This solicitation seeks proposals for the Army Family Housing Renovation at Joint Base Myer-Henderson Hall in Fort McNair, District of Columbia. Key requirements include renovating existing Army family housing units to improve livability, including repairing or replacing roofs, HVAC systems, plumbing and electrical systems, and installing new flooring, kitchens, and bathrooms. The work must be completed within 540 calendar days of the Notice to Proceed. Proposals are due by 2:00 PM Eastern on April 15, 2022 and the contract is to be awarded by July 15, 2022. The anticipated value is between $5-10 million. The solicitation is set aside for small business and requests pricing for fixed-price line items as well as unit prices for additional work. The U.S. Army Corps of Engineers Engineering District Baltimore is the contracting agency.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 70 PAGES

Ft. McNair

01 14 00 SD-01 Preconstruction Submittals

1.2.1 G AOConstruction Phasing Plan

01 30 00 SD-01 Preconstruction Submittals

1.3 G AOView Location Map

1.4 G AOProgress and Completion

Pictures

1.7.2 G AOSuperintendent Qualifications

1.7.3 G AOProject Manager Qualifications

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G AOProject Scheduler Qualifications

3.4.1 G AOPreliminary Project Schedule

3.4.2 G AOInitial Project Schedule

3.6.2 G AOPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 G AOAccident Prevention Plan (APP)

SD-06 Test Reports

1.12Notifications and Reports

1.12.2 G AOAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G AOStandard Lift Plan

1.7.2.3 G AOCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(REV 08 SEPT 2021)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 70 PAGES

01 35 26 1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G AOContractor Quality Control (CQC)

Plan

SD-02 Shop Drawings

3.5.1 G AOCoordination Drawings

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written NTD Practices

3.1.2NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Certificate of Compliance

1.5 G AOSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 G AOComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.4 G AOConstruction Site Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 70 PAGES

01 50 00 3.4.1 G AOTraffic Control Plan

3.3.1 G AOTemporary Power Plan

SD-02 Shop Drawings

1.3 G AOSign Legend Orders

SD-06 Test Reports

2.4Backflow Preventer Tests

SD-07 Certificates

1.5.1Backflow Tester

2.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.5.2 G AORegulatory Notifications

1.6 G AOEnvironmental Protection Plan

1.6.7.1 G AODirt and Dust Control Plan

SD-07 Certificates

1.5.4 G AOEnvironmental Manager

Qualifications

SD-11 Closeout Submittals

3.4.1 G AOWaste Determination

Documentation

1.9 G AOSolid Waste Management Permit

1.9.1 G AOSolid Waste Disposal Report

01 58 00 SD-02 Shop Drawings

1.3.1 G AOSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.5 G AOWaste Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 70 PAGES

01 74 19 SD-11 Closeout Submittals

1.6 G AORecords

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.5Warranty Tags

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G AOOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G AOAs-Built Drawings

3.3 G AORecord Drawings

1.7.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 G AOFinal Approved Shop Drawings

3.5 G AOConstruction Contract

Specifications

3.9.1 G AOInterim DD FORM 1354

3.9.2 G AOChecklist for DD FORM 1354

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 70 PAGES

01 78 00 3.9.2 G AOHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.3 G AOO&M Database

3.1.1 G AOTraining Plan

3.1.3 G AOTraining Outline

SD-11 Closeout Submittals

3.1.6 G AOValidation of Training Completion

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 G AOCommissioning Firm

1.7.1 G AOLead Commissioning Specialist

1.7.2 G AOTechnical Commissioning

Specialists

1.7 G AOCommissioning Firm's Contract

SD-06 Test Reports

3.1.3.1 G AEInterim Construction Phase

Commissioning Plan

3.1.3.2 G AEFinal Construction Phase

Commissioning Plan

3.1.5.2 G AEPre-Functional Checklists

3.1.3.2.2 G AEFunctional Performance Test

Checklists

1.8 G AEIssues Log

3.2 G AECommissioning Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 70 PAGES

01 91 00.15 10 3.3.1 G AEPost-Construction Trend Log

Report

SD-07 Certificates

1.9 G AOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 G AOTraining Plan

3.1.6 G AOTraining Attendance Rosters

3.1.7 G AOSystems Manual

3.1.8 G AOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.2 G AOFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G AODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 G AONotification

SD-11 Closeout Submittals

3.3.4Receipts

02 42 91 SD-01 Preconstruction Submittals

1.2 G AOWork Plan

SD-04 Samples

3.2.2.1 G AOSalvage Representative Samples

3.2.2.1 G AOMock-ups

02 81 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 70 PAGES

02 81 00 2.1.1Packaging Notifications

3.1 G AEHazardous Waste Management

Plan

3.2 G AEOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.7 G AERecordkeeping

SD-07 Certificates

1.4.1 G AETransportation and Disposal

Coordinator

1.4.2 G AETraining

1.4.3Certification

3.3.3 G AEShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.6Waste Minimization

02 82 00 SD-03 Product Data

1.2.2Amended Water

1.3.9 G AESafety Data Sheets (SDS) for All

Materials

3.1.2.1Respirators

3.1.7Local Exhaust Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 70 PAGES

02 82 00 3.1.7Pressure Differential Automatic

Recording Instrument

3.1.8Vacuums

3.1.10Glovebags

SD-06 Test Reports

1.5.5 G AEAir Sampling Results

1.5.6Pressure Differential Recordings for Local Exhaust System

3.2.13.5 G AEClearance Sampling

3.3.3.2Asbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 G AEEmployee Training

1.3.5 G AENotifications

1.3.7 G AERespiratory Protection Program

1.3.10 G AEAsbestos Hazard Abatement Plan

1.3.11 G AETesting Laboratory

1.3.12 G AELandfill Approval

1.3.12Delivery Tickets

1.3.12Waste Shipment Records

1.3.13Transporter Certification

1.3.14 G AEMedical Certification

1.5.1Private Qualified Person

Documentation

1.5.2Designated Competent Person

1.5.3 G AEWorker's License

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 70 PAGES

02 82 00 1.5.4 G AEContractor's License

1.5.9Federal, State or Local Citations on Previous Projects

3.1Equipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3Water Filtration Equipment

3.1.8Vacuums

3.1.8Ventilation Systems

SD-11 Closeout Submittals

1.3.5 G AEPermits and Licenses

1.3.5 G AENotifications

1.3.7.1 G AERespirator Program Records

1.5.7Protective Clothing

Decontamination Quality Control

Records

1.5.8Protective Clothing

Decontamination Facility

Notification

1.7.1Rental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1Competent Person

1.5.1.2Training Certification

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.4Medical Examinations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 70 PAGES

02 83 00 1.5.2.8Lead, Cadmium, Chromium

Waste Management Plan

1.5.4 G AELicenses, Permits and

Notifications

1.5.5Occupant Protection Plan

1.5.2.2Lead, Cadmium, Chromium

Compliance Plan

3.1.1.6Lead, Cadmium, Chromium

Compliance Plan

3.4.1.1Initial Sample Results

3.5.2.1Written Evidence of TSD

Approval

SD-03 Product Data

1.6.1Respirators

1.6.4Vacuum Filters

1.6.7Negative Air Pressure System

2.1Materials and Equipment

2.1.1Expendable Supplies

3.1.1.5Local Exhaust Equipment

3.1.1.5Pressure Differential Automatic

Recording Instrument

3.1.1.6Pressure Differential Log

SD-06 Test Reports

1.3.3Sampling and Analysis

1.5.2.3Occupational and Environmental

Assessment Data Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 70 PAGES

02 83 00 1.5.2.3Sampling Results

1.5.3Pressure Differential Recordings

For Local Exhaust System

SD-07 Certificates

1.5.1.3 G AETesting Laboratory

1.5.1.4 G AEThird Party Consultant

Qualifications

3.1.1.1 G AEOccupant Notification

3.1.1.1Notification of the

Commencement of LBP Hazard

Abatement

3.5.1.1Clearance Certification

SD-11 Closeout Submittals

3.5.2.1Hazardous Waste Manifest

02 84 16 SD-07 Certificates

1.8.1 G AEQualifications of CIH

1.8.1 G AETraining Certification

1.8.2 G AEPCB and Lamp Removal Work

Plan

1.8.3 G AEPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 G AETransporter certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3.2DD Form 1348-1

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 70 PAGES

02 84 16 3.3.1Testing results

02 84 33 SD-07 Certificates

1.7.1Training certification

1.7.2Qualifications of CIH

1.7.3PCB removal work plan

1.7.4PCB disposal plan

1.7.5Notification

3.8Transporter certification

3.5.4Certification of Decontamination

3.5.5Post cleanup sampling

3.8.1Certificate of disposal

02 85 00 SD-01 Preconstruction Submittals

1.4.1.1 G AEPreliminary Visual Assessment

Report

1.4.1.2 G AEMicrobial Remediation Plan

1.4.1.3 G AERespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 G AECertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

SD-03 Product Data

1.2.11 G AEDisinfectants or Biocide

Sanitizing Solutions

1.2.14 G AEFungicidal Agents, (EPA)

1.2.21 G AEPersonal Protective Equipment

(PPE)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 70 PAGES

02 85 00 1.2.24Pressure Differential Measuring

Instrument

2.2 G AESafety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 G AEIH Daily Reports

SD-11 Closeout Submittals

1.4.4 G AESubmittals at Completion of

Remediation Work

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5Quality Control Plan

1.6.6Quality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8Laboratory Accreditation

1.6.2.1Form Removal Schedule

3.3.8Maturity Method Data

SD-02 Shop Drawings

1.6.2.1Formwork

1.6.2.2 G AEReinforcing Steel

SD-03 Product Data

2.4.4Joint Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 70 PAGES

03 30 00 2.4.3Joint Filler

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.5Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

2.3.4Admixtures

2.2.2Waterstops

1.8.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 G AEConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G AEConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.10.2.1Tolerance Report

3.14.2.3 G AECompressive Strength Tests

3.14.2.5Unit Weight of Structural

Concrete

3.14.2.6Chloride Ion Concentration

3.14.2.4Air Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 70 PAGES

03 30 00 3.14.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.6.3.2VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.3Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.4Joint Sealants

2.4.1Curing Compound

04 03 00 SD-01 Preconstruction Submittals

1.5.1 G AOQuality Control Plan

1.5.1 G AOProject Training Program

1.5.2 G AEQualifications

SD-02 Shop Drawings

1.5.5Photographic Documentation

SD-03 Product Data

1.5.2Qualifications

1.5.6 G AECleaning and Restoration

Methods

2.1 G AECleaning Materials

2.2.2.2 G AEReplacement Mortar

2.4 G AEMortar Mix

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 70 PAGES

04 03 00 3.4.8.1 G AEStone Consolidants

SD-04 Samples

1.5.7.1 G AEMock-ups

SD-06 Test Reports

2.2.2.1Testing and Matching

3.5.1Existing Sealants for Asbestos and PCBs

SD-07 Certificates

2.2Repair Materials

04 20 00 SD-03 Product Data

1.5.1 G AOHot Weather Procedures

1.5.2 G AOCold Weather Procedures

2.2.2 G AOClay Brick

2.4.1.1 G AOCementitious Materials

SD-04 Samples

1.3.1.1 G AEMock-Up Panel

2.2.2 G AEClay Brick

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

SD-06 Test Reports

2.2.2.1.3Efflorescence Test

3.6.1.1Field Testing of Mortar

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2Clay Brick

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 70 PAGES

04 20 00 2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors and Ties

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G AEErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G AEFabrication Drawings

SD-03 Product Data

2.5.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

2.2.1Recycled Content for Structural

Steel

2.2.2Recycled Content for Structural

Steel Tubing

2.2.3Recycled Content for Steel Pipe

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 70 PAGES

05 12 00 1.4.2 G AEShoring and Temporary Bracing

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

3.6.2.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.4Welding Procedure Specifications

(WPS)

05 50 13 SD-02 Shop Drawings

2.4 G AEAngles and Plates

SD-03 Product Data

2.2.5.4 G AOBolts, Nuts, Studs and Rivets

2.1Recycled Content

SD-07 Certificates

2.1 G AOCertificates of Compliance

2.2 G AOCertified Mill

05 52 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 70 PAGES

05 52 00 1.2.1 G AEFabrication Drawings

3.2 G AEIron and Steel Hardware

3.2 G AESteel Shapes, Bars, and Strips

SD-03 Product Data

2.2.1 G AEStructural-Steel Plates, Shapes, and Bars

2.2.2 G AEHot-Rolled Carbon Steel Bars

2.2.3 G AEMasonry Anchorage Devices

2.1.2 G AEProtective Coating

2.2.5 G AESteel Railings and Handrails

1.2.1 G AEAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 G AOWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 03 12 SD-02 Shop Drawings

1.4.1 G AEShop Drawings

SD-03 Product Data

2.3.2.1 G AOEpoxy Consolidants

2.3.2.2 G AOEpoxy Patching Compound

2.3.3.1 G AOBorate Preservative Treatment

2.3.3.2.2 G AOMildewcide

SD-04 Samples

2.3.2 G AERepaired Wood

1.4.2 G AEMock-ups

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 70 PAGES

06 10 00 SD-02 Shop Drawings

1.8.1 G AEStructural Members

1.8.2 G AEModifications of Structural

Members

2.2.2 G AENailing Strips

SD-03 Product Data

2.4Underlayment

1.4.3Structural-Use and OSB Panels

2.3Oriented Strand Board

2.5.4Adhesives

SD-05 Design Data

1.8.2 G AEModifications of Structural

Members

SD-06 Test Reports

1.4.4Preservative-treated

SD-07 Certificates

1.9.1Certificates of Grade

1.9.2Certified Sustainably Harvested

Wood and Composite Wood

Products

2.1.1Certified Sustainably Harvested

Virgin Lumber

2.2.2Certified Sustainably Harvested

Framing Lumber

2.3.1.1Certified Sustainably Harvested

Plywood Subflooring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 70 PAGES

06 10 00 2.1.2Certified Sustainably Harvested natural-decay and insect-resistant wood

2.3.2.1Certified Sustainably Harvested

Plywood Roof Sheathing

2.3.3.1Certified Sustainably Harvested

Plywood for Other Uses

2.4.1Certified Sustainably Harvested

Plywood Underlayment

1.7Preservative Treatment

2.5.4Indoor Air Quality for Adhesives and Sealants

SD-10 Operation and Maintenance

Data

3.6Take-back Program

06 20 00 SD-02 Shop Drawings

1.3 G AEDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 G AOWood Products

1.4 G AOTreated Wood Products

2.2 G AOFascias and Trim

2.7 G AOHardware and Accessories

2.1.10VOC Content for Siding

2.1.6Recycled Content for

MDF/Particleboard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 70 PAGES

06 20 00 SD-04 Samples

1.5 G AESamples

1.7.2 G AEMock-ups

SD-07 Certificates

1.7.3.1 G AOCertificates of Grade

2.1.3Certified Sustainably Harvested

Wood for Trim and Frames

2.1.4Certified Sustainably Harvested

Softwood Plywood

2.1.5Certified Sustainably Harvested

Hardwood Plywood

2.1.10Certified Sustainably Harvested

Siding

2.1.5Indoor Air Quality for Hardwood

Plywood

2.1.6Indoor Air Quality for MDF

2.8.1.2Indoor Air Quality for Non-aerosol

Adhesives

06 61 16 SD-02 Shop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G AESolid Polymer Material

1.5.1Qualifications

2.3Fabrications

SD-04 Samples

2.1 G AEMaterial

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 70 PAGES

06 61 16 2.3.4 G AECounter and Vanity Tops

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

1.4.1.1Indoor Air Quality for Adhesives and Sealants

2.2.4Indoor Air Quality for Adhesives and Sealants

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 14 00 SD-03 Product Data

2.1 G AOFluid-Applied Membrane

2.2 G AOMembrane Primer

2.8 G AOElastomeric Sheet

3.3Solvent

3.4.1Moisture Meter

2.10 G AODrainage Mat

SD-11 Closeout Submittals

1.6Warranty

3.5 G AOInstructions To Government

Personnel

07 17 00 SD-02 Shop Drawings

3.1 G AEInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 70 PAGES

07 17 00 SD-03 Product Data

2.1 G AOBentonite Materials

2.1.3 G AOBentonite Panels

1.4 G AOAccessories

SD-08 Manufacturer’s Instructions

3.3Application

3.4Protection

3.6 G AOCorrections

07 21 13 SD-03 Product Data

1.3 G AOManufacturer's Standard Details

2.1 G AOBlock or Board Insulation

2.1.6 G AOVapor Retarder

2.2Pressure Sensitive Tape

1.4 G AOProtection Board or Coatings

2.4 G AOAccessories

2.1.4Recycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 G AOBlock or Board Insulation

2.1.6 G AOVapor Retarder

2.3 G AOProtection Board or Coating

3.4.2 G AOProtection Board or Coating

1.8 G AOSpecial Warranties

1.8 G AOSpecial Warranties

2.1.5Indoor Air Quality For Block Or

Board Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 70 PAGES

07 21 13 SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.4.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2Recycled Content for Insulation

Materials

2.2Sill Sealer Insulation

2.4Accessories

SD-07 Certificates

2.1.4Indoor Air Quality for Insulation

Materials

2.4.1Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 27 19.01 SD-01 Preconstruction Submittals

1.6.1 G AOQualifications of Manufacturer

1.6.2 G AOQualifications of Installer

SD-02 Shop Drawings

1.3 G AOSelf-adhering Air Barrier

SD-03 Product Data

1.3 G AESelf-adhering Air Barrier

2.2 G AEPrimers, Adhesives, and Mastics

1.3.2 G AOSafety Data Sheets

SD-06 Test Reports

1.5 G AOField Peel Adhesion Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 70 PAGES

07 27 19.01 1.3.3 G AOFlame Propagation of Wall

Assemblies

1.3.3 G AOFlame Spread and Smoke

Developed Index Ratings

3.4.1 G AOSite Inspections and Testing

SD-07 Certificates

1.3 G AOSelf-adhering Air Barrier

1.6.1 G AOQualifications of Manufacturer

1.6.2 G AOQualifications of Installer

SD-08 Manufacturer’s Instructions

1.3 G AOSelf-adhering Air Barrier

2.2 G AOPrimers, Adhesives, and Mastics

07 32 15 SD-02 Shop Drawings

1.3 G AESlate Roofing Systems

SD-03 Product Data

1.3 G AESlate Roofing Systems

1.3 G AOQualifications

SD-04 Samples

2.1.2 G AOSlate Roofing

2.1.7 G AOSealant

2.1.6 G AOElastic Cement

2.1.3 G AOUnderlayment Membrane

2.1.4 G AOFasteners

SD-07 Certificates

2.1 G AOMaterials

07 54 23 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 70 PAGES

07 54 23 1.7 G AERoof Plan

2.2 G AEThermoplastic Polyolefin (TPO)

Roofing

2.3 G AOAuxiliary Roofing Materials

2.4 G AOSubstrate Boards

SD-03 Product Data

2.2 G AEThermoplastic Polyolefin (TPO)

Roofing

2.3 G AOAuxiliary Roofing Materials

2.4 G AOSubstrate Boards

SD-04 Samples

2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.3 G AOAuxiliary Roofing Materials

2.4 G AOSubstrate Boards

SD-05 Design Data

2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.1System Description

1.4.2Wind Uplift Resistance

SD-06 Test Reports

2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.3Auxiliary Roofing Materials

2.4 G AOSubstrate Boards

2.1 G AOSystem Description

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 70 PAGES

07 54 23 SD-07 Certificates

2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.3Auxiliary Roofing Materials

2.4 G AOSubstrate Boards

2.1 G AOSystem Description

1.4.1Fire Resistance

SD-08 Manufacturer’s Instructions

2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.3 G AOAuxiliary Roofing Materials

2.4 G AOSubstrate Boards

SD-09 Manufacturer’s Field

Reports

2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.3 G AOAuxiliary Roofing Materials

2.4 G AOSubstrate Boards

SD-10 Operation and Maintenance

Data

2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.3 G AOAuxiliary Roofing Materials

2.4 G AOSubstrate Boards

2.1 G AOSystem Description

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 70 PAGES

07 54 23 2.2 G AOThermoplastic Polyolefin (TPO)

Roofing

2.3 G AOAuxiliary Roofing Materials

2.4 G AOSubstrate Boards

2.1 G AOSystem Description

3.8 G AOInstructions to Government

Personnel

07 62 13 SD-02 Shop Drawings

2.1.6 G AESheet Metal

SD-03 Product Data

3.10Contractor Quality Control

SD-04 Samples

2.1 G AOMaterials

07 92 00 SD-03 Product Data

2.1 G AOSealants

2.2 G AOPrimers

2.3 G AOBond Breakers

2.4 G AOBackstops

SD-06 Test Reports

3.1 G AOField Adhesion

SD-07 Certificates

1.4.1.1Indoor Air Quality for Adhesives and Sealants

08 14 00 SD-02 Shop Drawings

2.1 G AEDoors

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 70 PAGES

08 14 00 2.1 G AEDoors

2.2Accessories

2.3.6Water-resistant Sealer

1.5Warranty

SD-04 Samples

2.1 G AODoors

SD-07 Certificates

1.3.1.1Indoor Air Quality for Composite

Wood and Agrifiber Products

SD-11 Closeout Submittals

1.5Warranty

08 52 00 SD-02 Shop Drawings

2.1 G AEWood Windows

SD-03 Product Data

2.1 G AEWood Windows

2.1Energy Star Label for Residential

Windows

SD-08 Manufacturer’s Instructions

2.1Wood Windows

SD-10 Operation and Maintenance

Data

2.1 G AOWood Windows

08 71 00 SD-02 Shop Drawings

1.3 G AOVerification of Existing Conditions

1.4 G AEHardware Schedule

2.2.4 G AOKeying System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 70 PAGES

08 71 00 SD-03 Product Data

2.2 G AEHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.4 G AOHardware Schedule

SD-11 Closeout Submittals

1.5.1Key Bitting

08 81 00 SD-03 Product Data

2.3 G AOInsulating Glass

1.3Glazing Accessories

2.4.1.1Sealants

SD-04 Samples

2.3 G AOInsulating Glass

2.4.3Tape

2.4.3Sealing Tapes

SD-07 Certificates

2.3Insulating Glass

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

2.1.1Energy Efficient Equipment for

Residential Windows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 70 PAGES

08 91 00 SD-02 Shop Drawings

1.4 G AOWall Louvers

SD-03 Product Data

2.2 G AOMetal Wall Louvers

SD-04 Samples

1.5 G AOWall Louver Samples

09 01 90.50 SD-03 Product Data

1.2 G AEWork Plan

1.2Materials

1.4.4Qualifications

SD-07 Certificates

1.2Work Plan

09 23 00 SD-03 Product Data

2.2 G AEGypsum Base Coat Plaster

2.3 G AEGypsum Finish Coat Plaster

SD-04 Samples

1.3.1 G AESample Panel

SD-07 Certificates

1.6.1Indoor Air Quality

SD-08 Manufacturer’s Instructions

2.7Ready-Mix Gypsum Plaster

09 26 00 SD-03 Product Data

2.1.2Gypsum Veneer Plaster

SD-07 Certificates

1.7.1.1Indoor Air Quality for Gypsum and Plaster Coatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 70 PAGES

09 26 00 1.7.1.2Indoor Air Quality for Gypsum

Board Products

09 29 00 SD-03 Product Data

2.1.5Cementitious Backer Units

2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.2Water-Resistant Gypsum Backing

Board

2.1.4Glass Mat Covered or Reinforced

Gypsum Sheathing

2.1.4.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.1.9Accessories

2.1.1Gypsum Board

2.1.1Recycled Content for Gypsum

Board

2.1.1Recycled Content for Paper

Facing and Gypsum Cores

2.1.6VOC Content of Joint Compound

SD-07 Certificates

2.1 G AOAsbestos Free Materials

2.1.1Indoor Air Quality for Gypsum

Board

2.1.8Indoor Air Quality for Non-aerosol

Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 70 PAGES

09 29 00 2.1.8Indoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

3.2 G AEDetail Drawings

SD-03 Product Data

2.1.1 G AEPorcelain Tile

2.1.2 G AEMosaic Tile

2.1.2Recycled Content for Mosaic Tile

2.3 G AEMortar, Grout, and Adhesive

SD-04 Samples

2.1 G AETile

2.1 G AOAccessories

2.1.3 G AOAccessories

2.3.3 G AEGrout

SD-07 Certificates

2.3Indoor Air Quality for Adhesives

2.3.5Indoor Air Quality for Sealants

SD-08 Manufacturer’s Instructions

3.6Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 G AOInstallation

09 64 24 SD-03 Product Data

2.1.1 G AEEngineered Wood Flooring

2.1.4.2Indoor air quality for adhesive

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 70 PAGES

09 64 24 2.1.1 G AEEngineered Wood Flooring

SD-08 Manufacturer’s Instructions

2.1.4Accessories and Supporting

Materials

2.1.4.2Adhesive

2.1.3Premolded Cork Strips

SD-10 Operation and Maintenance

Data

2.1 G AOFlooring Materials

G AOManufacturer's Printed

Instructions

SD-11 Closeout Submittals

1.6Warranty

09 64 29 SD-02 Shop Drawings

2.1 G AOStrip Flooring

SD-03 Product Data

2.1 G AEStrip Flooring

2.5Indoor Air Quality for Asphalt

Mastic

3.1Installation

SD-04 Samples

2.1.1 G AEStrip And Plank Flooring

SD-07 Certificates

1.4.1Certified Sustainably Harvested

Wood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 70 PAGES

09 64 29 2.3Indoor Air Quality for Resilient

Pads

09 68 00 SD-02 Shop Drawings

3.3 G AOInstallation Drawings

SD-03 Product Data

2.1 G AECarpet

2.3 G AOCarpet Cushion

2.1.1Recycled Content for Carpeting

2.3.1Recycled Content for Fiber

Cushion

2.4Indoor Air Quality for Aerosol

Adhesives

2.4Indoor Air Quality for Non-Aerosol

Adhesives

2.4Indoor Air Quality for Concrete

Primer

SD-04 Samples

2.1 G AECarpet

2.3 G AECarpet Cushion

SD-06 Test Reports

3.2 G AOMoisture and Alkalinity Tests

SD-07 Certificates

2.1.2Indoor Air Quality for Carpet

2.3.1Indoor Air Quality for Fiber

Cushion

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 70 PAGES

09 68 00 3.1Surface Preparation

SD-10 Operation and Maintenance

Data

3.4Cleaning and Protection

SD-11 Closeout Submittals

1.6Warranty

09 90 00 SD-02 Shop Drawings

3.10Piping Identification

SD-03 Product Data

2.1 G AECoating

SD-04 Samples

1.9 G AEColor

SD-07 Certificates

1.4Applicator's Qualifications

2.1Indoor Air Quality for Paints and

Coatings

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

3.6.2Mixing

1.7.2Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 G AOCoatings

09 96 00 SD-03 Product Data

2.1.1 G AOHeat-Resistant Coatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 70 PAGES

09 96 00 SD-04 Samples

1.3 G AEColor Chips

SD-07 Certificates

2.1.1 G AOHeat-Resistant Coatings

3.1.4 G AOManufacturer's Printed

Instructions

10 28 13 SD-03 Product Data

2.1.2 G AEFinishes

2.2 G AEAccessory Items

SD-04 Samples

2.1.2 G AEFinishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

11 31 13 SD-03 Product Data

2.1 G AOKitchen Equipment

2.1.2Energy Star Label for Refrigerator

2.1.5Energy Star Label for Dishwasher

SD-08 Manufacturer’s Instructions

2.1Kitchen Equipment

2.1.4 G AORange Hood

2.1.8 G AORange

SD-10 Operation and Maintenance

Data

2.1 G AOKitchen Equipment

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 70 PAGES

11 31 13 3.3Manufacturer's Warranty

3.4Contractor's Warranty for

Installation

12 21 00 SD-02 Shop Drawings

3.3 G AEInstallation

SD-03 Product Data

2.1 G AEWindow Blinds

2.1Recycled Content for aluminum components

SD-04 Samples

2.1 G AEWindow Blinds

SD-06 Test Reports

2.1Window Blinds

SD-07 Certificates

2.1Indoor Air Quality for window blinds

2.1Indoor Air Quality for window blinds

SD-08 Manufacturer’s Instructions

2.1 G AOWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 G AOWindow Blinds

12 32 00 SD-02 Shop Drawings

2.2 G AEFabrication

3.1.2 G AEInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 70 PAGES

12 32 00 SD-03 Product Data

2.3.1 G AECabinets

2.4 G AOHardwood

2.4 G AOHardwood Plywood

2.4 G AOAdhesives

2.4 G AOFiller Material

2.5 G AEAccessories and Hardware

SD-04 Samples

2.5 G AEAccessories and Hardware

1.3 G AEManufacturer's Standard Color

Charts

SD-07 Certificates

2.4Hardwood

1.5.2Indoor Air Quality for Composite

Wood Products

1.5.1Certified Sustainably Harvested

Composite Wood and Hardwood

Products

2.4Adhesives

2.4Fasteners

2.5Accessories and Hardware

SD-08 Manufacturer’s Instructions

Part 3Manufacturer's Instructions

12 34 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

1.2.1 G AEInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 70 PAGES

12 34 00 SD-03 Product Data

2.2 G AECatalog Data

SD-04 Samples

1.2.1 G AOCasework Samples

1.2.1 G AEAccessories and Hardware

1.2.1 G AEManufacturer's Standard Color

Charts

SD-07 Certificates

1.2.1Certificates of Conformance

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 G AEShop Drawings

3.6As-Built Drawings

SD-03 Product Data

1.4.1Fire Protection Related

Submittals

2.3 G AEMaterials and Equipment

1.6Spare Parts

3.5 G AEPreliminary Tests

3.6 G AEFinal Acceptance Test

1.4.1 G AEFire Protection Specialist

1.4.2 G AESprinkler System Installer

SD-05 Design Data

1.2.1.2 G AEHydraulic Calculations

SD-06 Test Reports

3.5Preliminary Test Report

3.6Final Acceptance Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 70 PAGES

21 13 13.00 10 SD-07 Certificates

3.3Inspection by Fire Protection

Specialist

22 00 00 SD-02 Shop Drawings

3.7.1 G AEPlumbing System

SD-03 Product Data

2.1 G AORecycled Content for Steel Pipe

2.1 G AORecycled Content for Cast Iron

Pipe

2.4Fixtures

2.4.2 G AEFlush Tank Water Closets

2.4.2 G AEWaterSense Label for Flush Tank

Water Closet

2.4.4 G AECountertop Lavatories

2.4.1WaterSense Label for Lavatory

Faucet

2.4.5 G AEKitchen Sinks

2.4.7 G AEBathtubs, Cast Iron

2.6.2WaterSense Label for

Showerhead

2.4.6 G AELaundry Tub Sinks

2.4.3 G AEPedestal Sinks

2.9 G AEWater Heaters

2.9.1.1Energy Star Label for Gas

Storage Water Heater

2.10 G AEPumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 70 PAGES

22 00 00 3.7.1.1 G AEBackflow Prevention Assemblies

2.6.2 G AEShower Faucets

2.4.1 G AELavatory Faucets

3.7.1 G AOPlumbing System

SD-06 Test Reports

3.7 G AOTests, Flushing and Disinfection

3.7.1.1 G AOTest of Backflow Prevention

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .