A.03 North Clearwell Draft Sources Sought Notice - FINAL.docx.pdf
PDF 191 KB Posted
- Attached to
- MCMILLAN NORTH CLEARWELL REPLACEMENT
- Solicitation number
- W912DR25X15AK
About this file
This is a Sources Sought notice from the U.S. Army Corps of Engineers (USACE) Baltimore District for the McMillan North Clearwell Replacement project at the Washington Aqueduct Water Treatment Plant in Washington, DC. The project involves replacing an existing 14-million-gallon underground clearwell structure built in 1904 with a new structurally sound reservoir, with an estimated construction cost between $25-50 million and a 36-month duration starting around November 2025.
The major work includes demolishing and reconstructing the clearwell while maintaining existing structural walls, installing a support of excavation system, reconstructing two historic buildings according to preservation standards, replacing valve actuators, constructing concrete baffle walls, installing drainage systems, and chemical dosing equipment. Key constraints include maintaining water treatment plant operations, weight restrictions on the existing roof, and protecting critical infrastructure. Interested vendors must submit a 10-page capabilities statement by March 26, 2025, detailing their experience with similar water facility construction, historic preservation work, and ability to bond for the project value. An industry day presentation is scheduled for March 17, 2025. The project uses NAICS code 237110 with a small business size standard of $45 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
WASHINGTON AQUEDUCT
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE DISTRICT
5900 MACARTHUR BOULEVARD, NW
WASHINGTON, DC 20016-2514
CONTRACT OPPORTUNITY
MCMILLAN NORTH CLEARWELL REPLACEMENT
Notice ID
W912DR25X15AK
Related Notice
Department/Ind. Agency
DEPARTMENT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NAD
Office
W2SD ENDIST BALTIMORE
Classification Original Set Aside:
Product Service Code: Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction Place of Performance: Washington, DC 20001 USA
Description
TITLE: MCMILLAN NORTH CLEARWELL REPLACEMENT – WASHINGTON AQUEDUCT DIVISION,
WASHINGTON, DC
SOLICITATION NO. TBD
This Sources Sought is not a Request for Proposal, Request for Quote, or Invitation for Bid.
There is no commitment by the Government to issue a solicitation, make awards, or pay for respondent's expenditures made in response to this notice. Interested vendors are responsible for monitoring this notice for any subsequent amendments. All submissions become government property and will not be returned. Any solicitation issued as a result of this notice will be in a separate announcement. The purpose of this notice is to survey interest and obtain capability statements from industry.
The U.S. Army Corps of Engineers (USACE), Baltimore District has a requirement for design-bid-build construction at the Washington Aqueduct (WA) McMillan Water Treatment Plant to replace the entirety of the existing north clearwell to provide a structurally sound reservoir with improved water quality and reliable operation. The project’s anticipated magnitude of construction is between $25,000,000.00 and $50,000,000.00 with a construction duration of 36 months from issuance of the Notice to Proceed (around November 2025). A solicitation would be publicized on or about May 2025. The North American Industry Classification System (NAICS) code for this procurement is 237110 – “Water and Sewer Line and Related Structures Construction”, which has a small business size standard of $45,000,000.
PROJECT DESCRIPTION:
WA maintains and operates the Dalecarlia and McMillan Water Treatment Plants (WTPs). At the McMillan Plant, water is pumped from the McMillan Reservoir via the McMillan Pumping Station to the Filtration Building for treatment. Filtered water then flows through a 14 million gallon (MG) North Clearwell to a 20 million gallon (MG) South Clearwell before being pumped into the distribution system.
The McMillan North Clearwell (NCW) is an approximate 612 LF x 162 LF underground structure that is 25’ deep and was built in 1904. The structure (i.e. roof, walls and floor) was constructed using un-reinforced concrete. The roof structure consists of a grid pattern of un-reinforced concrete arch slabs that bear on reinforced columns at 18 LF center to center.
The project consists of replacing the entirety of the existing North Clearwell to provide a structurally sound reservoir with improved water quality and reliable operation within the distribution system. The major features of this project include the following:
a. Construct a replacement for the existing NCW with an underground reinforced concrete, watertight tank (to prevent water seepage and infiltration). The project shall include the partial demolition of the existing NCW. The existing roof of the clearwell has strict loading requirements. The contractor shall adhere to these and establish a sequence that allows for the roof to be demolished safely prior to any interior demolition work.
b. Utilize existing structural walls to establish a support of excavation (SOE) system to facilitate construction of the new walls. Proposed SOE system cannot use any tiebacks or penetrations through existing walls. The SOE system shall consist of struts, lateral bracings, supporting columns with micropile foundations, and connection elements between struts and existing concrete wall. Dewatering is expected to be required In order to reduce hydrostatic pressures on existing walls. A monitoring and contingency plan will be required to allow for measuring lateral and vertical movements along the existing walls. Careful sequencing of existing foundation mat slab and construction of the new foundation mat slab will be required to maintain structural stability of the existing walls.
c. Reconstruct in kind two historic building structures which will sit in their original locations on the above-ground landscape which will rest upon the roof of the newly replaced NCW. Reconstruction will be carried out in accordance with the Secretary of Interior’s Standards for Reconstruction. The buildings will be clearly identified as contemporary re-creations through the incorporation of corner stones or other means.
Their replacement shall meet District of Columbia State Historic Preservation Office (SHPO) requirements to match original building historical construction. A responsive bidder will be required to demonstrate qualifications and experience with historic preservation and reconstruction projects that follow these standards.
d. Replace multiple valve actuators. This will require installing and field testing slide gates and actuators complete with frames, operating stems, stem guides, and all necessary accessories and appurtenances. Cast-Iron slide gates must be constructed and assembled in accordance with AWWA C560. Electric actuators must meet the requirements of AWWA C542.
e. Construct cast in place concrete baffle walls inside the clearwell to assist with process mixing.
f. Construct multiple access hatches and drainage chambers. Drainage chambers shall be protected during construction to prevent infiltration and damage to the overall system.
g. Install and field test chemical dosing and sampling equipment.
h. Install a roof underdrain system to control drainage on top of the NCW.
Major constraints of this project include the following:
a. All work is being performed at an operational water treatment plant that must remain in service at all times. This project will require careful consideration to the electrical utilities surrounding the clearwell. This project will require relocation of electrical feeds prior to construction.
b. Existing structural walls must remain. The proposed support of excavation (SOE) system cannot include significant penetrations of the existing walls nor tiebacks nor systems that will threaten the existing utilities surrounding the clearwell. Careful sequencing of existing foundation mat slab and construction of the new foundation mat slab will be required to maintain structural stability of the existing walls.
c. The NCW roof structure has limited weight restrictions. Work should be sequenced to allow for equipment to demolish the roof without violating the loading requirements and prior to demolition of the interior.
d. There is an influent gate control valve located adjacent to the clearwell. This must be protected throughout construction to prevent infiltration and damage to the overall system.
e. There is an existing drainage chamber sump below the existing control house building.
This must be protected at all times. Existing drainage chamber walls cannot be demolished until the SOE is in place.
f. The worksite is a secure facility with specific access and personnel requirements.
INDUSTRY DAY
USACE Baltimore District will conduct a live presentation of this project via WebEx. The presentation is tentatively scheduled for March 17, 2025 at 11:30AM Eastern Time. To attend the presentation, register by emailing the Contract Specialist and Contracting Officer listed below for the WebEx URL.
CAPABILITIES STATEMENT – Ten (10) page limit, double sided counts as two pages.
Vendors interested in the potential procurement shall submit a brief capabilities statement as one PDF. The capabilities statement shall include the following:
1. Company name, address, point of contact, phone number, e-mail address, CAGE code, and UEI number.
2. Business size in relation to the NAICS, including small business socioeconomic status as applicable (e.g. woman-owned small business, service-disabled veteran-owned small business, 8(a), HUBZone, SDVOSB, WOSB, and EDWOSB VOSB, ANC, HNO, and Indian Tribe, etc.)
3. A narrative and completed Experience Worksheet (see Attachment 1) of construction projects completed within the past ten years with experience in the following areas. Describe work performed as a prime or subcontractor, and the capability to meet any areas with no past experience (e.g. subcontract, joint venture, etc.):
Performing quality construction work within limited and time-constrained outages without impacting production of potable water at an operating water treatment plant.
The demolition and reconstruction of concrete water basin storage facilities.
Managing soil removal, stock piling and regarding soil with production limited by weight restrictions for equipment that can be placed on roof slab.
The demolition and reconstruction of historically significant brick masonry buildings.
Reconstruction projects should have included historic construction standards and requirements to be approved for compliance with historic preservation societies.
Construction of chemical dosing and sampling rooms including heating, ventilation, electrical and SCADA equipment.
Successful replacement of large diameter valve actuators from trained and certified personnel in a timely manner.
Excavation, grading, manhole, drain line and sub-drainage system installation.
Describe any large or small business subcontracting possibilities.
5. Describe bonding capability for a single contract action between $25,000,000 and $50,000,000, and total aggregate bonding capacity.
Email capabilities statement to the following:
Clark Miller, Contract Specialist at Clark.B.Miller@usace.army.mil Sharon Alexander, Contracting Officer at sharon.l.alexander@usace.army.mil
Interested parties are invited to submit a response to this Sources Sought Notice no later than
11:00 AM Eastern Standard Time, March 26, 2025 reference Sources Sought number W912DR25. Submissions will be shared with the Government project delivery team, but otherwise will be held in strict confidence. No feedback or evaluations will be provided to respondents regarding their submissions. If you have any questions, contact Clark Miller and Sharon Alexander by email.
CONTACT INFORMATION:
Contracting Office Address 2 Hopkins Plaza
Baltimore, MD 21201
Place of Performance:
The geographic area is within the North Atlantic Division (NAD) Area of Responsibility (AOR).
Baltimore, Maryland 21201 United States
Primary Point of Contact Clark Miller, Contract Specialist at Clark.B.Miller@usace.army.mil
Secondary Point of Contact Sharon Alexander, Contracting Officer at sharon.l.alexander@usace.army.mil
File details come from the government source that posted it. Updated .