Specifications_Section_01200_para_7_11_3_(REV_27-Jul-16).pdf

PDF 9 KB Posted

Attached to
Maintenance dredging of the Hudson River, NY City to Waterford, New York, Federal Navigation Project.
Solicitation number
W912DS-16-B-0011
Issued by

About this file

Specifications_Section 01200 para 7 11 3

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7.11.3 Removal and Reinstallation of Interior Weir. Raising existing exterior and interior containment dikes in containment cells B.1 and B.2 may necessitate the Contractor to remove, relocate and reinstall one or more of the existing weir systems, including the geomembrane, weir box(s) and pipeline(s). If required, the relocated weir system(s) shall conform to all weir box requirements shown on the contract plans and specifications. Should relocation of the existing weir box(s) not be required, the Contractor shall extend the existing weir discharge pipeline and geomembrane to the toe of the newly constructed slope. The Contractor shall provide all labor, equipment and materials to make the necessary modifications to the pipeline and geomembrane in accordance with the details shown on the plans. All new materials shall match and be compatible with the existing materials. Metal fabrication shall be in accordance with specification Section 05 50 13, Miscellaneous Metals Fabrication. The Contractor shall reinstall the weir systems in accordance with plans and specifications.

File details come from the government source that posted it. Updated .