WPES_Specs_VOL_1_Revised.pdf

PDF 9 MB Posted

Attached to
FY16 DODEA PN AM0033 Replace Elementary School Federal contract opportunity
Solicitation number
W912DS-16-R-0010
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

W912DS-16-R-0010 SPECIFICATIONS VOLUME 1

View the file

Other files for this federal contract opportunity

Other files attached to FY16 DODEA PN AM0033 Replace Elementary School, newest first.
File Type Posted
DS-16-R-0010-0009.pdf PDF
A-602.pdf PDF
S-104.pdf PDF
A-123.pdf PDF
A-105.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume1C.pdf PDF
A-413.pdf PDF
S-302.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_1B.pdf PDF
W912DS-16-R-0010-0007_(2).pdf PDF
32_31_13_CHAIN_LINK_FENCES_AND_GATE.pdf PDF
27_51_16_PUBLIC_ADDRESS_AND_MISCELLANEOUS_AUDIO_VIDEO_SYSTEMS.pdf PDF
DELETE_Section_09_67_23.13_STANDARD_RESINOUS_FLOORING.pdf PDF
23_05_15_COMMON_PIPING_FOR_HVAC.pdf PDF
06_61_16_SOLID_POLYMER_(SOLID_SURFACING)_FABRICATIONS.pdf PDF
23_52_00_HEATING_BOILERS.pdf PDF
09_67_23.14_CHEMICAL_RESISTANT_RESINOUS_FLOORING.pdf PDF
23_70_03.00_10_HEATING_AND_UTILITIES_SYSTEMS _CENTRAL_STEAM.pdf PDF
32_18_16.13_PLAYGROUND_AND_PROTECTIVE_SURFACING.pdf PDF
23_07_00_THERMAL_INSULATION_FOR_MECHANICAL_SYSTEMS.pdf PDF
23_09_23_LONWORKS_DIRECT_DIGITAL_CONTROL_FOR_HVAC_AND_OTHER_BUILDING_CONTROL_SYSTEMS.pdf PDF
05_40_00_COLD-FORMED_METAL_FRAMING.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_2B.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_1A.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume_1B.pdf PDF
2016-08-03_WPES_Amend_6_Submittal_Volume1C.pdf PDF
SWPPP_Final.pdf PDF
Pages_from_New_Elementary_School_-_Geotech_Report.pdf PDF
DPW_Equipment_Inventory_Amendment6.xlsx XLSX spreadsheet
W912DS-16-R-0010-Amendment_0006.pdf PDF
Amendment_0006_Q A.pdf PDF
W912DS-16-R-0010-0005.pdf PDF
site_visit_Sign_in_Sheet.pdf PDF
J A_Name_Brand_USMA_West_Point_Elem_School_Redacted.pdf PDF
A-107_LEVEL_1_-_UNIT_C_FLOOR_PLAN.pdf PDF
A-812_SIGNAGE_ELEVATIONS_AND_DETAILS.pdf PDF
A-108_LEVEL_1_-_UNIT_D_FLOOR_PLAN.pdf PDF
A-609_ALUMINUM_CURTAINWALL_ELEVATIONS.pdf PDF
A-811_SIGNAGE_ELEVATIONS_AND_DETAILS.pdf PDF
R-0010_Site_Visit_Location.pdf PDF
Amendment_1___A-720_-_ROOM_FINISH_SCHEDULE_-_LEVEL_1.pdf PDF
Amendment_1___Fire_Alarm_Drawings_REV1_-1.pdf PDF
Amendment_1___A-428_-_CASEWORK_PLANS_AND_DETAILS.pdf PDF
Amendment_1___A-421_-_LEVEL_1_-_UNIT_A_EQUIPMENT_PLAN.pdf PDF
W912DS-16-R-0010_SOLICITATION_Amendment_0001.pdf PDF
2016-08-03_WPES_RTA_Submittal_Volume_1.pdf PDF
W912DS-16-R-0010_SOLICITATION.pdf PDF
WPES_Specs_VOL_2.pdf PDF
2016-08-03_WPES_RTA_Submittal_Volume_2.pdf PDF
2016-08-03_WPES_RTA_Civil_Bid_Option_Sheets.pdf PDF
Show all 50

FY16 DODEA PN AM0033 Replace Elementary School has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST POI NT ELEMENTARY SCHOOL REPLACEMENT W91236-15-D-0014

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LI ST OF DRAWI NGS

00 73 00 SPECI AL CONTRACT REQUI REMENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 03 00 OPTIONS

01 11 00 SUMMARY OF WORK

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 18 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 02. 00 18 QUALI TY CONTROL SYSTEM ( QCS)

01 45 20. 00 18 TESTI NG FOR MECHANI CAL AND ELECTRI CAL SYSTEMS

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 52 60. 00 18 CONSTRUCTI ON I NDOOR AI R QUALI TY ( I AQ) MANAGEMENT

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00. 00 18 CLOSEOUT SUBMI TTALS

01 78 23. 00 18 OPERATI ON AND MAI NTENANCE DATA

01 91 13 GENERAL COMMI SSI ONI NG REQUI REMENTS

01 91 19. 43 EXTERI OR ENCLOSURE COMMI SSI ONI NG

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 66 00 SELECT FI LL AND TOPSOI L FOR LANDFI LL COVER

02 82 13. 00 10 ASBESTOS ABATEMENT

02 83 13. 00 20 LEAD I N CONSTRUCTI ON

02 84 16 HANDLI NG OF LI GHTI NG BALLASTS AND LAMPS CONTAI NI NG PCBs

AND MERCURY

DI VI SI ON 03 - CONCRETE

03 11 13. 00 10 STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG

03 15 00. 00 10 CONCRETE ACCESSORI ES

03 20 00. 00 10 CONCRETE REI NFORCI NG

03 30 00. 00 10 CAST- I N- PLACE CONCRETE

03 31 01. 00 10 CAST- I N- PLACE STRUCTURAL CONCRETE FOR CI VI L WORKS

03 35 00. 00 10 CONCRETE FI NI SHI NG

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 05 23. 16 STRUCTURAL WELDI NG

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOI ST FRAMI NG

05 30 00 STEEL DECKS

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

05 50 14 STRUCTURAL METAL FABRI CATI ONS

PROJECT TABLE OF CONTENTS Page 1

05 51 00 METAL STAI RS

05 51 33 METAL LADDERS

05 52 00 METAL RAI LI NGS

05 72 00 DECORATI VE METAL SPECI ALTI ES

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 20 00 FI NI SH CARPENTRY

06 41 16. 00 10 LAMI NATE CLAD ARCHI TECTURAL CASEWORK

06 61 16 SOLI D POLYMER ( SOLI D SURFACI NG) FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS

07 11 13 BI TUMI NOUS DAMPPROOFI NG

07 13 53 ELASTOMERI C SHEET WATERPROOFI NG

07 17 00 BENTONI TE WATERPROOFI NG

07 21 13 BOARD I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 22 00 ROOF AND DECK I NSULATI ON

07 26 30 SPRAY POLYURETHANE FOAM MOI STURE/ AI R/ THERMAL BARRI ER

07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM

07 52 00 MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG

07 60 00 FLASHI NG AND SHEET METAL

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

07 84 00 FIRESTOPPING

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMI NUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 METAL ROLLI NG COUNTER DOORS

08 33 23 OVERHEAD COI LI NG DOORS

08 34 01 FORCED ENTRY RESI STANT COMPONENTS

08 34 73 SOUND CONTROL DOOR ASSEMBLI ES

08 41 13 ALUMI NUM- FRAMED ENTRANCES

08 44 00 CURTAI N WALL AND GLAZED ASSEMBLI ES

08 60 45 TUBULAR DAYLI GHTI NG DEVI CES AND TRANSLUCENT PANELS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMI C TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 66 23 RESI NOUS MATRI X TERRAZZO FLOORI NG

09 67 23. 13 STANDARD RESI NOUS FLOORI NG

09 68 00 CARPETING

09 72 00 WALLCOVERINGS

09 83 13 ACOUSTI CAL WALL COATI NG

09 90 00 PAI NTS AND COATI NGS

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VI SUAL DI SPLAY UNI TS

10 14 00. 10 EXTERI OR SI GNAGE

10 14 00. 20 I NTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 21 23. 16 CUBI CLE TRACK AND HARDWARE

10 22 39 FOLDI NG PANEL PARTI TI ONS

10 22 43 SLI DI NG PARTI TI ONS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

10 51 13 METAL LOCKERS

10 75 00 FLAGPOLES

DI VI SI ON 11 - EQUI PMENT

11 13 19. 13 DOCK LEVELERS

11 44 00 FOODSERVI CE EQUI PMENT

11 61 43 STAGE CURTAI NS

11 68 13 PLAYGROUND EQUI PMENT

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WI NDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 SI TE FURNI SHI NGS

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 23 HYDRAULI C PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 08 00 COMMI SSI ONI NG OF FI RE SUPPRESSI ON

21 13 13. 00 10 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

21 21 03. 00 10 WET CHEMI CAL FI RE EXTI NGUI SHI NG SYSTEM

21 30 00 FI RE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

22 08 00 COMMI SSI ONI NG OF PLUMBI NG

22 31 00 WATER SOFTENERS, CATI ON- EXCHANGE ( SODI UM CYCLE)

22 33 30. 00 10 SOLAR WATER HEATI NG EQUI PMENT

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 05 15 COMMON PI PI NG FOR HVAC

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 08 00. 00 10 COMMI SSI ONI NG OF HVAC SYSTEMS

23 09 23 LONWORKS DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER

BUI LDI NG CONTROL SYSTEMS

23 11 25 FACI LI TY GAS PI PI NG

23 23 00 REFRI GERANT PI PI NG

23 25 00 CHEMI CAL TREATMENT OF WATER FOR MECHANI CAL SYSTEMS

23 52 00 HEATI NG BOI LERS

PROJECT TABLE OF CONTENTS Page 3

23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE

23 64 26 CHI LLED WATER PI PI NG SYSTEMS

23 70 03. 00 10 HEATI NG AND UTI LI TI ES SYSTEMS, CENTRAL STEAM

23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL

26 05 19. 10 10 I NSULATED WI RE AND CABLE

26 05 72 OVERCURRENT PROTECTI VE DEVI CE SHORT- CI RCUI T STUDY

26 05 73 OVERCURRENT PROTECTI VE DEVI CE COORDI NATI ON STUDY

26 05 74 OVERCURRENT PROTECTI VE DEVI CE ARC- FLASH STUDY

26 08 00 COMMI SSI ONI NG OF ELECTRI CAL SYSTEMS

26 09 13 ENERGY EFFI CI ENCY EDUCATI ON DASHBOARDS

26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 24 13 SWITCHBOARDS

26 27 14. 00 20 ELECTRI CI TY METERI NG

26 29 23 VARI ABLE FREQUENCY DRI VE SYSTEMS UNDER 600 VOLTS

26 31 00 SOLAR PHOTOVOLTAI C ( PV) COMPONENTS

26 32 23. 13 HORI ZONTAL- AXI S WI ND TURBI NES

26 33 23. 11 BATTERY EQUI PMENT FOR EMERGENCY LI GHTI NG

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

27 51 16 PUBLI C ADDRESS SYSTEMS

27 51 23. 10 I NTERCOMMUNI CATI ON SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG

28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)

28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM

DI VI SI ON 31 - EARTHWORK

31 11 00 CLEARI NG AND GRUBBI NG

31 23 00. 00 20 EXCAVATI ON AND FI LL

31 32 11 SOI L SURFACE EROSI ON CONTROL

31 67 99 SOLDI ER PI LE WALL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 16. 17 COLD MI LLI NG OF BI TUMI NOUS PAVEMENTS

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 16 BASE COURSE FOR RI GI D AND SUBBASES FOR FLEXI BLE PAVI NG

32 11 23 AGGREGATE AND/ OR GRADED- CRUSHED AGGREGATE BASE COURSE

32 12 10 BI TUMI NOUS TACK AND PRI ME COATS

32 12 11 BI TUMI NOUS SURFACE TREATMENT

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE

FACILITIES

PROJECT TABLE OF CONTENTS Page 4

32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS

32 17 24. 00 10 PAVEMENT MARKI NGS

32 18 16. 13 PLAYGROUND PROTECTI VE SURFACI NG

32 31 13 CHAI N LI NK FENCES AND GATES

32 32 23 SEGMENTAL CONCRETE BLOCK RETAI NI NG WALL

32 92 19 SEEDING

32 93 00 EXTERI OR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 12 33. 00 30 WATER UTI LI TY METERI NG

33 30 00 SANI TARY SEWERS

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 51 13. 00 30 NATURAL- GAS METERI NG

33 63 13 EXTERI OR UNDERGROUND STEAM DI STRI BUTI ON SYSTEM

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 5

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/11

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

I NDEX OF DRAWI NGS

SHEET # SHEET TI TLE

G- 001 COVER SHEET - VOLUME 1

G- 002 I NDEX OF DRAWI NGS

G- 003 I NDEX OF DRAWI NGS

LS001 LI FE SAFETY GENERAL NOTES

LS002 LEVEL B - LI FE SAFETY OCCUPANCY TABLES

LS003 LEVEL 1 - LI FE SAFETY OCCUPANCY TABLES

LS101 LEVEL B - LI FE SAFETY PLAN

LS102 LEVEL 1 - LI FE SAFETY PLAN

LS103 LEVEL 2 - LI FE SAFETY PLAN

LS104 LI FE SAFETY DETAI LS

H- 001 HAZMAT REMOVAL - GENERAL NOTES & PHOTOS

H- 101 BUI LDI NG 705 - PARTI AL 1ST FLOOR PLAN HAZMAT REMOVAL

H- 102 BUI LDI NG 705 - PARTI AL 1ST FLOOR PLAN HAZMAT REMOVAL

H- 103 BUI LDI NG 705 - PARTI AL 2ND FLOOR PLAN HAZMAT REMOVAL

H- 104 BUI LDI NG 705 - PARTI AL 2ND FLOOR PLAN HAZMAT REMOVAL

H- 105 BUI LDI NG 705 - ROOF PLAN HAZMAT REMOVAL

CA001 GENERAL NOTES

CA002 GENERAL NOTES

CA003 GENERAL NOTES

SV101 TOPOGRAPHI C SURVEY

SV102 TOPOGRAPHI C SURVEY

CA101 PHASE 1 AND 2 I MPLEMENTATI ON PLAN

CA102 PHASE 3 AND 4 I MPLEMENTATI ON PLAN

CA103 PHASE 5 I MPLEMENTATI ON PLAN

BG101 BORI NG LOGS

BG102 BORI NG LOGS

BG103 BORI NG LOGS

CD101 DEMOLI TI ON PLAN

CD102 DEMOLI TI ON PLAN

CD103 DEMOLI TI ON PLAN

CD201 DEMOLI TI ON PLAN - BOULDERS

CE101 EROSI ON & SEDI MENT CONTROL PLAN PHASE A

CE102 EROSI ON & SEDI MENT CONTROL PLAN PHASE B

CE103 EROSI ON & SEDI MENT CONTROL PLAN PHASE C

CE501 EROSI ON & SEDI MENT CONTROL DETAI LS

CE502 EROSI ON & SEDI MENT CONTROL DETAI LS

CS100 PAVI NG PLAN

DOCUMENT 00 01 15 Page 1

CS101 SI TE LAYOUT PLAN

CS102 SI TE LAYOUT PLAN

CS103 SI TE LAYOUT PLAN

CS200 RETAI NI NG WALL PLAN

CS201 RETAI NI NG WALL PLAN

CS202 LEVEL 1 RETAI NI NG WALL PROFI LE

CS203 LEVEL 1 RETAI NI NG WALL PROFI LE

CS204 LEVEL 2 RETAI NI NG WALL PROFI LE

CS205 LEVEL 3 RETAI NI NG WALL PROFI LE

CS206 LANDFI LL RETAI NI NG WALLS PROFI LES

CS207 PLAY COURT & CLASSROOM RETAI NI NG WALL PROFI LES

CS208 PARKI NG LOT - CURB WALL 1

CS209 PARKI NG LOT - CURB WALL 2

CS210 LOADI NG DOCK GYM ACCESS

CS211 RETAI NI NG WALL SECTI ONS

CS212 RETAI NI NG WALL SECTI ONS

CS213 RETAI NI NG WALL SECTI ONS

CS214 RETAI NI NG WALL SECTI ONS

CS215 RETAI NI NG WALL ALI GNMENT DATA SHEET

CS216 RETAI NI NG WALL ALI GNMENT DATA SHEET

CS501 SI TE DETAI LS

CS502 SI TE DETAI LS

CS503 SI TE DETAI LS

CS504 SI TE DETAI LS

CS505 SI TE DETAI LS

CS506 RETAI NI NG WALL SECTI ONS AND DETAI LS

CS507 RETAI NI NG WALL SECTI ONS AND DETAI LS

CG101 DRAI NAGE PLAN

CG102 DRAI NAGE PLAN

CG103 DRAI NAGE PLAN

CG104 STORM SEWER SCHEDULE

CG105 STORM SEWER SCHEDULE

CG106 STORM SEWER SCHEDULE

CG200 GRADI NG PLAN SHEET I NDEX

CG201 GRADI NG PLAN

CG202 GRADI NG PLAN

CG203 GRADI NG PLAN

CG204 GRADI NG PLAN

CG205 DETAI LED GRADI NG PLAN

CG206 DETAI LED GRADI NG PLAN

CG207 DETAI LED GRADI NG PLAN

CG208 DETAI LED GRADI NG PLAN

CG209 DETAI LED GRADI NG PLAN

CG301 STORM SEWER PROFI LES

CG302 STORM SEWER PROFI LES

CG303 STORM SEWER PROFI LES

CG304 STORM SEWER PROFI LES

CG305 STORM SEWER PROFI LES

CG501 GRADI NG AND DRAI NAGE DETAI LS

CG502 GRADI NG AND DRAI NAGE DETAI LS

CG503 GRADI NG AND DRAI NAGE DETAI LS

CU101 UTI LI TY PLAN

CU102 UTI LI TY PLAN

CU103 UTI LI TY PLAN

CU104 SANI TARY SEWER SCHEDULE

CU201 SANI TARY SEWER PROFI LES

CU202 SANI TARY SEWER PROFI LES

CU203 SANI TARY SEWER PROFI LES

CU204 SANI TARY SEWER PROFI LES

DOCUMENT 00 01 15 Page 2

CU501 SANI TARY SEWER DETAI LS

CL101 LANDSCAPE PLAN

CL102 LANDSCAPE PLAN

CL103 PLAY AREAS

CL104 HARDSCAPE ENLARGEMENTS

CL105 HARDSCAPE ENLARGEMENTS

CL106 HARDSCAPE ENLARGEMENTS

CL107 ADDI TI VE ALTERNATE LANDSCAPE PLAN

CL201 SI TE SECTI ONS

CL202 SI TE DETAI LS

CL203 LANDSCAPE DETAI LS

B- 001 TEST BORI NGS

B- 002 TEST BORI NGS

B- 003 TEST BORI NGS

S- 001 STRUCTURAL NOTES

S- 002 STRUCTURAL NOTES

S- 003 STRUCTURAL NOTES AND ABBREVI ATI ONS

S- 004 DI MENSI ON PLAN - OVERALL

S- 005 DI MENSI ON PLAN - UNI T A

S- 006 DI MENSI ON PLAN - UNI T B

S- 007 DI MENSI ON PLAN - UNI T C

S- 008 DI MENSI ON PLAN - UNI T D

S- 009 DI MENSI ON PLAN - UNI T E

S- 010 MASONRY WALL VERTI CAL REI NFORCI NG PLAN

S- 011 FOUNDATI ON MASTER STRUCTURAL PLAN

S- 012 LEVEL 1 MASTER STRUCTURAL PLAN

S- 013 LEVEL 2 MASTER STRUCTURAL PLAN

S- 014 ROOF MASTER STRUCTURAL PLAN

S- 100 LEVEL B AND LEVEL 1 - FOUNDATI ON AND FRAMI NG NOTES AND LEGENDS

S- 101 LEVEL B - UNI T A FOUNDATI ON PLAN

S- 102 LEVEL B - UNI T B AND UNI T C FOUNDATI ON PLAN

S- 103 LEVEL B - UNI T D FOUNDATI ON PLAN

S- 104 LEVEL B - UNI T E FOUNDATI ON PLAN

S- 105 LEVEL 1 - UNI T A FOUNDATI ON AND FRAMI NG PLAN

S- 106 LEVEL 1 - UNI T B FOUNDATI ON AND FRAMI NG PLAN

S- 107 LEVEL 1 - UNI T C FRAMI NG PLAN

S- 108 LEVEL 1 - UNI T D FOUNDATI ON AND FRAMI NG PLAN

S- 109 LEVEL 1 - UNI T E FOUNDATI ON AND FRAMI NG PLAN

S- 110 LEVEL 2 AND ROOF - FRAMI NG PLAN NOTES AND LEGENDS

S- 111 LEVEL 2 - UNI T A FRAMI NG PLAN

S- 112 LEVEL 2 - UNI T B FRAMI NG PLAN

S- 113 LEVEL 2 - UNI T C FRAMI NG PLAN

S- 114 LEVEL 2 - UNI T D FRAMI NG PLAN

S- 115 LEVEL 2 - UNI T E FRAMI NG PLAN

S- 121 CANOPY - FOUNDATI ON PLAN

S- 122 CANOPY - FRAMI NG PLAN

S- 131 ROOF - UNI T A FRAMI NG PLAN

S- 132 ROOF - UNI T B FRAMI NG PLAN

S- 133 ROOF - UNI T C FRAMI NG PLAN

S- 134 ROOF - UNI T D FRAMI NG PLAN

S- 135 ROOF - UNI T E FRAMI NG PLAN

S- 201 SCHEMATI C PARTI AL ELEVATI ON OF UNDERPI NNI NG

S- 202 MASONRY WALL ELEVATI ON

S- 203 FI RE WALL PORTAL ELEVATI ON

S- 211 SPECI AL JOI ST FRAMI NG ELEVATI ONS

S- 301 SECTI ONS

S- 302 SECTI ONS

S- 303 SECTI ONS

S- 310 FLOOR FRAMI NG SECTI ONS

DOCUMENT 00 01 15 Page 3

S- 311 FLOOR FRAMI NG SECTI ONS

S- 312 FLOOR FRAMI NG SECTI ONS

S- 313 FLOOR FRAMI NG SECTI ONS

S- 314 FLOOR FRAMI NG SECTI ONS

S- 320 FLOOR FRAMI NG SECTI ONS

S- 330 ROOF FRAMI NG SECTI ONS

S- 331 ROOF FRAMI NG SECTI ONS

S- 332 ROOF FRAMI NG SECTI ONS

S- 333 ROOF FRAMI NG SECTI ONS

S- 334 ROOF FRAMI NG SECTI ONS

S- 335 ROOF FRAMI NG SECTI ONS

S- 340 CANOPY FRAMI NG SECTI ONS

S- 401 PLATFORM STAGE FRAMI NG PLAN AND DETAI LS

S- 501 TYPI CAL DETAI LS

S- 502 TYPI CAL DETAI LS

S- 503 TYPI CAL DETAI LS

S- 504 TYPI CAL DETAI LS

S- 510 TYPI CAL DETAI LS

S- 511 TYPI CAL DETAI LS

S- 512 TYPI CAL DETAI LS

S- 513 TYPI CAL DETAI LS

S- 514 SPECI AL CONNECTI ON DETAI LS

S- 515 SPECI AL CONNECTI ON DETAI LS

S- 516 SPECI AL CONNECTI ON DETAI LS

AD101 BUI LDI NG 705 - PARTI AL FI RST FLOOR DEMOLI TI ON PLAN

AD102 BUI LDI NG 705 - PARTI AL FI RST FLOOR DEMOLI TI ON PLAN

AD103 BUI LDI NG 705 - PARTI AL SECOND FLOOR DEMOLI TI ON PLAN

AD104 BUI LDI NG 705 - PARTI AL SECOND FLOOR DEMOLI TI ON PLAN

AD105 BUI LDI NG 705 - EXI STI NG CONDI TI ONS PHOTOS

AD106 BUI LDI NG 705 - EXI STI NG CONDI TI ONS PHOTOS

A- 001 ABBREVI ATI ONS

A- 002 LEGENDS AND SYMBOLS

A- 003 PARTI TI ON TYPES AND DETAI LS

A- 004 PARTI TI ON TYPES

A- 005 LEVEL B AI R BARRI ER PLAN

A- 006 LEVEL 1 AI R BARRI ER PLAN

A- 007 AI R BARRI ER BUI LDI NG SECTI ONS

A- 008 LEVEL B - ACOUSTI CAL PLAN

A- 009 LEVEL 1 - ACOUSTI CAL PLAN

A- 010 LEVEL 2 - ACOUSTI CAL PLAN

A- 011 LEVEL B OVERALL FLOOR PLAN

A- 012 LEVEL 1 OVERALL FLOOR PLAN

A- 013 LEVEL 2 OVERALL FLOOR PLAN

A- 014 FOUNDATI ON DRAI NAGE PLAN

A- 101 LEVEL B - UNI T A FLOOR PLAN

A- 102 LEVEL B - UNI T C FLOOR PLAN

A- 103 LEVEL B - UNI T D FLOOR PLAN

A- 104 LEVEL B - UNI T E FLOOR PLAN

A- 105 LEVEL 1 - UNI T A FLOOR PLAN

A- 106 LEVEL 1 - UNI T B FLOOR PLAN

A- 107 LEVEL 1 - UNI T C FLOOR PLAN

A- 108 LEVEL 1 - UNI T D FLOOR PLAN

A- 109 LEVEL 1 - UNI T E FLOOR PLAN

A- 110 LEVEL 2 - PLATFORM PLAN

A- 121 LEVEL B - UNI T A REFLECTED CEI LI NG PLAN

A- 122 LEVEL B - UNI T C REFLECTED CEI LI NG PLAN

A- 123 LEVEL B - UNI T D REFLECTED CEI LI NG PLAN

A- 124 LEVEL B - UNI T E REFLECTED CEI LI NG PLAN

A- 125 LEVEL 1 - UNI T A REFLECTED CEI LI NG PLAN

DOCUMENT 00 01 15 Page 4

A- 126 LEVEL 1 - UNI T B REFLECTED CEI LI NG PLAN

A- 127 LEVEL 1 - UNI T C REFLECTED CEI LI NG PLAN

A- 128 LEVEL 1 - UNI T D REFLECTED CEI LI NG PLAN

A- 129 LEVEL 1 - UNI T E REFLECTED CEI LI NG PLAN

A- 140 OVERALL ROOF PLAN

A- 201 OVERALL EXTERI OR ELEVATI ONS

A- 202 EXTERI OR ELEVATI ONS

A- 203 EXTERI OR ELEVATI ONS

A- 204 EXTERI OR ELEVATI ONS

A- 205 EXTERI OR ELEVATI ONS

A- 206 EXTERI OR ELEVATI ONS

A- 207 DETAI LED EXTERI OR ELEVATI ON AND STONE SHAPES

A- 301 BUI LDI NG SECTI ONS

A- 302 BUI LDI NG SECTI ONS

A- 303 BUI LDI NG SECTI ONS

A- 304 BUI LDI NG SECTI ONS

A- 305 BUI LDI NG SECTI ONS

A- 306 BUI LDI NG SECTI ONS

A- 307 BUI LDI NG SECTI ONS

A- 308 WALL SECTI ONS

A- 309 WALL SECTI ONS

A- 310 WALL SECTI ONS

A- 311 WALL SECTI ONS

A- 312 WALL SECTI ONS

A- 313 WALL SECTI ONS

A- 314 WALL SECTI ONS

A- 315 WALL SECTI ONS

A- 316 WALL SECTI ONS

A- 317 WALL SECTI ONS

A- 318 WALL SECTI ONS

A- 319 WALL SECTI ONS

A- 320 WALL SECTI ONS

A- 321 WALL SECTI ONS

A- 322 WALKWAY CANOPY - BI D OPTI ON

A- 323 WALL SECTI ONS

A- 324 WALL SECTI ON

A- 325 CHI LLER ENCLOSURE PLAN, ELEVATI ONS AND SECTI ONS

A- 326 SECTI ONS AND DETAI LS

A- 401 ENLARGED STAI R PLANS

A- 402 ENLARGED STAI R PLANS

A- 403 STAI R SECTI ONS

A- 404 STAI R SECTI ONS

A- 405 STAI R DETAI LS

A- 406 STAI R DETAI LS

A- 407 STAI R DETAI LS

A- 408 STAI R AND RAI LI NG DETAI LS

A- 409 STAI R AND RAI LI NG DETAI LS

A- 410 ELEVATOR PLANS, SECTI ONS AND DETAI LS

A- 411 PERFORMANCE PLATFORM PLAN AND DETAI LS

A- 412 ENLARGED RESTROOM PLANS

A- 413 ENLARGED RESTROOM PLANS

A- 414 ENLARGED RESTROOM PLANS AND DETAI LS

A- 415 I NTERI OR ELEVATI ONS - RESTROOMS

A- 416 I NTERI OR ELEVATI ONS - RESTROOMS

A- 417 LEVEL B - UNI T A EQUI PMENT PLAN

A- 418 LEVEL B - UNI T C EQUI PMENT PLAN

A- 419 LEVEL B - UNI T D EQUI PMENT PLAN

A- 420 LEVEL B - UNI T E EQUI PMENT PLAN

A- 421 LEVEL 1 - UNI T A EQUI PMENT PLAN

DOCUMENT 00 01 15 Page 5

A- 422 LEVEL 1 - UNI T B EQUI PMENT PLAN

A- 423 LEVEL 1 - UNI T C EQUI PMENT PLAN

A- 424 LEVEL 1- UNI T D EQUI PMENT PLAN

A- 425 LEVEL 1 - UNI T E EQUI PMENT PLAN

A- 426 CASEWORK PLANS AND DETAI LS

A- 427 CASEWORK PLANS AND DETAI LS

A- 428 CASEWORK PLANS AND DETAI LS

A- 429 CASEWORK PLANS AND DETAI LS

A- 430 CASEWORK PLANS AND DETAI LS

A- 431 CASEWORK SCHEDULE AND DETAI LS

A- 432 CASEWORK DETAI LS

A- 433 RECEPTI ON DESK AND DETAI LS

A- 501 TYPI CAL METAL ROOF DETAI LS

A- 502 TYPI CAL FLAT ROOF DETAI LS

A- 503 ROOF DETAI LS

A- 504 ROOF DETAI LS

A- 505 ROOF DETAI LS

A- 506 ROOF DETAI LS

A- 507 ROOF DETAI LS

A- 508 PLAN AND COLUMN DETAI LS

A- 509 PLAN AND COLUMN DETAI LS

A- 510 PLAN AND COLUMN DETAI LS

A- 511 PLAN AND COLUMN DETAI LS

A- 512 PLAN AND COLUMN DETAI LS

A- 513 PLAN AND COLUMN DETAI LS

A- 514 ENTRANCE SI GN PLAN AND DETAI LS AND STORAGE SHED DETAI LS

A- 515 CONTROL JOI NT DETAI LS

A- 516 MI SCELLANEOUS DETAI LS

A- 517 MI SCELLANEOUS DETAI LS

A- 518 ROOF DETAI LS

A- 519 ROOF DETAI LS - TYPI CAL SCUPPER DETAI LS

A- 520 ROOF DETAI LS

A- 521 PLAN DETAI LS, SECTI ONS AND MI SCELLANEOUS DETAI LS

A- 601 DOOR SCHEDULE

A- 602 DOOR SCHEDULE

A- 603 DOOR SCHEDULE

A- 604 DOOR SCHEDULE

A- 605 DOOR ELEVATI ONS

A- 606 DOOR DETAI LS

A- 607 DOOR DETAI LS

A- 608 ALUMI NUM CURTAI N WALL ELEVATI ONS

A- 609 ALUMI NUM CURTAI N WALL ELEVATI ONS

A- 610 ALUMI NUM CURTAI N WALL DETAI LS

A- 611 ALUMI NUM CURTAI N WALL DETAI LS

A- 612 ALUMI NUM CURTAI N WALL DETAI LS

A- 613 ARCHI TECTURAL LOUVER ELEVATI ONS AND DETAI LS

A- 701 LEVEL B - UNI T A FI NI SH PLAN

A- 702 LEVEL B - UNI T C FI NI SH PLAN

A- 703 LEVEL B - UNI T D FI NI SH PLAN

A- 704 LEVEL B - UNI T E FI NI SH PLAN

A- 705 LEVEL 1 - UNI T A FI NI SH PLAN

A- 706 LEVEL 1 - UNI T B FI NI SH PLAN

A- 707 LEVEL 1 - UNI T C FI NI SH PLAN

A- 708 LEVEL 1 - UNI T D FI NI SH PLAN

A- 709 LEVEL 1 - UNI T E FI NI SH PLAN

A- 710 FLOOR TRANSI TI ON DETAI LS

A- 711 FLOOR TRANSI TI ON DETAI LS

A- 712 I NTERI OR ELEVATI ONS - CORRI DOR WAI NSCOT

A- 713 I NTERI OR ELEVATI ONS - CORRI DOR GRAPHI CS

DOCUMENT 00 01 15 Page 6

A- 714 I NTERI OR ELEVATI ONS

A- 715 I NTERI OR ELEVATI ONS

A- 716 I NTERI OR ELEVATI ONS

A- 717 LI ST OF FI NI SHES

A- 718 FI NI SH NOTES

A- 719 ROOM FI NI SH SCHEDULE - LEVEL B

A- 720 ROOM FI NI SH SCHEDULE - LEVEL 1

A- 801 LEVEL B - UNI T A SI GNAGE PLAN

A- 802 LEVEL B - UNI T C SI GNAGE PLAN

A- 803 LEVEL B - UNI T D SI GNAGE PLAN

A- 804 LEVEL B - UNI T E SI GNAGE PLAN

A- 805 LEVEL 1 - UNI T A SI GNAGE PLAN

A- 806 LEVEL 1 - UNI T B SI GNAGE PLAN

A- 807 LEVEL 1 - UNI T C SI GNAGE PLAN

A- 808 LEVEL 1 - UNI T D SI GNAGE PLAN

A- 809 LEVEL 1 - UNI T E SI GNAGE PLAN

A- 810 SI GNAGE SCHEDULE

A- 811 SI GNAGE ELEVATI ONS AND DETAI LS

A- 812 SI GNAGE ELEVATI ONS AND DETAI LS

I - 101 LEVEL B - UNI T A FURNI TURE PLAN

I - 102 LEVEL B - UNI T C FURNI TURE PLAN

I - 103 LEVEL B - UNI T D FURNI TURE PLAN

I - 104 LEVEL B - UNI T E FURNI TURE PLAN

I - 105 LEVEL 1 - UNI T A FURNI TURE PLAN

I - 106 LEVEL 1 - UNI T B FURNI TURE PLAN

I - 107 LEVEL 1 - UNI T C FURNI TURE PLAN

I - 108 LEVEL 1 - UNI T D FURNI TURE PLAN

I - 109 LEVEL 1 - UNI T E FURNI TURE PLAN

I - 110 FURNI TURE PLANS AND DETAI LS

I - 111 FURNI TURE PLANS AND DETAI LS

I - 112 FURNI TURE PLANS AND DETAI LS

I - 113 FURNI TURE PLANS AND DETAI LS

G001A COVER SHEET - VOLUME 2

QF- 001 FOODSERVI CE ABBREVI ATI ONS & NOTES

QF- 101 FOODSERVI CE EQUI PMENT LAYOUT PLAN

QF- 102 FOODSERVI CE ROOFTOP EQUI PMENT LAYOUT PLAN

QF- 201 FOODSERVI CE PLUMBI NG & VENTI LATI ON ROUGH- I NS

QF- 202 FOODSERVI CE ELECTRI CAL ROUGH- I NS

QF- 203 FOODSERVI CE ELECTRI CAL ROOFTOP EQUI PMENT ROUGH- I NS

QF- 501 FOODSERVI CE EQUI PMENT DETAI LS

QF- 502 FOODSERVI CE EXHAUST HOOD DETAI LS

QF- 503 FOODSERVI CE EXHAUST HOOD DETAI LS

QF- 504 FOODSERVI CE UTI LI TY DI STRI BUTI ON SYSTEM

QF- 505 FOODSERVI CE UTI LI TY DI STRI BUTI ON SYSTEM

QF- 506 FOODSERVI CE EQUI PMENT ELEVATI ONS

QF- 507 FOODSERVI CE SERVI NG COUNTER DETAI LS

QF- 508 FOODSERVI CE SERVI NG COUNTER DETAI LS

QF- 509 FOODSERVI CE SERVI NG COUNTER DETAI LS

QF- 510 FOODSERVI CE SOAK SI NK DETAI LS

QF- 601 FOODSERVI CE EQUI PMENT SCHEDULE

QF- 602 FOODSERVI CE PLUMBI NG & VENTI LATI ON SCHEDULE

QF- 603 FOODSERVI CE ELECTRI CAL SCHEDULE

FA001 FI RE ALARM GENERAL NOTES

FA101 LEVEL B - UNI T A FI RE ALARM PLAN

FA102 LEVEL B - UNI T C FI RE ALARM PLAN

FA103 LEVEL B - UNI T D FI RE ALARM PLAN

FA104 LEVEL B - UNI T E FI RE ALARM PLAN

FA105 LEVEL 1 - UNI T A FI RE ALARM PLAN

FA106 LEVEL 1 - UNI T B FI RE ALARM PLAN

DOCUMENT 00 01 15 Page 7

FA107 LEVEL 1 - UNI T C FI RE ALARM PLAN

FA108 LEVEL 1 - UNI T D FI RE ALARM PLAN

FA109 LEVEL 1 - UNI T E FI RE ALARM PLAN

FA110 LEVEL 2 - FI RE ALARM PLAN

FA501 FI RE ALARM DETAI LS

FA502 FI RE ALARM DETAI LS

FX001 FI RE PROTECTI ON GENERAL NOTES

FX101 LEVEL B - UNI T A FI RE PROTECTI ON PLAN

FX102 LEVEL B - UNI T C FI RE PROTECTI ON PLAN

FX103 LEVEL B - UNI T D FI RE PROTECTI ON PLAN

FX104 LEVEL B - UNI T E FI RE PROTECTI ON PLAN

FX105 LEVEL 1 - UNI T A FI RE PROTECTI ON PLAN

FX106 LEVEL 1 - UNI T B FI RE PROTECTI ON PLAN

FX107 LEVEL 1 - UNI T C FI RE PROTECTI ON PLAN

FX108 LEVEL 1 - UNI T D FI RE PROTECTI ON PLAN

FX109 LEVEL 1 - UNI T E FI RE PROTECTI ON PLAN

FX110 LEVEL 2 - FI RE PROTECTI ON PLAN

FX501 FI RE PROTECTI ON DETAI LS

P- 001 PLUMBI NG LEGEND

P- 002 LEVEL B OVERALL PLUMBI NG PLAN

P- 003 LEVEL1 OVERALL PLUMBI NG PLAN

P- 101 LEVEL B FOUNDATI ON PLAN - UNI T A PLUMBI NG

P- 102 LEVEL B FOUNDATI ON PLAN - UNI T C PLUMBI NG

P- 103 LEVEL B FOUNDATI ON PLAN - UNI T D PLUMBI NG

P- 104 LEVEL B FOUNDATI ON PLAN - UNI T E PLUMBI NG

P- 105 LEVEL B FLOOR PLAN - UNI T A PLUMBI NG

P- 106 LEVEL B FLOOR PLAN - UNI T C PLUMBI NG

P- 107 LEVEL B FLOOR PLAN - UNI T D PLUMBI NG

P- 108 LEVEL B FLOOR PLAN - UNI T E PLUMBI NG

P- 109 LEVEL 1 FOUNDATI ON PLAN - UNI T A PLUMBI NG

P- 110 LEVEL 1 FOUNDATI ON PLAN - UNI T B PLUMBI NG

P- 111 LEVEL 1 FOUNDATI ON PLAN - UNI T E PLUMBI NG

P- 112 LEVEL 1 FLOOR PLAN - UNI T A PLUMBI NG

P- 113 LEVEL 1 FLOOR PLAN - UNI T B PLUMBI NG

P- 114 LEVEL 1 FLOOR PLAN - UNI T C PLUMBI NG

P- 115 LEVEL 1 FLOOR PLAN - UNI T D PLUMBI NG

P- 116 LEVEL 1 FLOOR PLAN - UNI T E PLUMBI NG

P- 117 LEVEL 2 FLOOR PLAN - PLUMBI NG

P- 401 ENLARGED MECHANI CAL ROOM PLUMBI NG PLAN

P- 402 ENLARGED KI TCHEN PLUMBI NG PLAN

P- 500 PLUMBI NG WATER HEATER & SOLAR DETAI L

P- 501 GAS RI SER DETAI L

P- 502 PLUMBI NG DETAI LS

P- 600 PLUMBI NG SCHEDULES

P- 601 PLUMBI NG SCHEDULES

P- 700 PLUMBI NG I SOMETRI CS

P- 701 PLUMBI NG I SOMETRI CS

MS101 HVAC SI TE PLAN

M- 001 HVAC ABBREVI ATI ONS AND NOTES

M- 002 HVAC SYMBOLS

MI 101 LEVEL B - SUBSLAB RADON VENTI LATI ON PLAN

MI 102 LEVEL 1 - SUBSLAB RADON VENTI LATI ON PLAN

MH101 LEVEL B - UNI T A VENTI LATI ON PLAN

MH102 LEVEL B - UNI T C VENTI LATI ON PLAN

MH103 LEVEL B - UNI T D VENTI LATI ON PLAN

MH104 LEVEL B - UNI T E VENTI LATI ON PLAN

MH105 LEVEL 1 - UNI T A VENTI LATI ON PLAN

MH106 LEVEL 1 - UNI T B VENTI LATI ON PLAN

MH107 LEVEL 1 - UNI T C VENTI LATI ON PLAN

DOCUMENT 00 01 15 Page 8

MH108 LEVEL 1 - UNI T D VENTI LATI ON PLAN

MH109 LEVEL 1 - UNI T E VENTI LATI ON PLAN

MP101 LEVEL B - UNI T A HVAC PI PI NG PLAN

MP102 LEVEL B - UNI T C HVAC PI PI NG PLAN

MP103 LEVEL B - UNI T D HVAC PI PI NG PLAN

MP104 LEVEL B - UNI T E HVAC PI PI NG PLAN

MP105 LEVEL 1 - UNI T A HVAC PI PI NG PLAN

MP106 LEVEL 1 - UNI T B HVAC PI PI NG PLAN

MP107 LEVEL 1 - UNI T C HVAC PI PI NG PLAN

MP108 LEVEL 1 - UNI T D HVAC PI PI NG PLAN

MP109 LEVEL 1 - UNI T E HVAC PI PI NG PLAN

M- 301 MECHANI CAL SECTI ONS

M- 302 MECHANI CAL SECTI ONS

M- 401 LEVEL B - UNI T E ENLARGED MECHANI CAL ROOM VENTI LATI ON PLAN

M- 402 LEVEL B - UNI T E ENLARGED MECHANI CAL ROOM PI PI NG PLAN

M- 403 LEVEL 1 - UNI T E ENLARGED KI TCHEN VENTI LATI ON PLAN

M- 404 LEVEL 2 - UNI T C ENLARGED MECHANI CAL ROOM PLAN

M- 405 LEVEL 2 - UNI T D ENLARGED MECHANI CAL ROOM PLAN

M- 501 HVAC DETAI LS

M- 502 HVAC DETAI LS

M- 503 AHU SCHEMATI C DETAI LS

M- 504 AHU SCHEMATI C DETAI LS

M- 505 AHU SCHEMATI C DETAI LS

M- 506 HVAC DETAI LS

M- 507 HVAC DETAI LS

M- 508 HVAC DETAI LS

M- 509 HVAC DETAI LS

M- 510 HVAC DETAI LS

M- 601 HVAC SCHEDULES

M- 602 HVAC SCHEDULES

M- 603 HVAC SCHEDULES

M- 604 HVAC SCHEDULES

M- 605 HVAC SCHEDULES

M- 606 HVAC SCHEDULES

M- 701 LEVEL B - UNI TS A & C TEMPERATURE CONTROL PLAN

M- 702 LEVEL B - UNI TS D & E TEMPERATURE CONTROL PLAN

M- 703 LEVEL 1 - UNI TS A, B & C TEMPERATURE CONTROL PLAN

M- 704 LEVEL 1 - UNI TS D & E TEMPERATURE CONTROL PLAN

M- 705 LEVEL 2 - TEMPERATURE CONTROL PLAN

M- 706 CONTROL SCHEMATI C DI AGRAMS

M- 707 CONTROL SCHEMATI C DI AGRAMS

M- 708 CONTROL SCHEMATI C DI AGRAMS

M- 709 CONTROL SCHEMATI C DI AGRAMS

M- 710 CONTROL SCHEMATI C DI AGRAMS

M- 711 CONTROL SCHEMATI C DI AGRAMS

ES100 ELECTRI CAL SI TE PLAN

ES101 ELECTRI CAL SI TE PLAN DETAI LS

E- 001 ELECTRI CAL SYMBOL LEGEND

E- 002 ELECTRI CAL SYMBOL LEGEND

E- 003 ELECTRI CAL SYMBOL LEGEND, GENERAL NOTES AND ABBREVI ATI ONS

E- 004 ELECTRI CAL SYMBOL LEGEND, GENERAL NOTES AND ABBREVI ATI ONS

EL101 LEVEL B - UNI T A LI GHTI NG PLAN

EL102 LEVEL B - UNI T C LI GHTI NG PLAN

EL103 LEVEL B - UNI T D LI GHTI NG PLAN

EL104 LEVEL B - UNI T E LI GHTI NG PLAN

EL105 LEVEL 1 - UNI T A LI GHTI NG PLAN

EL106 LEVEL 1 - UNI T B LI GHTI NG PLAN

EL107 LEVEL 1 - UNI T C LI GHTI NG PLAN

EL108 LEVEL 1 UNI T D - LI GHTI NG PLAN

DOCUMENT 00 01 15 Page 9

EL109 LEVEL 1 - UNI T E LI GHTI NG PLAN

EL110 LEVEL 2 - UNI T C & D LI GHTI NG PLAN

EP101 LEVEL B - UNI T A POWER PLAN

EP102 LEVEL B - UNI T C POWER PLAN

EP103 LEVEL B - UNI T D POWER PLAN

EP104 LEVEL B - UNI T E POWER PLAN

EP105 LEVEL 1 - UNI T A POWER PLAN

EP106 LEVEL 1 - UNI T B POWER PLAN

EP107 LEVEL 1 - UNI T C POWER PLAN

EP108 LEVEL 1 - UNI T D POWER PLAN

EP109 LEVEL 1 - UNI T E POWER PLAN

EP110 LEVEL 2 - UNI TS C & D POWER PLAN

E- 401 LI GHTNI NG PROTECTI ON AND GROUNDI NG PLAN

E- 402 ENLARGED ELECTRI CAL PLAN - MAI N ELECTRI CAL ROOM

E- 403 ENLARGED ELECTRI CAL PLAN - KI TCHEN

E- 404 ENLARGED ELECTRI CAL PLAN - MECHANI CAL ROOM

E- 501 LUMI NAI RE SCHEDULE

E- 502 ELECTRI CAL GROUNDI NG DETAI LS

E- 503 ELECTRI CAL GROUNDI NG DETAI LS

E- 504 ELECTRI CAL GROUNDI NG DETAI LS

E- 505 ELECTRI CAL LI GHTI NG DETAI LS

E- 506 ELECTRI CAL POWER DETAI LS

E- 507 ELECTRI CAL WI RI NG DI AGRAMS

E- 508 RENEWABLE ENERGY DETAI LS

E- 509 RENEWABLE ENERGY DETAI LS

E- 601 PRI MARY ONE LI NE DI AGRAM

E- 602 ONE LI NE DI AGRAM

E- 603 ONE LI NE DI AGRAM

E- 604 ENERGY DASHBOARD RI SER DI AGRAM

E- 701 PANELBOARD SCHEDULES

E- 702 PANELBOARD SCHEDULES

E- 703 PANELBOARD SCHEDULES

E- 704 PANELBOARD SCHEDULES

E- 705 PANELBOARD SCHEDULES

E- 706 PANELBOARD SCHEDULES

E- 707 PANELBOARD SCHEDULES

E- 708 PANELBOARD SCHEDULES

E- 709 PANELBOARD SCHEDULES

E- 710 PANELBOARD SCHEDULES

TS001 OVERALL TELECOMMUNI CATI ONS SI TE PLAN

TS002 DEMOLI TI ON TELECOMMUNI CATI ONS SI TE PLAN

TS003 DEMOLI TI ON TELECOMMUNI CATI ONS SI TE PLAN

TS101 TELECOMMUNI CATI ONS SI TE PLAN

TS102 TELECOMMUNI CATI ONS SI TE PLAN

TS103 TELECOMMUNI CATI ONS SI TE PLAN

TS104 TELECOMMUNI CATI ONS SI TE PLAN

TS105 TELECOMMUNI CATI ONS SI TE PLAN

ET001 TELECOMMUNI CATI ONS SYMBOL LEGEND, GENERAL NOTES AND ABBREVI ATI ONS

ET002 LEVEL B - SYSTEMS PLAN

ET003 LEVEL 1 - SYSTEMS PLAN

ET101 LEVEL B - UNI T A SYSTEMS PLAN

ET102 LEVEL B - UNI T C SYSTEMS PLAN

ET103 LEVEL B - UNI T D SYSTEMS PLAN

ET104 LEVEL B - UNI T E SYSTEMS PLAN

ET105 LEVEL 1 - UNI T A SYSTEMS PLAN

ET106 LEVEL 1 - UNI T B SYSTEMS PLAN

ET107 LEVEL 1 - UNI T C SYSTEMS PLAN

ET108 LEVEL 1 - UNI T D SYSTEMS PLAN

ET109 LEVEL 1 - UNI T E SYSTEMS PLAN

DOCUMENT 00 01 15 Page 10

ET110 LEVEL B - TELECOM MAXI MUM PULL LENGTH

ET111 LEVEL 1 - TELECOM MAXI MUM PULL LENGTH

ET501 SYSTEM DETAI LS

ET502 SYSTEM DETAI LS

ET503 SYSTEM DETAI LS

ET601 SYSTEM RI SERS

ET602 SYSTEM RI SERS

ET603 SYSTEM RI SERS

ET604 SYSTEM RI SERS

ET605 SYSTEM RI SERS

ET606 SYSTEM RI SERS

- - End of Document - -

DOCUMENT 00 01 15 Page 11

WEST POINT ELEMENTARY SCHOOL REPLACEMENT W91236-15-D-0014

SECTION 00 73 00 Page 1

SECTION 00 73 00

SPECIAL CONTRACT REQUIREMENTS

SECTION TABLE OF CONTENTS

1. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK:

2. LIQUIDATED DAMAGES – CONSTRUCTION

3. EQUAL OPPORTUNITY PREAWARD CLEARANCE OF SUBCONTRACTORS

4. INSURANCE – WORK ON A GOVERNMENT INSTALLATION

5. PERFORMANCE OF WORK BY THE CONTRACTOR

6. CERTIFICATES OF COMPLIANCE

7. IMPLEMENTING GUARANTEES

8. BID GUARANTEE

9. CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS

10. RECORD DRAWINGS (6-01 Version)

11. DESIGNATION OF PROPERTY ADMINISTRATOR

12. PHYSICAL DATA

13. PRICING OF ADJUSTMENTS

14. PAYMENT FOR MATERIALS DELIVERED OFF-SITE

15. EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

16. ALTERATIONS IN CONTRACT

17. AVAILABILITY AND USE OF UTILITY SERVICES AND PERMITS

18. ROAD CLOSURES AND UTILITY OUTAGES

19. EXISTING PARKING

20. SALVAGE MATERIALS AND EQUIPMENT

21. IDENTIFICATION OF GOVERNMENT-FURNISHED PROPERTY

22. CONSTRUCTION PROJECT SIGNS

23. LABOR SURPLUS AREA EXPENDITURE REQUIREMENTS

24. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

25. SCHEDULING AND DETERMINATION OF PROGRESS

26. CLEANING UP (CONSTRUCTION DISPOSAL, HOUSEKEEPING AND FINAL

CLEANUP)

27. EMPLOYEE AND VEHICLE IDENTIFICATION

28. FIELD OFFICE

29. WORKING CONDITIONS, WORKING HOURS, AND NON-WORKING DAYS

30. QUANTITY SURVEYS (Not Used)

31. TIME EXTENSIONS (Not Used)

32. MISPLACED MATERIAL (Not Used)

33. SUPERINTENDENCE OF SUBCONTRACTORS

34. PROCEDURES FOR SUBMISSION AND PAYMENT OF ALL CONTRACT PAYMENTS. 22

35. VERIFICATION OF SMALL BUSINESS UTILIZATION

36. HAZARDOUS MATERIAL IDENTIFICATION & MATERIAL SAFETY DATA

37. SAFETY AND HEALTH REQUIREMENTS MANUAL

38. SPECIAL SCHEDULING REQUIREMENTS FOR MECHANICAL AND ELECTRICAL

SYSTEMS

39. SUBMISSION OF CLAIMS

40. PARTNERSHIP IMPLEMENTATION PLAN

41. PRECONSTRUCTION CONFERENCE

42. GOVERNMENT RESIDENT MANAGEMENT SYSTEM AND CONTRACTOR QUALITY

CONTROL SYSTEM (QCS) MODULE

43. CONSTRUCTION COLOR BOARD SUBMITTALS

44. PRICING of CONTRACTOR-FURNISHED AND INSTALLED PRQPERTY AND

GOVERNMENT-FURNISHED CONTRACTOR-INSTALLED PROPERTY:

45. ENVIRONMENTAL RESPONSIBILITY (10-8-99)

SECTION 00 73 00 Page 2

46. QUALIFICATIONS FOR PERFORMANCE OF ELECTRICAL WORK (7-2005)

47. PROGRESS PHOTOGRAPHS

48. DIGGING PERMIT

49. PEST CONTROL

50. COORDINATION MEETINGS

51. CONTRACTOR’S KEY MANAGEMENT PERSONNEL

52. DISPENSARY AND HOSPITAL FACILITIES

53. (S-102) CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR

PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)

54. ANTITERRORISM/FORCE PROTECTION

55. UNEXPLODED ORDNANCES

56. TIMBER RATTLESNAKE MONITOR

SECTION 00 73 00 Page 3

SPECIAL CONTRACT REQUIREMENTS

1. COMMENCEMENT, PROSECUTION, COMPLETION OF WORK AND ESTIMATED COST

RANGE :

a. The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the notice to proceed, (ii) prosecute the work diligently, and

(iii) complete the entire work ready for use not later than XXXX calendar days after the date the Contractor receives the notice to proceed, except in the case that the Contracting Officer determines that seeding is not feasible during the construction period, the

Contractor shall accomplish such seeding in the first planting period following the contract completion date. This action will not operate to extend the performance time for the balance of the work. The time stated for completion shall include final cleanup and punch list.

b. Location: The project area is located at the West Point elementary school complex (off of Barry Road) behind the existing gym at West Point NY. Construction staging area will be on the landfill adjacent to the site accessed from Gerard Road entrance off of

Washington Road. Limited access to the Post will be allowed thru

Washington Gate. Stony Gate is the primary entrance. The site is on a military reservation and all rules and regulations issued by the

Commanding Officer covering general safety, security, and sanitary requirements, etc., shall be observed by the Contractor.

c. The intent of this solicitation is for the contractor to provide the following: construct a new elementary school, demolish the existing school and create a parking lot.

See Drawing Sheet CA101, CA102 and CA103 for the Project Phasing

Plan information.

d. All work shall be in accordance with the design plans and specifications, narratives and all appendices or instructions attached hereto and made a part thereof, or to be furnished hereafter by the

Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.

e. The Contracting Officer will award a firm fixed-price contract to that responsible bidder. Bidders are reminded that the Contract award shall not exceed the estimated cost range of for this project. The intent of this solicitation is to obtain the best proposal within the estimated cost range. There is no obligation to approach or match the target amount in the offer. The estimated cost range (including design, construction of base and all optional items) is between $25,000,000 and

$50,000,000.

2. LIQUIDATED DAMAGES – CONSTRUCTION

a. If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor shall pay to the Government as liquidated damages, the sum of $2,240 for each day of delay for extended supervision and administration by the USACE.

SECTION 00 73 00 Page 4

b. If the Government terminates the Contractor’s right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work together with any increased costs occasioned the Government in completing the work.

c. If the Government does not terminate the Contractor’s right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted.

d. At a time before the project is physically complete, but is functionally complete to the satisfaction of the Government, the

Government at its sole discretion may agree to accept transfer of the facility or project provided that the remaining work to be done

("punchlist") is completed no later than 30 days from the date of transfer. In this case the contractor shall pay liquidated damages for punchlist items not completed in the daily amount of $1,120 per day commencing after 30 days of project transfer or after date required for project completion (including all extensions), whichever occurs later.

3. PREAWARD SURVEY AND EQUAL OPPORTUNITY PREAWARD CLEARANCE OF

SUBCONTRACTORS

A. Notwithstanding the clause of this contract entitled “Limitation on Subcontracting”, the Contractor shall not enter into a first-tier subcontract for an estimated or actual amount of $1 million or more without obtaining in writing from the Contracting Officer a clearance that the proposed subcontractor is in compliance with the equal opportunity requirements and therefore is eligible for award.

4. INSURANCE – WORK ON A GOVERNMENT INSTALLATION

a. The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

(1) General Liability Insurance (Comprehensive form of policy):

Bodily Injury Liability - $500,000 per occurrence.

(2) Automobile Liability Insurance (Comprehensive form of policy):

Bodily Injury Liability - $200,000 per person and $500,000 per accident.

Property Damage Liability - $20,000 per accident.

(3) Workmen’s Compensation and Employer’s Liability Insurance:

Compliance with applicable workmen’s compensation and occupational disease statutes is required. Employer’s liability coverage in the minimum amount of $100,000 is also required.

SECTION 00 73 00 Page 5

b. Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such a period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.

c. The Contractor agrees to insert the substances of this clause, including this paragraph c., in all subcontracts hereunder.

5. PERFORMANCE OF WORK BY THE CONTRACTOR

The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

6. CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in 4 copies. Each certificates shall be signed by an official authorized to certify in behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certification apply. Copies of laboratory tests reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the

Contractor from furnishing satisfying material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

7. IMPLEMENTING GUARANTEES

At any time subsequent to the acceptance by the Government of a completed installation under this contract, which installation is required to be covered by a specific guarantee under the terms of the various sections in the TECHNICAL PROVISIONS, the Base Commander will be an authorized party for the purpose of implementing the provisions of such guarantees in behalf of the Government.

8. BID GUARANTEE

See contract clause entitled BID GUARANTEE in Section 007200

CONTRACT CLAUSES.

SECTION 00 73 00 Page 6

9. CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS

Plans and specifications issued under separate cover.

10. RECORD DRAWINGS

a. General: The Contractor will maintain as-built drawings during the construction period and will submit final record drawings at the completion of the project. The Government will provide to the

Contractor the CAD (Computer-Aided Drafting) files consisting of compact (computer) disks of the drawing files in “AutoCAD” and the BIM model in AutoCad-Revit for the project. The Contractor is required to make prints from the CAD files and continuously maintain drawings to show current as-built conditions for the duration of the construction.

Except for updates as indicated below, the Contractor may maintain as-built drawings by marking up drawings by hand or by CAD methods.

Scanned drawings will not be acceptable. If the Government cannot provide CAD files for the project drawings, reproducible drawings will be provided. The Contractor will then be required to comply with all requirements indicated herein by the use of hand drafting.

b. Progress As-built Prints: During construction the Contractor is responsible for maintaining up to date one set of paper prints to show as-built construction conditions. These prints shall be kept current and available on the job site at all times. All changes from the contract plans which are made in the work or additional information which might be uncovered in the course of construction shall be accordingly and neatly recorded as they occur by means of details and notes. The Contractor will be provided responses to RFI’s and any other design changes in Autocad format. The contractor is responsible for assuring the original design is annotated properly to incorporate changes. The as-built prints will be jointly inspected for accuracy and completeness by the Contracting Officer’s Representative and a responsible representative of the Contractor prior to submission of each monthly pay estimate. Partial payment will be withheld (amount to be determined) if the monthly review of as-built drawings reveals inaccuracies or incompleteness of as-built conditions. Progress as-builts shall show the following information, but not limited thereto:

(1) The location and description of any utility lines, valves, or other installations of any kind within the construction area.

The location includes dimensions to permanent features.

Average depth below surface shall also be indicated. The location of all underground utility lines, valve boxes or other items shall be located using a minimum of two tie-point dimensions. All dimensions must be taken from permanent structures or points that will remain after the construction work is completed.

(2) The location and dimensions of any changes with the building and structure.

(3) Correct grade or alignment of roads, structures or utilities if any changes were made from the contract plans.

SECTION 00 73 00 Page 7

(4) Correct elevations if changes were made in site grading.

(5) Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including but not limited to fabricated, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.

(6) The topography and grades of all drainage installed or affected as part of the project construction.

(7) All changes, which result from contract modifications.

(8) Where contract drawings or specifications allow options, only the option selected for construction shall be shown on the as-built prints.

(9) Systems designed or enhanced by the Contractor, such as HVAC controls, fire alarm, fire sprinkler and irrigation systems.

(10) All amendments to the contract drawings issued during the solicitation period shall be posted on the as-built drawings.

c. Hand Drafting: If reproducible drawings only are provided to the

Contractor, they shall be updated using hand drafting. Only personnel proficient in the preparation of engineering drawings to standards satisfactory and acceptable to the Government shall be employed to modify the reproduction drawings or prepare additional new drawings.

All additions and corrections to the contract drawings shall be neat, clean and legible, and shall match the adjacent line work and/or lettering being annotated in type, density, size and style. All drafting work shall be done using the same medium (pencil, plastic lead or ink) that was employed on the original contract drawings and with graphic lead on paper base material. The title block to be used for any new as-built drawings shall be similar to that used on the original contract drawings.

d. Protection of Records: The Contractor shall be responsible for the protection and safety of drawings and CAD record until returned to the Contracting Officer. Any drawings damaged or lost by the

Contractor shall be satisfactorily replaced by the Contractor at his expense.

e. 50% As-Built Update: At the 50% point in construction of this project (as determined by progress payments) the Contractor will update the CAD files of the project drawings in the appropriate CAD program to show as-built conditions as above, and submit an updated computer disk and one set of prints to the Contracting Officer for approval. If reproducible drawings only are provided to the Contractor, they shall be updated at this stage using hand-drafting as specified herein, and the Contractor shall submit one set of prints to the Contracting

Officer for approval. Any required corrections will be made by the

Contractor before payment will be approved for this item. The

Contractor must use the updated CAD record or drawings to produce required prints.

SECTION 00 73 00 Page 8

f. Preliminary Record Drawing Submittal: At least thirty calendar

(30) days before the anticipated date of final acceptance inspection the Contractor shall deliver two copies of progress prints showing final as-built conditions to the Contracting Officer for review and approval. These prints shall correctly show all the features of the project as it has been constructed, adding such additional drawings as may be necessary. They shall be printed from the CAD files updated in the appropriate CAD program, or from updated reproducible drawings if they were provided to the Contractor. Within ten days, the Government will provide the Contractor one set of prints indicating required corrections to the preliminary submittal. Contractor will correct and resubmit within 5 days. Any required subsequent review and resubmission periods will each be accomplished within 5 days. Upon

Government approval of the preliminary submittal, the Contractor will prepare final record drawings.

g.1.1 As-Built BIM (if applicable): Reflect Field Changes from Final

Design Submittal

Provide one (1) copy in a CD media of updated BIM model in Autodesk

Revit and AutoCAD latest versions (same or newer version of

Revit/AutoCAD MEP) with BIM model IFC (2x3 or better) files.

Note 2: The Contractor will be given the final design and issued for construction set of AutoCAD Dwgs and BIM models (Revit/AutoCAD MEP latest versions). The revisions in these As-Built deliverables reflecting the significant changes in the work made during construction are based on data furnished by the contractor. Care shall be taken in any further use of this final design and issued for construction set of

AutoCAD Dwgs and BIM models such as extension of this project. It is recommended that field verification of critical information be carried out to confirm the accuracy of information contained herein prior to extending the project. Architect shall not be held responsible for the accuracy of the information provided by the contractor. The Contractor is responsible for incorporating as-built data to reflect field changes from final design submittal and resubmitting the updated as-built BIM model in digital format. The digital files will be provided to the government in both Revit/AutoCAD MEP model files and IFC files as one complete set in a CD/DVD media. As-Built BIM model requirements pertain to elements already modeled in final design BIM model.

g.1.2 As-Built BIM: Installed Manufacture Information (if applicable)

Provide one (1) copy in a CD media of updated BIM model in

Revit/AutoCAD latest version with BIM model IFC (2x3 or better) files.

Note 3: The Contractor will be given the final design and issued for construction set of AutoCAD Dwgs and BIM models (Revit/AutoCAD latest version). The revisions in these As-Built deliverables reflecting the significant changes in the work made during construction are based on data furnished by the contractor. Care shall be taken in any further use of these final design and issued for construction set of AutoCAD

Dwgs and BIM models such as extension of this project. It is recommended that field verification of critical information be carried out to confirm the accuracy of information contained herein prior to extending the project. Architect shall not be held responsible for the

SECTION 00 73 00 Page 9 accuracy of the information provided by the contractor. The Contractor is responsible for incorporating as-built data to include installed manufacturer information, in addition to reflect changes from final design submittal, and resubmitting the updated as-built BIM model in digital format. This includes updating the BIM modeled elements and related schedules to include installed manufacturer information.

Manufacture information shall include Manufacturer Name, Model, Serial

Number as applicable based on elements already modeled in final design

BIM model:

Architecture: Windows, Doors and related Hardware, Reflected Ceiling, Manufactured Casework, Restroom

Partitions and Accessories (Architecture Models)

Mechanical: Scheduled Equipment (Mechanical Models)

Plumbing: Scheduled Equipment (Plumbing Models);

Restroom/Kitchen Fixtures: Sinks, Faucets, Toilets, Shower Equipment: Drinking Fountains (Architecture

Models)

Electrical: Power (generator / UPS / unit substation

/ transformers / switchboards /overcurrent protection devices) - Lighting (occupancy sensors / fixtures) -

Fire Alarm (entire system minus cabling - all devices and panels) - Access Control (card readers / control panels / power supplies / access control door hardware) -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .