About this file

Amendment 0001 to W912DS-10-B-0011

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS-10-B-0011 Amendment 0010.pdf PDF
W912DS-10-B-0011 Amendment 0009.pdf PDF
W912DS-10-B-0011 Amendment 0008.pdf PDF
W912DS-10-B-0011 Amendment 0007.pdf PDF
140-GB_SEBRNG_SEG B1_S-002002.pdf PDF
W912DS-10-B-0011 Amendment 0006.pdf PDF
Plans Amendment 6.pdf PDF
plans Amendend 5-SEBRNG.pdf PDF
W912DS-10-B-0011 Amendment 0005.pdf PDF
Specs Amendend 5.pdf PDF
W912DS-10-B-0011 Amendment 00004.pdf PDF
W912DS-10-B-0011 Amendment 00003.pdf PDF
Amend 3 plans.pdf PDF
Amend 3 specs.pdf PDF
AMED2-CHANGS TRACK Master List PLANS AND SPECS Amendment 0002.pdf PDF
VOL 3-AMENDMENT-2 PLANS Amendment 0002.pdf PDF
VOL 2-AMENDMENT-2 PLANS Amendment 0002.pdf PDF
VOL 1-AMENDMENT-2 PLANS Amendment 0002.pdf PDF
Amended Spec2RO Amendment 0002.pdf PDF
W912DS-10-B-0011 Amendment 0002.pdf PDF
Plans Volume 2 of 3.pdf PDF
Plans Volume 3 of 3.pdf PDF
Plans Volume 1 of 3.pdf PDF
PLANS SEBRINGS PAGES 175-261 2010.pdf PDF
PLANS SEBRINGS PAGES 88-174 2010.pdf PDF
PLANS SEBRINGS PAGES 1-87 2010.pdf PDF
Specifications Pages 861-1177 FINAL.pdf PDF
Specifications Pages 561-860 FINAL.pdf PDF
Specifications Pages 1-280 FINAL.pdf PDF
Specifications Pages 281-560 FINAL.pdf PDF
W912DS-10-B-0011.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE01600662

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Add Wage Rates Somerset County NJ100047 06/04/2010 NJ47, and NJ100068 06/04/2010 NJ68

2. Reissue Plans from 8.5x11 to 22x34 format.

3. Answ er questions of prospective bidders for informational purposes only

4. Bid Opening Date remains unchanged as 19 August 2010 at 2:00 PM local time.

Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF1442, by separate letter, or by telegram, or by signing the block 15 below FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jul-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0011

X 9B. DATED (SEE ITEM 11)

01-Jul-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jul-2010

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-10-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

AMENDMENT 0001

Raritan River Basin, Green Brook Sub-Basin, NJ Flood Damage Reduction Project B-1, Sebring

Mills Road Bridge Reconstruction, Floodwall, Levee and pump station

AMENDMENT #0001

IFB NO. W912DS-10-B-0011

The following are responses to questions received from potential bidders (FOR

INFORMATIONAL PURPOSES ONLY):

Question 1. Is the project being bid union or non-union?

Response 1. Everyone union or non-union can bid on this project

Question 2. Will the contract be awarded as General Contract or separately to specialty trades (i.e. Plumbing, Mechanical, Electric etc.)?

Response 2. General Contract

Question 3. Is there a approximate range for the electrical scope of work?

Response 3. No range of electrical work is being provided.

Question 4. Is there a walk-through scheduled? If so, please provide location, date, time, and contact.

Response 4. There is no Scheduled walk Through

Question 5. What is the due date and approximate start date for the project?

Response 5. Bids due 19 Aug 2010. Anticipated contract award/start date- September 2010

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

WAGE RATES SOMERSET

General Decision Number: NJ100047 06/04/2010 NJ47

Superseded General Decision Number: NJ20080047

State: New Jersey JR 11 June 2010

Construction Type: Building

County: Somerset County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 03/12/2010 1 05/07/2010 2 06/04/2010

ASBE0032‐007 09/19/2009

SOMERSET COUNTY (Boroughs of Bernardsville and Bound Brook; Township of Bridgewater; Borough of Far Hills; Township of Green Brook; Boroughs of North Plainfield, Peapack‐Gladstone, Raritan, Somerville, South Bound Brook and Watchung; Township of Warren)

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 43.70 27.84

ASBE0089‐007 07/01/2009

SOMERSET COUNTY (Townships of Branchburg, Franklin, Hillsborough and Montgomery)

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 37.92 26.83

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

BRNJ0002‐013 11/01/2009

Rates Fringes

Bricklayer.....................$ 36.70 23.47

Work on high stacks: 22% per hour additional.

BRNJ0004‐001 11/01/2009

Rates Fringes

BRICKLAYER (Cement Mason)........$ 36.70 23.47

BRNJ0007‐001 06/01/2009

Rates Fringes

Tile finisher..................$ 37.27 21.31 Tile setter....................$ 46.42 24.56

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

CARP0006‐009 05/01/2009

CARPENTER (Scaffold Builder).....$ 39.45 49.75%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0006‐011 05/01/2009

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging and Formwork....................$ 39.45 49.75%

CARP0715‐007 05/01/2009

Rates Fringes

Millwright.....................$ 40.27 49.75%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0102‐022 06/01/2009

SOMERSET COUNTY (does not include the township of Franklin east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown‐ Zion road to the Hillsborough township line)

ELECTRICIAN (Including Low voltage wiring) Cable Splicer...............$ 51.55 51.25% Electrician.................$ 46.86 51.25%

Work forty ft. or more above the ground or protective rigging

(does not apply to pole work, or to use of a manlift or high reach‐type lift): 10% per hour additional.

Work with, or the removal of, asbestos materials: 114% times the journeyman rate.

ELEC0269‐019 10/01/2006

SOMERSET COUNTY (Township of Montgomery (west and south of a line following U.S.

Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown‐Zion road to the Hillsborough township line))

Electrician (Including Low Voltage Wiring)..................$ 44.48 51.3% + .25

* ELEC0456‐007 05/31/2010

SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line)):

Electricians: (Including Low Voltage Wiring) Cable splicer...............$ 48.84 60.25% Electrician.................$ 46.04 59.75%

Work on line voltage of 440 volts and over: 10% per hour additional.

Work from trusses, scaffolds and ladders 40 ft. or more from the ground or floor; or under air pressure; or over conveyors or moving equipment or machinery: 10% per hour additional.

ELEV0001‐003 03/17/2008

Rates Fringes

Elevator mechanic Work on the addition, replacement, refurbishing or relocation of control, drive, generating equipment, hoistway or pit equipment, including work involving a structural rise in the elevator shafts in an existing building and other elevator work in the machine room, hoistway or pit; Also, changes in design and appearance of basic escalator equipment...$ 38.46 21.565 All other work..............$ 48.19 21.715

PAID HOLIDAYS:

New Year's Day, President's Day, Good Friday, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

PAID VACATION:

A worker who has worked less than 5 years: 4% of his or her hourly rate for all hours worked.

A worker who has worked 5 to 10 years: 6% of his or her hourly rate for all hours worked.

A worker who has worked 15 or more years: 8% of his or her hourly rate for all hours worked.

ENGI0825‐020 07/01/2009

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 42.02 22.50

GROUP 2.....................$ 40.43 22.50

GROUP 3.....................$ 38.52 22.50

GROUP 4.....................$ 36.89 22.50

GROUP 5.....................$ 35.18 22.50

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down‐the‐hole drill, rotary drill, self‐propelled hydraulic drill, self‐powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic

GROUP 5:

Oiler

IRON0011‐010 07/01/2009

SOMERSET COUNTY (Northern Half of County)

Rates Fringes

Ironworkers:

Reinforcing.................$ 34.34 35.60 Structural, Ornamental, Rigger......................$ 37.14 35.60

IRON0068‐015 07/01/2009

Somerset County (Southern Half of County)

Rates Fringes

IRONWORKER

Reinforcing.................$ 32.35 34.85 Structural, Ornamental, Rigger......................$ 34.35 34.85

LABO0222‐006 05/01/2009

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 28.55 19.42

LABO0222‐009 05/01/2009

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Pipelayer, Power Tool Operator and Screedman...................$ 28.05 19.42

LABO1030‐002 05/01/2009

Rates Fringes

Asbestos Removal Laborer.........$ 28.05 16.22

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean‐up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co‐generation plants)

PAIN0711‐018 05/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 35.58 17.67

PAIN0711‐020 05/01/2009

Rates Fringes

PAINTER (Brush & Roller).........$ 27.72 14.28 PAINTER (Paperhanger)............$ 28.42 14.36 PAINTER (Spray)..................$ 30.50 14.28

PAIN0711‐021 05/01/2010

Rates Fringes

Glazier........................$ 40.60 17.44

Work welding or using a cutting torch:

$1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PLAS0008‐008 05/01/2009

Rates Fringes

Plasterer......................$ 32.90 23.35

PLUM0009‐020 03/01/2010

SOMERSET COUNTY (Township of Montgomery; Borough of Rocky Hill)

Rates Fringes

PLUMBER/PIPEFITTER

Pipefitter, Including HVAC Pipe Installation...........$ 43.53 27.65 Plumber, Excluding HVAC Pipe Installation...........$ 43.53 27.65

Service and Repair..........$ 32.03 16.53

PLUM0024‐011 11/01/2009

SOMERSET COUNTY (does not include the township of Montgomery; Borough of Rocky Hill)

PLUMBER..........................$ 46.25 26.05

Excluding HVAC Pipe Installation................$ 45.25 26.05

PLUM0475‐012 11/01/2009

SOMERSET COUNTY (does not include the Township of Montgomery; Borough of Rocky

PIPEFITTER (Including HVAC Pipe Installation)...............$ 48.43 23.77

ROOF0004‐004 06/01/2009

SOMERSET COUNTY (north of a line drawn from the Mercer/Somerset county line along Route #206 north to Route #514; then, west along Route #514 to the Hunterdon/Somerset county line);

Roofer (All Types)...............$ 31.57 16.50 Roofer......................$ 32.82 18.77

ROOF0030‐029 05/01/2009

SOMERSET COUNTY (south of a line drawn from the Mercer/Somerset county line north along Route #206 to Route #514; then, west along Route #514 to the Hunterdon/Somerset county line):

Roofer

SHINGLES....................$ 23.25 13.77

SLATE AND TILE..............$ 26.25 13.77

ALL OTHER WORK..............$ 30.00 22.70

Mopper, and operator of felt‐laying machine: $.50 per hour additional.

Work applying roofing material, on any new construction job, on those days on which a felt‐laying machine or slag‐dispensing machine is used: $.50 per hour additional.

PAID HOLIDAY:

The last working day before Christmas, to be paid at the rate of four hours pay.

SFNJ0669‐008 01/01/2010

SOMERSET COUNTY (Townships of Branchburg and Montgomery; Borough of Rocky Hill)

SPRINKLER FITTER (Fire Sprinklers)......................$ 45.25 18.85

SFNJ0696‐004 01/01/2010

SOMERSET COUNTY (remainder of county)

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 51.00 20.61

SHEE0025‐005 06/01/2008

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 41.69 29.13

TEAM0469‐005 05/01/2008

Rates Fringes

Truck drivers:

Dump Truck..................$ 33.00 19.185 Off the Road Truck..........$ 32.85 19.185

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

VACATION PAY CREDIT:

Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates.

Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: NJ100068 06/04/2010 NJ68

Superseded General Decision Number: NJ20080068

State: New Jersey JR 11 June 2010

Construction Type: Heavy

County: Somerset County in New Jersey.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 03/26/2010 3 05/07/2010 4 06/04/2010

BRNJ0004‐001 11/01/2009

Rates Fringes

BRICKLAYER (Cement Mason)........$ 36.70 23.47

CARP0006‐014 05/01/2009

Rates Fringes

CARPENTER........................$ 39.45 49.75%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0715‐007 05/01/2009

Rates Fringes

Millwright.....................$ 40.27 49.75%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP1456‐013 05/01/2008

CARPENTER (Dock Builder) Concrete form work..........$ 37.00 27.02 All other work..............$ 37.00 32.90

Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote‐impregnated products: $.25 per hour additional.

Work on hazardous/toxic/contaminated waste removal, on a hazardous/toxic/contaminated waste site, where the worker comes into contact with hazardous/toxic/contaminated waste material, and when A, B or C personal protective equipment is required and used for respiratory, skin or eye protection: 20% per hour additional.

ELEC0102‐025 06/01/2009

SOMERSET COUNTY (does not include the township of Franklin east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown‐ Zion road to the Hillsborough township line)

ELECTRICIAN

Cable Splicer...............$ 51.55 51.25% Electrician.................$ 46.86 51.25%

Work forty ft. or more above the ground or protective rigging (does not apply to pole work, or to use of a manlift or high reach‐type lift): 10% per hour additional.

Work with, or the removal of, asbestos materials: 114% times the journeyman rate.

ELEC0269‐023 10/01/2006

SOMERSET COUNTY (Township of Montgomery (west and south of a line following U.S.

Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown‐Zion road to the Hillsborough township line))

Electrician......................$ 44.48 51.3% + .25

* ELEC0456‐009 05/31/2010

SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line)):

Electricians:

Cable splicer...............$ 48.84 60.25% Electrician.................$ 46.04 59.75%

Work on line voltage of 440 volts and over: 10% per hour additional.

Work from trusses, scaffolds and ladders 40 ft. or more from the ground or floor; or under air pressure; or over conveyors or moving equipment or machinery: 10% per hour additional.

ENGI0825‐021 07/01/2009

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 42.02 22.50

GROUP 2.....................$ 40.43 22.50

GROUP 3.....................$ 38.52 22.50

GROUP 4.....................$ 36.89 22.50

GROUP 5.....................$ 35.18 22.50

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down‐the‐hole drill, rotary drill, self‐propelled hydraulic drill, self‐powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable)

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1

cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;

Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump

GROUP 5:

Oiler

IRON0011‐010 07/01/2009

SOMERSET COUNTY (Northern Half of County)

Rates Fringes

Ironworkers:

Reinforcing.................$ 34.34 35.60 Structural, Ornamental, Rigger......................$ 37.14 35.60

IRON0068‐015 07/01/2009

Somerset County (Southern Half of County)

IRONWORKER

Reinforcing.................$ 32.35 34.85 Structural, Ornamental, Rigger......................$ 34.35 34.85

LABO0172‐009 03/01/2010

Rates Fringes

Laborers:

Common or General Laborer;

Landsacpe Laborer, Power Tool Operator...............$ 30.85 20.40 Pipelayer...................$ 31.55 20.40

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, or C personal protection: $1.00 per hour additional.

New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.

LABO0222‐013 05/01/2009

Rates Fringes

LABORER

MASON TENDER:

Cement/Concrete.............$ 28.55 19.42

PAIN0711‐023 05/01/2009

Rates Fringes

Painters:

Work on bridges (Major Bridges Designed for Commercial Navigation)......$ 46.50 19.13

PAIN0711‐024 11/01/2008

Rates Fringes

Painters:

New Construction Brush and roller...........$ 34.47 16.14 Spray......................$ 37.92 16.14 Steel......................$ 35.81 16.30 Repaint work, on projects on which no major alterations occur.

Brush and roller...........$ 26.67 13.80 Spray......................$ 29.34 13.80 Steel......................$ 27.74 13.93

PLUM0009‐027 03/01/2010

SOMERSET COUNTY (Township of Montgomery; Borough of Rocky Hill)

Rates Fringes

PLUMBER/PIPEFITTER...............$ 43.53 26.65

Service and Repair..........$ 32.03 16.53

PLUM0024‐020 11/01/2009

SOMERSET COUNTY (does not include the township of Montgomery; Borough of Rocky

PLUMBER..........................$ 46.25 26.05

PLUM0475‐019 11/01/2009

SOMERSET COUNTY (does not include the Township of Montgomery; Borough of Rocky

PIPEFITTER.......................$ 48.43 23.77

TEAM0469‐008 05/01/2008

Truck drivers:

Dump Truck; Flatbed Truck...$ 33.00 19.185 Off the Road Truck; Pickup Truck.......................$ 32.85 19.185

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

VACATION PAY CREDIT:

Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates.

Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)