About this file

Amendment 0003

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

1. Bid opening date remains 09 August 2016 at 2:00 P.M. EST

2. Revise and Reissue Draw ings. Sheet 6 of 6. Please see Attached.

3. Revised but Not Reissue Specification Section 01200. Please see Continuation Sheet.

3. Add Specifications. Section 05 50 13 and Main Table of Contents. Please see Continuation Page.

NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by the follow ing method:

in the space provided on the SF 1442, by separate letter by signing block 15 below .

FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0011

X 9B. DATED (SEE ITEM 11)

08-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

Maintenance dredging of the Hudson River, NY City to Waterford, New York, Federal Navigation Project.

Amendment 0003

Amendment 0003 to DRAWINGS and SPECIFICATIONS

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

a. Sheet 6 of 6 – revised as follows:

1) Revised Raising Exterior Containment Dike #1 (TYP), Raising Exterior Containment Dike #2 (TYP), Raising Interior Containment Dike (TYP), and Interior Berm and Weir (TYP) details

2) Dike Section Notes – deleted original notes #3 and #4, and added new note #3

3) Placement Site Notes – revised note #4

3. The following DRAWINGS have been ADDED:

- None-

SPECIFICATIONS:

1. The following SPECIFICATIONS have been ADDED:

a. Main Table of Contents added in this amendment

b. Section 05 50 13, Miscellaneous Material Fabrications added in this amendment

2. The following SPECIFICATION SECTION has been REVISED but NOT

REISSUED:

Section 01200, Technical Specifications:

Replace paragraph 7.11.3 in its entirety as below:

7.11.3 Removal and Reinstallation of Interior Weir. Raising existing exterior and interior containment dikes in containment cells B.1 and B.2 may necessitate the Contractor to remove, relocate and reinstall one or more of the existing weir systems, including the geomembrane, weir box(s) and pipeline(s). If required, the relocated weir system(s) shall conform to all weir box requirements shown on the contract plans and specifications. Should relocation of the existing weir box(s) not be required, the Contractor shall extend the existing weir discharge pipeline and geomembrane to the toe of the newly constructed slope. The Contractor shall provide all labor, equipment and materials to make the necessary modifications to the pipeline and geomembrane in accordance with the details shown on the plans.

All new materials shall match and be compatible with the existing materials. Metal fabrication shall be in accordance with specification Section 05 50 13, Miscellaneous Metals Fabrication. The Contractor shall reinstall the weir systems in accordance with plans and specifications.

3. The following SPECIFICATION SECTIONS has been REVISED and REISSUED:

4. The following SPECIFICATION SECTIONS have been DELETED in their entirety:

(End of Summary of Changes)

File details come from the government source that posted it. Updated .