W912DS-10-B-0011 Amendment 0005.pdf
PDF 21 KB Posted
- Solicitation number
- W912DS-10-B-0011
About this file
Amendment 0005 to W912DS-10-B-0011
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE01600662
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. revise and reissue plans
2. revise and reissue sheets
3. answ er questions to prospective bidders for informational purposes only
4. No further questions w ill be accepted by the Government after 13 August 2010 at 12:00 P.M. EST. Offerors must bid the project as they see it, unless major technical deficiencies are found.
5. Extend the bid opening date from 19-August-2010 at 2:00 P.M. EST to 24-August-2010 at 2:00 P.M. EST Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF1442, by separate letter, or by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE
LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0011
X 9B. DATED (SEE ITEM 11)
01-Jul-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2010
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-10-B-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 19-Aug-2010 12:00 AM to 24-Aug-2010 02:00 PM.
The following have been added by full text:
AMENDMENT 0004
Green Brook Flood Damage Reduction Project Segment B-1 Sebrings Mills Road Bridge, Floodwall, Levee and Pump Station
AMENDMENT #0005
IFB NO. W912DS-10-B-0011
Bid Opening hour and date are changed to 24 August 2010 at 2:00PM local time.
1. The following changes were made to the plans:
CG503
1. The Following Plan Sheets have been revised and reissued: LP002, S-002, S-420, S-408 S- 302, S-202, S-510, C-105, C-106, CG502 and CG503
2. The following changes were made to the specifications:
1. Revise and reissue the following specifications: SECTION 31 63 26 DRILLED MINI
CAISSONS.
3. The following are responses to questions received from bidders (FOR INFORMATIONAL
PURPOSES ONLY):
Question No. 1: Sheet 140 of 281 Pump Station General Notes: Foundation Notes (E) References a Geotechnical Report. Please advise as to the report's location or make the report available.
Response: See revised Sheet S-002 included in this amendment. Foundation Notes (E) has been revised to the following:
Refer to boring Log Sheets B-601 thru B-605 for information about soil types.
Question No. 2: Specification 31 63 26 2.1.F requires ten (10) feet of coal tar epoxy coating corrosion protection for the upper ten (10) feet of casing. Due to the nature of mini caissons, the epoxy coating will be scraped away during installation. Industry standard allows for additional steel thickness to serve as corrosion protection. Please confirm that sacrificial steel will be acceptable in lieu of coal tar epoxy corrosion protection.
Response: Additional thickness was considered for the mini caisson design. See revised Specification 31 63 26 included in this amendment which deleted Paragraph 2.1 Section F.
Question No. 3: Prior to submission of the bid, a site visit is necessary due to the work zone's close proximity to the Green Brook waterway and numerous residential structures. It is our understanding that
W912DS-10-B-0011
a pre-bid visit has not been scheduled. Please advise as to any permissions that should be obtained or protocol to follow in order to visit the site.
Response: Interested bidders would have to arrange their own access with private property owners.
Question No. 4: Please specify the deadline to submit questions.
Response: Questions must be submitted by 12 noon on 13 August 2010.
Question No. 5: Please grant a two week extension to the bid date.
Response: See bid date change included in this amendment.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .