AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment:

1. Add Site Visit Clause 52.236-27 and Site Visit instructions.

2. Update w age rates.

3. Bid opening remains 09 Aug 2016 at 2:00 P.M. EST

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION,REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 35

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0011

X 9B. DATED (SEE ITEM 11)

08-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 16 - INSTRUCTIONS, CONDITIONS AND NOTICE TO OFFEROR

The following have been added by full text:

SITE VISIT INSTRUCTIONS

Pre-bid Site Visit to the Houghtaling Island Dredged Material Placement Site

A onetime pre-bid site visit sponsored by the Government will be scheduled during the bidding period.

The date and time of this pre-bid site to the Houghtaling Island dredged material placement site (Site U-3A) will be Tuesday, July 26th commencing at 10:00 AM. The purpose of the pre-bid site visit will be to provide an opportunity for potential contractors and subcontractors to investigate the Houghtaling Island site, and meet with a USACE representative to answer general and technical questions pertaining to this project. All participants must register by 10:00 AM on Monday, July 25th. The USACE will transport all registered participants to and from the site by boat. The boats will leaving at 10:00 AM for the site, and will be returning no later than 12:00 PM. Participants are requested to bring their own USCG approved (Type III, Type V, or better) personal flotation device (PFD). However, a PFD will be issued to those participants who cannot provide one of their own. Participants are advised that there will be a moderate level of difficulty walking around this site; and that it is a tick-infested area. Participants should contact Robert Berrian or James Smith by phone at 518-273-0870; or by email at robert.d.berrian@usace.army.mil or james.b.smith2@usace.army.mil to register. Participants will be notified of the location of the meeting place and point of departure to the site when they register.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- Tuesday, July 26th commencing at 10:00 AM.

(c) Participants will meet at-- Hook Boat Club Stuyvesant, NY

(End of provision)

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

WAGE RATES JUL-16

General Decision Number: NY160014 07/08/2016 NY14

Superseded General Decision Number: NY20150014

State: New York

Construction Types: Heavy and Highway

HEAVY & HIGHWAY CONSTRUCTION

County: Oneida County in New York.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis‐Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 03/11/2016 2 04/01/2016 3 05/20/2016 4 06/17/2016 5 07/08/2016

BRNY0002‐009 07/01/2015

UTICA CHAPTER

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.01 18.38

FOOTNOTE:

a. Paid Holidays: Memorial Day, July the 4th, Labor Day, and Thanksgiving Day (provided the employee is employed one

(1) day before and one (1) day after the holiday).

CARP0277‐001 07/01/2014

HEAVY & HIGHWAY CONSTRUCTION

Rates Fringes

Carpenters:

Carpenters, Millwrights, Piledrivers................$ 28.40 18.29

ELEC0043‐001 06/01/2016

Rates Fringes

CABLE SPLICER....................$ 36.00 22.27

ELECTRICIAN......................$ 35.75 3%+22.27

ELEC1249‐003 05/02/2016

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 24.99 7.25%+21.75+a Groundman (Truck Driver)....$ 33.32 7.25%+21.75+a Groundman Truck Driver (tractor trailer unit)......$ 35.40 7.25%+21.75+a Lineman & Technician........$ 41.65 7.25%+21.75+a Mechanic....................$ 33.32 7.25%+21.75+a

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249‐004 05/02/2016

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 30.28 7.25%+21.75+a Groundman digging machine operator...................$ 45.41 7.25%+21.75+a Groundman truck driver (tractor trailer unit).....$ 42.89 7.25%+21.75+a Groundman Truck driver.....$ 40.37 7.25%+21.75+a Lineman and Technician.....$ 50.46 7.25%+21.75+a Mechanic...................$ 40.37 7.25%+21.75+a Substation:

Cable Splicer..............$ 52.75 7.25%+21.75+a Flagman....................$ 28.77 7.25%+21.75+a Ground man truck driver....$ 38.36 7.25%+21.75+a Groundman digging machine operator...................$ 43.16 7.25%+21.75+a Groundman truck driver (tractor trailer unit).....$ 40.76 7.25%+21.75+a Lineman & Technician.......$ 47.95 7.25%+21.75+a Mechanic...................$ 38.36 7.25%+21.75+a Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 54.20 7.25%+21.75+a Flagman....................$ 29.56 7.25%+21.75+a Groundman Digging Machine Operator...................$ 44.34 7.25%+21.75+a Groundman Truck Driver (tractor‐trailer unit).....$ 41.88 7.25%+21.75+a Groundman Truck Driver.....$ 39.42 7.25%+21.75+a Lineman & Technician.......$ 49.27 7.25%+21.75+a Mechanic...................$ 39.42 7.25%+21.75+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249‐008 01/01/2014

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 29.12 3%+4.43 Groundman..................$ 12.98 3%+4.43 Installer Repairman‐ Teledata Lineman/Technician‐ Equipment Operator.........$ 27.64 3%+4.43 Tree Trimmer................$ 22.41 8.30+3%+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

* ENGI0545‐002 07/01/2016

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 38.97 24.90+a GROUP 2.....................$ 38.09 24.90+a GROUP 3.....................$ 34.81 24.90+a GROUP 4.....................$ 42.97 24.90+a GROUP 5.....................$ 41.97 24.90+a GROUP 6.....................$ 40.97 24.90+a GROUP 7.....................$ 40.32 24.90+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB‐4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self‐propelled), Hydra‐Spiker, ride‐on, Hydraulic Pump (jacking system), Hydro‐Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self‐contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro‐Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride‐on, Shell Winder, Skid steer loader (Bobcat or similar), Span‐Saw, ride‐on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self‐contained Ride‐on Rock Drill, Excluding Air‐Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride‐on Boiler (used in conjunction with production), Bituminous Heater, self‐propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands‐off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self‐propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride‐on, Tie Extractor, ride‐on, Tie Handler, ride‐on, Tie Inserter, ride‐on, Tie Spacer, ride‐on, Tire Repair, Track Liner, ride‐on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday.

IRON0440‐001 05/01/2015

REMANINDER OF COUNTY

Rates Fringes

Ironworkers:

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 25.95 24.24

LABO0035‐002 07/01/2014

Rates Fringes

LABORER

GROUP 1.....................$ 26.75 19.94+a GROUP 2.....................$ 26.95 19.94+a GROUP 3.....................$ 27.15 19.94+a GROUP 4.....................$ 27.35 19.94+a GROUP 5.....................$ 25.55 15.14+a

a. Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day and New Year's Day provided the employee must work the day before and the work the day after a holiday to receive holiday pay.

GROUP 1: Laborers, flagman, outboard and hand boats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortor Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborers's tools, Installation of bridge drainage; Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw Operator on asphalt paver, Water pump operator (1 1/2" and single diaphram), Nozzle (aphlat, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and Air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powerman

GROUP 4: Blasterers, form setters, stone and granite curb setters

GROUP 5: Hazardous waste removal

PAIN0004‐020 05/01/2015

Rates Fringes

Painters:

BUILDING CONSTRUCTION

Brush & Roll, Drywall Taping/Finishing...........$ 23.00 18.94 Spray, Sandblasting, Structural Steel...........$ 23.50 18.94

HEAVY & HIGHWAY

CONSTRUCTION

Bridges....................$ 38.00 24.00

PAIN0677‐002 05/01/2015

GLAZIER..........................$ 23.85 15.99

PLUM0112‐005 05/01/2016

Rates Fringes

PLUMBER (Including Steamfitting) Northern Zone...............$ 34.50 25.00

SFNY0669‐001 01/01/2016

Rates Fringes

SPRINKLER FITTER.................$ 31.66 21.42

TEAM0182‐001 06/01/1996

Rates Fringes

Truck drivers:

GROUP 1.....................$ 17.37 7.70+a GROUP 2.....................$ 17.42 7.70+a GROUP 3.....................$ 17.47 7.70+a GROUP 4.....................$ 17.62 7.70+a GROUP 5.....................$ 17.77 7.70+a

FOOTNOTES:

PAID HOLIDAYS: A‐New Year's Day, B‐Memorial Day, C‐Independence Day, D‐Labor Day, E‐Thanksgiving Day, F‐Christmas Day

a. Paid Holidays: Independence Day and Labor Day provided the employee works his scheduled day before and his scheduled day after the holiday and is on the payroll week in which the holiday falls.

TRUCK DRIVERS:

GROUP 1: Pickups, panel trucks, flatboy material truck (straight jobs), single axle dump trucks, dumpsters, receives, greasers, truck tiremen.

GROUP 2: Tandems, batch trucks, mechanics.

GROUP 3: Semi‐trailers, low‐boy trucks, asphalt distributors trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck.

GROUP 4: Specialized earth moving equipment‐euclid type or similar off‐highway equipment where not self‐loader, and straddle (ross) carrier, self contained concrete unit

GROUP 5: Off‐highway tandem back‐dump, twin engine equipment and double hitched equipment where not self‐loaded.

WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: NY160031 07/08/2016 NY31

Superseded General Decision Number: NY20150031

State: New York

Construction Types: Building, Heavy and Highway

County: Herkimer County in New York.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis‐Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 03/11/2016 3 04/01/2016 4 05/06/2016 5 05/20/2016 6 06/17/2016 7 07/08/2016

ASBE0030‐001 05/01/2016

Rates Fringes

Asbestos/Insulator Worker includes application of all materials, protective coverings, coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement......$ 31.15 20.66

HAZARDOUS MATERIAL HANDLER

SCOPE OF WORK: DUTIES

LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system...........$ 18.72 9.95

BOIL0197‐001 01/01/2013

Rates Fringes

BOILERMAKER......................$ 31.10 23.72

BRNY0002‐002 07/01/2015

BUILDING CONSTRUCTION

UTICA CHAPTER

Rates Fringes

BRICKLAYER

BRICKLAYERS & STONE

MASONS. CEMENT MASONS,

PLASTERERS, POINTERS,

CLEANERS & CAULKERS........$ 31.90 17.82

MARBLE, TILE & TERRAZZO

WORKERS.....................$ 28.78 16.63

MARBLE, TILE & TERRAZZO

FINISHERS...................$ 24.43 16.23

BRNY0002‐010 07/01/2015

UTICA CHAPTER

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

HEAVY/HIGHWAY CONSTRUCTION

CEMENT MASONS..............$ 34.01 18.38

FOOTNOTE:

a. Paid Holidays: Memorial Day, July the 4th, Labor Day, and Thanksgiving Day (provided the employee is employed one day before and one day after the holiday).

CARP0277‐005 07/01/2014

Rates Fringes

CARPENTER

BUILDING CONSTRUCTION

Carpenters, Millwrights....$ 25.10 15.79 Piledriver.................$ 25.10 15.79

HEAVY & HIGHWAY

CONSTRUCTION................$ 28.40 18.29

ELEC0043‐005 06/01/2016

CABLE SPLICER....................$ 36.00 22.27

ELECTRICIAN......................$ 35.75 3%+22.27

ELEC1249‐003 05/02/2016

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 24.99 7.25%+21.75+a Groundman (Truck Driver)....$ 33.32 7.25%+21.75+a Groundman Truck Driver (tractor trailer unit)......$ 35.40 7.25%+21.75+a Lineman & Technician........$ 41.65 7.25%+21.75+a Mechanic....................$ 33.32 7.25%+21.75+a

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249‐004 05/02/2016

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 30.28 7.25%+21.75+a Groundman digging machine operator...................$ 45.41 7.25%+21.75+a Groundman truck driver (tractor trailer unit).....$ 42.89 7.25%+21.75+a Groundman Truck driver.....$ 40.37 7.25%+21.75+a Lineman and Technician.....$ 50.46 7.25%+21.75+a Mechanic...................$ 40.37 7.25%+21.75+a Substation:

Cable Splicer..............$ 52.75 7.25%+21.75+a Flagman....................$ 28.77 7.25%+21.75+a Ground man truck driver....$ 38.36 7.25%+21.75+a Groundman digging machine operator...................$ 43.16 7.25%+21.75+a Groundman truck driver (tractor trailer unit).....$ 40.76 7.25%+21.75+a Lineman & Technician.......$ 47.95 7.25%+21.75+a Mechanic...................$ 38.36 7.25%+21.75+a Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 54.20 7.25%+21.75+a

Flagman....................$ 29.56 7.25%+21.75+a Groundman Digging Machine Operator...................$ 44.34 7.25%+21.75+a Groundman Truck Driver (tractor‐trailer unit).....$ 41.88 7.25%+21.75+a Groundman Truck Driver.....$ 39.42 7.25%+21.75+a Lineman & Technician.......$ 49.27 7.25%+21.75+a Mechanic...................$ 39.42 7.25%+21.75+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249‐008 01/01/2014

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 29.12 3%+4.43 Groundman..................$ 12.98 3%+4.43 Installer Repairman‐ Teledata Lineman/Technician‐ Equipment Operator.........$ 27.64 3%+4.43 Tree Trimmer................$ 22.41 8.30+3%+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0035‐002 01/01/2016

Elevator Constructor.............$ 42.33 29.985+a+b a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

* ENGI0106‐003 07/01/2016

HERKIMER COUNTY (Area East of a line running North and South through the railroad station at Little Falls)

Power equipment operators:

HEAVY & HIGHWAY

GROUP 1....................$ 40.46 24.75+a GROUP 2....................$ 39.55 24.75+a GROUP 3....................$ 36.98 24.75+a GROUP 4....................$ 44.46 24.75+a GROUP 5....................$ 43.46 24.75+a GROUP 6....................$ 42.46 24.75+a GROUP 7....................$ 42.07 24.75+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB‐4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self‐propelled), Hydra‐Spiker, ride‐on, Hydraulic Pump (jacking system), Hydro‐Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self‐contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro‐Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride‐on, Shell Winder, Skid steer loader (Bobcat or similar), Span‐Saw, ride‐on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self‐contained Ride‐on Rock Drill, Excluding Air‐Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride‐on Boiler (used in conjunction with production), Bituminous Heater, self‐propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands‐off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self‐propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride‐on, Tie

Extractor, ride‐on, Tie Handler, ride‐on, Tie Inserter, ride‐on, Tie Spacer, ride‐on, Tire Repair, Track Liner, ride‐on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's Birthday, Washington's Brithday, Good Friday, Columbus Day, November Election Day and Veteran's Day

* ENGI0106‐005 07/01/2016

HERKIMER COUNTY (Area East of a line running North and South

(BUILDING)

GROUP A(1)..................$ 41.08 24.40+a 1..........................$ 42.08 24.40+a 2..........................$ 43.08 24.40+a GROUP A.....................$ 40.61 24.40+a GROUP B.....................$ 39.65 24.40+a GROUP C.....................$ 36.92 24.40+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS:

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline.

GROUP A(1): Crane Premiums

1 over 150' :add $1.00

2 over 200' : add $2.00

GROUP A: Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front‐end rubber tire loader, tractor‐mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, belcrete system, automated asphalt concrete plant and tractor road paver.

GROUP B: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hosting (single drum), hoist ‐ two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A‐L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro‐Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller.

GROUP C: Fork lift, high lift, lull, Oiler, fireman and heavy‐ duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps

FOOTNOTE:

a. PAID HOLIDAYS; New Years Day, Memorial Day, Independence Day Labor Day, Thanksgiving Day, and Christmas Day, provided the employee has worked the day before and the day after the holiday.

* ENGI0545‐007 07/01/2016

HERKIMER COUNTY (Area West of a line running North and South

HEAVY AND HIGHWAY

GROUP 1....................$ 38.97 24.90+a GROUP 2....................$ 38.09 24.90+a GROUP 3....................$ 34.81 24.90+a GROUP 4....................$ 42.97 24.90+a GROUP 5....................$ 41.97 24.90+a GROUP 6....................$ 40.97 24.90+a GROUP 7....................$ 40.32 24.90+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB‐4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self‐propelled), Hydra‐Spiker, ride‐on, Hydraulic Pump (jacking system), Hydro‐Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self‐contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro‐Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride‐on, Shell Winder, Skid steer loader (Bobcat or similar), Span‐Saw, ride‐on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self‐contained Ride‐on Rock Drill, Excluding Air‐Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride‐on Boiler (used in conjunction with production), Bituminous Heater, self‐propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands‐off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self‐propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride‐on, Tie Extractor, ride‐on, Tie Handler, ride‐on, Tie Inserter, ride‐on, Tie Spacer, ride‐on, Tire Repair, Track Liner, ride‐on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, provided the employee has worked the working day before and the working day after the holiday.

* ENGI0545‐008 07/01/2016

HERKIMER COUNTY (Area West of a line running North and South

BUILDING

GROUP 1....................$ 35.32 23.55+a GROUP 2....................$ 33.32 23.55+a GROUP 3....................$ 29.34 23.55+a GROUP 4....................$ 37.32 23.55+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)

GROUP 1: Air plako, asphalt and blacktop roller, automated concrete spreader (CMI or equivalent), automated fine grade machine (CMI), backhoe, elt palcer, blacktop spreader (such as barber Green & Blaw Knox), blacktop plant (automated), blast or rotary drill (truck or cat mounted), boom truck, cableway, caisson auger, central mix plant (automated), cherry picker (15 tons), concrete pump, crane, crusher (rock), derrick, diesel power unit, dragline, dredge, dual drum paver, elevating grader (self‐propelled), elevator hoist (2 cage), excavator (all purpose‐hydraulically operated), fork lift (loed and lull and other rough terrain type), front end loader (4 c.y. and over), gradall, grader (power), head tower (Saurman or equal), host ( 2 or 3 drum), hydroblaster (laser pump), work boat operator (LCM), light plants (compressors and generators), locomotive,maintenance engineer, maintenance welder, mine hoist, mucking machine or mole, overhead crane ‐fixed permanent, pile driver, quarry master or equivalent, refrigeration equipment (for soil stabilization), scraper sea mule, shovel, side boom, slip form paver, straddle buggy (ross carrier, lumber carrier), tractor drawn belt type loader (Euclid loader), tranching machine (digging capacity of over 4 ft depth), truck crane (operator), truck of trailer mounted log chipper (self feeder), tug operator (manned, rented equipment excluded), tunnel shovel, vibro or sonic hammer controls (when not mounted in proximity to the rig operator

GROUP 2: "A" frame truck, blacktop plant (non automatic), All Back Dumps, boring machine, bulldozer, cagehoist, central mix plant (non automated), cherry picker 15 tons and under), than 5), concrete paver (single drum over 16S), core boring machine, drill rigs (tractor mounted), elevator (as a material hoist), fork lift (all others), front end loader (under 4 c.y.), gunite machine, high pressure boiler 915 lbs & over), hoist (one drum), hydraulic breaking hammer (drop hammer), Kolman plant loader (screening gravel), maintenance grease man, mizer for stabilized base (self propelled Seaman mixer), monrail machine, parapet concrete or pavement grinder, parts man, post hole digger (truck or tractor mounted), power sweeper (wayne or similar), grout pump, pump‐ crete or sqeeze‐crete, road widener (front end of grader or self prop.), roller, self contained hydraulic bench drill, shell winder (motorized), snorkel (overhead arms), snowblower control man, trenching machine (digging capacity of 4 ft or less), tugger hoist, vibrotamp, well drill, well point system, winch (motor driven), winch cat, winch truck

GROUP 3: Compressor (up to 500 C.F.), concrete pave ror mixer (under 16S), concrete pavement spreaders and finishers (not automated), conveyor (over 12 ft), electric submersible pump (4" and over), farm tractor with or without accessories, fine grade machine (not automated), fireman, form tamper, generator (2,500 Watts and over), hydraulic pump, mechanical heaters (more than 2 whosw combined output exceeds 640,000 BTU per hour (manufacturer's rating) plus one self contained heating unit (sundog, air heat type, new Holland hay dryer type excluded), power heaterman (hay dryer), pumps (water and trash), revinus widener (road widener), single light plant, steam cleaner or jenny, tractor with or without towed accessories

GROUP 4: Master mechanic

PREMIUMS:

Hazmat Work 2.50 Quad 9 Bulldozer or Multibowl Scraper .50

CRANE PREMIUMS (add to Group 1 Rate):

All Lattic Boom Cranes (65 ton capacity and over) Group 1 Rate Plus 1.25 All Hydraulic Cranes (100 ton capacity and over) Group 1 Rate Plus 1.75 All Hydraulic Cranes (80 ton capacity to 99 ton capacity) Group 1 Rate Plus 1.25 All Hydraulic Cranes (65 ton capacity to 79 ton capacity) Group 1 Rate Plus 1.10

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day provided the employee has worked five consecutive working days before and the working day after the holiday.

IRON0440‐001 05/01/2015

REMANINDER OF COUNTY

Rates Fringes

Ironworkers:

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 25.95 24.24

LABO0035‐005 06/01/2013

Rates Fringes

Laborers:

BUILDING CONSTRUCTION:

Asbestos Removal...........$ 22.00 16.29 Blasters, Form Setters, MotorBuggy Operator (Rider Type)...............$ 21.00 16.29 Hazardous Waste Removal (Hazardous waste removal includes, wetting,stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, wheather they contain asbestos or not, from mechanical systems)........$ 22.00 16.29 Laborers...................$ 20.50 16.29 Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind) Power Lift (Walk Behind)..............$ 20.65 16.29 Wagon Drill Operator.......$ 20.90 16.29

HEAVY & HIGHWAY

CONSTRUCTION:

GROUP 1:...................$ 26.15 19.04

GROUP 2:...................$ 26.35 19.04

GROUP 3:...................$ 26.55 19.04

GROUP 4:...................$ 26.75 19.04

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day Labor Day, Thanksgiving Day and Christmas Day.

GROUP 1: Common Laborers, Flagman, Outboard and Hand boats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortor Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborers's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw Operator on asphalt paver, Water pump operator (1 1/2" and single diaphram), Nozzle (aphlat, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and Air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master amd similar type), Acetylene torch operators, and Asphalt paver, Powerman

GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters

GROUP 5: Hazardous waste removal

PAIN0004‐020 05/01/2015

Rates Fringes

Painters:

BUILDING CONSTRUCTION

Brush & Roll, Drywall Taping/Finishing...........$ 23.00 18.94 Spray, Sandblasting, Structural Steel...........$ 23.50 18.94

HEAVY & HIGHWAY

CONSTRUCTION

Bridges....................$ 38.00 24.00

PAIN0677‐002 05/01/2015

Rates Fringes

GLAZIER..........................$ 23.85 15.99

PLUM0112‐003 05/01/2016

Rates Fringes

PLUMBER (Including Steamfitting) Northern Zone...............$ 34.50 25.00

ROOF0195‐001 06/01/2016

Rates Fringes

ROOFER...........................$ 26.23 19.90

SFNY0669‐001 01/01/2016

Rates Fringes

SPRINKLER FITTER.................$ 31.66 21.42

SHEE0058‐001 05/01/2012

Sheet Metal Worker

Projects 10 million or less.$ 26.94 17.19 Projects over $10 million...$ 27.94 17.19

WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .