B.08.02 Attachment A - Experience in Relevant Projects.pdf
PDF 118 KB Posted
- Solicitation number
- W912DR21R0018
About this file
This document contains a template for submitting experience on relevant projects as an attachment to a federal solicitation. It requests information on previous design-build or design-bid-build projects including location, agency, scope of work, cost, schedule, and an explanation of relevance. At least two elements from the requirement section must be addressed. Also included is a related federal contract opportunity for a 911th Vehicle Maintenance Shop at Fort Belvoir, VA issued by the Department of the Army Corps of Engineers Engineering District Baltimore under solicitation number W912DR21R0018. No other details are provided on the required products or services for this opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PHASE I - ATTACHMENT C: EXPERIENCE IN RELEVANT PROJECTS
<<Picture>>
Contractor’s Name (Who performed the work?):
Project Name: Project Location:
City, State
Design-Build or Design-Bid-Build:
New Construction or Renovation:
Agency/Government Contracting Activity: Point of contact information (address, PCO name, email address and phone number) If Government Contract, additionally provide the contract number and contracting office)
Agency/Government Technical Rep./COR: Point of contact information (email address and phone number). If Government Contract, additionally provide the contract number)
Project Description: General scope. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.
Description of the actual work performed by the contractor submitting this project:
Explanation of Relevancy (Must be in narrative format): All relevant projects must clearly identify at least two of the elements specified under section 2.2.1. Each element must have a description of how the project meets the element to ensure that it meets the project requirements (e.g. concrete paving – For this project, 500 LF of concrete sidewalks were installed, 300 LF of curbs were removed and re-installed, etc.).
BGSF: XXX,XXX Lost Time Accidents:
Schedule:
Start Date:
MM-DD-YYYY
Original Completion:
MM-DD-YYYY
Final Contract Completion:
MM-DD-YYYY
Beneficial Occupancy Date:
MM-DD-YYYY
Design Percent Complete: Construction Percent Complete:
Cost Original Project Cost:
Final Project Cost:
Cost Difference
*Original Subcontractor Cost:
*Final Subcontractor Cost:
*Cost Difference
Cost and Time Growth Discussion: Reason(s) for differences between original and final schedule or costs. This section can be excluded if not applicable to the project. Response should contain more detail than “Owner requested/initiated changes”. Provide examples to support growth.
*Only to be completed if the experience was performed as a subcontractor on the submitted project.
OFFERORS MAY INCREASE SPACING IN FORM AS NECESSAR