W912DS-10-B-0001-Amendment7.pdf
PDF 32 KB Posted
- Attached to
- Maintenance Dredging, Long Island Intracoastal Waterway, New York, Federal Navigation Project.
- Solicitation number
- W912DS-10-B-0001
About this file
Amendment 0007
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE92367322
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise specif ications in 1.1 of Section 01 11 00.00 40, 1.3 of Section 01 22 00.00, and Project Plans to include the stockpile placement area for dew atering.
2. Revise 3.1 of Special Contract Requirements Section 00 80 00 to change completion date from 53 calendar days to 66 calendar days (Basic: 41 days, option: 25 days).
3. Revise bid schedule to add CLIN for Mobilization & Demobilization from Basic to Option Area.
Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE
LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Dec-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0001
X 9B. DATED (SEE ITEM 11)
15-Oct-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Dec-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-10-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0007
SECTION 00010 Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum Mobilization and Demobilization
FFP
FOB: Destination
MILSTRIP: W16ROE92367322
PURCHASE REQUEST NUMBER: W16ROE92367322
NET AMT
0002 45,040 Cubic
Yard
Dredging and Disposal
FFP
Removal and Placement – Removal of all material except ledge rock lying above the plane of 6 feet below the MWL with 2 foot allowable overdepth from the specified area of the Federal Navigation Channel and placement of the dredged material along a nearby shoreline and/or at a nearby upland stockpile as shown on the contract drawings.
FOB: Destination
0003 1 Lump Sum OPTION Mobilization and Demobilization
FFP
From Basic to Option Area
0004 24,620 Cubic
Yard
OPTION Option 1
FFP
Removal and Placement – This option is for the removal of an additional 24,620 CY of all dredged material except ledge rock lying above the plane of 6 feet below the MWL with 2 foot allowable overdepth from the specified area of the Federal Navigation Channel and placement of the dredged material along a nearby shoreline and/or at a nearby upland stockpile as shown on the contract drawings.
TOTAL BASE BID (ITEMS NO. 0001, 0002): _________________
TOTAL OPTION BID (ITEMS NO. 0003, 0004): _________________
TOTAL AMOUNT (BASE PLUS OPTIONS): _________________
NOTE 1: Bidders must bid on the basic and option. Failure to bid on the basic and option will be cause for rejection of the bid as no responsive.
NOTE 2: Award of this contract will be based on the lowest total price of the total of the basic work and option.
NOTE 3: The option will be exercised, at the Government’s discretion, within (5) calendar days of receipt of the contractor of the Notice to Proceed (Basic Work); if they are exercised at all. If the option is exercised, its performance period will be consecutive.
NOTE 4: All bidders are hereby advised that the dredging quantity in the price schedule is estimated and based on the survey data collected in July 2009.
AMENDMENT 0007
Maintenance Dredging of the Long Island Intracoastal Waterway
Federal Navigation Project, New York IFB No. W912DS-10-B-0001
The Purpose of this amendment is to:
1. Revise specifications in 1.1 of Section 01 11 00.00 40, 3.1 of Section 00
80 00, 1.3 of Section 01 22 00.00, the Bid Schedule, and Project Plans to include the stockpile placement area for dewatering.
Section 1.1 Summary of Section 01 11 00.00 40 of the specifications have been changed to the following:
1.1 SUMMARY
The work to be performed under this project consists of providing the labor, equipment, and materials to perform maintenance dredging of the Moriches Bay section of the Long Island Intracoastal Waterway with disposal of the dredged material at a nearby beach and upland stockpile for dewatering for a portion of material considered too fine for beach placement as shown on the Contract Documents prepared by US Army Corps of Engineers, NYD.
The work consists of dredging approximately 45,040 cubic yards (CY) of material for the basic work and 24,620 CY for the option to the required depth of 6 feet below Mean Low Water, the 2 ft allowable overdepth is included in approximate amounts. The maximum amount of dredged material to be placed at the upland stockpile is 6,000 cubic yards.
The dike for the dewatering site shall be constructed from the sand existing at the location of the stockpile placement area. A weir box shall be placed at the northwest corner of the dewatering site. The routes for incoming and discharge pipeline and the weir box location shall be located as described in the dewatering site plan.
The fine grain material not suitable for beach placement shall be transferred to the stockpile placement area for dewatering. Sandy material from the stockpile dewatering site deemed suitable for beach placement shall be transferred to the beach placement site.
A temporary dike shall be constructed along the beach placement site to contain the material above mean high water and prevent unfiltered return flow into the ocean.
Section 3.1 Special Contract Requirements of Section 00 80 00 of the specifications have been changed to the following:
3.1 Special Contract Requirements
3.1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (1965 APRIL)
a. The Contractor will be required to commence work under this contract within 5 calendar days after the date of receipt by him of notice to proceed, to prosecute said work diligently and to complete the work under the basic contract ready for use not later than 66 calendar days (Basic:
41 days, Option: 25 days) after the date of receipt by him of notice to proceed. This is based on an average production rate of 2,000 CY per day for dredging. Should the total quantity of material to be paid for and actually removed under the contract exceed the limit established in the clause entitled "Variations in Estimated Quantities," additional time will be allowed at the rate of one (1) calendar day for each 2,000 cubic yards in excess of the established limit. The time stated for completion shall include final clean-up of the premises. (EFARS 52.2/9110 (a))
c. Location: The work described within these specifications involves the dredging of the Long Island Intracoastal Waterway, in the Moriches Bay section of the channel, with placement of the material dredged at a nearby beach and upland stockpile as indicated in the plans.
3.1.5 CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS (AUG 2000)
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Contract Drawings Description File Number LIIW_2009 (4 Sheet)
Maintenance Dredging - Long Island Intracoastal Waterway Federal Navigation Channel: Moriches Bay
1 Index
2 General Location & Placement Areas Maps
3 Channel Sounding Map (Basic Work)
4 Channel Sounding Map (Option 1)
Section 1.3 Unit Price Payment Items of Section 01 22 00 of the specifications have been changed to the following:
1.3 Unit Price Payment Items
1.3.1.2 Measurement
The total amount of material removed and paid for under the contract (Basic Work: Bid Item No. 0001, Mobilization and Demolition and Bid Item No. 0002, Dredging and Option 1: Bid Item No. 0003, Mobilization and Demolition and Bid Item No. 0004, Dredging) will be measured by the cubic yard dredged. Measurement of the number of cubic yards in place will be made by computing the volume between the bottom surface shown by soundings of the last survey made before dredging and the bottom surface shown by soundings of a survey made as soon as practicable after the entire work specified has been completed. The volume for measurement shall include the material within the limits of the overdepth; side slopes described in SECTION 35 20 23, paras. 1.5 Quantity of Material,
1.6 Overdepth Dredging, and 1.7 Side Slopes.
SECTION 00010 - SOLICITATION CONTRACT FORM
The contractor period of performance end date has increased by 13 days from 53 days to 66 days.
(End of Summary of Changes)