W912DS-10-B-0011 Amendment 0010.pdf
PDF 68 KB Posted
- Solicitation number
- W912DS-10-B-0011
About this file
Amendment 0010 to W912DS-10-B-0011
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE01600662
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to:
Answ er questions to prospective bidders for informational purposes only.
Revise and Reissue Cover sheet of the specs
No further questions w ill be accepted by the Government. Bidders must bid the project as they see it, unless major technical deficiencies are found.
bid opening date remains 1-September-2010 at 2:00 P.M. EST Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF1442, by separate letter, or by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE
LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0011
X 9B. DATED (SEE ITEM 11)
01-Jul-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES T HE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Aug-2010
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-10-B-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0010
Green Brook Flood Damage Reduction Project Segment B-1 Sebrings Mills Road Bridge, Floodwall, Levee and Pump Station
AMENDMENT #0010
IFB NO. W912DS-10-B-0011
Bid Opening hour and date are unchanged from 1 September 2010 at 2:00PM local time.
Question 1: Please refer to the contract plan sheet S-401, this plan sheet shows proposed North Abutment Plan. On this plan sheet is shown the proposed PZ22 Sheeting in 12'' wide trench (Typical). However specification section 31 43 16 page 8 calls for the installation of the sheeting using slurry trench method. Also see sheet S501 for the details and section of this proposed sheeting. Please confirm how this sheeting shall be installed, using the slurry trench method (as mentioned in the specifications) or by excavating 12'' wide trench (as shown on plans)? Your response for this question is very critical for us to submit bid proposal accurately and competitively so please expedite your response to this question.
Response: North abutment will be installed using the slurry trench method noted in section 31 43 16, The trench width is 12-inches as noted on sheet S-401. At this point we don’t see a need to make any revisions to the drawings.
Question 2: Does the I Wall section constructed with a fluted finish on one side or both sides?
No fluted finish is shown on the drawings.
Response:
There is no fluting called for on the I-Wall- station 0+36 to station 1+04.40.
Question 3: Top of T Wall, please see detail sheet 198, shows cap as poured in place. Detail for composite wall sheet 176 shows cap as precast. Please confirm which one is correct and is precast required or allowed for all caps on walls?
Top of Wall shown on Sheet 198 references detail on sheet S-523 (sheet 210). This Detail sheet calls out “precast concrete panel” Above Station 2+14, all tops are precast to provide access to electric conduit chase. From station 1+05 to station 2+14 top is cast in place (see detail 2 sheet S- 510)as no conduits extend west of station 2+14 and to provide a solid base to attach the fence on top of the wall.
Question 4: Detail section of the T Wall, please see sheet 198, shows 1'' Fluted fin texture on both sides of the wall (Riverside and Protected side) Detail on the sheet 208 and notes only require fluted fin texture on the protected side only. Please confirm which detail is correct?
Both details show fluted fin correctly as being on both river and protected sides of the wall.
Question 5: As per amendment # 007 page 3 of 8 paragraph 5 titled “ REPRESENTATIONS AND CERTIFICATIONS” ,requires the bidders to submit a certification for “PROHIBITION OF SEGRERATED FACILITIES”. This paragraph also calls out that failure to submit this certification will render bidder or offeror non responsive to the terms of solicitations. Since we have been unable to locate this form with in the contract documents so please provide us this certification form or specify under which section of the specification this form can be found . As you know this form has to be submitted at the time of bid opening so we request you to please expedite your response.
Response: See updated Cover sheet below
NEW YORK DISTRICT
CORPS OF ENGINEERS
NEW YORK, NEW YORK 10278-0090
INVITATION FOR BIDS
FOR
Green Brook Flood Damage Reduction Project Segment B-1 Sebrings Mills Road Bridge, Floodwall
Levee, and Pump Station Borough of Middlesex, Township of Green Brook, New Jersey
1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-10-B-0011
2. BIDS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United States Code, Section 1001.
3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00100).
4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF
REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY in Section 00100 of this IFB).
5. REPRESENTATIONS AND CERTIFICATIONS – SECTION 00600 Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.
6. THIS PROJECT IS A CIVIL WORKS PROGRAM PROCUREMENT AND IS NOT
FUNDED BY THE DEPARTMENT OF DEFENSE. BUY AMERICAN ACT –
CONSTRUCTION MATERIALS (MAY 1993) IN ACCORDANCE WITH FAR 52.225-5
APPLIES.
7. Bid Bonds (Standard Form 24) MUST NOT bear computer printer-generated signatures and/or seals.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .