W912DS-16-B-0013
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise some sections of the Specifications.
The bid opening date of 07 September 2016 at 1500 hours (3:00 p.m.) Denmark time remains unchanged.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0013
X 9B. DATED (SEE ITEM 11)
28-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2016
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 72 00 - CONTRACT CLAUSES
The following have been added by reference:
252.247-7023 Transportation of Supplies by Sea APR 2014
The following have been deleted:
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
Thule Runway Replacement Phase III Thule Air Base, Greenland
W921DS-16-B-0013
Amendment 0002
AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for Thule Runway Replacement Phase III, Thule Air Base, Greenland.
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- None
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- APPENDIX R – DBA Waiver – is hereby reissued in its entirety.
- APPENDIX P – FY17 (Projected) Sealift Rates – is hereby replaced in its entirety.
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 00 10 00 – Solicitation/Contract Form (Bid Schedule) – replace note #1 in its entirety with the following: “All goods must be wrapped accordingly. It should be protected to withstand handling as well as storage and transportation by sea. Due to packing in containers, in warehouse and on ship every package must be able to withstand a pressure from above of at least it's own weight. For information about the current sea lift carrier please contact the US Embassy in Denmark and refer to section 00 73 00 paragraph 35(g).”
- Section 00 73 00 – Special Contract Requirements – correct title of Appendix P in the LIST OF APPENDICES as follows: “APPENDIX P – FY17 (Projected) Sealift Rates.”
- Section 00 73 00 – Special Contract Requirements – replace paragraph 35(g) in its entirety as follows:
“Contract Administrator (Construction, A/E, Airlift & Sealift) Detachment 1, 21 Contracting Sq. (DET 1) c/o American Embassy Dag Hammarskjölds Allé 24
DK-2100 Copenhagen Ø, Denmark Attn: Jasper Nielsen jesper.nielsen@det1.dk +45 3341 7468”
(1) Thule Air Base's seaport is not a commercial port and therefore does not operate in accordance with typical commercial practices. Operation and support services are contracted out and are performed by the Base Maintenance Contract (BMC) contractor. Due to the base's location, its operation is limited to 60 calendar days, during the months of July and August. Ice is a frequent condition and should be expected. Additionally, the depth of the bay varies significantly with mean depth and tide, and is known to be shallow. While cargo and tanker vessels frequent the port annually without incident, larger vessels may find the port too shallow for berthing. Berth Depths in North Star Bay are typically greater than 12 m (MLW), except within a few meters from the face of the pier where the average depth rises to 9.5 m (min.
depth: 7.5 m.). There are no Length Overall (LOA) restrictions.
(2) The U.S. Government contracts for charter sealift to Thule from both the USA and Denmark, and return. Contractors shall use one or both Government chartered sealifts for transport of construction materials to/from Thule in accordance with the stipulations of this contract. The contractors may subcontract their own sealift and shall do so in accordance with all shipping/sea transportation clauses listed in this contract (252.247-7023).
For the use of the US Government charter sealift contracts, and at the rates identified in this contract, the contractor shall enter a transportation cost in the bid schedule. The transportation amount will be part of the contract award price, and will be used in the overall bid evaluation costs. Any amount over the bid amount will be the responsibility of the contractor to pay. Should the requirements of the work require furnishing their own sealift, the contractor should include those costs in his base bid item under CLIN 001 inclusive of any offloading costs at Thule air base following the requirements of all applicable sea transportation clauses (252.247-7023).
Government chartered sealifts provide the following:
(i) Sealift of contractor materials, equipment, tools, and supplies directly attributable to the performance of this contract from Norfolk, Virginia and or Aalborg Denmark to Thule Air Base and reverse (the sealift from Norfolk Virginia ONLY to/from Thule is provided free of charge to the contractors). See contract clause 52.247-60, Guaranteed Shipping Characteristics. Such transportation will occur only on scheduled Military Sealift Command (MSC) ships. Shipment will be in accordance with published summer shipping schedules of MSC. Transportation to Norfolk, Virginia shall be at the Contractor's expense , transportation to Aalborg and from Aalborg Denmark to/from Thule AB shall be contractors responsibility. The Contractor is responsible for the direct coordination with the Military Ocean Terminal, Norfolk, Virginia and/or Aalborg Denmark shipper to determine deadline date(s) for delivery of cargo to the terminal for shipment, as well as prior booking, proper markings and documentation and all other requirements necessary for acceptance of cargo for shipment.
(ii) The Government shall provide transportation, at no cost to the Contractor, of Contractor's equipment, tools, materials, and supplies from the ship to designated storage areas at Thule AB and retrograde equipment and tools from the same storage areas to the ship. This transportation shall include off-loading and loading of ships. Items will be shipped containerized to the maximum extent possible. Full containers shall be delivered to the Contractor's storage area, and it is the Contractor's responsibility to unload these containers. All non-contractor owned shipping containers are required to be emptied within 36 hours of delivery and made available for transport back to the Sealift carrier. Arrangements to keep the containers for a longer period of time should be coordinated directly with the Sealift carrier.
(iii) The contractor is required to provide similar packing, marking and documentation with retrograde shipments as with shipments headed to Thule AB. Retrograde shipments shall be properly packed for sealift transportation; the contract number shall be clearly marked on all items; and a list of items shall be provided to the shipping contractor.
These items are required not only for the safety of the goods being transported, but are required in order to transport the goods via our Sealift carrier. Items not properly packaged, marked and identified will not be accepted by the Sealift carrier.
(iv) The Government shall not assume responsibility for any equipment, materials, or property until such is integrated into the final work product at Thule Air Base, and paid for under the clause at 52.232-5. Any damage claims and settlement shall be handled directly between the transportation carrier(s) and the construction contractor(s); however, the Contracting Officer shall be notified of any damage within 72 hours of discovery.
(v) The Contractor shall furnish its own drivers who are required to have a valid driver's license.
(vi) Contact Information:
(A) For MSC (shipments originating from/to the US): Point of Contact:
Ms. Joyce Williams/ Mr. Rufus Strothers, Pacer Goose Coordinators, Commercial Phone: 757- 443-1031/757-443-1039, Cell Phone: 757-544-51217/757-544-5128, DSN: 646-1031 , FAX 757-443-1075, E-mail (joyce.williams@dla.mil), rufus.strothers@dla.mil. Request all transportation relating to Pacer Goose (the US cargo vessel used for transportation) be directed to the above numbers or delivered to: SW3185 - PACER GOOSE, DLA Distribution Norfolk, V.A. SW3185, Intermodal Hub Code O, 9551 Decatur Ave, Pier-8, Norfolk, VA 23511.
(B) For shipments originating from/to Denmark: Please contact the US
Embassy in Denmark at the contact number provided above. The current sealift contract has expired and the Government is working on procuring new sealift contract. The sealift carrier details shall be available in March 2017.
(vii) All other transportation not covered in this clause is the Contractor's responsibility at the Contractor's expense.
(3) Should it be required, by the work, for the contractor to furnishing their own sealift, the following applies.
(i) Documentation and justification shall be submitted to Contracting officer in accordance with clause (252.247-7024).
(ii) Private vessels must meet port entrance requirements.
(iii) To limit scheduling conflicts as much as possible, private vessels must coordinate arrival/departure dates/times with port operations well in advance.
With the exception of on/off-loading of ships, the services in paragraphs b(2)(ii) above apply.
The contractor shall load/unload their vessel(s). Additionally, cargo shall be containerized to the maximum extent possible. Optionally, the contractor may arrange for the port operations contractor (BMC) to perform loading and/or unloading services; however, such would be an agreement between contractors and cannot interrupt or take precedence over Government Contract requirements.”
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
NONE
(End of Summary of Changes)