Amendment 0003
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE92367322
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Include revisions to the Specif ications.
2. Provide answ ers to questions for informational purposes only.
Date and Time of bid opening remains unchanged at 23 NOV 09 at 2:00pm EST.
Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE
LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Nov-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0001
X 9B. DATED (SEE ITEM 11)
15-Oct-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Nov-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-10-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
AMENDMENT 0003
Maintenance Dredging of the Long Island Intracoastal Waterway
Federal Navigation Project, New York IFB No. W912DS-10-B-0001
1. SPECIFICATIONS CHANGES
Section 3.1.9 Datums and Bench Marks of Section 00 80 00 of the specifications have been changed to the following:
3.1.9 DATUM AND BENCH MARKS
Generally, elevations in these specifications refer to the U.S. Army Corps of Engineers' Mean Low Water Datum. The plane of mean low water below the North American Vertical Datum of 1988 (NAVD88) is pertinent to the Long Island Intracoastal Waterway Federal Navigation Channel:
Elevation Location on LIIW
1.3 Patchogue to Tuthill Pt. - Mile 0.0 to 15.2
1.5 Tuthill Pt. to Quantuck Bay - Mile 15.2 to 22.7
1.3 Quantuck Bay to Shinnecock Bay - Mile 22.7 to 29.9
1.2 Shinnecock Bay to Shinnecock Canal - Mile 29.9 to 33.6
Survey Benchmarks are tabulated in the table above (also see 00900-L). It should be noted that temporary benchmarks are established from time-to-time and that the Contractor shall contact the New York District's Survey Section at (212)264-0180 or at (212)264-0181 for any future reference to horizontal control data.
BENCHMARK DESCRITPION
Designation - MORICHES
PID – AA9073
State/County - NY/Suffolk USCG QUAD - Eastport (1956) Horz Datum - NAD 83 Vert Datum - NAVD 1988 Height – 4.86 ft
Position - 229236.755 (N) 1331379.278 (E)
STATION MARK IS A FLANGE ENCASED ROD NGS
THE MARK IS STAMPED: MORICHES USCG 1994
STATION DESCRIPTION
(BY NATIONAL GEODETIC SURVEY 1994
THE STATION IS LOCATED ON THE GROUP MORICHES COAST GUARD STATION IN EAST
MORICHES, NY. TO REACH THE STATIONFROM THE INTERSECTION OF MONAUK HIGHWAY
AND ATLANTIC AVENUE IN EAST MORICHES, DRIVE SOUTH ON ATLANTIC AVENUE FOR 0.8
MI TO MORICHES ISLAND ROAD, TUEN LEFT (EAST) ON MORICHES ISLAND ROAD AND
FOLLOW SOUT SOUTHWEST FOR 0.75 MI TO MAIN GATE OF THE USCG STATION. FROM
MAIN GATE USCG STATION, CONTINUE SOUTHWEST FOR 0.05 MI TO STATION ON THE
LEFT. THE STATION IS LOCATED 262 FEET SOUTHWEST OF CENTER OF GATE, 97 FEET
SOUTHEAST OF CENTER OF ROAD, 12 FEET NORTH NORTHWEST OF PHONE JUNCTION BOX
AND 2.5 FEET NORTHWEST OF CARSONITE WITNESS POST. FOR ACCESS CONTACT C.W.O
GLEN BACHMAN, U.S.C.G. GROUP MORICHES ISLAND, 100 MORIHES ISLAND ROAD, EAST
MORICHES, NY 11940, PHONE 631-395-4462.
More benchmark data referencing USGS Quads may be found at the National Geodetic Survey's website, http://www.ngs.noaa.gov/cgi-bin/ds_quads.prl and at the NOAA's Center for Operational Oceanographic Products and Services (CO-OPS) website, http://www.co-ps.nos.noaa.gov/bench_mark.shtml?region=ny
Section 3.1.46 Estimated Quantities of Section 00 80 00 of the specifications have been changed to the following:
3.1.46 ESTIMATED QUANTITIES
The total estimated quantity of material necessary to be removed from within the specified limits to complete the work described in this specification, as computed from the information shown on the contract drawings, are as follows:
DREDGING AREA DREDGING VOLUME
Long Island Intracoastal Waterway: Moriches Bay Basic Work 45,040 CY Option 24,620 CY
The total estimated quantity of material of 45,040 cubic yards (CY) for the basic work and 24,620 CY for the option, includes overdepth, is based on the 17 March 2008 hydrographic survey of the project. The quantities are calculated based on the contour dredging method and in accordance with Section 01 22 00.00 10, TECHNICAL SPECIFICATION, para. 14 entitled:
"MEASUREMENTS AND PAYMENTS" of these specifications where payment is allowed for all material up to Overdepth Grade except in the areas below project grade or on slide slopes.
The following sections of Section 35 20 23 of the specifications have been changed to the following:
1.5 QUANTITY OF MATERIAL
The total estimated amount of material to be removed from within the specified limits, excluding overdepth, is 19,350 cubic yards (CY) for the basic work. For the option, the total estimated amount of material to be removed from within the specified limits, excluding overdepth, is 15,890 CY.
The maximum amount of allowable overdepth dredging is estimated to be 25,690 CY for the basic work and 8,730 CY for the option. The estimated total quantity for bidding purposes and for application of the "FAR 52.212-11, Variation in Estimated Quantity" shall be 69,660 cubic yards, includes overdepth. The quantities are calculated based on the contour dredging method where payment is allowed for all material up to Overdepth Grade except in the areas below project grade or on slide slopes. The quantities listed are estimates only. Within the limits of available funds, complete the work specified whether the quantities involved are greater or less than those estimated.
1.6 OVERDEPTH DREDGING
To cover unavoidable inaccuracies of dredging processes, material actually removed to a depth of 2 feet below the depth specified and within the dredging limits will be measured and paid for at full contract price. The quantity of overdepth dredging is based on the contour dredging method where payment is allowed for all material up to Overdepth Grade except for areas below project grade.
1.7 SIDE SLOPES
Dredging on side slopes shall follow, as closely as practicable, the lines indicated or specified. A 2 feet allowance will be made for dredging beyond the indicated or specified side slopes, except as provided herein. The amount of material excavated from side slopes will be determined by either cross-sections or computer, or both. The quantity of the side slope material dredging is based on the contour dredging method where payment is allowed for all material up to Overdepth Grade except below project grade on side slopes.
2. QUESTIONS AND ANSWERS
The following is a list of questions asked by interested vendors (regarding original posted solicitation), and associated responses to those questions:
Q1: The DEC permit in the specs call for material placement in an upland diked disposal area on East Inlet Island and the New York Dept. of State permit calls for placement on Cupsogue County Park Beach. Which is correct?
A1: The placement area will be at Cupsogue Park. The DEC permit in the specification is presently being amended to reflect this placement.
Q2: Do you have a scale for the plans and/or distances from the dredge area to the disposal area?
A2: The placement area is approximately 1.0 miles from the dredging areas.
Q3: Can we run the pipeline up Clam Creek between the Towns of Brookhaven and South Hampton? Is there a pipeline route? Are there easements?
A3: The main pipeline route from the dredging areas which are east and west of East Island should run due south from East Island to Cupsogue Beach. The pipeline shall come onshore at the RV parking area and extend across the dune in non vegetated areas.
Q4: Is there a contractor’s lay down area provided by the Corp to mobilize pipe, etc.?
A4: The Contractor may use Cupsogue Park as a mobilization area for pipe.
Q5: Section 35 20 23 1.5 1st sentence says the quantity is 45,040 for the basic and 24,620 for the option excluding over depth. Then the next sentence says the maximum amount of allowable over depth is 45,040 basic and 24,620 option. CLIN 0002 and 0003 state yardage with over depth as 45,040 basic and 24,620 option respectively. Please clarify the correct quantity with allowable over depth.
A5: The total estimated amount of material to be removed from within the specified limits, excluding overdepth, is 19,350 CY for the basic work.
For the option, the total estimated amount of material to be removed from within the specified limits, excluding overdepth, is 15,890 CY. The maximum amount of allowable overdepth dredging is estimated to be 25,690 CY for the basic work and 8,730 CY for the option. The estimated total quantity for bidding purposes is 45,040 CY for the basic work and 24,620 for the option, totaling 69,660 CY.
Q6: Wage Rate question.
Ref:
Page 76 of 90….Statewide Wage Rates for Dredging
Page 82 of 90….Building Construction…Power Equipment Operators
Page 83 of 90….Heavy and Highway….. Power Equipment Operators
Each of these classifications lists dredge operator. In performing the dredge operations, the fill placer will be a dozer operator.
This operator would also unload HDPE pipe, for the dredge discharge line, from a semi-trailer.
I know the “Statewide Dredging Rates” will apply to the Leverman.
Question: Will these same “Statewide Dredging Rates” apply for the fill placer/dozer operator?
A6: The Wage Rate to be used for all work performed on land shall be the Heavy and Highway Power Equipment Operators rate. The rate of pay should be established by the equipment being operated (eg. Dozer, payloader).
(End of Summary of Changes)