This document is an Industry Day Announcement for the McMillan North Clearwell Replacement project by the U.S. Army Corps of Engineers (USACE) Baltimore District. The project involves replacing the existing North Clearwell at the McMillan Water Treatment Plant, a critical infrastructure component built in 1904. The scope includes constructing a new underground reinforced concrete, watertight tank, partial demolition of the existing structure, reconstructing two historic building structures, replacing valve actuators, installing baffle walls, access hatches, drainage chambers, chemical dosing equipment, and a roof underdrain system.
The Industry Day event is scheduled for July 30, 2025, at the Fallon Building in Baltimore, Maryland, where USACE seeks industry feedback on design modifications. Potential contractors must register by July 28, 2025, by emailing specific contact information. The project has significant constraints, including maintaining continuous operation of the water treatment plant, preserving existing structural walls, managing limited roof weight restrictions, and working within a secure facility. The anticipated construction budget ranges between $25-50 million, with an estimated 36-month duration, and is classified under NAICS code 237110 with a small business size standard of $45 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
WASHINGTON AQUEDUCT
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE DISTRICT
5900 MACARTHUR BOULEVARD, NW
WASHINGTON, DC 20016-2514
CONTRACT OPPORTUNITY
MCMILLAN NORTH CLEARWELL REPLACEMENT
NOTICE ID
W912DR25X15AK
DEPARTMENT/IND. AGENCY
DEPARTMENT OF DEFENSE
SUBTIER
DEPARTMENT OF THE ARMY
MAJOR COMMAND
US ARMY CORPS OF ENGINEERS
SUB COMMAND
NORTH ATLANTIC DISTRICT
OFFICE
W2SD ENDIST BALTIMORE
CLASSIFICATION
PRODUCT SERVICE CODE: Y1NE – CONSTRUCTION OF WATER SUPPLY FACILITIES
NAICS CODE: 237110 WATER AND SEWER LINE AND RELATED STRUCTURES
CONSTRUCTION
PLACE OF PERFORMANCE: WASHINGTON, DC, 20001, USA
DESCRIPTION
TITLE: MCMILLAN NORTH CLEARWELL REPLACEMENT – WASHINGTON AQUEDUCT
DIVISION, WASHINGTON, DC
SOLICITATION NO.: TBD
This Special Notice is not a Request for Proposal, Request for Quote, or Invitation for Bid. There is no commitment by the Government to issue a solicitation, make awards, or pay for respondent's expenditures made in response to this notice. Interested vendors are responsible for monitoring this notice for any subsequent amendments. All submissions become government property and will not be returned. Any solicitation issued as a result of this notice will be in a separate announcement. The purpose of this notice is to survey interest and obtain capability statements from industry.
Special Industry Day Announcement: The U.S. Army Corps of Engineers (USACE) invites industry professionals to attend an upcoming Industry Day Event on July 30, 2025 beginning at 9:00 AM at the Fallon Building in Baltimore, Maryland. This in-person event will feature a presentation followed by same-day one-on-one discussions.
The event aims to engage industry experts on the upcoming requirement for constructing the North Clearwell at McMillan Water Treatment Plant. USACE seeks industry feedback on design modifications that can optimize value for the Government while fulfilling the Washington Aqueduct’s mission requirements. Participants are encouraged to provide suggestions, with discussions focusing on key areas such as:
• Concrete specification, design, and detailing
• Admixtures and crack prevention
• Water tightness
• Support of excavation
To facilitate preparation, draft documents related to this requirement will be posted sam.gov for industry review.
Insights gained from this Industry Day will help USACE refine project requirements to enable a more optimized approach to ensuring continuous production of drinking water for Washington Aqueduct customers.
RSVP information: Individuals interested in attending the Industry Day MUST register in advance by submitting their Name, Title, Company Name, and Company Unique Entity Identifier to Clark Miller via email at clark.b.miller@usace.army.mil no later than 2:00 PM Eastern Daylight Time on 28 July 2025. The Industry Day will begin at 10:00 AM at the George H Fallon Federal Building, 31 Hopkins Pl, Baltimore, MD 21201.
PROJECT DESCRIPTION: WA maintains and operates the Dalecarlia and McMillan Water Treatment Plants (WTPs). At the McMillan Plant, water is pumped from the McMillan Reservoir via the McMillan Pumping Station to the Filtration Building for treatment. Filtered water then flows through a 14 million gallon (MG) North Clearwell to a 20 million gallon (MG) South Clearwell before being pumped into the distribution system.
The McMillan North Clearwell (NCW) is an approximate 612 LF x 162 LF underground structure that is 25’ deep and was built in 1904. The structure (i.e. roof, walls and floor) was constructed using un-reinforced concrete. The roof structure consists of a grid pattern of un-reinforced concrete arch slabs that bear on reinforced columns at 18 LF center to center. The project consists of replacing the entirety of the existing North Clearwell to provide a structurally sound reservoir with improved water quality and reliable operation within the distribution system. The major features of this project include the following:
a. Construct a replacement for the existing NCW with an underground reinforced concrete, watertight tank (to prevent water seepage and infiltration). The project shall mailto:clark.b.miller@usace.army.mil include the partial demolition of the existing NCW. The existing roof of the clearwell has strict loading requirements. The contractor shall adhere to these and establish a sequence that allows for the roof to be demolished safely prior to any interior demolition work.
b. Utilize existing structural walls to establish a support of excavation (SOE) system to facilitate construction of the new walls. Proposed SOE system cannot use any tiebacks or penetrations through existing walls. The SOE system shall consist of struts, lateral bracings, supporting columns with micropile foundations, and connection elements between struts and existing concrete wall. Dewatering is expected to be required In order to reduce hydrostatic pressures on existing walls. A monitoring and contingency plan will be required to allow for measuring lateral and vertical movements along the existing walls. Careful sequencing of existing foundation mat slab and construction of the new foundation mat slab will be required to maintain structural stability of the existing walls.
c. Reconstruct in kind two historic building structures which will sit in their original locations on the above-ground landscape which will rest upon the roof of the newly replaced NCW. Reconstruction will be carried out in accordance with the Secretary of Interior’s Standards for Reconstruction. The buildings will be clearly identified as contemporary re-creations through the incorporation of corner stones or other means.
Their replacement shall meet District of Columbia State Historic Preservation Office (SHPO) requirements to match original building historical construction. A responsive bidder will be required to demonstrate qualifications and experience with historic preservation and reconstruction projects that follow these standards.
d. Replace multiple valve actuators. This will require installing and field-testing slide gates and actuators complete with frames, operating stems, stem guides, and all necessary accessories and appurtenances. Cast-Iron slide gates must be constructed and assembled in accordance with AWWA C560. Electric actuators must meet the requirements of AWWA C542.
e. Construct cast in place concrete baffle walls inside the clearwell to assist with process mixing.
f. Construct multiple access hatches and drainage chambers. Drainage chambers shall be protected during construction to prevent infiltration and damage to the overall system.
g. Install and field test chemical dosing and sampling equipment.
h. Install a roof underdrain system to control drainage on top of the NCW.
Major constraints of this project include the following:
a. All work is being performed at an operational water treatment plant that must remain in service at all times. This project will require careful consideration to the electrical utilities surrounding the clearwell. This project will require relocation of electrical feeds prior to construction.
b. Existing structural walls must remain. The proposed support of excavation (SOE) system cannot include significant penetrations of the existing walls nor tiebacks nor systems that will threaten the existing utilities surrounding the clearwell. Careful sequencing of existing foundation mat slab and construction of the new foundation mat slab will be required to maintain structural stability of the existing walls.
c. The NCW roof structure has limited weight restrictions. Work should be sequenced to allow for equipment to demolish the roof without violating the loading requirements and prior to demolition of the interior.
d. There is an influent gate control valve located adjacent to the clearwell. This must be protected throughout construction to prevent infiltration and damage to the overall system.
e. There is an existing drainage chamber sump below the existing control house building.
This must be protected at all times. Existing drainage chamber walls cannot be demolished until the SOE is in place.
f. The worksite is a secure facility with specific access and personnel requirements.
Major constraints of this project include the following: