B.08.03 - Amendment 0002 Specifications.pdf
PDF 5 MB Posted
- Attached to
- Joint Base Myer-Henderson Hall: Army Family Housing Renovation, Fort McNair, District of Columbia
- Solicitation number
- W912DR21B0028
About this file
This solicitation seeks proposals for the Army Family Housing Renovation at Joint Base Myer-Henderson Hall in Fort McNair, District of Columbia. Key requirements include renovating existing Army family housing units to improve livability, including repairing or replacing roofs, HVAC systems, plumbing and electrical systems, and installing new flooring, kitchens, and bathrooms. The work must be completed within 540 calendar days of the Notice to Proceed. Proposals are due by 2:00 PM Eastern on April 15, 2022 and the contract is to be awarded by July 15, 2022. The anticipated value is between $5-10 million. The solicitation is set aside for small business and requests pricing for fixed-price line items as well as unit prices for additional work. The U.S. Army Corps of Engineers Engineering District Baltimore is the contracting agency.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 70 PAGES
Ft. McNair
01 14 00 SD-01 Preconstruction Submittals
1.2.1 G AOConstruction Phasing Plan
01 30 00 SD-01 Preconstruction Submittals
1.3 G AOView Location Map
1.4 G AOProgress and Completion
Pictures
1.7.2 G AOSuperintendent Qualifications
1.7.3 G AOProject Manager Qualifications
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G AOProject Scheduler Qualifications
3.4.1 G AOPreliminary Project Schedule
3.4.2 G AOInitial Project Schedule
3.6.2 G AOPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G AOSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 G AOAccident Prevention Plan (APP)
SD-06 Test Reports
1.12Notifications and Reports
1.12.2 G AOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G AOStandard Lift Plan
1.7.2.3 G AOCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(REV 08 SEPT 2021)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 70 PAGES
01 35 26 1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G AOContractor Quality Control (CQC)
Plan
SD-02 Shop Drawings
3.5.1 G AOCoordination Drawings
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written NTD Practices
3.1.2NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Certificate of Compliance
1.5 G AOSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 G AOComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.4 G AOConstruction Site Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 70 PAGES
01 50 00 3.4.1 G AOTraffic Control Plan
3.3.1 G AOTemporary Power Plan
SD-02 Shop Drawings
1.3 G AOSign Legend Orders
SD-06 Test Reports
2.4Backflow Preventer Tests
SD-07 Certificates
1.5.1Backflow Tester
2.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.5.2 G AORegulatory Notifications
1.6 G AOEnvironmental Protection Plan
1.6.7.1 G AODirt and Dust Control Plan
SD-07 Certificates
1.5.4 G AOEnvironmental Manager
Qualifications
SD-11 Closeout Submittals
3.4.1 G AOWaste Determination
Documentation
1.9 G AOSolid Waste Management Permit
1.9.1 G AOSolid Waste Disposal Report
01 58 00 SD-02 Shop Drawings
1.3.1 G AOSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.5 G AOWaste Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 70 PAGES
01 74 19 SD-11 Closeout Submittals
1.6 G AORecords
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.5Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 G AOOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G AOAs-Built Drawings
3.3 G AORecord Drawings
1.7.1As-Built Record of Equipment and Materials
3.6As-Built Record of Equipment and Materials
3.4 G AOFinal Approved Shop Drawings
3.5 G AOConstruction Contract
Specifications
3.9.1 G AOInterim DD FORM 1354
3.9.2 G AOChecklist for DD FORM 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 70 PAGES
01 78 00 3.9.2 G AOHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
1.3 G AOO&M Database
3.1.1 G AOTraining Plan
3.1.3 G AOTraining Outline
SD-11 Closeout Submittals
3.1.6 G AOValidation of Training Completion
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 G AOCommissioning Firm
1.7.1 G AOLead Commissioning Specialist
1.7.2 G AOTechnical Commissioning
Specialists
1.7 G AOCommissioning Firm's Contract
SD-06 Test Reports
3.1.3.1 G AEInterim Construction Phase
Commissioning Plan
3.1.3.2 G AEFinal Construction Phase
Commissioning Plan
3.1.5.2 G AEPre-Functional Checklists
3.1.3.2.2 G AEFunctional Performance Test
Checklists
1.8 G AEIssues Log
3.2 G AECommissioning Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 70 PAGES
01 91 00.15 10 3.3.1 G AEPost-Construction Trend Log
Report
SD-07 Certificates
1.9 G AOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.6 G AOTraining Plan
3.1.6 G AOTraining Attendance Rosters
3.1.7 G AOSystems Manual
3.1.8 G AOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.2 G AOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.2 G AODemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 G AONotification
SD-11 Closeout Submittals
3.3.4Receipts
02 42 91 SD-01 Preconstruction Submittals
1.2 G AOWork Plan
SD-04 Samples
3.2.2.1 G AOSalvage Representative Samples
3.2.2.1 G AOMock-ups
02 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 70 PAGES
02 81 00 2.1.1Packaging Notifications
3.1 G AEHazardous Waste Management
Plan
3.2 G AEOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.7 G AERecordkeeping
SD-07 Certificates
1.4.1 G AETransportation and Disposal
Coordinator
1.4.2 G AETraining
1.4.3Certification
3.3.3 G AEShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.6Waste Minimization
02 82 00 SD-03 Product Data
1.2.2Amended Water
1.3.9 G AESafety Data Sheets (SDS) for All
Materials
3.1.2.1Respirators
3.1.7Local Exhaust Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 70 PAGES
02 82 00 3.1.7Pressure Differential Automatic
Recording Instrument
3.1.8Vacuums
3.1.10Glovebags
SD-06 Test Reports
1.5.5 G AEAir Sampling Results
1.5.6Pressure Differential Recordings for Local Exhaust System
3.2.13.5 G AEClearance Sampling
3.3.3.2Asbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 G AEEmployee Training
1.3.5 G AENotifications
1.3.7 G AERespiratory Protection Program
1.3.10 G AEAsbestos Hazard Abatement Plan
1.3.11 G AETesting Laboratory
1.3.12 G AELandfill Approval
1.3.12Delivery Tickets
1.3.12Waste Shipment Records
1.3.13Transporter Certification
1.3.14 G AEMedical Certification
1.5.1Private Qualified Person
Documentation
1.5.2Designated Competent Person
1.5.3 G AEWorker's License
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 70 PAGES
02 82 00 1.5.4 G AEContractor's License
1.5.9Federal, State or Local Citations on Previous Projects
3.1Equipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3Water Filtration Equipment
3.1.8Vacuums
3.1.8Ventilation Systems
SD-11 Closeout Submittals
1.3.5 G AEPermits and Licenses
1.3.5 G AENotifications
1.3.7.1 G AERespirator Program Records
1.5.7Protective Clothing
Decontamination Quality Control
Records
1.5.8Protective Clothing
Decontamination Facility
Notification
1.7.1Rental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1Competent Person
1.5.1.2Training Certification
1.5.2.3Occupational and Environmental
Assessment Data Report
1.5.2.4Medical Examinations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 70 PAGES
02 83 00 1.5.2.8Lead, Cadmium, Chromium
Waste Management Plan
1.5.4 G AELicenses, Permits and
Notifications
1.5.5Occupant Protection Plan
1.5.2.2Lead, Cadmium, Chromium
Compliance Plan
3.1.1.6Lead, Cadmium, Chromium
Compliance Plan
3.4.1.1Initial Sample Results
3.5.2.1Written Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
1.6.7Negative Air Pressure System
2.1Materials and Equipment
2.1.1Expendable Supplies
3.1.1.5Local Exhaust Equipment
3.1.1.5Pressure Differential Automatic
Recording Instrument
3.1.1.6Pressure Differential Log
SD-06 Test Reports
1.3.3Sampling and Analysis
1.5.2.3Occupational and Environmental
Assessment Data Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 70 PAGES
02 83 00 1.5.2.3Sampling Results
1.5.3Pressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 G AETesting Laboratory
1.5.1.4 G AEThird Party Consultant
Qualifications
3.1.1.1 G AEOccupant Notification
3.1.1.1Notification of the
Commencement of LBP Hazard
Abatement
3.5.1.1Clearance Certification
SD-11 Closeout Submittals
3.5.2.1Hazardous Waste Manifest
02 84 16 SD-07 Certificates
1.8.1 G AEQualifications of CIH
1.8.1 G AETraining Certification
1.8.2 G AEPCB and Lamp Removal Work
Plan
1.8.3 G AEPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 G AETransporter certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.5.3.2DD Form 1348-1
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 70 PAGES
02 84 16 3.3.1Testing results
02 84 33 SD-07 Certificates
1.7.1Training certification
1.7.2Qualifications of CIH
1.7.3PCB removal work plan
1.7.4PCB disposal plan
1.7.5Notification
3.8Transporter certification
3.5.4Certification of Decontamination
3.5.5Post cleanup sampling
3.8.1Certificate of disposal
02 85 00 SD-01 Preconstruction Submittals
1.4.1.1 G AEPreliminary Visual Assessment
Report
1.4.1.2 G AEMicrobial Remediation Plan
1.4.1.3 G AERespiratory Protection Program
1.4.1.4Worker Records
1.4.1.5 G AECertified Industrial Hygienist
(CIH)/Industrial Hygienist (IH)
Qualifications
SD-03 Product Data
1.2.11 G AEDisinfectants or Biocide
Sanitizing Solutions
1.2.14 G AEFungicidal Agents, (EPA)
1.2.21 G AEPersonal Protective Equipment
(PPE)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 70 PAGES
02 85 00 1.2.24Pressure Differential Measuring
Instrument
2.2 G AESafety Data Sheets (SDS) for All
Materials
3.1.4Dehumidifiers
3.1.5Air Filtration Units
SD-06 Test Reports
1.4.3 G AEIH Daily Reports
SD-11 Closeout Submittals
1.4.4 G AESubmittals at Completion of
Remediation Work
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5Quality Control Plan
1.6.6Quality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8Laboratory Accreditation
1.6.2.1Form Removal Schedule
3.3.8Maturity Method Data
SD-02 Shop Drawings
1.6.2.1Formwork
1.6.2.2 G AEReinforcing Steel
SD-03 Product Data
2.4.4Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 70 PAGES
03 30 00 2.4.3Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.5Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.3.4Admixtures
2.2.2Waterstops
1.8.1Local/Regional Materials
2.2.3Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 G AEConcrete Mix Design
SD-06 Test Reports
1.6.1.1 G AEConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.10.2.1Tolerance Report
3.14.2.3 G AECompressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete
3.14.2.6Chloride Ion Concentration
3.14.2.4Air Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 70 PAGES
03 30 00 3.14.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.6.3.2VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.3Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.4Joint Sealants
2.4.1Curing Compound
04 03 00 SD-01 Preconstruction Submittals
1.5.1 G AOQuality Control Plan
1.5.1 G AOProject Training Program
1.5.2 G AEQualifications
SD-02 Shop Drawings
1.5.5Photographic Documentation
SD-03 Product Data
1.5.2Qualifications
1.5.6 G AECleaning and Restoration
Methods
2.1 G AECleaning Materials
2.2.2.2 G AEReplacement Mortar
2.4 G AEMortar Mix
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 70 PAGES
04 03 00 3.4.8.1 G AEStone Consolidants
SD-04 Samples
1.5.7.1 G AEMock-ups
SD-06 Test Reports
2.2.2.1Testing and Matching
3.5.1Existing Sealants for Asbestos and PCBs
SD-07 Certificates
2.2Repair Materials
04 20 00 SD-03 Product Data
1.5.1 G AOHot Weather Procedures
1.5.2 G AOCold Weather Procedures
2.2.2 G AOClay Brick
2.4.1.1 G AOCementitious Materials
SD-04 Samples
1.3.1.1 G AEMock-Up Panel
2.2.2 G AEClay Brick
SD-05 Design Data
2.1.2 G AEMasonry Compressive Strength
SD-06 Test Reports
2.2.2.1.3Efflorescence Test
3.6.1.1Field Testing of Mortar
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2Clay Brick
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 70 PAGES
04 20 00 2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors and Ties
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G AEErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G AEFabrication Drawings
SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
2.2.1Recycled Content for Structural
Steel
2.2.2Recycled Content for Structural
Steel Tubing
2.2.3Recycled Content for Steel Pipe
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 70 PAGES
05 12 00 1.4.2 G AEShoring and Temporary Bracing
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
3.6.2.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.4Welding Procedure Specifications
(WPS)
05 50 13 SD-02 Shop Drawings
2.4 G AEAngles and Plates
SD-03 Product Data
2.2.5.4 G AOBolts, Nuts, Studs and Rivets
2.1Recycled Content
SD-07 Certificates
2.1 G AOCertificates of Compliance
2.2 G AOCertified Mill
05 52 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 70 PAGES
05 52 00 1.2.1 G AEFabrication Drawings
3.2 G AEIron and Steel Hardware
3.2 G AESteel Shapes, Bars, and Strips
SD-03 Product Data
2.2.1 G AEStructural-Steel Plates, Shapes, and Bars
2.2.2 G AEHot-Rolled Carbon Steel Bars
2.2.3 G AEMasonry Anchorage Devices
2.1.2 G AEProtective Coating
2.2.5 G AESteel Railings and Handrails
1.2.1 G AEAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 G AOWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 03 12 SD-02 Shop Drawings
1.4.1 G AEShop Drawings
SD-03 Product Data
2.3.2.1 G AOEpoxy Consolidants
2.3.2.2 G AOEpoxy Patching Compound
2.3.3.1 G AOBorate Preservative Treatment
2.3.3.2.2 G AOMildewcide
SD-04 Samples
2.3.2 G AERepaired Wood
1.4.2 G AEMock-ups
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 70 PAGES
06 10 00 SD-02 Shop Drawings
1.8.1 G AEStructural Members
1.8.2 G AEModifications of Structural
Members
2.2.2 G AENailing Strips
SD-03 Product Data
2.4Underlayment
1.4.3Structural-Use and OSB Panels
2.3Oriented Strand Board
2.5.4Adhesives
SD-05 Design Data
1.8.2 G AEModifications of Structural
Members
SD-06 Test Reports
1.4.4Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
1.9.2Certified Sustainably Harvested
Wood and Composite Wood
Products
2.1.1Certified Sustainably Harvested
Virgin Lumber
2.2.2Certified Sustainably Harvested
Framing Lumber
2.3.1.1Certified Sustainably Harvested
Plywood Subflooring
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 70 PAGES
06 10 00 2.1.2Certified Sustainably Harvested natural-decay and insect-resistant wood
2.3.2.1Certified Sustainably Harvested
Plywood Roof Sheathing
2.3.3.1Certified Sustainably Harvested
Plywood for Other Uses
2.4.1Certified Sustainably Harvested
Plywood Underlayment
1.7Preservative Treatment
2.5.4Indoor Air Quality for Adhesives and Sealants
SD-10 Operation and Maintenance
Data
3.6Take-back Program
06 20 00 SD-02 Shop Drawings
1.3 G AEDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 G AOWood Products
1.4 G AOTreated Wood Products
2.2 G AOFascias and Trim
2.7 G AOHardware and Accessories
2.1.10VOC Content for Siding
2.1.6Recycled Content for
MDF/Particleboard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 70 PAGES
06 20 00 SD-04 Samples
1.5 G AESamples
1.7.2 G AEMock-ups
SD-07 Certificates
1.7.3.1 G AOCertificates of Grade
2.1.3Certified Sustainably Harvested
Wood for Trim and Frames
2.1.4Certified Sustainably Harvested
Softwood Plywood
2.1.5Certified Sustainably Harvested
Hardwood Plywood
2.1.10Certified Sustainably Harvested
Siding
2.1.5Indoor Air Quality for Hardwood
Plywood
2.1.6Indoor Air Quality for MDF
2.8.1.2Indoor Air Quality for Non-aerosol
Adhesives
06 61 16 SD-02 Shop Drawings
3.1 G AEInstallation
SD-03 Product Data
2.1 G AESolid Polymer Material
1.5.1Qualifications
2.3Fabrications
SD-04 Samples
2.1 G AEMaterial
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 70 PAGES
06 61 16 2.3.4 G AECounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
1.4.1.1Indoor Air Quality for Adhesives and Sealants
2.2.4Indoor Air Quality for Adhesives and Sealants
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 14 00 SD-03 Product Data
2.1 G AOFluid-Applied Membrane
2.2 G AOMembrane Primer
2.8 G AOElastomeric Sheet
3.3Solvent
3.4.1Moisture Meter
2.10 G AODrainage Mat
SD-11 Closeout Submittals
1.6Warranty
3.5 G AOInstructions To Government
Personnel
07 17 00 SD-02 Shop Drawings
3.1 G AEInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 70 PAGES
07 17 00 SD-03 Product Data
2.1 G AOBentonite Materials
2.1.3 G AOBentonite Panels
1.4 G AOAccessories
SD-08 Manufacturer’s Instructions
3.3Application
3.4Protection
3.6 G AOCorrections
07 21 13 SD-03 Product Data
1.3 G AOManufacturer's Standard Details
2.1 G AOBlock or Board Insulation
2.1.6 G AOVapor Retarder
2.2Pressure Sensitive Tape
1.4 G AOProtection Board or Coatings
2.4 G AOAccessories
2.1.4Recycled Content for Block or
Board Insulation
SD-07 Certificates
2.1 G AOBlock or Board Insulation
2.1.6 G AOVapor Retarder
2.3 G AOProtection Board or Coating
3.4.2 G AOProtection Board or Coating
1.8 G AOSpecial Warranties
1.8 G AOSpecial Warranties
2.1.5Indoor Air Quality For Block Or
Board Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 70 PAGES
07 21 13 SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.4.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2Recycled Content for Insulation
Materials
2.2Sill Sealer Insulation
2.4Accessories
SD-07 Certificates
2.1.4Indoor Air Quality for Insulation
Materials
2.4.1Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 27 19.01 SD-01 Preconstruction Submittals
1.6.1 G AOQualifications of Manufacturer
1.6.2 G AOQualifications of Installer
SD-02 Shop Drawings
1.3 G AOSelf-adhering Air Barrier
SD-03 Product Data
1.3 G AESelf-adhering Air Barrier
2.2 G AEPrimers, Adhesives, and Mastics
1.3.2 G AOSafety Data Sheets
SD-06 Test Reports
1.5 G AOField Peel Adhesion Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 70 PAGES
07 27 19.01 1.3.3 G AOFlame Propagation of Wall
Assemblies
1.3.3 G AOFlame Spread and Smoke
Developed Index Ratings
3.4.1 G AOSite Inspections and Testing
SD-07 Certificates
1.3 G AOSelf-adhering Air Barrier
1.6.1 G AOQualifications of Manufacturer
1.6.2 G AOQualifications of Installer
SD-08 Manufacturer’s Instructions
1.3 G AOSelf-adhering Air Barrier
2.2 G AOPrimers, Adhesives, and Mastics
07 32 15 SD-02 Shop Drawings
1.3 G AESlate Roofing Systems
SD-03 Product Data
1.3 G AESlate Roofing Systems
1.3 G AOQualifications
SD-04 Samples
2.1.2 G AOSlate Roofing
2.1.7 G AOSealant
2.1.6 G AOElastic Cement
2.1.3 G AOUnderlayment Membrane
2.1.4 G AOFasteners
SD-07 Certificates
2.1 G AOMaterials
07 54 23 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 70 PAGES
07 54 23 1.7 G AERoof Plan
2.2 G AEThermoplastic Polyolefin (TPO)
Roofing
2.3 G AOAuxiliary Roofing Materials
2.4 G AOSubstrate Boards
SD-03 Product Data
2.2 G AEThermoplastic Polyolefin (TPO)
Roofing
2.3 G AOAuxiliary Roofing Materials
2.4 G AOSubstrate Boards
SD-04 Samples
2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.3 G AOAuxiliary Roofing Materials
2.4 G AOSubstrate Boards
SD-05 Design Data
2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.1System Description
1.4.2Wind Uplift Resistance
SD-06 Test Reports
2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.3Auxiliary Roofing Materials
2.4 G AOSubstrate Boards
2.1 G AOSystem Description
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 70 PAGES
07 54 23 SD-07 Certificates
2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.3Auxiliary Roofing Materials
2.4 G AOSubstrate Boards
2.1 G AOSystem Description
1.4.1Fire Resistance
SD-08 Manufacturer’s Instructions
2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.3 G AOAuxiliary Roofing Materials
2.4 G AOSubstrate Boards
SD-09 Manufacturer’s Field
Reports
2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.3 G AOAuxiliary Roofing Materials
2.4 G AOSubstrate Boards
SD-10 Operation and Maintenance
Data
2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.3 G AOAuxiliary Roofing Materials
2.4 G AOSubstrate Boards
2.1 G AOSystem Description
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 70 PAGES
07 54 23 2.2 G AOThermoplastic Polyolefin (TPO)
Roofing
2.3 G AOAuxiliary Roofing Materials
2.4 G AOSubstrate Boards
2.1 G AOSystem Description
3.8 G AOInstructions to Government
Personnel
07 62 13 SD-02 Shop Drawings
2.1.6 G AESheet Metal
SD-03 Product Data
3.10Contractor Quality Control
SD-04 Samples
2.1 G AOMaterials
07 92 00 SD-03 Product Data
2.1 G AOSealants
2.2 G AOPrimers
2.3 G AOBond Breakers
2.4 G AOBackstops
SD-06 Test Reports
3.1 G AOField Adhesion
SD-07 Certificates
1.4.1.1Indoor Air Quality for Adhesives and Sealants
08 14 00 SD-02 Shop Drawings
2.1 G AEDoors
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 70 PAGES
08 14 00 2.1 G AEDoors
2.2Accessories
2.3.6Water-resistant Sealer
1.5Warranty
SD-04 Samples
2.1 G AODoors
SD-07 Certificates
1.3.1.1Indoor Air Quality for Composite
Wood and Agrifiber Products
SD-11 Closeout Submittals
1.5Warranty
08 52 00 SD-02 Shop Drawings
2.1 G AEWood Windows
SD-03 Product Data
2.1 G AEWood Windows
2.1Energy Star Label for Residential
Windows
SD-08 Manufacturer’s Instructions
2.1Wood Windows
SD-10 Operation and Maintenance
Data
2.1 G AOWood Windows
08 71 00 SD-02 Shop Drawings
1.3 G AOVerification of Existing Conditions
1.4 G AEHardware Schedule
2.2.4 G AOKeying System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 70 PAGES
08 71 00 SD-03 Product Data
2.2 G AEHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.4 G AOHardware Schedule
SD-11 Closeout Submittals
1.5.1Key Bitting
08 81 00 SD-03 Product Data
2.3 G AOInsulating Glass
1.3Glazing Accessories
2.4.1.1Sealants
SD-04 Samples
2.3 G AOInsulating Glass
2.4.3Tape
2.4.3Sealing Tapes
SD-07 Certificates
2.3Insulating Glass
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
2.1.1Energy Efficient Equipment for
Residential Windows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 70 PAGES
08 91 00 SD-02 Shop Drawings
1.4 G AOWall Louvers
SD-03 Product Data
2.2 G AOMetal Wall Louvers
SD-04 Samples
1.5 G AOWall Louver Samples
09 01 90.50 SD-03 Product Data
1.2 G AEWork Plan
1.2Materials
1.4.4Qualifications
SD-07 Certificates
1.2Work Plan
09 23 00 SD-03 Product Data
2.2 G AEGypsum Base Coat Plaster
2.3 G AEGypsum Finish Coat Plaster
SD-04 Samples
1.3.1 G AESample Panel
SD-07 Certificates
1.6.1Indoor Air Quality
SD-08 Manufacturer’s Instructions
2.7Ready-Mix Gypsum Plaster
09 26 00 SD-03 Product Data
2.1.2Gypsum Veneer Plaster
SD-07 Certificates
1.7.1.1Indoor Air Quality for Gypsum and Plaster Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 70 PAGES
09 26 00 1.7.1.2Indoor Air Quality for Gypsum
Board Products
09 29 00 SD-03 Product Data
2.1.5Cementitious Backer Units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.2Water-Resistant Gypsum Backing
Board
2.1.4Glass Mat Covered or Reinforced
Gypsum Sheathing
2.1.4.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant
2.1.9Accessories
2.1.1Gypsum Board
2.1.1Recycled Content for Gypsum
Board
2.1.1Recycled Content for Paper
Facing and Gypsum Cores
2.1.6VOC Content of Joint Compound
SD-07 Certificates
2.1 G AOAsbestos Free Materials
2.1.1Indoor Air Quality for Gypsum
Board
2.1.8Indoor Air Quality for Non-aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 70 PAGES
09 29 00 2.1.8Indoor Air Quality for Aerosol
Adhesives
09 30 10 SD-02 Shop Drawings
3.2 G AEDetail Drawings
SD-03 Product Data
2.1.1 G AEPorcelain Tile
2.1.2 G AEMosaic Tile
2.1.2Recycled Content for Mosaic Tile
2.3 G AEMortar, Grout, and Adhesive
SD-04 Samples
2.1 G AETile
2.1 G AOAccessories
2.1.3 G AOAccessories
2.3.3 G AEGrout
SD-07 Certificates
2.3Indoor Air Quality for Adhesives
2.3.5Indoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.6Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 G AOInstallation
09 64 24 SD-03 Product Data
2.1.1 G AEEngineered Wood Flooring
2.1.4.2Indoor air quality for adhesive
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 70 PAGES
09 64 24 2.1.1 G AEEngineered Wood Flooring
SD-08 Manufacturer’s Instructions
2.1.4Accessories and Supporting
Materials
2.1.4.2Adhesive
2.1.3Premolded Cork Strips
SD-10 Operation and Maintenance
Data
2.1 G AOFlooring Materials
G AOManufacturer's Printed
Instructions
SD-11 Closeout Submittals
1.6Warranty
09 64 29 SD-02 Shop Drawings
2.1 G AOStrip Flooring
SD-03 Product Data
2.1 G AEStrip Flooring
2.5Indoor Air Quality for Asphalt
Mastic
3.1Installation
SD-04 Samples
2.1.1 G AEStrip And Plank Flooring
SD-07 Certificates
1.4.1Certified Sustainably Harvested
Wood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 70 PAGES
09 64 29 2.3Indoor Air Quality for Resilient
Pads
09 68 00 SD-02 Shop Drawings
3.3 G AOInstallation Drawings
SD-03 Product Data
2.1 G AECarpet
2.3 G AOCarpet Cushion
2.1.1Recycled Content for Carpeting
2.3.1Recycled Content for Fiber
Cushion
2.4Indoor Air Quality for Aerosol
Adhesives
2.4Indoor Air Quality for Non-Aerosol
Adhesives
2.4Indoor Air Quality for Concrete
Primer
SD-04 Samples
2.1 G AECarpet
2.3 G AECarpet Cushion
SD-06 Test Reports
3.2 G AOMoisture and Alkalinity Tests
SD-07 Certificates
2.1.2Indoor Air Quality for Carpet
2.3.1Indoor Air Quality for Fiber
Cushion
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 70 PAGES
09 68 00 3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.4Cleaning and Protection
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-02 Shop Drawings
3.10Piping Identification
SD-03 Product Data
2.1 G AECoating
SD-04 Samples
1.9 G AEColor
SD-07 Certificates
1.4Applicator's Qualifications
2.1Indoor Air Quality for Paints and
Coatings
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
3.6.2Mixing
1.7.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 G AOCoatings
09 96 00 SD-03 Product Data
2.1.1 G AOHeat-Resistant Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 70 PAGES
09 96 00 SD-04 Samples
1.3 G AEColor Chips
SD-07 Certificates
2.1.1 G AOHeat-Resistant Coatings
3.1.4 G AOManufacturer's Printed
Instructions
10 28 13 SD-03 Product Data
2.1.2 G AEFinishes
2.2 G AEAccessory Items
SD-04 Samples
2.1.2 G AEFinishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
11 31 13 SD-03 Product Data
2.1 G AOKitchen Equipment
2.1.2Energy Star Label for Refrigerator
2.1.5Energy Star Label for Dishwasher
SD-08 Manufacturer’s Instructions
2.1Kitchen Equipment
2.1.4 G AORange Hood
2.1.8 G AORange
SD-10 Operation and Maintenance
Data
2.1 G AOKitchen Equipment
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 70 PAGES
11 31 13 3.3Manufacturer's Warranty
3.4Contractor's Warranty for
Installation
12 21 00 SD-02 Shop Drawings
3.3 G AEInstallation
SD-03 Product Data
2.1 G AEWindow Blinds
2.1Recycled Content for aluminum components
SD-04 Samples
2.1 G AEWindow Blinds
SD-06 Test Reports
2.1Window Blinds
SD-07 Certificates
2.1Indoor Air Quality for window blinds
2.1Indoor Air Quality for window blinds
SD-08 Manufacturer’s Instructions
2.1 G AOWindow Blinds
SD-10 Operation and Maintenance
Data
2.1 G AOWindow Blinds
12 32 00 SD-02 Shop Drawings
2.2 G AEFabrication
3.1.2 G AEInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 70 PAGES
12 32 00 SD-03 Product Data
2.3.1 G AECabinets
2.4 G AOHardwood
2.4 G AOHardwood Plywood
2.4 G AOAdhesives
2.4 G AOFiller Material
2.5 G AEAccessories and Hardware
SD-04 Samples
2.5 G AEAccessories and Hardware
1.3 G AEManufacturer's Standard Color
Charts
SD-07 Certificates
2.4Hardwood
1.5.2Indoor Air Quality for Composite
Wood Products
1.5.1Certified Sustainably Harvested
Composite Wood and Hardwood
Products
2.4Adhesives
2.4Fasteners
2.5Accessories and Hardware
SD-08 Manufacturer’s Instructions
Part 3Manufacturer's Instructions
12 34 00 SD-02 Shop Drawings
1.2.1 G AEFabrication Drawings
1.2.1 G AEInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 70 PAGES
12 34 00 SD-03 Product Data
2.2 G AECatalog Data
SD-04 Samples
1.2.1 G AOCasework Samples
1.2.1 G AEAccessories and Hardware
1.2.1 G AEManufacturer's Standard Color
Charts
SD-07 Certificates
1.2.1Certificates of Conformance
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 G AEShop Drawings
3.6As-Built Drawings
SD-03 Product Data
1.4.1Fire Protection Related
Submittals
2.3 G AEMaterials and Equipment
1.6Spare Parts
3.5 G AEPreliminary Tests
3.6 G AEFinal Acceptance Test
1.4.1 G AEFire Protection Specialist
1.4.2 G AESprinkler System Installer
SD-05 Design Data
1.2.1.2 G AEHydraulic Calculations
SD-06 Test Reports
3.5Preliminary Test Report
3.6Final Acceptance Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 70 PAGES
21 13 13.00 10 SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
22 00 00 SD-02 Shop Drawings
3.7.1 G AEPlumbing System
SD-03 Product Data
2.1 G AORecycled Content for Steel Pipe
2.1 G AORecycled Content for Cast Iron
Pipe
2.4Fixtures
2.4.2 G AEFlush Tank Water Closets
2.4.2 G AEWaterSense Label for Flush Tank
Water Closet
2.4.4 G AECountertop Lavatories
2.4.1WaterSense Label for Lavatory
Faucet
2.4.5 G AEKitchen Sinks
2.4.7 G AEBathtubs, Cast Iron
2.6.2WaterSense Label for
Showerhead
2.4.6 G AELaundry Tub Sinks
2.4.3 G AEPedestal Sinks
2.9 G AEWater Heaters
2.9.1.1Energy Star Label for Gas
Storage Water Heater
2.10 G AEPumps
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 70 PAGES
22 00 00 3.7.1.1 G AEBackflow Prevention Assemblies
2.6.2 G AEShower Faucets
2.4.1 G AELavatory Faucets
3.7.1 G AOPlumbing System
SD-06 Test Reports
3.7 G AOTests, Flushing and Disinfection
3.7.1.1 G AOTest of Backflow Prevention
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .