng Val ves
Val ves desi gned f or a wor ki ng pr essur e of not l ess t han 125 psi g shal l be pr ovi ded wher ever i ndi cat ed or r equi r ed. Each val ve shal l be i nst al l ed wi t h a st r ai ner , a t hr ee- val ve bypass, and a saf et y val ve.
3. 2. 10 St eam Tr aps
Fl oat t r aps shal l be i nst al l ed wher e i ndi cat ed. Al l ot her st eam t r aps shal l be i nst al l ed wher e i ndi cat ed.
3. 2. 11 Insulation
Thi ckness and appl i cat i on of i nsul at i on mat er i al s f or pi pi ng and equi pment shal l be i n accor dance wi t h Sect i on 23 07 00 THERMAL I NSULATI ON FOR
MECHANI CAL SYSTEMS.
3. 3 FI ELD TRAI NI NG
Conduct a t r ai ni ng cour se f or t he mai nt enance and oper at i ng st af f . The t r ai ni ng per i od of 2 hour s nor mal wor ki ng t i me shal l s t ar t af t er t he syst em i s f unct i onal l y compl et e but bef or e t he f i nal accept ance t est s. The Cont r act i ng Of f i ce shal l be gi ven at l east 2 weeks advance not i ce of such t r ai ni ng. The t r ai ni ng shal l i nc l ude al l of t he i t ems cont ai ned i n t he appr oved Oper at i ng and Mai nt enance I nst r uct i ons as wel l as demonst r at i ons of r out i ne mai nt enance oper at i ons. Submi t 2 compl et e copi es of oper at i on manual s out l i ni ng t he st ep- by- st ep pr ocedur es r equi r ed f or syst em st ar t up, oper at i on, and shut down. I ncl ude i n t he manual s t he manuf act ur er ' s name, model number , ser vi ce manual , par t s l i s t , and a br i ef descr i pt i on of al l equi pment and t hei r basi c oper at i ng f eat ur es. Submi t 2 compl et e copi es of mai nt enance manual s l i s t i ng r out i ne mai nt enance pr ocedur es, possi bl e
SECTI ON 23 70 03. 00 10 Page 15 br eakdowns and r epai r s, and t r oubl eshoot i ng gui des. I ncl ude i n t he manual s pi pi ng l ayout , equi pment l ayout , and s i mpl i f i ed wi r i ng and cont r ol di agr ams of t he syst em as i nst al l ed.
3. 4 ADJUSTI NG, BALANCI NG, TESTI NG AND I NSPECTI NG
Submi t t est r epor t s i n bookl et f or m showi ng al l f i el d t est s per f or med t o adj ust each component and al l f i el d t est s per f or med t o pr ove compl i ance wi t h t he speci f i ed per f or mance cr i t er i a, upon compl et i ng and t est i ng t he syst em. I ndi cat e i n each t est r epor t t he f i nal posi t i on of cont r ol s.
3. 4. 1 Fi el d Test s
Not i f y t he Cont r act i ng Of f i cer 30 days bef or e t he per f or mance and accept ance t est s ar e t o be conduct ed. The t est s shal l be per f or med i n t he pr esence of t he Cont r act i ng Of f i cer . Fur ni sh al l i nst r ument s and per sonnel r equi r ed f or t he t est s. El ect r i c i t y, st eam, and wat er wi l l be f ur ni shed by t he Gover nment . Bef or e t her mal i nsul at i on i s i nst al l ed, t he ent i r e heat i ng syst em, i ncl udi ng al l heat i ng uni t s, val ves and f i t t i ngs, shal l be hydr ost at i cal l y t est ed at 1- 1/ 2 t i mes t he desi gn oper at i ng pr essur e f or a mi ni mum of 4 hour s.
3. 4. 2 Cl eani ng and Adj ust i ng
Af t er hydr ost at i c t est s have been made and pr i or t o t he oper at i ng t est s, pi pi ng shal l be t hor oughl y c l eaned by f i l l i ng t he syst em wi t h a sol ut i on of one pound of caust i c soda or 3 pounds of t r i sodi um phosphat e per 100 gal l ons of wat er . The wat er shal l be heat ed t o appr oxi mat el y 150 degr ees F, and t he sol ut i on c i r cul at ed i n t he syst em f or a per i od of 48 hour s, t hen dr ai ned and t hor oughl y f l ushed out wi t h f r esh wat er . Equi pment shal l be wi ped cl ean, wi t h al l t r aces of oi l , dust , di r t , or pai nt spot s r emoved.
I t i s t he Cont r act or ' s r esponsi bi l i t y t o mai nt ai n t he syst em i n a c l ean condi t i on unt i l f i nal accept ance. Bear i ngs shal l be l ubr i cat ed as r ecommended by t he manuf act ur er . Bel t s shal l be adj ust ed wi t h cor r ect t ensi on, and ot her mi scel l aneous equi pment shal l be adj ust ed t o set t i ng i ndi cat ed or as r ecommended by t he r espect i ve manuf act ur er s.
3. 4. 3 Syst em Oper at i on
Upon compl et i on and pr i or t o accept ance of t he pr oj ect , t he i nst al l at i on shal l be subj ect ed t o such oper at i ng t est s as may be r equi r ed t o demonst r at e t hat t he st eam heat i ng syst em wi l l oper at e as speci f i ed or i ndi cat ed. Test s shal l be conduct ed by a qual i f i ed t est engi neer at such t i mes as di r ect ed. Pr ovi de i nst r ument s, f aci l i t i es, and l abor r equi r ed t o conduct t he t est s. I ndi cat i ng i nst r ument s shal l be r ead at 1/ 2- hour i nt er val s, unl ess ot her wi se di r ect ed. Test s shal l cover a per i od of 3 or mor e hour s f or each syst em t est ed, and t est r epor t s shal l i ncl ude t he f ol l owi ng appl i cabl e speci f i c i nf or mat i on t oget her wi t h concl usi ons as t o t he adequacy of t he syst em:
a. Ti me, dat e, and dur at i on of t est .
b. Fl ow and pr essur e of st eam t o t he i nl et of t he equi pment .
c. Make, model , and s i ze of each pi ece of equi pment .
d. Dr y bul b t emper at ur e ent er i ng and l eavi ng heat i ng and vent i l at i ng uni t s.
e. St at i c di schar ge pr essur e act ual l y obt ai ned, t ot al cf m handl ed, and
SECTI ON 23 70 03. 00 10 Page 16 vol t met er and ammet er r eadi ngs f or f an mot or dur i ng oper at i on.
f . Heat i ng out put f or space- heat i ng equi pment .
g. Capaci t y and di schar ge pr essur e of each pump.
h. Aut omat i c cont r ol sequence and oper at i on.
3. 4. 4 Retesting
Any def i c i enci es r eveal ed dur i ng t est i ng shal l be cor r ect ed and t est s shal l be r econduct ed.
3. 5 FI ELD PAI NTI NG
Pai nt i ng r equi r ed f or sur f aces not ot her wi se speci f i ed, and f i ni sh pai nt i ng of i t ems onl y pr i med at t he f act or y, ar e speci f i ed i n Sect i on 09 90 00
PAI NTS AND COATI NGS.
- - End of Sect i on - -
SECTI ON 23 70 03. 00 10 Page 17
File details come from the government source that posted it. Updated .