B.08.03 AMD 0001 W912DR22B0011 7-29-22.pdf
PDF 5 MB Posted
- Attached to
- Letterkenny Army Depot (LEAD) Building 370 Interior Renovations Task 1, LEAD, Chambersburg, PA
- Solicitation number
- W912DR22B0011
About this file
This document provides details for a federal contract opportunity for interior renovations at Letterkenny Army Depot Building 370 in Chambersburg, Pennsylvania. The project scope includes a full gut renovation of approximately 40,000 square feet of space on the second floor to convert it for multipurpose "pod" use, including raised access flooring, power strips along walls, and replacement of fire alarm, mechanical, and sprinkler systems in the entire building. Hazardous material remediation will be conducted in locations impacted by construction. The solicitation is designated as 100% small business set-aside, and is being conducted by the Department of the Army Corps of Engineers Baltimore District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT NAME: Letterkenny Army Depot (LEAD) Building 370 Interior Renovations, Task 1, Chambersburg, PA
The purpose of this Amendment (0001) is to:
1. Provide revised drawings.
2. Provide the responses to Request for Information (RFIs).
3. Provide an updated wage determination.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3 0
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR22B0011
X 9B. DATED (SEE ITEM 11)
08-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jul-2022
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR22B0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION
General Decision Number: PA20220090 07/22/2022
Superseded General Decision Number: PA20210090
State: Pennsylvania
Construction Type: Building
County: Franklin County in Pennsylvania.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on |
| | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 01/14/2022 2 01/28/2022 3 02/11/2022 4 02/25/2022 5 04/01/2022 6 06/03/2022 7 07/01/2022 8 07/08/2022 9 07/22/2022
* ASBE0023-007 06/27/2022
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation) (Asbestos Abatement, Removal from Mechanical Systems Only).........$ 37.25 29.01
BOIL0013-008 01/01/2022
Rates Fringes
BOILERMAKER......................$ 50.17 34.96
BRPA0005-062 05/03/2020
Rates Fringes
BRICKLAYER (Including Pointing, Caulking, and Cleaning)........................$ 33.99 16.87
CARP0287-017 06/01/2021
Rates Fringes
CARPENTER (Scaffold Building Only)............................$ 30.77 16.86
CARP0443-003 05/01/2021
Rates Fringes
MILLWRIGHT.......................$ 36.08 53.41%+.86
CARP0900-017 06/01/2021
Rates Fringes
CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 30.77 16.86
CARP2235-007 01/01/2022
Rates Fringes
PILEDRIVERMAN....................$ 37.60 20.50
ELEC0143-011 06/01/2022
Rates Fringes
ELECTRICIAN (Includes HVAC/Temperature Controls Installation, and Low Voltage Wiring; Excludes Installation of Sound and Communication Systems and Alarm Installation)....................$ 35.25 25.98
ELEC0229-004 01/01/2022
Rates Fringes
ELECTRICIAN (Alarm Installation Only)...............$ 35.11 20.98
ELEC0743-011 09/01/2016
Rates Fringes
ELECTRICIAN (Installation of Communication and Sound System)..........................$ 34.77 20.19
ELEV0059-004 01/01/2022
Rates Fringes
ELEVATOR MECHANIC................$ 51.66 36.885+a+b
FOOTNOTES:
A. Employer contributes 8% of basic hourly rate for 5 years or more of service as vacation pay credit, and 6% of basic hourly rate for less than 5 years of service.
B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;
Labor Day; Veterans' Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
ENGI0066-044 07/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
Mechanic....................$ 28.37 15.66 Pump........................$ 25.20 15.66
ENGI0542-032 05/01/2021
Rates Fringes
POWER EQUIPMENT OPERATOR
Crane.......................$ 42.12 28.60 Hoist (Single Drum), Forklift (under 20 ft., excludes masonry work)......$ 36.87 27.04 Hoist (With Two Towers), Forklift (20 ft and over, excludes masonry work)......$ 39.59 27.85 Oiler.......................$ 34.40 26.32
IRON0404-022 07/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL,
REINFORCING AND ORNAMENTAL.......$ 35.26 31.13
LABO0373-001 01/01/2017
Rates Fringes
LABORER (Asbestos Abatement (Removal from Floors, Walls, and Ceilings))...................$ 22.60 15.44
LABO1180-013 05/01/2019
Rates Fringes
LABORER
Concrete Worker; Concrete
Saw (Walk Behind/Hand Held).$ 22.29 14.53 Forklift (Masonry Work Only).......................$ 26.32 14.53 Jack Hammer; Mason Tender- Brick.......................$ 24.82 14.53
PAIN0057-037 06/01/2014
Rates Fringes
PAINTER (Brush, Roller, and Spray)...........................$ 26.98 15.65
PLUM0520-020 05/01/2021
Rates Fringes
PLUMBER..........................$ 38.77 28.29
PLUM0520-021 05/01/2021
Rates Fringes
PIPEFITTER (Includes HVAC Pipe and HVAC Unit Installation)....................$ 38.77 28.29
SFPA0669-004 04/01/2022
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 42.29 27.23
SHEE0019-015 06/01/2022
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 40.22 40.39
FOOTNOTE: Paid Holiday: Election Day
* UAVG-PA-0016 01/01/2016
Rates Fringes
OPERATOR: Bulldozer.............$ 37.85 22.72
SUPA2011-048 08/20/2014
Rates Fringes
CARPENTER (Acoustical Ceiling Installation Only)...............$ 37.73 4.59
CARPENTER (Form Work Only).......$ 23.39 10.25
CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging and Metal Stud Installation, Form Work, and Scaffold Building.........................$ 21.71 6.62
CEMENT MASON/CONCRETE FINISHER...$ 26.33 10.14
FLOOR LAYER: Carpet Only.........$ 18.78 5.02
FLOOR LAYER: Hardwood Floors Only.............................$ 26.91 11.88
FLOOR LAYER: Vinyl Flooring Only.............................$ 19.71 5.94
GLAZIER..........................$ 20.00 1.54
LABORER: Common or General......$ 18.09 8.34
LABORER: Landscape..............$ 15.01 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 26.17 4.88
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 23.73 7.50
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 24.14 13.55
OPERATOR: Drill.................$ 25.58 17.07
OPERATOR: Gradall...............$ 32.70 18.43
OPERATOR: Grader/Blade..........$ 32.51 17.98
OPERATOR: Loader................$ 27.05 14.52
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 30.39 15.05
OPERATOR: Roller................$ 30.39 13.72
ROOFER, Excludes Waterproofing...$ 21.32 10.39
ROOFER: Waterproofing Only.......$ 28.60 18.02
TILE FINISHER....................$ 20.65 8.24
TILE SETTER......................$ 24.31 11.62
TRUCK DRIVER: Dump Truck........$ 19.77 5.02
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
LEAD BLDG. 370 INTERIOR RENOVATION – TASK 1
AMENDMENT 0001
DRAWINGS:
Sheet CU501: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet AD101: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet AD102: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet A-101: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet A-102: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet A-150: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet A-502: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet I-601: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet S-101: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet S-102: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
Sheet ED-101: Delete this sheet in its entirely and substitute the attached revised sheet dated
07/27/2022.
G
F
E
D
C
B
1 2
INSTALL STEEL BOLLARD POSTS AT EACH CORNER OF
HYDRANT THAT FACES PAVEMENT FOR TRAFFIC PROTECTION.
SEE STEEL BOLLARD DETAIL ON THIS SHEET.
BOLLAR0-0
_of} .., BOLLAR0-0 :::;
z
EDGE OF PAVEMENT :::;
0-BOLLARO
FIRE HYDRANT
45 DEGREES
(TYP)
0-BOLLARO
k---90 DEGREES
FIRE HYDRANT PLACEMENT DETAIL
NOT TO SCALE
INSTALL STEEL BOLLARD POSTS AT EACH CORNER OF PIV
VALVE THAT FACES PAVEMENT FOR TRAFFIC PROTECTION.
SEE STEEL BOLLARD DETAIL ON THIS SHEET.
BOLLAR0-0
"'I;)
t;:
BOLLAR0-0 ; :::;
z
EDGE OF PAVEMENT :::;
0-BOLLARO
PIV VALVE
45 DEGREES
(TYP)
0-BOLLARO
k---90 DEGREES
PIV VALVE PLACEMENT DETAIL
NOT TO SCALE
6" Ml
CROSSES
NOTES:
1. COVER OVER TOP OF PIPE SHAl.l BE 42" MIN.
2. THRUST BLOCKS SHAl.l BE BUILT AGAINST UNDISTURBED SOIL WITH
ADEQUATE BACKING TO PREVENT MOVEMENT OF FITTING.
3. NO THRUST BLOCKS TO BE PLACED IN SEWIER LATERIJ.. DITCHES.
4. CONCRETE SHALL BE POURED AGAINST UNDISTURBED GROUND.
5. POLYETHYLENE ENCASEMENT IS REQUIRED ON ALL D.I. PIPE AND FITTINGS.
6. THRUST BLOCKING SHALL BE PERFORMED SUCH THAT PIPE JOINTS AND
BOLTS ARE ACCESSIBLE.
7. SUFFICIENT CLEARANCE SHALL BE ALLOWED BETWEEN CONCRETE AND BOLTS
FOR FUTURE MAINTENANCE.
8. ALL ANCHOR BOLTS SHAl.l BE STAINUESS STEEL, MINIMUM 3/4" DIAMETER.
9. ALL M.J. AND FLG. RTTINGS TO RECEIVE THRUST BLOCKS SHALL BE
WRAPPED IN POLYWRAP. CONTRACTOR SHALL ENSURE THAT POLYWRAP
EXTENDS FAR ENOUGH BEYOND THE RTTING TO ENSURE ALL BOLTS WITHIN
THE POLYWRAP.
10. PORTLAND CEMENT CONCRETE USED FOR THRUST BLOCKS SHALL BE MIN
3000 PSI CONCRETE.
A 11. FOR UNSTABLE SOIL CONDITIONS, CHECK WITH ENGINEER FOR THRUST
BLOCK DIMENSIONS.
12. ALL REBAR SURFACES EXPOSED TO SOIL SHALL BE COATED WITH 2 COATS
OF A BITUMINOUS COATING.
FINISHED GRADE
".-1 ,L ' a
ADJUSTABLE VALVE BOX. PROVIDE
POST INDICATOR WHERE REQUIRED.
GATE VIJ..VE
P�N
SECTION
VALVE BOX
NOT TO SCALE
7 CUBIC FT.
CRUSHED STONE
(MIN.) ABOVE,
BELOW ANO
AROUND HYDRANT
DRAIN PORTS
X< :::;
BLOCK FIRE HYDRANT
WITH 12" x 12" x 12" ANO 15" x 15" x 6"
CONCRETE BLOCKS
SEE NOTE
5, SHEET
B504.
" ' 11
1" b.
CONCRETE
ANCHOR BLOCK
WITH #4 REBAR
AT EACH ENO
FOR
NONMETALLIC
WATERLINES
ONLY. SEE
THRUST BLOCK
DETAILS THIS
SHEET.
+I
'te z 1-. :::;
t')
NOTE:
ANGLE lYPE OPERATING
WRENCH LOCKED IN
POSITION
HEAVY PLATE GLASS WINDOW
INDICATING "OPEN"
POSITION FACING CURB OR
ROADWAY
n Tit_=�rr:> --- JTTillT F i--- INDICATOR POST
WATERLINE
r- ,,__ ANCHOR BLOCK
SEE VIJ..VE BOX DET
SEE FIRE PROTECTION FOR
TAMPER SWITCH ANO
ELECTRICAL DETAILS.
POST INDICATOR VALVE
NOT TO SCALE
PUMPER CONNECTION SHALL
FACE ROAO .
3'-7' TO
EDGE OF ROAO OR CURB.
@1:-::-------ooZ
�:::; FINISH GRADE
6" GATE VALVE
WITH ADJUSTABLE
VALVE BOX
�_._--ANCHOR BLOCK/SEE
VALVE BOX DETAIL
SEE THRUST BLOCK NOTES
TEE
BUTTRESS
PLACE CONCRETE BLOCKING TO CLEAR DRAIN PORTS ANO ASSURE
POSITIVE DRAINAGE INTO STONE FOR FREEZE PROTECTION.
lYPICAL FIRE HYDRANT SETTING
NOT TO SCALE
4 A •
KEEP
CONCRETE
f4 REBAR
SEE THRUST BLOCK
NOTES THIS SHffi.
REBAR DETAIL
NOT TO SCALE
BLOCK PLAN
NOT TO SCALE
VALVE A B C SIZE
4" & 6" 1·-10" 1 • -0" 1 '-4"
8" 2'-0" 1 1 -2 11 1 '-6"
1 o· 2'-4" 1 '-3" 1 '-7"
NOTE: REFER TO VALVE BOX DETAIL.
NOTES:
ANCHOR BLOCK FOR VALVES
FILL POST
WITH CONCRETE
I 4'-0' w z w w
<J)
NOT TO SCALE
,,,_ __ YELLOW
REFLECTIVE
PAINT
6' DIA
STEEL PIPE,
1/4' MIN
THICKNESS
4' DEEP BELOW
GRADE SET IN
CONCRETE,
1'-10' WIDE.
1 • -0'"
1'-2"
1 '-3"
1. BOLLARD DEPTH ALONG PERIMETER OF BUILDING
SHALL BE AOJUSTEO AS NECESSARY TO CLEAR TOP
OF BUILDING FOUNDATIONS BUT SHALL BE A MINIMUM
DEPTH OF 3'.
EXTERIOR BOLLARD DETAIL
NOT TO SCALE
CLEAR OF BELL
SECTIONA-A PLUGS
THRUST BLOCKS DETAIL A
BENDS A • I
TEES
NOT TO SCALE
REQUIRE BEARING AREA UNDISTURBED SOIL AND TYPICAL DIMENSIONS
CROSSES/90" BENDS 45· BENDS 11-1/4" BENDS 22-1/2" BENDS TEES & PLUGS
AREA '"A,, "8" AREA '"A" "8" AREA '"A,, "B" AREA '"A" "B" AREA "A" "8"
SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT.
6" 4.0 32" 18" 2.2 18" 16" 0.6 5" 18" 1 . 1 g" 18" 2.8 23" 18"
8" 7.0 42" 24" 3.8 23" 24" 1.0 6" 24" 2.0 12" 24" 5.0 30" 24"
1 o· 11.0 53" 30" 6.3 30" 30" 1.6 8" 30" 3.1 15" 30" 8.0 38" 30"
12· 1 6. 1 64" 36 11 10.0 4011
36 11 2.2 g" 36 11 4.4 18 11 36" 11 .3 45 11
36 11
14" 21.6 74" 42" 12.5 43" 42" 3.0 1 O" 42" 6.0 21" 42" 15.5 53" 42"
16" 28.3 85" 48" 17.7 53" 48" 4.0 12" 48" 7.7 23" 48" 20.1 60" 48"
SURFACE AREA OF BEARING SOIL IS PROVIOEO FOR 200 PSI MAXIMUM PRESSURE (INCLUDING SURGE) ANO 2000 PSF SOIL BEARING. IF PRESSURE IS HIGHER OR SOIL BEARING 10 POTENTIALLY LOWER, CONSULT THE ENGINEER
FOR ADJUSTMENTS.
7 8 9 10
--EXISTING PAVEMENT EXISTING PAVEMENT--�
.---NOTE 2 MATCH EXISTING CONCRETE THICKNESS,
5,000 PSI REINFORCED CONCRETE (NOTE 1
NOTE 2--
6" MIN 1
EXISTING BASE
:I:
(COMPACT TO 100%)
PENNDOT #2A BASE COURSE
(COMPACT TO 100% MAX DENSITY) 1±
EXISTING BASE
(COMPACT TO 100%)
i--
,-, -----11-i������'-0
,.;,.,.--;,1---- FLOWABLE FILL
:'::·� .... " .-�'·: . UTILITY
)\{;\"iJ6:,: .. : . .t'.Pilk:
(SEE PLAN)
NOTE 1: CONCRETE MIX DESIGN SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL 30 DAYS PRIOR TO
WORK. MIX SHALL MEET REQUIREMENTS IN PENNDOT 408/2016, 5,000PSI WITH WELDED WIRE
REINFORCEMENT.
NOTE 2: LIMITS FOR REPLACEMENT SHALL BE SAWCUT FULL DEPTH BEFORE DEMOLITION. EXPOSED
FACE TO REMAIN SHALL BE POWER WASHED AND SATURATED. NEW CONCRETE SHALL BE FULLY
BONDED AND FLUSH WITH EXISTING SURFACE. UTILIZE DOWELS AS DESCRIBED BELOW. 2" COVER
REINFORCEMENT.
NOTE 3: SMOOTH PAVING DOWELS (1" DIAMETER AND 12" LONG) SHALL BE DRILLED AND EPOXIED INTO EXPOSED FACE AT 12" O.C. BEFORE PLACEMENT. DO NOT GREASE OR OIL EITHER END OF
DOWEL.
NOTE 4: ALL EXISTING JOINTS TO BE DEMOLISHED SHALL BE REPLACED IN MATCHING LOCATIONS TO
MAINTAIN JOINT TYPE AS EXISTING (EXPANSION / CONTRACTION).
NOTE 5: CONCRETE SHALL BE GIVEN A MATCHING FINISH AND MOIST CURED FOR MINIMUM OF 3 DAYS, FOLLOWED BY CURING COMPOUND APPLIED EVENLY OVER ENTIRE AREA.
REPLACEMENT OF CONCRETE PAVEMENT
N.T.S.
--EXISTING PAVEMENT EXISTING PAVEMENT--�
.---NOTE 2
MIN"" I,
EXISTING BASE
:I:
(COMPACT TO 100%)
MATCH EXISTING ASPHALT THICKNESS, WITH PENN DOT SUPERPAVE (NOTE 1 J
PENNDOT #2A BASE COURSE
(COMPACT TO 100% MAX DENSITY)
NOTE 2--
1±
EXISTING BASE
(COMPACT TO 100%)
,.,:,.,...,,1---- FLOWABLE FILL
NOTE 1: PENN DOT SUPERPAVE MIX DESIGNS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL 30
DAYS PRIOR TO WORK.
NOTE 2: LIMITS FOR REPLACEMENT SHALL BE SAWCUT FULL DEPTH BEFORE DEMO. APPLY TACK COAT
TO ALL SURFACES.
NOTE 3: PLACEMENT AND COMPACTION OF ASPHALT AND AGGREGATES SHALL MEET REQUIREMENTS IN
PENNDOT PUB 408/2016, PLACED IN APPROPRIATE LIFT THICKNESSES, AS SUBMITTED.
REPLACEMENT OF ASPHALT PAVEMENT
N.T.S.
NOTE 1: SEE UTILITY SPECIFICATIONS FOR TRENCHING AND BEDDING REQUIREMENTS SPECIFIC TO EACH
UTILITY.
UTILITY TRENCHING OUTSIDE PAVED AREAS
N.T.S.
I
US Army Corps OF Engineers ® 0AL Tl"l"IRE DIJ::TRl"T
0 z z
� N
� <:N oo w "' 0:, z :J CJ) ::::, g� .., z z
Q;§:: 18Sl :a; oo oa::
U) a:: 0 w w N � Z>- N z a:: z C9 ,2
Cl w ti; ::iLL-a_>-OClu,a::u,Wz<(D. a:: -:a;C!'.01f: o::.ow O>=I� ��N� c::: m j:::
<( _J
U) ell z _J � z
�z w ' D.
z
� z w Cl'.
Cl'.
w
.... z 0 D. 0 w Cl "' >-:a; z Cl'. 15 <( >-zz Cl w
Cl'. _J w w
0 lie z I- w
l) ., ii
I- z z w 0 l) u:
0 w
I=� Ulll 1il [Il wa::
0 :a;
<ziS "'-oz .... -�o!!l ->Ill a:: ->-ClZ !!l (!) £2ClZUJ c,'.5':W ww0 WW)-zza::--<((!) (!) .... zz-ww::::!
Cl'. <( U) en ..J
�w
::i j::
SHEET
CU501
w "C?
:; 0 <"'z:, w u -' M - ...u_ M
Cl w 00NZ"' <
B
B
A
A
I
X
X
1.1N
2N
3N
4N
5N
6N
W
W
V U T S R P N
M
M
L
L
JJ
JJ
AX
AX
1 1
MATCH LINE A-102MATCH LINE A-102
DEMOLITION LEGEND & KEYNOTES:
INDICATES AREA TO HAVE ALL EXISTING FLOORING,
CEILING SYSTEMS, CONDUIT, CABLE TRAYS, PIPING AND
RELATED HANGERS, FASTENERS, ADHESIVE REMOVED
AND DISPOSED OF UNLESS OTHERWISE NOTED TO
REMAIN.
WALLS DOORS, FRAMES, HARDWARE BRACING,
CONDUIT PIPING, AND ALL RELATED ACCESSORIES TO
BE REMOVED AND DISPOSED OF UNLESS OTHER
NOTED.
REMOVE EXISTING DOOR, FRAME AND HARDWARE AND
PREPARE OPENING FOR NEW DOOR FRAME AND
HARDWARE
REMOVE EXISTING BUILT UP SUBFLOOR, WOOD CEILING
FRAMING, PLYWOOD CEILING AND RESIDUAL CONCRETE
VAULT WALLS AND CEILING. FLOOR IN ROOMS 216, 217,
218 & 219 SHALL BE MADE LEVEL THROUGHOUT
FOLLOWING DEMOLITION.
REMOVE EXISTING CEILING SYSTEM, LIGHTING AND
FLOORING. 3
REMOVE EXISTING WINDOW OR DOOR AND FRAME
COMPLETE TO PREPARE OPENING TO BE FILLED TO A
ONE HOUR RATED ASSEMBLY.
5 REMOVE EXISTING STEEL STAIRS COMPLETE, TO
INCLUDE LANDINGS, RAILINGS AND ALL RELATED
STRUCTURE. CUT ACHORAGE AND GRIND FLUSH TO
FLOOR.
SAWCUT EXISTING MASONRY WALL AND PROVIDE NEW
76" WIDE BY 88" HIGH FINISHED OPENING. PROVIDE NEW
DOUBLE ANGLE STEEL HEADER AND ALL NECESSARY
BRACING AND SHORING TO MAINTAIN INTEGRITY OF
WALL DURING DEMOLITION.
SAWCUT EXISTING MASONRY WALL AND PROVIDE NEW
72" WIDE BY 84" HIGH FINISHED OPENING. PROVIDE NEW
DOUBLE ANGLE STEEL HEADER AND ALL NECESSARY
BRACING AND SHORING TO MAINTAIN INTEGRITY OF
WALL DURING DEMOLITION.
SAWCUT EXISTING MASONRY WALL TO EXTEND
MASONRY OPENING UP 12" TO ACOMMODATE NEW
DOOR HEIGHT. PROVIDE NEW DOUBLE ANGLE STEEL
HEADER AND ALL NECESSARY BRACING AND SHORING
TO MAINTAIN INTEGRITY OF WALL DURING DEMOLITION.
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N
O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
AD101
P A
R T
IA
L S
E C
O N
D F
L O
O R
D E
M O
L
IT
IO
N
P L A
N
A R
E A
A
L E
T T
E R
K E
N N
Y A
R M
Y D
E P
O T
P
E N
N S
Y L V
A N
IA
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M
A R
Y L A
N D
U S
A C
E E
N G
IN
E
E R
IN
G
S U
P P
O R
T C
E N
T E
R
H U
N T
S V
IL
L E
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
A R
C H
IT
E
C T
U R
A L B
R A
N C
H
D H
A W
K
D H
A W
K
R O
L M
E D
O
J U
N
F
IR
S T
T
IT
L E
L E
A D
B U
IL
D
IN
G
I N
T E
R
IO
R R
E N
O V
A T
IO
N
S
T A
S K
BALTIMORE DISTRICT
3/32" = 1'-0"AD101
PARTIAL SECOND FLOOR DEMOLITION PLAN -
AREA "A"
R e v is e d b y a m e n d m e n t
/2
/2
0 5' 20'10'
SCALE: 3/32" = 1' - 0"
2ND FLOOR KEY PLAN
3 3
4 4
5 5
6 6
7 7
8 8
9 9
9.5
9.5
10 10
U1 T1 S1 R1 P1 M1 L2 L1
V U T S R P N
N
M
M
L
L
R5
4.5 4.5
5.5 5.5
6.5 6.5
7.5 7.5
8.5 8.5
DEMOLITION LEGEND & KEYNOTES:
INDICATES AREA TO HAVE ALL EXISTING FLOORING,
CEILING SYSTEMS, CONDUIT, CABLE TRAYS, PIPING AND
RELATED HANGERS, FASTENERS, ADHESIVE REMOVED
AND DISPOSED OF UNLESS OTHERWISE NOTED TO
REMAIN.
WALLS DOORS, FRAMES, HARDWARE BRACING,
CONDUIT PIPING, AND ALL RELATED ACCESSORIES TO
BE REMOVED AND DISPOSED OF UNLESS OTHER
NOTED.
REMOVE EXISTING DOOR, FRAME AND HARDWARE AND
PREPARE OPENING FOR NEW DOOR FRAME AND
HARDWARE
REMOVE EXISTING BUILT UP SUBFLOOR, WOOD CEILING
FRAMING, PLYWOOD CEILING AND RESIDUAL CONCRETE
VAULT WALLS AND CEILING. FLOOR IN ROOMS 216, 217,
218 & 219 SHALL BE MADE LEVEL THROUGHOUT
FOLLOWING DEMOLITION.
REMOVE EXISTING CEILING SYSTEM, LIGHTING AND
FLOORING. 3
REMOVE EXISTING WINDOW OR DOOR AND FRAME
COMPLETE TO PREPARE OPENING TO BE FILLED TO A
ONE HOUR RATED ASSEMBLY.
5 REMOVE EXISTING STEEL STAIRS COMPLETE, TO
INCLUDE LANDINGS, RAILINGS AND ALL RELATED
STRUCTURE. CUT ACHORAGE AND GRIND FLUSH TO
FLOOR.
SAWCUT EXISTING MASONRY WALL AND PROVIDE NEW
76" WIDE BY 88" HIGH FINISHED OPENING. PROVIDE NEW
DOUBLE ANGLE STEEL HEADER AND ALL NECESSARY
BRACING AND SHORING TO MAINTAIN INTEGRITY OF
WALL DURING DEMOLITION.
SAWCUT EXISTING MASONRY WALL AND PROVIDE NEW
72" WIDE BY 84" HIGH FINISHED OPENING. PROVIDE NEW
DOUBLE ANGLE STEEL HEADER AND ALL NECESSARY
BRACING AND SHORING TO MAINTAIN INTEGRITY OF
WALL DURING DEMOLITION.
SAWCUT EXISTING MASONRY WALL TO EXTEND
MASONRY OPENING UP 12" TO ACOMMODATE NEW
DOOR HEIGHT. PROVIDE NEW DOUBLE ANGLE STEEL
HEADER AND ALL NECESSARY BRACING AND SHORING
TO MAINTAIN INTEGRITY OF WALL DURING DEMOLITION.
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
AD102
P A
R T
IA
L S
E C
O N
D F
L O
O R
D E
M O
L
IT
IO
N
P L A
N
A R
E A
B
L E
T T
E R
K E
N N
Y A
R M
Y D
E P
O T
P
E N
N S
Y L V
A N
IA
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M
A R
Y L A
N D
U S
A C
E E
N G
IN
E
E R
IN
G
S U
P P
O R
T C
E N
T E
R
H U
N T
S V
IL
L E
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
A R
C H
IT
E
C T
U R
A L B
R A
N C
H
D H
A W
K
D H
A W
K
R O
L M
E D
O
J U
N
F
IR
S T
T
IT
L E
L E
A D
B U
IL
D
IN
G
I N
T E
R
IO
R R
E N
O V
A T
IO
N
S
T A
S K
BALTIMORE DISTRICT
3/32" = 1'-0"AD102
PARTIAL SECOND FLOOR DEMOLITION PLAN -
AREA "B"
R e v is e d b y a m e n d m e n t
/2
/2
EXISTING STEEL FRAME STAIRS AND CONCRETE LANDING TO REMAIN
0 5' 20'10'
SCALE: 3/32" = 1' - 0"
2ND FLOOR KEY PLAN
DN
DN
DN
I I
2 2
1.1N 1.1N
2N 2N
3N 3N
4N 4N
5N 5N
6N
6N
W V U T S R P
N M L JJ
1E 1E
A-301
3689 SF
INDUST TEST
EQUIP
1600 SF
MECHANICAL
407 SF
WIP STORAGE
371 SF
BREAK
5343 SF
LAB REPAIR
AREA 1
894 SF
CLASSROOM
10737 SF
LAB REPAIR
AREA 2
244 SF
SUPERVISORS
115 SF
UTILITY
304 SF
ELECTRICAL
282 SF
BREAK
208 SF
FIBER NODE RM
605 SF
SUPERVISORS
708 SF
CORRIDOR
201A
203A
205B
213B 211
206A
112 SF
IDF/COM
/2
24'-9"
44'-6"
66'-2" + or - / FIELD VERIFY
53'-5" + or - / FIELD VERIFY
12'-4"
20'-7" + or - / FIELD VERIFY
17'-3"
/2
/4
RAISED FLOOR RAMP
UP
RAISED FLOOR RAMP
UP
PROVIDE TEMPORARY RAMP
FOR RAISED FLOOR SYSTEM
CONSTRUCTED OF RAISED
FLOOR SYSTEM FOR REUSE IN
PHASE 2.
206B
PROVIDE TEMPORARY
YELLOW WARNING TAPE
AT ELEVATION CHANGE
203B
201B
200B
MATCH LINE A-102
A0
C0
B0
M
IN
14'-0"
LOCATE WALL FLUSH WITH
EXISTING. PROVIDE TEAR-AWAY
(ZIP STRIP) TRANSISTION TO CMU
WALL
213A E0
A-401
469 SF
CORRIDOR
200B
159 SF
CORRIDOR
200A
UP
202A
TENANT
B0B0
B0
B0
B0
B0
B0
C0
C0
12'-0"
B0
A0
PROVIDE TEMPORARY RAILING
AT RAISED FLOOR AND RAMP
CONSTRUCTION OF RAILING
SHALL MEET ALL OSHA & EM
385-1-1 REQUIREMENTS
B0
E0
E0
E0
MATCH LINE A-102
NEW KNEE WALL PARTITION W/
SOLID SURFACE CAP AND SS
CORNER GUARDSK
K
1'-10"
PROVIDE WALL MOUNTED HANDRAIL
SEE SHEET A-603 FOR DETAILS
PROVIDE WALL MOUNTED HANDRAIL
AT RAMP. SEE SHEET A-603 FOR
DETAILS
B0
M1
M1
M1
A-301
6' - 4"
DOORS TO BE REMOVED AT THE
END OF CONSTRUCTION TO ALLOW
EXIT EGRESS
EXISTING ELEC.
PANEL TO REMAIN
EXISTING STAIR, RAILING, WALLS AND
CEILING TO BE PAINTED. INSTALL
NEW RUBBER TREADS AND RISERS
S
S
S
S
S
SSS SS
S SS
201C
50'-9" + or - / FIELD VERIFY
1. SEE SHEET A-001 FOR ANNOTATION SYMBOLS
2. FOR DOOR TYPES AND SCHEDULE SEE SHEET A-601.
3. FOR PARTITION TYPE INFORMATION SEE SHEET A-501 AND A-502
4. ALL NEW DOORS SHALL BE LOCATED 6" FROM CLOSEST INTERIOR WALL CORNER OR AS
OTHERWISE DIMENSIONED.
5. CONTRACTOR TO ENSURE ALL FIRE RATED PARTITIONS ARE MAINTAINED AND EXTEND FROM
FLOOR TO BOTTOM OF DECK.
6. CONTRACTOR TO PROVIDE ALL NECESSARY MISCELLANEOUS FIRE CAULKING AND GASKETING
TO PROVIDE A COMPLETE RATED WALL WHERE INDICATED ON A-101, A-102 & A-103 TO INCLUDE
WALL INFILL AT EXISTING AND NEW PENETRATION AND DEMOLISHED WINDOWS IN ROOMS 217,
219, 221 & 225.
7. FOR MECHANICAL EQUIPMENT DESCRIPTION SEE MECHANICAL DWGS.
8. ALL EXPOSED STEEL COLUMNS AND CROSS BRACING TO BE SANDED SMOOTH AND PAINTED
PNT 5.
9. DIMENSIONS TO BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK. CONFLICTS
GREATER THAN 2" AFFECTING PLACEMENT OF NEW WORK SHALL BE RESOLVED THROUGH THE
COR PRIOR TO CONSTRUCTION.
10. EXTENT OF NEW ARCHITECTURAL WORK ON FIRST FLOOR LIMITED TO IDF/COM ROOM 101
LOCATED DIRECTLY BELOW NEW SECOND FLOOR IDF/COM ROOM 221 AND TR ROOM 102. SEE
SHEE A-103
11. SEE SHEETS A-401 & A-402 FOR BREAKROOM DETAILS
12. FOR FURNITURE AND EQUIPMENT PLAN LAYOUTS REFER TO SHEETS I-101 AND I-102 ALL
FURNITURE SHOWN IS NOT IN CONTRACT.
13. ALL EXPOSED EXISTING CMU WALLS TO REMAIN SHALL BE SCRAPED, PATCHED, SANDED,
PRIMED AND PAINTED TWO COATS OF FINISH PAINT.
14. ALL FACES OF NEW WALLS WITHIN ROOMS 200A, 201, 203, 205, 207 & 214 SHALL HAVE ABUSE
RESISTANT GYP BD UP TO 8' ABOVE FINISHED FLOOR.
NOTES:
LEGEND:
INDICATES NEW WALL CONSTRUCTION SEE WALL TYPES FOR DETAILS.
EXISTING COLUMN GRID LINE
1 HOUR RIRE RATED PARTITION ( "S" INDICATES SMOKE PARTITION ONLY)
2 HOUR FIRE RATED PARTITION
REPAIR AND PATCH EXISTING GWB/PLASTER TO LEVEL 4 FINISH. PAINT PER FINISH SCHEDULE
REMOVE EXISTING FLOOR & BASE. INSTALL NEW LVT FLOORING & BASE PER FINISH
SCHEDULE
INSTALL NEW PAIRED PANEL FOLDING PARTITION SYSTEM CONTRACTOR TO PROVIDE
STRUCTURE FOR TOP TRACK
FILL OPENING WITH ONE HOUR GWB ASSEMBLY FINISH ACCORDINGLY
FILL OPENINGS WITH RATED WALL ASSEMBLY AND PATCH PRIME AND PAINT ALL WALLS.
INSTALL NEW SUSPENDED ACOUSTICAL CEILING SYSTEM AND NEW CARPETING.
PREP, PRIME AND PAINT EXISTING DOOR AND FRAME.
X
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
A-101
P A
R T
IA
L S
E C
O N
D F
L O
O R
P L A
N
A R
E A
A
L E
T T
E R
K E
N N
Y A
R M
Y D
E P
O T
P
E N
N S
Y L V
A N
IA
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M
A R
Y L A
N D
U S
A C
E E
N G
IN
E
E R
IN
G
S U
P P
O R
T C
E N
T E
R
H U
N T
S V
IL
L E
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
A R
C H
IT
E
C T
U R
A L B
R A
N C
H
D H
A W
K
D H
A W
K
R O
L M
E D
O
J U
N
F
IR
S T
T
IT
L E
L E
A D
B U
IL
D
IN
G
I N
T E
R
IO
R R
E N
O V
A T
IO
N
S
T A
S K
BALTIMORE DISTRICT
3/32" = 1'-0"A-101
1 PARTIAL SECOND FLOOR PLAN - AREA "A"
R e v is e d b y a m e n d m e n t
/2
/2
2ND FLOOR KEY PLAN
N
SCALE: 3/32"=1'-0"
816 16
3 3
4 4
5 5
6 6
7 7
8 8
9 9
9.5 9.5
10 10
T1
T1
S1
S1
R1
R1
P1
P1
M1
M1
U
U
T
T
S
S
R P N
R5
R5
4.5 4.5
5.5 5.5
6.5 6.5
7.5 7.5
8.5 8.5
A-301
A-301
A-603
A-301
PROVIDE RAILING AT STEPS
TO RAISED FLOOR. SEE
SHEET A-603 FOR TYPICAL
STAIR DETAILS.
E0
PAINT EXISTING
WALLS, CEILING &
RAILING. INSTALL
NEW RUBBER RISERS
AND TREADS.
S S S
S
S
S
S
S
S
S
S
S S
10'-3"
10'-3"
12'-0"
14'-3"
14'-9"
E0
PAINT ALL EXPOSED
STEEL CROSS BRACING
PNT5
PAINT EXISTING
WALLS, CEILING &
RAILING. INSTALL
NEW RUBBER RISERS
AND TREADS.
A-603
LAB REPAIR
AREA 2
SUPERVISOR
DOIM ADMIN
DOIM SERVER
LAB
BREAK
SUPERVISOR
CORRIDOR
DOIM OFFICE
COMM
TEAM ROOM
STAIR
220B
2000JJJJJJJ
A
219B
221A
215A 222A
A
216A
218A
219A
223A
A0
A0
A0
A0 A0
A0
A0
E0
A0
A0 B0
A0
Ex 1
A0
B0
1. SEE SHEET A-001 FOR ANNOTATION SYMBOLS
2. FOR DOOR TYPES AND SCHEDULE SEE SHEET A-601.
3. FOR PARTITION TYPE INFORMATION SEE SHEET A-501 AND A-502
4. ALL NEW DOORS SHALL BE LOCATED 6" FROM CLOSEST INTERIOR WALL CORNER OR AS
OTHERWISE DIMENSIONED.
5. CONTRACTOR TO ENSURE ALL FIRE RATED PARTITIONS ARE MAINTAINED AND EXTEND FROM
FLOOR TO BOTTOM OF DECK.
6. CONTRACTOR TO PROVIDE ALL NECESSARY MISCELLANEOUS FIRE CAULKING AND GASKETING
TO PROVIDE A COMPLETE RATED WALL WHERE INDICATED ON A-101, A-102 & A-103 TO INCLUDE
WALL INFILL AT EXISTING AND NEW PENETRATION AND DEMOLISHED WINDOWS IN ROOMS 217,
219, 221 & 225.
7. FOR MECHANICAL EQUIPMENT DESCRIPTION SEE MECHANICAL DWGS.
8. ALL EXPOSED STEEL COLUMNS AND CROSS BRACING TO BE SANDED SMOOTH AND PAINTED
PNT 5.
9. DIMENSIONS TO BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK. CONFLICTS
GREATER THAN 2" AFFECTING PLACEMENT OF NEW WORK SHALL BE RESOLVED THROUGH THE
COR PRIOR TO CONSTRUCTION.
10. EXTENT OF NEW ARCHITECTURAL WORK ON FIRST FLOOR LIMITED TO IDF/COM ROOM 101
LOCATED DIRECTLY BELOW NEW SECOND FLOOR IDF/COM ROOM 221 AND TR ROOM 102. SEE
SHEE A-103
11. SEE SHEETS A-401 & A-402 FOR BREAKROOM DETAILS
12. FOR FURNITURE AND EQUIPMENT PLAN LAYOUTS REFER TO SHEETS I-101 AND I-102 ALL
FURNITURE SHOWN IS NOT IN CONTRACT.
13. ALL EXPOSED EXISTING CMU WALLS TO REMAIN SHALL BE SCRAPED, PATCHED, SANDED,
PRIMED AND PAINTED TWO COATS OF FINISH PAINT.
14. ALL FACES OF NEW WALLS WITHIN ROOMS 200A, 201, 203, 205, 207 & 214 SHALL HAVE ABUSE
RESISTANT GYP BD UP TO 8' ABOVE FINISHED FLOOR.
NOTES:
LEGEND:
INDICATES NEW WALL CONSTRUCTION SEE WALL TYPES FOR DETAILS.
EXISTING COLUMN GRID LINE
1 HOUR FIRE RATED PARTITION ( "S" INDICATES SMOKE PARTITION ONLY)
2 HOUR FIRE RATED PARTITION
REPAIR AND PATCH EXISTING GWB/PLASTER TO LEVEL 4 FINISH. PAINT PER FINISH SCHEDULE
REMOVE EXISTING FLOOR & BASE. INSTALL NEW LVT FLOORING & BASE PER FINISH
SCHEDULE
INSTALL NEW PAIRED PANEL FOLDING PARTITION SYSTEM CONTRACTOR TO PROVIDE
STRUCTURE FOR TOP TRACK
FILL OPENING WITH ONE HOUR GWB ASSEMBLY FINISH ACCORDINGLY
FILL OPENINGS WITH RATED WALL ASSEMBLY AND PATCH PRIME AND PAINT ALL WALLS.
INSTALL NEW SUSPENDED ACOUSTICAL CEILING SYSTEM AND NEW CARPETING.
PREP, PRIME AND PAINT EXISTING DOOR AND FRAME.
X
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
A-102
P A
R T
IA
L S
E C
O N
D F
L O
O R
P L A
N
A R
E A
B
L E
T T
E R
K E
N N
Y A
R M
Y D
E P
O T
P
E N
N S
Y L V
A N
IA
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M
A R
Y L A
N D
U S
A C
E E
N G
IN
E
E R
IN
G
S U
P P
O R
T C
E N
T E
R
H U
N T
S V
IL
L E
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
A R
C H
IT
E
C T
U R
A L B
R A
N C
H
D H
A W
K
D H
A W
K
R O
L M
E D
O
J U
N
F
IR
S T
T
IT
L E
L E
A D
B U
IL
D
IN
G
I N
T E
R
IO
R R
E N
O V
A T
IO
N
S
T A
S K
BALTIMORE DISTRICT
SCALE: 3/32"=1'-0"
816 16N
2ND FLOOR KEY PLAN
3/32" = 1'-0"A-102
1 PARTIAL SECOND FLOOR PLAN - AREA "B"
R e v is e d b y a m e n d m e n t
/2
/2
I I
2 2
X
X
1.1N 1.1N
2N 2N
3N 3N
4N 4N
5N 5N
6N 6N
W
W
V
V
U
U
T
T
S
S
R
R
P
P
N
N
M
M
L
L
JJ
JJ
KK
KK
1E
1E
FIRST FLOOR BELOW
F
IR
S T
F L
O O
R B
E L
O W
EXP
EXISTING
TO REMAIN
EXP
EXP
EXISTING GWB CEILING TO REMAIN
REPAIR, PATCH AND PAINT TO A LEVEL 5 FINISH
NO CEILING WORK THIS AREA
NO WORK IN THIS AREA
PAIRED PANEL
FOLDING
PARTITION
CEILING TRACK
MATCH LINE MATCH LINEMATCH LINE
EXP
12" EXTRUDED ALUMINUM PERIMETER TRIM BY ACT MANUFACTURER
12" EXTRUDED ALUMINUM PERIMETER TRIM BY
ACT MANUFACTURER
RECESSED
MOTORIZED
PROJECTION
SCREEN
GYP BD CEILING
RECESSED CAN LIGHTING FIXTURE
SUPPLY DIFFUSER
RETURN GRILLE
LAY-IN ACOUSTICAL CEILING
OR
OR LED LAY IN LIGHT FIXTURE
OS
CEILING MOUNTED
OCCUPANCY SENSOR
SPOT ELEVATION SEE GENERAL CEILING NOTES
EXPOSED STRUCTURAL TO BE
PAINTED, SEE FINISH SCHEDULE
EXP
CEILING LEGEND
OR
EXHAUST GRILLE
3'-10" x 7'-10" or 3'-10" x 7'-10" SUSPENDED
ACOUTICAL CLOUD CEILING
HIGH BAY CEILING OF FIRST FLOOR BELOW (NO
NEW CEILING WORK)
PENDANT MOUNT LED LIGHT FIXTURE
CEILING OR WALL MOUNTED EXIT SIGN WITH
ARROWS AS INDICATED (SHADING INDICATES
ILLUMINATED FACE(S) OF SIGN)
OR
GENERAL CEILING NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY
BRACING OF CEILING CLOUDS AND SUSPENDED CEILING SYSTEM
TO MEET MANUFACTURERS AND SEISMIC REQUIREMENTS.
2. CEILING SYSTEM AND CLOUD SUSPENSION WIRES AND
BRACING VISIBLE FROM EYE LEVEL SHALL BE PAINTED FLAT
BLACK TO HIDE FROM VIEW TO THE GREATEST EXTENT
POSSIBLE.
3. SPOT ELEVATION ON REFLECTED CEILING PLAN INDICATE
HEIGHT OF SUSPENDED CEILING ABOVE RAISE FLOOR SYSTEM
EM INDICATES EMERGENCY LIGHT FIXTURE
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
A-150
S E
C O
N D
F L O
O R
R C
P
A R
E A
A
L E
T T
E R
K E
N N
Y A
R M
Y D
E P
O T
P
E N
N S
Y L V
A N
IA
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M
A R
Y L A
N D
U S
A C
E E
N G
IN
E
E R
IN
G
S U
P P
O R
T C
E N
T E
R
H U
N T
S V
IL
L E
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
A R
C H
IT
E
C T
U R
A L B
R A
N C
H
D H
A W
K
D H
A W
K
R O
L M
E D
O
J U
N
F
IR
S T
T
IT
L E
L E
A D
B U
IL
D
IN
G
I N
T E
R
IO
R R
E N
O V
A T
IO
N
S
T A
S K
BALTIMORE DISTRICT
3/32" = 1'-0"A-150
1 PARTIAL SECOND FLOOR RCP - AREA "A"
R e v is e d b y a m e n d m e n t
/2
/2
2ND FLOOR KEY PLAN
EM EM
EM EM
EM EM
EM EM
EMEM
EM
EM
EM
EM
EM
EM
EM EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
N
SCALE: 3/32"=1'-0"
816 16
NEW LIGHTWEIGHT
CMU INFILL TO
MATCH FIRE RATING
AND THICKNESS OF
EXISTING WALL.
(REINFORCED PER
NOTES AND DETAILS
THIS SHEET)
BASE AS SCHEDULED
(BOTH SIDES)
EXISTING MASONRY WALL
HEAD
PLAN
SILL
NEW GYPSUM WALLBOARD
PARTITION
EXISTING CMU WALL
TEAR-AWAY (ZIP STRIP)
TRANSITION
BOTH SIDES TYPICAL. CAULK CMU
SIDE OF STRIP AFTER TEAR OFF.
EXISTING CMU WALL
#4 BARS AT EACH JAMB,
GROUT SOLID
#4 DOWELS AT EACH JAMB.
DRILL AND EPOXY INTO EXISTING
CONCRETE FLOOR/FOOTING
TOOTH NEW CMU
INTO EXISTING CMU (TYP.)KEEP EXISTING
HORIZONTAL
REINFORCEMENT (IF
PRESENT) INTACT
OPENING SIZE (SEE A101)
F
IE
L D
V E
R
IF
Y
N O
M
SQUEEZE LINTEL, SEE
TYPICAL DETAILS ON THIS SHEET
6x3 1/2 X 5/16 LLV ANGLES
EACH SIDE FOR 8" CMU
WALLS & L5 X 5 X 5/16
ANGLES EACH SIDE FOR
12" CMU WALLS. INSTALL
ANGLES & BOLTS PRIOR
TO REMOVING MASONRY
BELOW.
EXISTING
MASONRY WALL
TO REMAIN
1/2" DIA. THRU-
BOLTS AT 16" O.C.
AND AT EACH END
EXISTING
MASONRY WALL
BEYOND
(E) CMU WALL
# 3 BAR AT EACH JAMB,
GROUT SOLID
#3 DOWELS AT EACH JAMB.
DRILL AND EPOXY INTO (E)
CONCRETE FLOOR/FOOTING
F
IE
L D
V E
R
IF
Y
N O
M
EXISTING OPENING
INFILL EXISTING
MASONRY OPENING
W/
NEW CMU
TOOTH NEW CMU
INTO EXISTING CMU (TYP.)KEEP EXISTING
HORIZONTAL
REINFORCEMENT (IF
PRESENT) AND LAP NEW
HORIZONTAL
REINFORCING 8" (TYP.)
NOTES:
1. SEE SHEET A-501 FOR PARTITION TYPE NOTES
2. CONCRETE MASONRY CONSTRUCTION SHALL CONFORM TO ACI 530 "BUILDING CODE
REQUIREMENTS FOR MASONRY STRUCTURES", AND ACI 530.1 SPECIFICATIONS.
3. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE MASONRY 19OO PSI).
4. GROUT SHALL CONFORM TO ASTM C476 AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 21 MPA (3000 PSI) AT 28 DAYS. TESTING SHALL CONFORM TO ASTM C1019. GROUT SHALL HAVE A
SLUMP OF 203-254 MM (8-10 INCHES).WATER-REDUCING ADMIXTURES ARE NOT ALLOWED.
5. MASONRY CONSTRUCTION SHALL BE ERECTED IN LIFTS NOT TO EXCEED 1220 (4'-0") PRIOR TO GROUTING CELLS. PROVIDE GROUT KEY BETWEEN GROUT LIFTS BY TERMINATING THE GROUT 50
BELOW MORTAR JOINT.
6. MORTAR SHALL CONFORM TO ASTM C270 OR KS L 5220, TYPE M OR S. MORTAR USED BELOW
GRADE SHALL BE TYPE M.
7. ALL MASONRY SHALL BE LAID IN RUNNING BOND, U.O.N. & MINIMUM REINFORCING LAP SPLICES
SHALL BE 48 BAR DIAMETERS, U.O.N.
8. REINFORCEMENT IN WALLS SHALL BE PLACED IN THE CENTER OF THE CELL, U.O.N.
9. PROVIDE SLEEVES THROUGH ALL CMU WALL PENETRATIONS. NO PENETRATION ALLOWED
THROUGH BOND BEAMS OR LINTELS.
10. WHEN VERTICAL REINFORCING IS NOT SPECIFIED, PROVIDE 1 #5 VERTICAL MINIMUM EACH SIDE
OF CONTROL JOINTS, OPENINGS, CORNERS, END OF WALLS AND INTERSECTIONS.
11. FILL CMU CELLS SOLID BELOW ALL LINTEL AND BEAM BEARING ENDS FROM THE FOUNDATION TO
THE LINTEL OR BEAM.
12. THE CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION AND ALL
TEMPORARY SHORING/BRACING UNTIL THE PERMANENT STRUCTURAL SUPPORT SHOWN IN THE
CONTRACT DOCUMENTS HAS BEEN INSTALLED.
13. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND MAINTAINING THE STRUCTURAL
INTEGRITY OF THE EXISTING BUILDING DURING ALL STAGES OF CONSTRUCTION.
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
A-502
P A
R T
IT
IO
N T
Y P
E S
A N
D M
A S
O N
R Y
D E
T A
IL
S
L E
T T
E R
K E
N N
Y A
R M
Y D
E P
O T
P
E N
N S
Y L V
A N
IA
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M
A R
Y L A
N D
U S
A C
E E
N G
IN
E
E R
IN
G
S U
P P
O R
T C
E N
T E
R
H U
N T
S V
IL
L E
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
A R
C H
IT
E
C T
U R
A L B
R A
N C
H
D H
A W
K
D H
A W
K
R O
L M
E D
O
J U
N
F
IR
S T
T
IT
L E
L E
A D
B U
IL
D
IN
G
I N
T E
R
IO
R R
E N
O V
A T
IO
N
S
T A
S K
BALTIMORE DISTRICT
1" = 1'-0"
WALL TYP M1
1" = 1'-0"A-502
4 TYPICAL NEW PARTITION AT EXISTING CMU
1/2" = 1'-0"A-502
3 NEW MASONRY OPENING DETAIL
1" = 1'-0"A-502
2 SQUEEZE LINTEL DETAIL (TYP.)
1/2" = 1'-0"A-502
1 MASONRY INFILL DETAIL
R e v is e d b y a m e n d m e n t
/2
/2
ACOUSTICALLY RATED PARTITIONS SHALL PROVIDE NO LESS
THAN THE MINIMUM STC RATINGS INDICATED. (TYP.)
1.
FIRE RATED & ACOUSTICAL PARTITIONS SCHEDULED AS
RATED ASSEMBLIES REQUIRED CONTINUOUS &
UNINTERRUPTED SEPARATIONS IN ACCORDANCE WITH
APPLICABLE CODE & TESTED ASSEMBLIES INDICATED.
SEPARATIONS SHALL INCLUDE SAFING & SEALS AT
CORNERS, TERMINATIONS, PENETRATIONS, PLENUMS,
COLUMN ENCLOSURES, & ELECTRICAL BOXES, AS WELL AS
AT PHYSICAL INTERRUPTIONS, SUCH AS COLUMNS, BEAMS,
JOISTS, TRUSSES, & FLOORS, ETC. CONTRACTOR SHALL BE
RESPONSIBLE FOR ASSURING CONTINUOUS
UNINTERRUPTED SEPARATIONS AS SCHEDULED. (TYP.)
2.
PROVIDE PRIME COAT PAINT FINISH FOR ALL GWB
SURFACES THROUGHOUT, INCLUDING SURFACES NOT
EXPOSED SUCH AS AT CEILING & FLOOR PLENUMS. ALL
EXPOSED GWB SURFACES SHALL BE PROVIDE ADDITIONAL
PAINT COAT FINISHED AS SPECIFIED & SCHEDULED (TYP.)
3.
WHERE WALL HUNG ITEMS ARE INDICATED AS EITHER
SURFACE & / OR RECESSED, PROVIDE BLOCKING
CONCEALED WITHIN PARTITION FRAME ASSEMBLY. WALL
MOUNTED ITEMS SHALL INCLUDE, BUT NOT BE LIMITED
TOO; WATER FOUNTAINS, FIRE EXTINGUISHER CABINETS,
TOILET ACCESSORIES, TOILET PARTITIONS, CASEWORK,
COUNTERTOPS, MIRRORS, ETC. METHOD OF BLOCKING TO
BE APPROVED BY CONTRACTING OFFICER. EXPAND &
OVERSIZE AREA OF BLOCKING 20% LARGER THAN WALL
HUNG ITEM SCHEDULED, SPECIFICALLY ASSURING FINAL
LOCATION OF SURFACE MOUNTED ITEMS WILL BE
ACCOMMODATED (TYP.).
4.
NOTES:
ALL VISIBLE AND EXPOSED STRUCTURAL STEEL,
CONDUIT, SPRINKLER PIPE, DUCTWORK AND
MISCELANEOUS BRACING AT OR ABOVE THE
HEIGHT OF THE CEILING CLOUDS IN LAB REPAIR
AREA 1 & 2 (ROOMS 205 & 207) SHALL BE PAINTED
PT2 UNLESS REQUIRED TO NOT BE PAINTED BY ANY
APPLICABLE CODE OR UFC.
5.
BRACE PARTITION STUD FRAMES TO STRUCTURE ABOVE
AS FOLLOWS:
6.
PARTITIONS SCHEDULED FOR AREAS OF KNOWN OR
EXPECTED EXPOSURE TO WATER SHALL BE MODIFIED BY
CONTRACTOR AS FOLLOWS: REPLACE GWB INDICATED ON
EXPOSED SIDE(S) OF PARTITION WITH CEMENTITIOUS
BACKER BOARD IN THE SAME THICKNESS, & INSTALL
CONTINUOUS & UNIFORM 4-MIL POLYETHYLENE MEMBRANE
BACKING BEHIND CEMENTITIOUS BACKER. PREPARE
EXPOSED SURFACE OF CEMENTITIOUS BACKER FOR
SCHEDULED FINISHES. AREAS OF EXPECTED WATER
EXPOSURE ARE DEFINED AS – SHOWER ROOMS, ETC…
7.
PARTITIONS SCHEDULED FOR AREAS OF KNOWN OR
EXPECTED EXPOSURE TO MOISTURE SHALL BE MODIFIED BY
CONTRACTOR AS FOLLOWS: REPLACE GWB INDICATED ON
EXPOSED SIDE(S) OF PARTITION WITH MOISTURE RESISTANT
GWB OF THE SAME THICKNESS, & PREPARE EXPOSED
SURFACE FOR SCHEDULED FINISHES. AREAS OF EXPECTED
MOISTURE ARE DEFINED AS – TOILET ROOMS, JANITOR
CLOSETS, SINK SURROUNDS, VESTIBULES, ETC… (TYP.)
8.
PENETRATIONS THROUGH FIRE RESISTANT
ASSEMBLIES SHALL BE FIRE-STOPPED WITH SAFING
AS SPECIFIED. (TYP.)
9.
SUPPLY FULL HEIGHT PARTITIONS USING TWO
CONTINUOUS TOP TRACKS, WITH TOP TRACK BEING
A DEEP LEG DEFLECTION TRACK FASTENED
DIRECTLY TO DECK & PROVIDING SPACE FOR
STRUCTURAL DEFLECTION WITHOUT DAMAGE
CAUSED TO PARTITION ASSEMBLY.
PARTIAL HEIGHT PARTITIONS WITH SPLAYED
METAL STUD BRACING FASTENED DIRECTLY TO
STRUCTURE ABOVE. PROVIDE SPLAYED
BRACING ON BOTH SIDES OF ASSEMBLY AT NO
MORE THAN 4 FEET ON CENTER.
A -
B -
WHERE FLOOR FINISHES ARE DESIGNATED WITH
RF1 FOLLOWED AN ADDITIONAL FINISH, THE
SECOND FINISH LISTED IS APPLIED TO THE RAISED
FLOOR.
10.
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
I-601
IN
T
E R
IO
R
F
IN
IS
H
S C
H E
D U
L E
L E
T T
E R
K E
N N
Y A
R M
Y D
E P
O T
P
E N
N S
Y L V
A N
IA
B A
L T
IM
O
R E
D
IS
T R
IC
T
H
O P
K
IN
S P
L A
Z A
B A
L T
IM
O
R E
M
A R
Y L A
N D
U S
A C
E E
N G
IN
E
E R
IN
G
S U
P P
O R
T C
E N
T E
R
H U
N T
S V
IL
L E
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
A R
C H
IT
E
C T
U R
A L B
R A
N C
H
D H
A W
K
D H
A W
K
R O
L M
E D
O
J U
N
F
IR
S T
T
IT
L E
L E
A D
B U
IL
D
IN
G
I N
T E
R
IO
R R
E N
O V
A T
IO
N
S
T A
S K
BALTIMORE DISTRICTROOM FINISH SCHEDULE
ROOM
NO ROOM NAME FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH CEILING HEIGHT COMMENTS
FIRST FLOOR
100 CORRIDOR SC1 RB1 PNT1 PNT2 9'-6"
101 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING
102 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING
103 CORRIDOR SC1 RB1 PNT1 PNT2 9'-6"
104 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING
105 WORKSHOP EXISTING EXISTING EXISTING - OPEN TO ABOVE / EXISTING
106 CORRIDOR SC1 RB1 PNT1 PNT2 9'-6"
107 MEN'S RR EXISTING EXISTING EXISTING - EXISTING
108 JC EXISTING EXISTING EXISTING - EXISTING
109 TOILET EXISTING EXISTING EXISTING - EXISTING
150 IDF/COM SC1 RB1 PNT1 - OPEN TO ABOVE / EXISTING
160 TR SC1 RB1 PNT1 - OPEN TO ABOVE / EXISTING
02 FLOOR PLAN OVERALL DOC
200A CORRIDOR RF1 / LVT1 RB1 PNT1 PNT2 EXISTING
200B CORRIDOR RF1 / LVT1 / EJC1 RB1 PNT1 PNT2 8'-6" ABOVE RAISE FLOOR
201 INDUST TEST EQUIP RF1 RB1 PNT1 PNT2 EXISTING
202 MECHANICAL SC1 RB1 PNT1 - EXISTING
203 WIP STORAGE RF1 RB1 PNT1 ACT1 8'-6" ABOVE RAISE FLOOR
204 BREAK LVT1 RB2 PNT1 & PNT4 ACT1 8'-6" ABOVE RAISE FLOOR
205 LAB REPAIR AREA 1 RF1 RB1 PNT1 PNT2 & ACC1 VARIES - CLOUDS AT 8'-6"
ABOVE RAISED FLOOR"
PN5 ON ALL EXPOSED COLUMNS AND
BRACING BELOW CEIING LINE
206 CLASSROOM RF1 RB2 PNT1 & PNT4 ACT1 8'-6" ABOVE RAISE FLOOR
207 LAB REPAIR AREA 2 RF1 RB1 PNT1 PNT2 & ACC1 VARIES - CLOUDS AT 8'-6"
ABOVE RAISED FLOOR"
PN5 ON ALL EXPOSED COLUMNS AND
BRACING BELOW CEIING LINE
208 SUPERVISORS RF1/CPT1 RB2 PNT6 ACT1 8'-6" ABOVE RAISE FLOOR
209 UTILITY SC1 RB1 PNT1 - EXISTING
210 ELECTRICAL SC1 RB1 PNT1 - EXISTING
211 BREAK LVT1 RB2 PNT1 & PNT4 ACT1 9'-0" ABOVE FINISHED FLOOR
212 FIBER NODE RM SC1 RB1 PNT1 ACT1 9'-0" ABOVE FINISHED FLOOR
213 SUPERVISORS RF1/CPT1 RB2 PNT6 ACT1 9'-0" ABOVE FINISHED FLOOR
214 CORRIDOR LVT2 / EJC1 RB3 PNT1 ACT1 9'-0" ABOVE FINISHED FLOOR
215 SUPERVISOR RF1 RB2 PNT5 ACT1 8'-6" ABOVE RAISE FLOOR
216 DOIM OFFICE RF1 RB2 PNT3 ACT1 8'-0" ABOVE RAISE FLOOR
217 DOIM ADMIN RF1 RB2 PNT1 - 8'-0" ABOVE RAISE FLOOR
218 TEAM ROOM RF1/LVT2 RB1 PNT4 ACT1 8'-0" ABOVE RAISE FLOOR
219 DOIM SERVER LAB RF1 RB1 PNT1 - OPEN TO ABOVE / EXISTING
220…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .