W912DS-16-B-0013
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Amend the Draw ings.
2. Add appendices to the Specifications and revise Section 00 73 00, Section 32 11 16, and Section 32 11 23.
3. Provide responses to questions received from interested vendors, for informational purposes only.
The bid opening date is extended to 07 September 2016 at 1500 hours (3:00 p.m.) Denmark time.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0013
X 9B. DATED (SEE ITEM 11)
28-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Aug-2016
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Aug-2016 03:00 PM to 07-Sep-2016 03:00 PM.
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
Thule Runway Replacement Phase III Thule Air Base, Greenland
W921DS-16-B-0013
Amendment 0001
AMENDMENT 0001 to DRAWINGS and SPECIFICATIONS for Thule Runway Replacement Phase III, Thule Air Base, Greenland.
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
Remaining drawings within the same discipline category (i.e. CD, CS, CP, CG etc.)
that have not been revised that shared the same notes, the notes are hereby replaced with the notes as indicated on reissued drawings.
2. The following DRAWINGS have been REVISED and REISSUED:
1. Drawing G-002
2. Drawing C-001
3. Drawing C-002
4. Drawing C-003
5. Drawing C-004
6. Drawing C-005
7. Drawing C-006
8. Drawing VF101
9. Drawing CD101
10. Drawing CD102
11. Drawing CD103
12. Drawing CD104
13. Drawing CD105
14. Drawing CD106
15. Drawing CD501
16. Drawing CD502
17. Drawing CD503
18. Drawing CD504
19. Drawing CS101
20. Drawing CS102
21. Drawing CS103
22. Drawing CS104
23. Drawing CS105
24. Drawing CS106
25. Drawing CP101
26. Drawing CP102
27. Drawing CP104
28. Drawing CP105
29. Drawing CP106
30. Drawing CP501
31. Drawing CP502
32. Drawing CP503
33. Drawing CP802
34. Drawing CG101
35. Drawing CG102
36. Drawing CG103
37. Drawing CG104
38. Drawing CG105
39. Drawing CG106
40. Drawing CG204
41. Drawing CG301
42. Drawing CG302
43. Drawing CG303
44. Drawing CG304
45. Drawing CG305
46. Drawing CG306
47. Drawing CG307
48. Drawing CG308
49. Drawing CG309
50. Drawing CG310
51. Drawing CG311
52. Drawing CG312
53. Drawing CG313
54. Drawing CG314
55. Drawing CG315
56. Drawing CG316
57. Drawing CG317
58. Drawing CG318
59. Drawing CG319
60. Drawing CG401
61. Drawing CG402
62. Drawing CG404
63. Drawing CG405
64. Drawing CG406
65. Drawing ER101
66. Drawing ER106
67. Drawing ER108
68. Drawing ES101
69. Drawing ES102
70. Drawing ES103
71. Drawing ES104
72. Drawing ES105
73. Drawing ES106
3. The following DRAWINGS have been ADDED:
1. Drawing CD107
2. Drawing CD108
3. Drawing CS107
4. Drawing CS108
5. Drawing CP504
6. Drawing CG201
7. Drawing E-001
8. Drawing ES501
9. Drawing ES502
10. Drawing ES503
4. The following DRAWINGS have been DELETED:
1. Drawing ED101
2. Drawing ED102
3. Drawing ED103
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
APPENDIX A - Active Landfills APPENDIX B - NFS Material Borrow Site APPENDIX C - Conservation Mgmt Plan APPENDIX D - HAZMAT Management Plan APPENDIX E - Spill Prevention-Response Plan APPENDIX F - Pollution Prevention Management Plan APPENDIX G - Solid Waste Mgmt Plan APPENDIX H - Storm Water Mgmt Plan APPENDIX I - Slug Mgmt Plan APPENDIX J - Installation HAZMAT Management Plan APPENDIX K - FGS-GL (Environmental Protection) APPENDIX L - Affirmative Proc Plan APPENDIX M - PCB Replacement Plan APPENDIX N - Asbestos Management Plan APPENDIX O - Lead Paint Management Plan APPENDIX P - Shipping Rates Gov Furnished Transport APPENDIX Q - Pacer Goose Shipping Instructions APPENDIX R - DBA Waiver APPENDIX S - Fuel Pricing and DLA info
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
None
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 00 73 00 – Special Contract Requirements – add the following sub-paragraph following 1(k): “l. Explosives: Currently there are no explosives materials available at Thule AB. The total capacity of the explosives magazine is 10,000 lb. The contractor shall be responsible for procurement of their explosives and shipment to Thule AB.
Proper and advanced authorization is required from Thule AB BCE, prior to shipment.
Any quantities in excess of magazine storage capacity or without prior written authorization will be rejected and returned at contractor’s expense.”
- Section 32 11 16 – Subbase for Flexible Paving – replace the following sentences in paragraph 3.1“All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry. No other aggregate sources are available to the Contractor. Blasting and crushing of bedrock at the Base Quarry is the responsibility of the Contractor.” with “All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry or at the available locations as outlined in appendix B. Contractor shall be responsible for processing the material to meet the specifications requirements.”
- Section 32 11 23 – Graded-Crushed Aggregate Base Course – replace the following sentences in paragraph 3.2 “All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry. No other aggregate sources are available to the Contractor. Blasting and crushing of bedrock at the Base Quarry is the responsibility of the Contractor.” with “All new subbase material shall be manufactured by the Contractor from quarried and crushed bedrock at the Base Quarry or at the available locations as outlined in appendix B. Contractor shall be responsible for processing the material to meet the specifications requirements.”
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. Reference is made to drawing no. CD 501 – Note 5 – A portion of the existing subbase course Material shall be reused as shown on replacement sections. (Drawings CP501- 503). On the CP501-503 drawings the note #6 is instructing the contractor to prepare new subbase material in accordance with specification section 32 11 16. In part 2.1.1 use of existing materials would be permitted. However in parts 3.1 it is requested that all new material should come from the Base Quarry. This is in direct conflict with the above mentioned Note 5 on drawing CD 501. Please clarify. Response: Please refer to the revised drawings as issued under this Amendment 0001.
2. Please note the amount of subbase if requested from the Quarry could be too big to manage in the time given in this solicitation. Response: With the possibility of mining the subbase material from other areas at Thule, the government feels that the proposed duration is adequate to complete the work in the specified timeframe. Please refer to Appendix B for possible mining locations.
(End of Summary of Changes)