W912DS-16-B-0013_Amendment_0001.pdf

PDF 29 KB Posted

Attached to
Thule, Greenland Removal, Replacement, and/or Repair of Asphalt Taxiway
Solicitation number
W912DS-16-B-0013
Issued by

About this file

AMENDMENT 0001

View the file

Other files

File Type Posted
Amendment_0004_-_Plans.pdf PDF
Amendment_0004.pdf PDF
W912DS-16-B-0013_Amendment_0003.pdf PDF
Appendix_P_-_FY17_(Projected)_Sealift_Rates.pdf PDF
Appendix_R_-_DBA_Waiver.pdf PDF
W912DS-16-B-0013_Amendment_0002.pdf PDF
Appendix_S_-_Fuel_Pricing_and_DLA_info.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_P_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_O_-_Lead_Paint_Management_Plan.pdf PDF
Appendix_R_-_DBA_Waiver.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Sites.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Amendment_1_-_Thule_Runway_Phase_3_-_Plans.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Appendix_M_-_PCB_Replacement_Plan.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_Q_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_N_-_Asbestos_Management_Plan.pdf PDF
Package_2_-_Thule_Runway_Phase_3_-_Specs.pdf PDF
Package_1_-_Thule_Runway_Phase_3_-_Plans.pdf PDF
W912DS-16-B-0013_Thule_Solicitation.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS-16-B-0013

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

1. Amend the Draw ings.

2. Add appendices to the Specifications and revise Section 00 73 00, Section 32 11 16, and Section 32 11 23.

3. Provide responses to questions received from interested vendors, for informational purposes only.

The bid opening date is extended to 07 September 2016 at 1500 hours (3:00 p.m.) Denmark time.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0013

X 9B. DATED (SEE ITEM 11)

28-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 30-Aug-2016 03:00 PM to 07-Sep-2016 03:00 PM.

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Thule Runway Replacement Phase III Thule Air Base, Greenland

W921DS-16-B-0013

Amendment 0001

AMENDMENT 0001 to DRAWINGS and SPECIFICATIONS for Thule Runway Replacement Phase III, Thule Air Base, Greenland.

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

Remaining drawings within the same discipline category (i.e. CD, CS, CP, CG etc.)

that have not been revised that shared the same notes, the notes are hereby replaced with the notes as indicated on reissued drawings.

2. The following DRAWINGS have been REVISED and REISSUED:

1. Drawing G-002

2. Drawing C-001

3. Drawing C-002

4. Drawing C-003

5. Drawing C-004

6. Drawing C-005

7. Drawing C-006

8. Drawing VF101

9. Drawing CD101

10. Drawing CD102

11. Drawing CD103

12. Drawing CD104

13. Drawing CD105

14. Drawing CD106

15. Drawing CD501

16. Drawing CD502

17. Drawing CD503

18. Drawing CD504

19. Drawing CS101

20. Drawing CS102

21. Drawing CS103

22. Drawing CS104

23. Drawing CS105

24. Drawing CS106

25. Drawing CP101

26. Drawing CP102

27. Drawing CP104

28. Drawing CP105

29. Drawing CP106

30. Drawing CP501

31. Drawing CP502

32. Drawing CP503

33. Drawing CP802

34. Drawing CG101

35. Drawing CG102

36. Drawing CG103

37. Drawing CG104

38. Drawing CG105

39. Drawing CG106

40. Drawing CG204

41. Drawing CG301

42. Drawing CG302

43. Drawing CG303

44. Drawing CG304

45. Drawing CG305

46. Drawing CG306

47. Drawing CG307

48. Drawing CG308

49. Drawing CG309

50. Drawing CG310

51. Drawing CG311

52. Drawing CG312

53. Drawing CG313

54. Drawing CG314

55. Drawing CG315

56. Drawing CG316

57. Drawing CG317

58. Drawing CG318

59. Drawing CG319

60. Drawing CG401

61. Drawing CG402

62. Drawing CG404

63. Drawing CG405

64. Drawing CG406

65. Drawing ER101

66. Drawing ER106

67. Drawing ER108

68. Drawing ES101

69. Drawing ES102

70. Drawing ES103

71. Drawing ES104

72. Drawing ES105

73. Drawing ES106

3. The following DRAWINGS have been ADDED:

1. Drawing CD107

2. Drawing CD108

3. Drawing CS107

4. Drawing CS108

5. Drawing CP504

6. Drawing CG201

7. Drawing E-001

8. Drawing ES501

9. Drawing ES502

10. Drawing ES503

4. The following DRAWINGS have been DELETED:

1. Drawing ED101

2. Drawing ED102

3. Drawing ED103

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

APPENDIX A - Active Landfills APPENDIX B - NFS Material Borrow Site APPENDIX C - Conservation Mgmt Plan APPENDIX D - HAZMAT Management Plan APPENDIX E - Spill Prevention-Response Plan APPENDIX F - Pollution Prevention Management Plan APPENDIX G - Solid Waste Mgmt Plan APPENDIX H - Storm Water Mgmt Plan APPENDIX I - Slug Mgmt Plan APPENDIX J - Installation HAZMAT Management Plan APPENDIX K - FGS-GL (Environmental Protection) APPENDIX L - Affirmative Proc Plan APPENDIX M - PCB Replacement Plan APPENDIX N - Asbestos Management Plan APPENDIX O - Lead Paint Management Plan APPENDIX P - Shipping Rates Gov Furnished Transport APPENDIX Q - Pacer Goose Shipping Instructions APPENDIX R - DBA Waiver APPENDIX S - Fuel Pricing and DLA info

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- Section 00 73 00 – Special Contract Requirements – add the following sub-paragraph following 1(k): “l. Explosives: Currently there are no explosives materials available at Thule AB. The total capacity of the explosives magazine is 10,000 lb. The contractor shall be responsible for procurement of their explosives and shipment to Thule AB.

Proper and advanced authorization is required from Thule AB BCE, prior to shipment.

Any quantities in excess of magazine storage capacity or without prior written authorization will be rejected and returned at contractor’s expense.”

- Section 32 11 16 – Subbase for Flexible Paving – replace the following sentences in paragraph 3.1“All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry. No other aggregate sources are available to the Contractor. Blasting and crushing of bedrock at the Base Quarry is the responsibility of the Contractor.” with “All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry or at the available locations as outlined in appendix B. Contractor shall be responsible for processing the material to meet the specifications requirements.”

- Section 32 11 23 – Graded-Crushed Aggregate Base Course – replace the following sentences in paragraph 3.2 “All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry. No other aggregate sources are available to the Contractor. Blasting and crushing of bedrock at the Base Quarry is the responsibility of the Contractor.” with “All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry or at the available locations as outlined in appendix B. Contractor shall be responsible for processing the material to meet the specifications requirements.”

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

1. Reference is made to drawing no. CD 501 – Note 5 – A portion of the existing subbase course Material shall be reused as shown on replacement sections. (Drawings CP501- 503). On the CP501-503 drawings the note #6 is instructing the contractor to prepare new subbase material in accordance with specification section 32 11 16. In part 2.1.1 use of existing materials would be permitted. However in parts 3.1 it is requested that all new material should come from the Base Quarry. This is in direct conflict with the above mentioned Note 5 on drawing CD 501. Please clarify. Response: Please refer to the revised drawings as issued under this Amendment 0001.

2. Please note the amount of subbase if requested from the Quarry could be too big to manage in the time given in this solicitation. Response: With the possibility of mining the subbase material from other areas at Thule, the government feels that the proposed duration is adequate to complete the work in the specified timeframe. Please refer to Appendix B for possible mining locations.

(End of Summary of Changes)