B.08.03 - Amendment 05 TSF W912DR21R0027 8.11.2021.pdf
PDF 1 MB Posted
- Solicitation number
- W912DR-21-R-0027
About this file
This is an amendment to a solicitation for the construction of a new Training Support Facility at Humphreys Engineers Center in Alexandria, Virginia. The amendment provides answers to questions received during the request for information period, incorporates a revised price schedule, revises proposal submission instructions, provides a summary of changes to specifications, drawings, and other documents, and includes relevant appendices. Key changes and requirements include construction of a new building of at least 50,000 square feet, experience installing security and force protection measures, delivering furniture and equipment on a turnkey basis, and meeting small business participation goals of 27% total contract value. The submission deadline is provided, with electronic submission through a government portal required.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DR21R0027
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Title: SOCOM Training Support Facility, Humphreys Engineer Center, Alexandria, Virginia The purpose of this amendment is to:
1. Provide answ ers to the questions received during the Request for Information (RFI) period.
2. Incorporate the revised Price Schedule
3. Revise “Proposal Submission Instructions”.
4. Provide “Summary of Changes”.
5. Provide all amendment Attachments.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 33
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR21R0027
X 9B. DATED (SEE ITEM 11)
09-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Aug-2021
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
PRICE SCHEDULE
PRICE SCHEDULE
Revised 5 August 2021
Item No.
Description Amount
Base Bid Items 0001 All costs in connection with the construction of the Training Support Facility to points 5 feet outside the building lines, including utilities, complete as shown on drawings and specified, but exclusive of Base Bid Items 0002 – 0004 & Optional Bid Items 0005 – 0013 below. $_________
0002 All costs in connection with construction of the Storage and
Training Support Building beyond points 5 feet outside the building lines, including site improvements, utilities and applicable related work, complete as shown on the drawings and specified, but exclusive of work covered under Base Bid Items 0001, Base Bid Items 0003 – 0004 & Optional Bid Items 0005 – 0013 below. $_________
0003 All costs in connection with installation of the Gas Utility Connection by utility company . $_50,000 __
0004 All costs in connection with installation of the Electrical Utility by utility company. $_50,000 __
Total Base Bid Amount $__________
Optional Bid Items 0005 All cost associated with the removal of underground communication duct-bank complete as shown on the drawings and specified. $ ________
0006 All costs in connection with the purchase & delivery of
Furniture, Fixtures & Equipment, complete as shown on the drawings and specified. $ ________
0007 All costs in connection with installation of the Furniture, Fixtures & Equipment, complete as shown on drawings and specified. $________
0008 All costs in connection with the purchase & delivery of Audio- Visual Equipment, complete as shown on the drawings and specified. $________
0009 All costs in connection with the installation of the Audio-
Visual Equipment, complete as shown on the drawings and specified. $ _______
0010 All costs in connection with the purchase & delivery of IT/Communication Equipment, complete as shown on the drawings and specified. $________
0011 All costs in connection with the installation of the IT/Communication Equipment, complete as shown on the drawings and specified. $_______
0012 All costs in connection with the purchase & delivery of Electronic Surveillance Systems (ESS), complete as shown on the drawings and specified. $ _______
0013 All costs in connection with installation of the Electronic Surveillance
Systems (ESS), complete as shown on drawings and specified. $ _______
Total Base and Optional Bid Amount $__________
NOTES TO OFFERORS
Offerors must quote on all items including Optional Items. Failure to quote on all items may be cause for rejection of the proposal.
The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified below. The Government may exercise any, all or none of the listed Optional Items in any order. Optional items may be exercised as follows:
- Optional Item 0005 may be exercised at any time within 90 calendar days after Notice to Proceed.
- Optional Items 0006 through 0013 may be exercised at any time within 365 calendar days after Notice to Proceed.
No additional time for contract completion will be allowed when an Optional Item is exercised.
EVALUATION OF OPTIONS: Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirements. Evaluation of options will not obligate the Government to exercise the option(s). (FAR 52.217-5 JUL 1990)
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been added by full text:
SUMMARY OF CHANGES
SPECIFICATIONS:
1) Specification 01 14 00: Delete this section entirely and replace with attached like-named revised section dated 9 August 2021.
2) Specification 01 91 00.15 10: Insert Appendix A – Owner’s Project Requirements (OPR) and Appendix B – Design Phase Commissioning Plan to the end of specification section.
3) Specification 10 28 13, Paragraph 2.2 Accessory Items: Add “ABA Metal Shelf” and “Fixed ABA Bench” and associated specifications to end of list of accessory items.
ABA Metal Shelf Specification: 54"L x 12"D, 18 GA stainless steel with satin finish. 16 GA support brackets. Surface-mounted.
Fixed ABA Metal Bench Specification: Clear finished, 42"x20"x1.25" hardwood bench w/ stainless steel wall brackets. Add one of these in M Shower 133, W Shower 135, M Shower 214 and W Shower 211. In these additional spaces, the shelf will be reduced to 32"W and a curtain added to the opening from the toilet room.
4) Specification 27 10 00, Paragraph 2.3: Revise “unshielded twisted pair (STP)” to read “shielded twisted pair with an overall foil shield (STP)”.
5) Specification 27 10 00, Paragraph 2.3.2.1: Delete the word “blue” from the second sentence.
6) Specification 27 10 00, Paragraph 2.3.3.1: Delete the word “blue” from this paragraph.
7) Specification 27 10 00, Paragraph 2.4.2.c: Revise this paragraph to read as follows:
“Cabinets, freestanding modular type, 16 gauge steel construction, minimum, treated to resist corrosion. Cabinet shall have removable and lockable side panels, front and rear doors, and have adjustable feet for leveling. Cabinet shall be vented in the rear door. Cabinet shall have cable access in the roof and base and be compatible with 19 inches panel mounting. Provide cabinet with grounding bar and a surge protected power strip with 6 duplex 20 amp receptacles. All cabinets shall be keyed alike.”
8) Specification 27 41 00: Insert specification section after section 27 10 00.
9) Specification 28 10 05, Paragraph 2.4.5.5.6: Delete Paragraph 2.4.5.5.6 and all subparagraphs numbered 2.4.5.5.6.1-22.
10) Specification 31 61 00: Delete Paragraphs 1.4.2 and 1.4.3 from this specification.
DRAWINGS:
11) Sheet C-121: Delete Keyed Note #21 and #22 and delete concrete pads associated with these notes.
12) Sheet S-001, Foundations and Earthwork Note #1: Revise date of Geotechnical Report to June 2020.
13) Sheet A-111A, Floor Plan Legend: Revise “RECESSED FIRE EXTINGUISHER CABINET” to read
“SEMI-RECESSED FIRE EXTINGUISHER CABINET”
14) Sheet A-111B, Floor Plan Legend: Revise “RECESSED FIRE EXTINGUISHER CABINET” to read
“SEMI-RECESSED FIRE EXTINGUISHER CABINET”
15) Sheet A-112A, Floor Plan Legend: Revise “RECESSED FIRE EXTINGUISHER CABINET” to read
“SEMI-RECESSED FIRE EXTINGUISHER CABINET”
16) Sheet A-113A: Revise Mech Equip Screen labeled as WA-05 to WA-06.
17) Sheet A-113A: Add specifications for roof tie off anchor at Stair #1. Specifications: 5,000 lb capacity, 18"H galvanized steel, single-point roof tie-down anchor that meets ANSI and OSHA requirements for fall arrest systems. Submittals to include product data, stamped shop drawings, maintenance data, test reports and signage. Manufacturer's warranty: 12 months from date of substantial completion. The roof anchor will be either welded or bolted to the roof structural steel.
A L4x4x1/4 kicker on each side will extend to the adjacent W section or CMU wall.
18) Sheet A-610: Add partition type G43X to G4 Partition Schedule. Partition Type G43X is G43 type with ¾” plywood installed on one side under the GWB.
TYPE WIDTH STUD
SIZE
FIRE
RATING
STC
RATING
UL FILE
NO.
NOTES
G43X 5 5/8” 3 5/8” N/A 45 U438 WITH 3”
SOUND
BATT & ¾”
PLYWOOD
UNDER
GWB ONE
SIDE
19) Sheet IF-111A: Delete this sheet and replace with the attached like-named sheet dated 6 August 2021.
20) Sheet IF-111B: Delete this sheet and replace with the attached like-named sheet dated 6 August 2021.
21) Sheet IF-112A: Delete this sheet and replace with the attached like-named sheet dated 6 August 2021.
22) Sheet TN-601, Map Grid B-5: Revise cable labeled F03 to read F04.
23) Sheet TA-400, Detail B7: Delete two ADA references.
GENERAL:
24) Price Schedule: Delete this document and replace with the attached revised price schedule, dated 5 August 2021.
25) Geotechnical Report: Geotechnical Report dated June 2020 is included as a reference for information only.
26) Topographic Survey: Post Construction Conditions provided by Doyon Technical Services dated 6 July 2021 is included as a reference for information only.
The following have been modified:
PROPOSAL SUBMISSION
SECTION II
SOLICITATION PROVISIONS
1. PROPOSAL SUBMISSION INSTRUCTIONS
1.1 General: This request for proposal (“RFP”) seeks proposals from Offerors interested in being selected for construction of a new Training Support Facility. The proposed construction will be performed at Humphreys Engineers Center, Alexandria, Virginia
1.2 Basis for Award: A contract will be awarded to the Offeror whose proposal represents the “best value” to the
Government. The best value determination will be based on a comparative assessment of proposals against all source selection criteria in the solicitation, considering recommendations and minority opinions presented to the Source Selection Authority (SSA). While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA's independent judgment.
For the purposes of this solicitation, the Government will utilize the best value Trade-Off Process. The following evaluation factors will be used to evaluate each proposal. Award will be made to the Offeror whose proposal is the most advantageous to the Government based on an integrated assessment of the evaluation factors described below.
Factor 1 – Past Performance & Experience Factor 2 – Schedule and Management Approach Factor 3 – Small Business Participation Plan (SBPP) Factor 4 – Price
Past Performance and Experience (Factor 1), Schedule and Management Approach (Factor 2), and SBPP (Factor 3) will be adjectivally rated.
Past Performance and Experience (Factor 1) is more important than Schedule and Management Approach (Factor 2) which is more important than SBPP (Factor 3). All non-price factors (Factors 1-4), when combined, are approximately of equal importance to Price (Factor 4).
1.3 Source Selection: It is the intent of the Government to seek proposals from qualified Offerors with experience in the significant features of this RFP and who can demonstrate a successful performance history in completing relevant projects. For the purposes of this solicitation, the Government will utilize the Trade-Off Process. The successful Offeror will be selected based on the “Best Overall Value to the Government”. The Government will not make an award at a significantly higher price to obtain only slightly superior technical advantages; however, the degree of importance of price as a factor could become greater depending upon the equality of the proposals submitted. Where the technical merits of competing proposals are determined to be substantially equal, price could become the controlling factor.
1.4 Each Offeror is required to submit a proposal consisting of the following volumes in separate electronic files
CLEARLY MARKED WITH THE SUBMISSION DATE:
a. Volume I – Technical Proposal (Factors 1 and 2), (electronic copy)
b. Volume II – Small Business Participation Plan (electronic copy)
c. Volume III – Price (electronic copy)
*NOTE: Electronic submission instructions are outlined in section 1.7, below.
1.5 Specific Requirements: An Offeror’s proposal shall consist of all information and material submitted in writing for evaluation in response to this solicitation. The submission of false or misleading information shall be grounds for disqualification of the proposal. The Offeror’s name, solicitation number and solicitation Closing Time and Date, must be identified for each volume. Offerors must organize their proposals as described and outlined below.
Each volume must have a table of contents and a Cover Sheet to include the Offeror’s CAGE Code, address, NAICS and business size in accordance with the System for Award Management (SAM) and Point of Contact information, such as email and phone number. Each volume’s contents must be separated by tabs/page as discussed below. The proposals must be in an 8-1/2” x 11” format (except for organization chart, in which a folded 11” x 17” format may be used and shall be counted as one page provided the only information presented is the organization chart). Pages must be numbered. The minimum acceptable type size is eleven (11) point with a minimum of one-inch margins on all sides. The information in each volume must be organized as follows.
1.5.1 Volume I (Factors 1 and 2): Offerors must submit the information identified in section 2, below. The information must be divided by tabs/pages and shall be organized as follows:
Tab 1 – Factor 1 – Past Performance & Experience Tab 2 – Factor 2 – Schedule and Management Approach
The total number of pages must not exceed 30 pages in the aggregate. If the Offeror exceeds the page limitation, then the excess page(s) after page 30 will not be evaluated (cover page, table of contents, and actual tabs are not included in count). Offerors may distribute the pages among the Factors at their discrection.
The data appearng in Factor 1 relating to past performance & experience evaluations and awards, are not counted in the overall page limitation. Factor 2 relating to schedule and management approach, the Gantt Chart can utilize an 11” x 17”, landscape format and will be considered as (1) one page.
Submission shall consist SOLELY of technical information. Price WILL NOT be evaluated within Volume I.
1.5.2 Volume II (Small Business Participation Plan (SBPP) (Factor 3): All Offerors (both large and small businesses) regardless of size status are required to complete a SBPP. Offerors shall address their planned small business usage for this requirement and will be evaluated on the level of proposed participation of U.S. small businesses in the performance of this acquisition (as small business prime Offerors or small business subcontractors) relative to the objectives, requirements and goals established herein. Offerors shall articulate within their SBPP how they intend to meet the small business objectives. For other than Small Businesses (Large Businesses only), Small Business Subcontracting Plan is required (IAW FAR Clause 52.219-9). Large business prime Offerors shall include their subcontracting plan under a separately labeled tab within Volume II, SBPP.
The information must be divided by tabs and shall be organized as follows:
Tab 1 – Factor 3 Small Business Participation Plan Tab 2 – Subcontracting Plan
1.5.3 Volume III (Price) (Factor 4): The price proposal must be placed in a separate file. It must contain the following:
a. SF 1442 (Solicitation, Offer and Award) and acknowledgement of all amendments;
b. Certificate of Corporate Principal/Authority;
c. Price Schedule;
d. Section 00 45 00; and
e. Bid Guarantee.
1.6 Proposal shall be marked with the Offeror’s Name, Solicitation Number, and the Solicitation Closing Time and
Date. (See SF 1442 Block 1 and Block 13)
1.7 Offerors shall submit their proposals using the link, https://safe.apps.mil, to the Contract Specialist, Qiana
Bowman, at qiana.l.bowman@usace.army.mil for this procurement.
ALL PROPOSALS SHALL BE SUBMITTED ELECTRONICALLY THROUGH THE SAFE SITE.
Submission shall be in searchable Adobe PDF format and legible. You are limited to five (5) maximum files per upload (total size cannot exceed 2 GB). If you have a large number of files, it is recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
REQUEST FOR UPLOAD CODE: Offerors must email the Contract Specialist, Qiana Bowman, at qiana.l.bowman@usace.army.mil no later than five (5) business days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for a request code five
(5) business days before proposal submission date may not be able to receive a request code in time to upload their submission.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to the recipient you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)
INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:
1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC, the option to access the SAFE site as a guest.
2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for the recipient. For this solicitation, the recipient is the Contract Specialist. The Contract Specialist for this solicitation is Qiana Bowman, qiana.l.bowman@usace.army.mil. The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the E-Mail address for the Contract Specialist After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipient you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the Government recipient until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Proposer can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.
NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS:
For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded into the SAFE website. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
All proposals shall be submitted no later than the time and date specified on SF 1442, block 13. Offeror’s proposals received after the required time and date deadline will not be evaluated. Offerors should not assume that they will have an opportunity to clarify or correct anything in their proposals after submitting it in response to the original Solicitation, and so any submissions should be submitted on the best terms possible and free of errors.
2. SUBMISSION CRITERIA
2.1 VOLUME I – MINIMUM SUBMISSION CRITERIA (FACTORS 1 and 2):
For purposes of this solicitation, an “Offeror” may include a group of two (2) or more entities that have formed a “contractor team arrangement,” as that term is defined in the Federal Acquisition Regulation (FAR) subpart
9.6. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently-proposed contractor team arrangement, will be considered as a part of the evaluation of the Offeror’s proposal.
An Offeror that relies upon the experience and performance history of a member, members or affiliates of a proposed contractor team arrangement must provide a teaming agreement or commitment (in the case of any affiliates) signed by all parties. The Teaming agreement/commitment shall:
a. Identify the legal name(s) and cage code(s) of all entities.
b. Describe the nature of each entity’s relationship (partnership, joint venture, prime/sub or mentor/protégé) and their role on this project as a part of their proposal. The Offeror will be expected to maintain that arrangement during performance of any contract awarded to that Offeror under this solicitation.
c. This agreement/letter must be submitted with the proposal to include actual proposed percentages.
In the case of affiliates, past performance of an Offeror’s “affiliate,” as that term is defined in FAR 2.101, will be evaluated (as described within this section) if the Offeror demonstrates a firm commitment that the affiliate will participate meaningfully (e.g. roles, responsibilities, etc.) in the performance of the contract. This commitment, nature of each entity’s relationship and meaningful participation shall be described in a document signed by authorized representatives of both the Offeror and its affiliate.
The following are to be used in determining the status of the Offeror’s team for the evaluation of project submissions under Factor 1:
In the case of contractor team arrangements involving a Prime Contractor and Subcontractor(s), where the
Prime Contractor submits the proposal in response to this solicitation, the Prime Contractor is considered the “Prime Offeror”.
In the case of joint ventures, the “Prime Offeror” experience can come from any of the entities involved in the venture.
In the case of mentor/protégé relationships, the relationship must be established by the two Offerors and approved by the chosen Government Agency prior to proposal submission. Once the relationship has been approved, the “Prime Offeror” experience can come from any of the entities involved in the relationship.
The approved mentor/protégé document from the Government Agency must be submitted along with the teaming agreement.
In the case of additional projects submitted by subcontractors, the subcontractor must submit the final cost of their portion of the project along with total project cost and all other required information.
In the case of Offerors that are large, multi-function firms (consisting of subsidiaries), experience must only be submitted by the segment of the firm (e.g., division, group, and unit) that is submitting a proposal in response to this solicitation.
In the case of affiliates, Past performance of an Offeror's "affiliate," as that term is defined in FAR 2.101, will be evaluated (as described within this section) if the Offeror demonstrates a firm commitment that the affiliate will participate meaningfully in the performance of the contract. This commitment and meaningful participation shall be described in a document signed by authorized representatives of both the Offeror and its affiliate.
If a teaming agreement or commitment is not provided, the projects of any team members outside of the Prime Offeror will not be considered. If the Joint Venture/Mentor Protégé is a Small and Large business, the Small Business will be evaluated as the Prime Offeror.
2.2 FACTOR 1 – PAST PERFORMANCE & EXPERIENCE: The submitted material MUST be organized sequentially under tabs for each numbered section to facilitate evaluation. All narratives must contain sufficient detail to demonstrate technical capability.
An Offeror that relies upon the experience and performance history of a member, members or affiliates of a proposed contractor team arrangement, as indicated above, must provide a teaming agreement or commitment (in the case of any affiliates) signed by all parties.
In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this solicitation, the prime contractor must have completed at least fifty percent (50%) of the total number of projects that meet the requirements for Factor 1 for consideration in response to the experience requirements of this solicitation.
All teaming agreements/commitment shall be provided at the beginning of the Offeror’s technical proposal, prior to Factor 1, and will not be included in the overall page count.
2.2.1 EXPERIENCE IN RELEVANT PROJECTS: The Offeror shall submit information on at least two (2) but no more than four (4) design-build and/or design-bid-build completed projects. Of the projects submitted, at least one (1) must be a design-bid-build project. If the Offeror’s submission exceeds the maximum project limitation of four (4) completed projects, the first four (4) projects submitted will be evaluated only, while the remaining additional project(s) will not be evaluated. These projects must be of relevant scope and complexity and have either a minimum project size of 50,000 Building Gross Square Foot (BGSF) or demonstrate a minimum completion value of $35,000,000 considering adjustment for escalation from project completion to 2021 (all escalation values are to be labeled as escalated and the Offeror must explain in detail their escalation rationale, which must include any formulas, calculations, assumptions, etc.) and address the discussions requested on Attachment A while meeting the teaming agreement requirements above. All projects must have a construction completion date no earlier than seven (7) years preceding the original date of issuance of this solicitation. Projects that have a Beneficial Occupancy Date (BOD) within the same date range will also be considered.
*Note: In reference to Task Order Construction Contracts (TOCCs)/Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts: Contracts will not be accepted as a project submission; however, individual task orders/delivery orders on TOCCs and/or ID/IQ contracts can be submitted under Factor 1. Each task/delivery order submitted must individually meet the requirements of the factor. Submissions of multiple task/delivery orders as a project will not be accepted or evaluated.
At least one (1) of the submitted projects shall include a detailed discussion of experience with Sensitive Compartmented Information Facility (SCIF) construction as the PRIME CONTRACTOR.
All submitted projects shall include a detailed discussion of at least three (3) or more of the following elements:
Experience working on or connecting to existing utilities on a military installation Experience installing complex Mechanical/HVAC systems Experience implementing physical security and anti-terrorism/force protection measures Experience with deep foundations near wetlands Experience with construction of buildings with large garage/apparatus bays and mixed support areas
(i.e. administration areas, command briefing rooms, conference rooms, audio visual room, training rooms, equipment maintenance area, vehicle exhaust removal system, Equipment Wash room/fire extinguisher maintenance area, etc.)
Experience with construction of a Historical Storage Facility Experience working on a congested construction site around and/or adjacent to occupied structures with nearby pedestrian travel Installation of building systems that may include fire alarm/mass notification, fire suppression, utility management control, telephone, advance communication networks, cable television, and/or infrastructure for electronic security systems (i.e., intrusion detection, closed circuit surveillance, and electronic access control, etc.).
Experience delivering ‘turnkey’ project, where the Prime Contractor shows the ability to procure and install Furniture, Fixtures, and Equipment (FF&E) for construction projects, to include Audiovisual, IT and security equipment.
*Lists, charts/matrices and bullets will not be accepted when identifying relevant elements.
Each element must have a description of how the project meets the element (e.g. concrete paving – For this project, 500 LF of concrete sidewalks were installed, 300 LF of curbs were removed and re-installed, etc.).
It is the responsibility of the Offeror to identify, detail and demonstrate the relevancy of the submitted projects to the solicitation criteria elements. The evaluation committee WILL NOT make assumptions.
The information that is required to be supplied is identified on the form provided entitled “EXPERIENCE IN RELEVANT PROJECTS” (Attachment A). Offerors are not required to use the form itself as part of their proposal, but the information requested on the form must be in the Offeror’s proposal and should be in the same format as the form. Offerors may expand the form as necessary to accommodate the required project information.
The only submissions under the tab for this section are to be the completed “Attachment A” forms or similar format as indicated above. Only the information provided in either of these formats will be considered. Company summaries/introductions, project summary charts/matrixes, etc. will not be accepted or evaluated.
2.2.2 PAST PERFORMANCE QUESTIONNAIRES FOR EXPERIENCE IN RELEVANT PROJECTS:
For each of the projects submitted, provide a copy of the Contractor Performance Assessment Reporting System (CPARS) report, or USACE Past Performance Questionnaire (PPQ-0) (Attachment B) from a representative of the owner. The Offeror must request that their client complete the USACE Past Performance Questionnaire for Relevant Experience (Form PPQ-0) and submit the questionnaire as part of the Offeror’s technical proposal. The Offeror may provide an explanation if the performance evaluation rating is less than satisfactory. Offerors are encouraged to follow-up with clients/references to ensure timely submittal of questionnaires.
If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror must complete and submit with the proposal the first page of the PPQ (Attachment B) for projects submitted under the tab for EXPERIENCE IN RELEVANT PROJECTS, which will provide contract and client information for the respective project(s). Ensure correct phone numbers and email addresses are provided for the owner point of contact.
Previously completed PPQ-0s may be submitted provided that the documents do not reference any other solicitations. Submitted PPQ-0s must only reference this solicitation. Contractor Performance Assessment Reporting System (CPARS) ratings will take precedence over PPQs.
Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Assessment Reporting System (CPARS) or other databases using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal;
interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency. The information obtained from these sources will be evaluated supplementary to the past performance questionnaires. In reference to the contracts pulled from these sources, the relevancy of the projects, completion dates, ratings and comments in the individual categories and overall ratings will be considered in making the overall confidence assessment.
The Offeror also may provide information regarding any awards received for work done on any of the projects described by the Offeror (Copies of awards must be included under this factor for validation.). Awards, Past Performance Questionnaires, and other past performance information will not be included in the page count for the proposal submission.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
2.3. FACTOR 2 – SCHEDULE AND MANAGEMENT APPROACH: The submitted material MUST be organized sequentially under tabs/pages for each numbered section to facilitate evaluation. All narratives must contain sufficient detail to demonstrate technical and management capability.
2.3.1 Management Structure: Describe the proposed management structure for the team to include the construction firms, the resources and how the resources will be utilized, their roles and responsibilities, and what subcontracting firms the Offeror is considering utilizing. Offerors are encouraged to describe prior experience working with their proposed subcontractors.
Describe how subcontractors are managed by the contractor to include flow-down of contract requirements, duties, responsibilities, and coordination. Discuss how non-performance by subcontractors is handled by the Prime contractor.
The Offerors must provide a statement that, in accordance with the specifications of the RFP, all individuals, including subcontractors, shall be US Citizens or US Persons.
2.3.2 Project Team Management: The Offeror shall provide its proposed management approach to staffing/team and coordination/communication. This narrative shall also include at a minimum an organizational chart identifying the proposed team for this project with specific individuals named that will execute this project at home office and on-site levels. The chart must show the relationship of each entity to the Offeror as well as all lines of communication. This organizational chart must include the following:
The Offeror’s key personnel, Key Subcontractors, and In the case of an Offeror utilizing individuals from affiliates as key personnel, the affiliate company must be identified in the chart with the individual’s name.
Note: If the subcontractor firms have not been selected at the time of proposal submission, the Offeror must identify the intended subcontractor trades.
2.3.3 Pre-Award Project Schedule: The Offeror shall submit a detailed narrative on the sequencing of the work.
The narrative must demonstrate a reasonable approach and understanding of the solicitation requirements and project specifications to ensure an on-time completion of the project. The Offeror shall provide a comprehensive, start-to-finish discussion of all significant features of work to include material procurement and delivery, anticipated long lead items, and the Commissioning/Testing and Balancing (TAB) plan.
Durations shall be included for all significant features of work.
The Offeror shall also include a risk management plan that identifies major risks to the proposed schedule sequence and proposed mitigations.
The Offeror shall use a Gantt chart to graphically represent the schedule. The schedule shall be in color and legible. The schedule shall demonstrate how the Offeror will meet the required completion date by showing the following:
• Significant features of work;
• Material procurement and delivery;
• Commissioning and TAB plan;
• High level Project Milestones;
• Critical Path and;
• Adequate Detail
2.4 FACTOR 3 –SMALL BUSINESS PARTICIPATION PLAN (SBPP):
All Offerors (both large and small businesses) regardless of size status shall address their planned small business usage for this requirement and will be evaluated on the level of proposed participation of U.S.
small businesses in the performance of this acquisition (as small business prime Offerors or small business subcontractors) relative to the objectives, requirements and goals established herein.
Large business contractors may achieve the small business participation goals through subcontracting to small businesses. Small business contractors may achieve small business participation goals through their own performance/participation as a prime and also through a joint venture, teaming arrangement, and subcontracting to other small businesses in order to achieve the small business participation goals.
The Offeror shall articulate within their SBPP how they intend to meet the small business objectives and participation goals. Nothing precludes an Offeror from further demonstrating their extent of commitment to use small businesses beyond what has been required by the subject solicitation as articulated below.
Offerors are encouraged to submit proof of awards, accolades, etc., received for their current and/or past support of small businesses. Examples include clear pictures of award(s) received in support of small businesses, successful Small Business Administration Surveillance Review findings, CPARS ratings that address small business utilization, testimonials from customers and/or small business subcontractors in reference to the Offerors support to small businesses, etc. Discuss and submit proof of any specific outreach efforts performed in support of this requirement (e.g. holding virtual outreach meetings with potential small business subcontractors, ads within publications) that demonstrate the Offerors effort to identify small business subcontractors specifically in support of this requirement (e.g. roster, attendance sheet, etc.), and proof of any other pertinent information that demonstrates the Offeror’s current and/or past efforts to support small businesses.
Material submitted in support of this factor shall be organized sequentially under applicable tabs and all pages must be numbered to facilitate evaluation. The Small Business Evaluation Board (SBEB) will not look to obtain information in support of an Offeror’s SBPP proposal from other volumes or within the Subcontracting Plan (when applicable). The SBPP (IAW DFARS PGI 215.304) and the subcontracting plan (IAW DFARS PGI 219.705-4) are two distinct separate documents with different elements and should not be combined for submission. Offerors shall utilize the SBPP Proposal Format for submissions found at Appendix C, Attachment C. Offerors submitting SBPP for this project should limit submissions to data essential for the evaluation of plans.
Offerors must comply with all elements stated within the Submission Requirements and must also provide the requested information requested/identified within the SBPP Proposal Format.
SBPP Objectives:
The Government will evaluate:
a. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
The SSEB will review the firms specifically identified by the Offeror using section (d) of the SBPP Proposal Format in Appendix C, Attachment C.
Note: Small Business subcontractors identified within the SBPP should also be listed within the corresponding Subcontracting Plan.
b. The extent of commitment to use such firms (enforceable commitments will be considered more favorably than non-enforceable ones).
Note: Describe what types of commitments if any are in place for this specific acquisition either – small business prime, written contract, verbal, enforceable, non- enforceable, joint ventures, mentor-protégé, teaming agreements, partnership letters of commitment(s), etc.). Provide documentation regarding commitments to small business for this effort. Copies of such agreements should be provided as part of your SBPP and will not count against the page limitation for this volume.
Note: Supporting enforceable commitments must: (1) be with a small business, (2) includes the socioeconomic type of the small business and the services/supplies to be provided e.g. ABC Company, a WOSB, will provide commissioning, (3) be specific to the subject requirement by indicating the solicitation number, and (4) include legible signature blocks and signatures from BOTH parties acknowledging the business relationship. SB firms identified within an enforceable commitment must also be listed within section (d) of the SBPP Proposal Format.
c. Identification of the complexity and variety of the work small firms are to perform;
Offerors must identify supplies/services to be performed by small businesses that are considered complex/meaningful elements of the requirement. Use section (d) of the SBPP Proposal Format to identify such supplies and services.
d. The extent of participation of small business prime Offerors and small business subcontractors in terms of the percentage of the value of the total acquisition (not the percentage of subcontracted dollars). Use section (c) of the SPPP Proposal Format to identify.
These goals are a percentage of the value of the total acquisition. The goals for this procurement are as follows:
Small Business {27%} of the total contract value Small Disadvantaged Business (SDB) {8%} of the total contract value Woman-Owned Small Business (WOSB) {7%} of the total contract value Historically Underutilized Business Zone (HUBZone) {3%} of the total contract value Veteran-Owned Small Business (VOSB) {6%} of the total contract value Service-Disabled Veteran-Owned Small Business (SDVOSB) {5%} of the total contract value Historically Black Colleges and Universities & Minority Institutions (HBCU/MI)*
{0%} of the total contract value
The Government does not recognize a proposed zero percent as a goal, with the exception of the HBCU/MI socioeconomic category because it is an aspirational goal. However, if an Offeror is unable to meet any of the Small Business participation goals and/or proposes a zero percent goal for ANY of the remaining socioeconomic categories (except for HBCU/MI), the Offeror must provide a detailed explanation as to why the participation goal(s) cannot be met. The Offeror must also provide the actions that were taken prior to the submission of proposals to increase the participation goals for any of the socioeconomic categories the Offeror was not able to meet or submitted zero (0) percent.
Note: IAW the Army Source Selection Supplement (AS3), the SBEB will verify the total proposed price (not individual cost elements), and any subcontracting information with the Cost/Price team to ensure the dollar amounts are consistent with what is being proposed in the SBPP.
Offerors shall use the Small Business socioeconomic goal chart provided in the SBPP Proposal format template to identify BOTH the proposed percentage goal to include the corresponding dollars. The Government will evaluate to determine which Offeror(s) propose the best value in terms of SBPP goals and the extent to which the Offeror meets or exceeds the RFP’s goals.
e. The past performance of the Offerors in complying with requirements of the clauses at FAR 52.219-8, Utilization of Small Business, and 52.219-9, Small Business Subcontracting Plan.
Note: Compliance of FAR 52.219-8 applies to ALL Offerors to include small businesses.
All Offerors shall submit information substantiating their past performance in complying with FAR Clause 52.219-8, “Utilization of Small Business,” maximizing opportunities for U.S. small business subcontractors. The extent to which the Offeror complied with FAR 52.219-8, Small Business Utilization may be evaluated based on one and/or a combination of the following:
Reporting of small business performance in CPARS.
History of prompt payments to small businesses subcontractors.
Small business participation/utilization reporting.
Documentation from customers local, state or federal agencies that demonstrates use/support of small businesses and/or provide information that substantiates the use of small businesses.
Documentation demonstrating total small business contract completion by the small business prime Offeror and/or subcontracting to other small businesses.
Offerors with no prior contracts containing FAR Clause 52.219-8 must state so.
Offerors shall also provide a statement indicating whether any negative information has been reported in the past six years concerning the Offeror’s past compliance with FAR 52.219-8. If any negative information has been reported, the Offeror may submit explanations or comments responding to such negative information. Offerors with no prior contracts containing FAR 52.219-8 shall certify the same.
Note: Compliance of FAR 52.219-9 will only be evaluated against large businesses (and does not apply to small business prime Offerors)
The extent to which the Offeror complied with FAR 52.219-9, Small Business Subcontracting Plan may be evaluated based on one and/or a combination of the following:
Reporting of small business performance in CPARS Letters of commendation from local, state or federal customers about the Offerors use and/or support of small businesses Correspondence from small business subcontractors that acknowledge support SBA Compliance Reviews, Defense Contract Management Agency Small Business
Subcontracting Program Reviews, etc., Submission of Individual Subcontracting Reports (ISR) – the Government will evaluate how well the Offeror has performed on achieving its small business goals within the last six (6) years.
Offerors may submit a minimum of two (2), but not more than four (4) ISRs. Each ISR submitted must: 1) contain the contract number for referencing purposes; 2) be accompanied with a brief description of the requirement that discusses the services/supplies provided; and 3) include an explanation for not meeting subcontracting goals and/or what actions will be taken to increase participation in any of the subcontracting goals the Offeror was unable to meet. The SBEB must be able to determine which ISR, customer letter of commendation, etc., goes with each project description. Therefore, project descriptions and other supporting documentation described above should be directly followed by and/or before the ISR(s) for reference/evaluation purposes.
Offerors with no prior contracts containing FAR 52.219-9 must state so Offerors who never held a Federal contract as a large business must state so In addition to the above, the Government may review any other sources that may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), electronic Subcontracting Reporting System (eSRS), etc.
Subcontracting Plan Requirements for Other than U.S. Small Businesses (Large Businesses) ONLY:
Small Business Subcontracting Plan is required (IAW FAR Clause 52.219-9). Large business prime Offerors shall include their subcontracting plan under a separately labeled tab within Volume IV, SBPP.