This amendment modifies the solicitation for the Letterkenny Army Depot Building 370 Interior Renovations Task 1 project. The full renovation of the second floor will outfit approximately 40,000 square feet of space for multipurpose "pod" use, including maintenance of small electronics at desks. Notable requirements include raised access flooring and power strips along walls. Mechanical, electrical, fire alarm, and sprinkler systems will be removed and replaced throughout the building. Hazardous material remediation will be limited to areas impacted by construction. The amendment provides revised sheets for the partial second floor plan and interior finish schedule, and extends the response date to August 12, 2022. The opportunity is a 100% small business set-aside for the U.S. Army Corps of Engineers, Baltimore District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT NAME: Letterkenny Army Depot (LEAD) Building 370 Interior Renovations, Task 1, Chambersburg, PA

The purpose of this Amendment (0002) is to:

1. Provide revised Sheet A-101

2. Provide revised Sheet I-601

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR22B0011

X 9B. DATED (SEE ITEM 11)

08-Jul-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Aug-2022

CODE

USACE, BALTIMORE

2 HOPKINS PLAZA

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR22B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 09-Aug-2022 11:00 AM to 12-Aug-2022 11:00 AM.

(End of Summary of Changes)

LEAD BLDG. 370 INTERIOR RENOVATION – TASK 1

AMENDMENT 0002

AMENDMENTS:

1) Sheet A-101: Delete this sheet in its entirely as reissued by Amendment 0001 and substitute the attached revised sheet dated 08/02/2022.

2) Sheet I-601: Delete this sheet in its entirely as reissued by Amendment 0001 and substitute the attached revised sheet dated 08/02/2022.

DN

DN

DN

I I

2 2

1.1N 1.1N

2N 2N

3N 3N

4N 4N

5N 5N

6N

6N

W V U T S R P

N M L JJ

1E 1E

A-301

3689 SF

INDUST TEST

EQUIP

1600 SF

MECHANICAL

407 SF

WIP STORAGE

371 SF

BREAK

5343 SF

LAB REPAIR

AREA 1

894 SF

CLASSROOM

10737 SF

LAB REPAIR

AREA 2

244 SF

SUPERVISORS

115 SF

UTILITY

304 SF

ELECTRICAL

282 SF

BREAK

208 SF

FIBER NODE RM

605 SF

SUPERVISORS

708 SF

CORRIDOR

201A

203A

205B

213B 211

206A

112 SF

IDF/COM

/2

24'-9"

44'-6"

66'-2" + or - / FIELD VERIFY

53'-5" + or - / FIELD VERIFY

12'-4"

20'-7" + or - / FIELD VERIFY

17'-3"

/2

/4

RAISED FLOOR RAMP

UP

RAISED FLOOR RAMP

UP

PROVIDE TEMPORARY RAMP

FOR RAISED FLOOR SYSTEM

CONSTRUCTED OF RAISED

FLOOR SYSTEM FOR REUSE IN

PHASE 2.

206B

PROVIDE TEMPORARY

YELLOW WARNING TAPE

AT ELEVATION CHANGE

203B

201B

200B

MATCH LINE A-102

A0

C0

B0

M

IN

14'-0"

LOCATE WALL FLUSH WITH

EXISTING. PROVIDE TEAR-AWAY

(ZIP STRIP) TRANSISTION TO CMU

WALL

213A E0

A-401

469 SF

CORRIDOR

200B

159 SF

CORRIDOR

200A

202A

TENANT

B0B0

B0

B0

B0

B0

B0

C0

C0

12'-0"

B0

A0

PROVIDE TEMPORARY RAILING

AT RAISED FLOOR AND RAMP

CONSTRUCTION OF RAILING

SHALL MEET ALL OSHA & EM

385-1-1 REQUIREMENTS

B0

E0

E0

E0

MATCH LINE A-102

NEW KNEE WALL PARTITION W/

SOLID SURFACE CAP AND SS

CORNER GUARDSK

K

1'-10"

PROVIDE WALL MOUNTED HANDRAIL

SEE SHEET A-603 FOR DETAILS

PROVIDE WALL MOUNTED HANDRAIL

AT RAMP. SEE SHEET A-603 FOR

DETAILS

B0

M1

M1

M1

A-301

6' - 4"

DOORS TO BE REMOVED AT THE

END OF CONSTRUCTION TO ALLOW

EXIT EGRESS

EXISTING ELEC.

PANEL TO REMAIN

EXISTING STAIR, RAILING, WALLS AND

CEILING TO BE PAINTED. INSTALL

NEW RUBBER TREADS AND RISERS

S

S

S

S

S

SSS SS

S SS

201C

50'-9" + or - / FIELD VERIFY

1. SEE SHEET A-001 FOR ANNOTATION SYMBOLS

2. FOR DOOR TYPES AND SCHEDULE SEE SHEET A-601.

3. FOR PARTITION TYPE INFORMATION SEE SHEET A-501 AND A-502

4. ALL NEW DOORS SHALL BE LOCATED 6" FROM CLOSEST INTERIOR WALL CORNER OR AS

OTHERWISE DIMENSIONED.

5. CONTRACTOR TO ENSURE ALL FIRE RATED PARTITIONS ARE MAINTAINED AND EXTEND FROM

FLOOR TO BOTTOM OF DECK.

6. CONTRACTOR TO PROVIDE ALL NECESSARY MISCELLANEOUS FIRE CAULKING AND GASKETING

TO PROVIDE A COMPLETE RATED WALL WHERE INDICATED ON A-101, A-102 & A-103 TO INCLUDE

WALL INFILL AT EXISTING AND NEW PENETRATION AND DEMOLISHED WINDOWS IN ROOMS 217,

219, 221 & 225.

7. FOR MECHANICAL EQUIPMENT DESCRIPTION SEE MECHANICAL DWGS.

8. ALL EXPOSED STEEL COLUMNS AND CROSS BRACING TO BE SANDED SMOOTH AND PAINTED

PNT 5.

9. DIMENSIONS TO BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK. CONFLICTS

GREATER THAN 2" AFFECTING PLACEMENT OF NEW WORK SHALL BE RESOLVED THROUGH THE

COR PRIOR TO CONSTRUCTION.

10. EXTENT OF NEW ARCHITECTURAL WORK ON FIRST FLOOR LIMITED TO IDF/COM ROOM 101

LOCATED DIRECTLY BELOW NEW SECOND FLOOR IDF/COM ROOM 221 AND TR ROOM 102. SEE

SHEE A-103

11. SEE SHEETS A-401 & A-402 FOR BREAKROOM DETAILS

12. FOR FURNITURE AND EQUIPMENT PLAN LAYOUTS REFER TO SHEETS I-101 AND I-102 ALL

FURNITURE SHOWN IS NOT IN CONTRACT.

13. ALL EXPOSED EXISTING CMU WALLS TO REMAIN SHALL BE SCRAPED, PATCHED, SANDED,

PRIMED AND PAINTED TWO COATS OF FINISH PAINT.

14. ALL FACES OF NEW WALLS WITHIN ROOMS 200A, 201, 203, 205, 207 & 214 SHALL HAVE ABUSE

RESISTANT GYP BD UP TO 8' ABOVE FINISHED FLOOR.

NOTES:

LEGEND:

INDICATES NEW WALL CONSTRUCTION SEE WALL TYPES FOR DETAILS.

EXISTING COLUMN GRID LINE

1 HOUR RIRE RATED PARTITION ( "S" INDICATES SMOKE PARTITION ONLY)

2 HOUR FIRE RATED PARTITION

REPAIR AND PATCH EXISTING GWB/PLASTER TO LEVEL 4 FINISH. PAINT PER FINISH SCHEDULE

REMOVE EXISTING FLOOR & BASE. INSTALL NEW LVT FLOORING & BASE PER FINISH

SCHEDULE

INSTALL NEW PAIRED PANEL FOLDING PARTITION SYSTEM CONTRACTOR TO PROVIDE

STRUCTURE FOR TOP TRACK

FILL OPENING WITH ONE HOUR GWB ASSEMBLY FINISH ACCORDINGLY

FILL OPENINGS WITH RATED WALL ASSEMBLY AND PATCH PRIME AND PAINT ALL WALLS.

INSTALL NEW SUSPENDED ACOUSTICAL CEILING SYSTEM AND NEW CARPETING.

PREP, PRIME AND PAINT EXISTING DOOR AND FRAME.

X

US Army Corps of Engineers ®

SHEET

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N

O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A-101

P A

R T

IA

L S

E C

O N

D F

L O

O R

P L A

N

A R

E A

A

L E

T T

E R

K E

N N

Y A

R M

Y D

E P

O

P

E N

N S

Y L V

A N

IA

B A

L T

IM

O

R E

D

IS

T R

IC

T

H

O P

K

IN

S P

L A

Z A

B A

L T

IM

O

R E

M

A R

Y L A

N D

U S

A C

E E

N G

IN

E

E R

IN

G

S U

P P

O R

T C

E N

T E

R

H U

N T

S V

IL

L E

E N

G

IN

E E

R

IN

G D

IV

IS

IO

N

A R

C H

IT

E

C T

U R

A L B

R A

N C

H

D H

A W

K

D H

A W

K

R O

L M

E D

O

J U

N

F

IR

S T

T

IT

L E

L E

A D

B U

IL

D

IN

G

I N

T E

R

IO

R R

E N

O V

A T

IO

N

S

T A

S K

BALTIMORE DISTRICT

3/32" = 1'-0"A-101

1 PARTIAL SECOND FLOOR PLAN - AREA "A"

R e v is e d b y a m e n d m e n t

/2

/2

R e v is e d b y a m e n d m e n t

/0

/2

2ND FLOOR KEY PLAN

N

SCALE: 3/32"=1'-0"

816 16

ACOUSTICALLY RATED PARTITIONS SHALL PROVIDE NO LESS

THAN THE MINIMUM STC RATINGS INDICATED. (TYP.)

1.

FIRE RATED & ACOUSTICAL PARTITIONS SCHEDULED AS

RATED ASSEMBLIES REQUIRED CONTINUOUS &

UNINTERRUPTED SEPARATIONS IN ACCORDANCE WITH

APPLICABLE CODE & TESTED ASSEMBLIES INDICATED.

SEPARATIONS SHALL INCLUDE SAFING & SEALS AT

CORNERS, TERMINATIONS, PENETRATIONS, PLENUMS,

COLUMN ENCLOSURES, & ELECTRICAL BOXES, AS WELL AS

AT PHYSICAL INTERRUPTIONS, SUCH AS COLUMNS, BEAMS,

JOISTS, TRUSSES, & FLOORS, ETC. CONTRACTOR SHALL BE

RESPONSIBLE FOR ASSURING CONTINUOUS

UNINTERRUPTED SEPARATIONS AS SCHEDULED. (TYP.)

2.

PROVIDE PRIME COAT PAINT FINISH FOR ALL GWB

SURFACES THROUGHOUT, INCLUDING SURFACES NOT

EXPOSED SUCH AS AT CEILING & FLOOR PLENUMS. ALL

EXPOSED GWB SURFACES SHALL BE PROVIDE ADDITIONAL

PAINT COAT FINISHED AS SPECIFIED & SCHEDULED (TYP.)

3.

WHERE WALL HUNG ITEMS ARE INDICATED AS EITHER

SURFACE & / OR RECESSED, PROVIDE BLOCKING

CONCEALED WITHIN PARTITION FRAME ASSEMBLY. WALL

MOUNTED ITEMS SHALL INCLUDE, BUT NOT BE LIMITED

TOO; WATER FOUNTAINS, FIRE EXTINGUISHER CABINETS,

TOILET ACCESSORIES, TOILET PARTITIONS, CASEWORK,

COUNTERTOPS, MIRRORS, ETC. METHOD OF BLOCKING TO

BE APPROVED BY CONTRACTING OFFICER. EXPAND &

OVERSIZE AREA OF BLOCKING 20% LARGER THAN WALL

HUNG ITEM SCHEDULED, SPECIFICALLY ASSURING FINAL

LOCATION OF SURFACE MOUNTED ITEMS WILL BE

ACCOMMODATED (TYP.).

4.

NOTES:

ALL VISIBLE AND EXPOSED STRUCTURAL STEEL,

CONDUIT, SPRINKLER PIPE, DUCTWORK AND

MISCELANEOUS BRACING AT OR ABOVE THE

HEIGHT OF THE CEILING CLOUDS IN LAB REPAIR

AREA 1 & 2 (ROOMS 205 & 207) SHALL BE PAINTED

PT2 UNLESS REQUIRED TO NOT BE PAINTED BY ANY

APPLICABLE CODE OR UFC.

5.

BRACE PARTITION STUD FRAMES TO STRUCTURE ABOVE

AS FOLLOWS:

6.

PARTITIONS SCHEDULED FOR AREAS OF KNOWN OR

EXPECTED EXPOSURE TO WATER SHALL BE MODIFIED BY

CONTRACTOR AS FOLLOWS: REPLACE GWB INDICATED ON

EXPOSED SIDE(S) OF PARTITION WITH CEMENTITIOUS

BACKER BOARD IN THE SAME THICKNESS, & INSTALL

CONTINUOUS & UNIFORM 4-MIL POLYETHYLENE MEMBRANE

BACKING BEHIND CEMENTITIOUS BACKER. PREPARE

EXPOSED SURFACE OF CEMENTITIOUS BACKER FOR

SCHEDULED FINISHES. AREAS OF EXPECTED WATER

EXPOSURE ARE DEFINED AS – SHOWER ROOMS, ETC…

7.

PARTITIONS SCHEDULED FOR AREAS OF KNOWN OR

EXPECTED EXPOSURE TO MOISTURE SHALL BE MODIFIED BY

CONTRACTOR AS FOLLOWS: REPLACE GWB INDICATED ON

EXPOSED SIDE(S) OF PARTITION WITH MOISTURE RESISTANT

GWB OF THE SAME THICKNESS, & PREPARE EXPOSED

SURFACE FOR SCHEDULED FINISHES. AREAS OF EXPECTED

MOISTURE ARE DEFINED AS – TOILET ROOMS, JANITOR

CLOSETS, SINK SURROUNDS, VESTIBULES, ETC… (TYP.)

8.

PENETRATIONS THROUGH FIRE RESISTANT

ASSEMBLIES SHALL BE FIRE-STOPPED WITH SAFING

AS SPECIFIED. (TYP.)

9.

SUPPLY FULL HEIGHT PARTITIONS USING TWO

CONTINUOUS TOP TRACKS, WITH TOP TRACK BEING

A DEEP LEG DEFLECTION TRACK FASTENED

DIRECTLY TO DECK & PROVIDING SPACE FOR

STRUCTURAL DEFLECTION WITHOUT DAMAGE

CAUSED TO PARTITION ASSEMBLY.

PARTIAL HEIGHT PARTITIONS WITH SPLAYED

METAL STUD BRACING FASTENED DIRECTLY TO

STRUCTURE ABOVE. PROVIDE SPLAYED

BRACING ON BOTH SIDES OF ASSEMBLY AT NO

MORE THAN 4 FEET ON CENTER.

A -

B -

WHERE FLOOR FINISHES ARE DESIGNATED WITH

RF1 FOLLOWED AN ADDITIONAL FINISH, THE

SECOND FINISH LISTED IS APPLIED TO THE RAISED

FLOOR.

10.

US Army Corps of Engineers ®

SHEET

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C

N

O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

I-601

IN

T

E R

IO

R

F

IN

IS

H

S C

H E

D U

L E

L E

T T

E R

K E

N N

Y A

R M

Y D

E P

O

P

E N

N S

Y L V

A N

IA

B A

L T

IM

O

R E

D

IS

T R

IC

T

H

O P

K

IN

S P

L A

Z A

B A

L T

IM

O

R E

M

A R

Y L A

N D

U S

A C

E E

N G

IN

E

E R

IN

G

S U

P P

O R

T C

E N

T E

R

H U

N T

S V

IL

L E

E N

G

IN

E E

R

IN

G D

IV

IS

IO

N

A R

C H

IT

E

C T

U R

A L B

R A

N C

H

D H

A W

K

D H

A W

K

R O

L M

E D

O

J U

N

F

IR

S T

T

IT

L E

L E

A D

B U

IL

D

IN

G

I N

T E

R

IO

R R

E N

O V

A T

IO

N

S

T A

S K

BALTIMORE DISTRICTROOM FINISH SCHEDULE

ROOM

NO ROOM NAME FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH CEILING HEIGHT COMMENTS

FIRST FLOOR

100 CORRIDOR SC1 RB1 PNT1 PNT2 9'-6"

101 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING

102 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING

103 CORRIDOR SC1 RB1 PNT1 PNT2 9'-6"

104 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING

105 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING

106 CORRIDOR SC1 RB1 PNT1 PNT2 9'-6"

107 MEN'S RR EXISTING EXISTING EXISTING - EXISTING

108 JC EXISTING EXISTING EXISTING - EXISTING

109 TOILET EXISTING EXISTING EXISTING - EXISTING

150 IDF/COM SC1 RB1 PNT1 - OPEN TO ABOVE / EXISTING

160 TR SC1 RB1 PNT1 - OPEN TO ABOVE / EXISTING

02 FLOOR PLAN OVERALL DOC

200A CORRIDOR RF1 / LVT1 RB1 PNT1 PNT2 EXISTING

200B CORRIDOR RF1 / LVT1 / EJC1 RB1 PNT1 PNT2 8'-6" ABOVE RAISE FLOOR

201 INDUST TEST EQUIP SC1 RB1 PNT1 PNT2 EXISTING

202 MECHANICAL SC1 RB1 PNT1 - EXISTING

203 WIP STORAGE RF1 RB1 PNT1 ACT1 8'-6" ABOVE RAISE FLOOR

204 BREAK RF1/LVT1 RB2 PNT1 & PNT4 ACT1 8'-6" ABOVE RAISE FLOOR

205 LAB REPAIR AREA 1 RF1 RB1 PNT1 PNT2 & ACC1 VARIES - CLOUDS AT 8'-6"

ABOVE RAISED FLOOR"

PN5 ON ALL EXPOSED COLUMNS AND

BRACING BELOW CEIING LINE

206 CLASSROOM RF1/CPT1 RB2 PNT1 & PNT4 ACT1 8'-6" ABOVE RAISE FLOOR

207 LAB REPAIR AREA 2 RF1 RB1 PNT1 PNT2 & ACC1 VARIES - CLOUDS AT 8'-6"

ABOVE RAISED FLOOR"

PN5 ON ALL EXPOSED COLUMNS AND

BRACING BELOW CEIING LINE

208 SUPERVISORS RF1 / LVT1 RB2 PNT6 ACT1 8'-6" ABOVE RAISE FLOOR

209 UTILITY SC1 RB1 PNT1 - EXISTING

210 ELECTRICAL SC1 RB1 PNT1 - EXISTING

211 BREAK LVT1 RB2 PNT1 & PNT4 ACT1 9'-0" ABOVE FINISHED FLOOR

212 FIBER NODE RM LVT1 RB1 PNT1 ACT1 9'-0" ABOVE FINISHED FLOOR

213 SUPERVISORS LVT1 RB2 PNT6 ACT1 9'-0" ABOVE FINISHED FLOOR

214 CORRIDOR LVT2 / EJC1 RB3 PNT1 ACT1 9'-0" ABOVE FINISHED FLOOR

215 SUPERVISOR RF1/LVT1 RB2 PNT5 ACT1 8'-6" ABOVE RAISE FLOOR

216 DOIM OFFICE RF1/LVT1 RB2 PNT3 ACT1 8'-0" ABOVE RAISE FLOOR

217 DOIM ADMIN RF1/LVT1 RB2 PNT1 - 8'-0" ABOVE RAISE FLOOR

218 TEAM ROOM RF1/LVT2 RB1 PNT4 ACT1 8'-0" ABOVE RAISE FLOOR

219 DOIM SERVER LAB RF1 RB1 PNT1 - OPEN TO ABOVE / EXISTING

220 CORRIDOR LVT2 RB1 PNT4 ACT1 EXISTING

221 BREAK RF1/LVT1 RB3 PNT3 ACT1 9'-0" ABOVE FINISHED FLOOR

222 SUPERVISOR RF1/LVT1 RB2 PNT5 ACT1 8'-6" ABOVE RAISE FLOOR

223 COMM RF1 RB1 PNT1 - OPEN TO ABOVE / EXISTING

224 IDF/COM SC1 RB1 PNT1 - OPEN TO ABOVE / EXISTING

225 TENANT CPT1 RB1 PNT1 ACT1 9'-0" ABOVE FINISHED FLOOR

2ND FLR RAISED FLOOR

227 MECH MEZZANINE

230 STAIR

R e v is e d b y a m e n d m e n t

/2

/2

R e v is e d b y a m e n d m e n t

/0

/2

SCHEDULE - INTERIOR MATERIAL & COLOR BASIS OF DESIGN

FINISH DESCRIPTION MANUFACTURER STYLE COLOR COMMENTS ALTERNATE MANUFACTURERS

ACC 1 ACOUSTICAL CEILING

CLOUDS

ARMSTRONG SQUARE 4X8 (3'-10" X 7'-10") WHITE COORDINATE WHITE COLOR SELECTION USG, CERTAINTEED

ACT 1 ACOUSTICAL CEILING TILE ARMSTRONG OPTIMA TEGULAR 3354 WHITE MATCH EXISTING LEAD STANDARD USG, CERTAINTEED

CPT 1 CARPET TILE BENTLEY 18" x 36" 801532 - REDACTED DOCUMENT HERRINGBONE PATTERN INTERFACE

EJC 1 EXPANSION JOINT COVER INPRO 221 SERIES GRAY FIELD VERIFY FIT

LVT 1 LUXURY VINYL TILE ARMSTRONG LUXE PLANK 9" X 60" CONCRETE STRUCTURES - SOHO GRAY

LVT 2 LUXURY VINYL TILE ARMSTRONG 36"X36" WOVEN IMPRESSIONS FLAX

PLM1 PLASTIC LAMINATE LAMINART 3103T LACQUERED COCO VANITY COVER AND CUSTOM MILLWORK WILSONART

PNT 1 WALL PAINT SHERWIN WILLIAMS WASHABLE EGGSHELL FINISH SW7063 (NEBULOUS WHITE) BENJAMIN MOORE

PNT 2 CEILING PAINT SHERWIN WILLIAMS WASHABLE EGGSHELL FINISH SW7007 (CEILING BRIGHT WHITE) BENJAMIN MOORE

PNT 3 HM FRAME PAINT SHERWIN WILLIAMS HIGH PERFORMANCE FINISH - SEMI GLOSS SW7066 (GRAY MATTERS) PROVIDE MANUFACTURERS STANDARD FINISH

SAMPLES

BENJAMIN MOORE

PNT 4 ACCENT WALL PAINT SHERWIN WILLIAMS WASHABLE EGGSHELL FINISH SW2850 (CHELSEA GRAY) BENJAMIN MOORE

PNT 5 ACCENT STEEL PAINT SHERWIN WILLIAMS HIGH PERFORMANCE FINISH - SATIN SW7674 (PEPPERCORN) BENJAMIN MOORE

PNT 6 OFFICE WALL PAINT SHERWIN WILLIAMS WASHABLE EGGSHELL FINISH SW7641 (COLONADE GRAY)

RB 1 RUBBER BASE TARKETT COVER BASE 6" SILVER GRAY COORDINATE WITH LVT FLOORING JOHNSONITE

RB 2 RUBBER BASE TARKETT COVER BASE 6" DARK BROWN RAISED FLOOR AREA JOHNSONITE

RF1 RAISED FLOOR PANEL TEC-CRETE POLISHED CONCRETE CLEAR PROVIDE MANUFACTURERS STANDARD FINISH

SAMPLES

SC 1 SEALED CONCRETE SHERWIN WILLIAMS CLEAR GRIND AND POLISH EXISTING CONRETE

SMOOTH

BENJAMIN MOORE

SS1 SOLID SURFACE DUPONT CORIAN CUSTOM FABRICATION WILLOW GIBRALTER

ST1 PREFINISHED VENEER

DOOR STAIN

MASONITE OAK VENEER FILLED GRAIN ESPRESSO

LEAD BLDG. 370 INTERIOR RENOVATION – TASK 1 - AMENDMENT 0002.pdf
NARRATIVE
REVISED SHEET A-101 - PARTIAL SECOND FLOOR PLAN - AREA "A"
REVISED SHEET I-601 - INTERIOR FINISH SCHEDULE

File details come from the government source that posted it. Updated .