- W912DR21B0028
About this file
This document provides details for a federal contract solicitation to renovate Army Family Housing at Fort McNair in Washington, D.C. The solicitation was issued by the Department of the Army Corps of Engineers Baltimore District on behalf of Joint Base Myer-Henderson Hall. Offerors are invited to provide renovations and repairs to existing housing units at Fort McNair in accordance with specifications in the attached Volume 2. The solicitation number is W912DR21B0028 and responses are due by the date specified on FedBizOpps. Renovations are to include upgrades to mechanical, electrical and plumbing systems, as well as interior and exterior repairs and painting. The period of performance is 720 calendar days from NTP. This is a small business set-aside solicitation to be awarded on a best value tradeoff basis.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Baltimore District
CONSTRUCTION
SPECIFICATIONS
Army Family Housing, Group 1 Homes (Quarters 1, 3, and 11)
Ft. McNair, Washington, DC
Volume 2 – Division 21 through Division 33
REQUEST FOR PROPOSAL. W912DR-21-R-0028
CONTRACT NO.
DATE: AUG 2021
JBMHH-AFH - Fort McNair - FY21
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 33 00 08/18 SUBMITTAL PROCEDURES
01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 11/16 QUALITY CONTROL
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 02/15 SPECIAL INSPECTIONS
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 56 39 04/20 TEMPORARY TREE AND PLANT PROTECTION
01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/09 PROJECT IDENTIFICATION
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION
02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC
CONSTRUCTION MATERIALS
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 04/06 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 04/06 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
02 85 00 11/18 MOLD REMEDIATION
DI VI SI ON 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 03 00 11/17 CONSERVATION TREATMENT FOR PERIOD
MASONRY
04 20 00 11/15 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
PROJECT TABLE OF CONTENTS Page 1
06 03 12 07/20 HISTORIC WOOD REPAIR
06 10 00 08/16 ROUGH CARPENTRY
06 20 00 08/16 FINISH CARPENTRY
06 61 16 08/10 SOLID SURFACING AND QUARTZ AGGLOMERATE
SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 17 00 02/16 BENTONITE WATERPROOFING
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 32 15 07/20 SLATE ROOFING REPLACEMENT OR REPAIR
07 54 23 04/19, CHG 1: 05/21 THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING
07 62 13 08/09 COPPER SHEET METAL FLASHING AND TRIM
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 14 00 08/16 WOOD DOORS
08 52 00 08/11 WOOD WINDOWS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 01 90.50 05/09 PREPARATION OF HISTORIC WOOD FOR
PAINTING
09 23 00 08/16 GYPSUM PLASTERING
09 26 00 08/16 VENEER PLASTER
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING
09 64 24 07/21 ENGINEERED WOOD FLOORING
09 64 29 08/16 WOOD STRIP AND PLANK FLOORING
09 68 00 11/17 CARPETING
09 90 00 05/11 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 28 13 08/17 TOILET ACCESSORIES
DI VI SI ON 11 - EQUI PMENT
11 31 13 08/17 KITCHEN EQUIPMENT
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 08/17 WINDOW BLINDS
12 32 00 11/16 MANUFACTURED WOOD CASEWORK
12 34 00 08/17 MANUFACTURED PLASTIC CASEWORK
DI VI SI ON 13 - Not Used
DI VI SI ON 14 - Not Used
DI VI SI ON 21 - FI RE SUPPRESSI ON
PROJECT TABLE OF CONTENTS Page 2
21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 08/18 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 25 11/08 FACILITY GAS PIPING
23 23 00 10/07 REFRIGERANT PIPING
23 52 00 04/08 HEATING BOILERS
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS HVAC/MECHANICAL
25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY CONTROL
SYSTEMS
25 05 11.03 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE LIFE SAFETY
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 07/06 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 29 23 04/06 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER
600 VOLTS
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/16 INTERIOR LIGHTING
26 56 00 05/13 EXTERIOR LIGHTING
DI VI SI ON 27 - Not Used
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 74.00 20 02/10 INTERIOR FIRE DETECTION AND ALARM
SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 10/04 EARTHWORK AND HELICAL PILES
PROJECT TABLE OF CONTENTS Page 3
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 19 05/20 DECORATIVE FENCES AND GATES
32 92 23 04/06 SODDING
32 93 00 08/17 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 46 16 05/18 SUBDRAINAGE PIPING
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PIPING
DI VI SI ON 34 - Not Used
DI VI SI ON 35 - Not Used
DI VI SI ON 40 - Not Used
DI VI SI ON 41 - Not Used
DI VI SI ON 42 - Not Used
DI VI SI ON 43 - Not Used
DI VI SI ON 44 - Not Used
DI VI SI ON 45 - Not Used
DI VI SI ON 46 - Not Used
DI VI SI ON 48 - Not Used
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 21 13 13.00 10
WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
05/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C606 (2015) Grooved and Shouldered Joints
ASME INTERNATIONAL (ASME)
ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2014) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings
ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded
ASME B16.18 (2018) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.22 (2018) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.26 (2018) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B18.2.2 (2015) Nuts for General Applications:
Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)
ASTM INTERNATIONAL (ASTM)
ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings
ASTM A53/A53M (2018) Standard Specification for Pipe, 21 13 13.00 10 - 1
Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A135/A135M (2009; R2014) Standard Specification for Electric-Resistance-Welded Steel Pipe
ASTM A183 (2014) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use
ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings
ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use
ASTM B62 (2017) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B75/B75M (2011) Standard Specification for Seamless Copper Tube
ASTM B88 (2016) Standard Specification for Seamless Copper Water Tube
ASTM D2000 (2018) Standard Classification System for Rubber Products in Automotive Applications
ASTM F436 (2011) Hardened Steel Washers
ASTM F442/F442M (2013; E 2013) Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe (SDR-PR)
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2016; TIA 16-1; TIA 16-2; TIA 16-3 2016;
Errata 17-1; Errata 17-2) Standard for the Installation of Sprinkler Systems
NFPA 13D (2016) Standard for the Installation of Sprinkler Systems in One- and Two-Family Dwellings and Manufactured Homes
NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
21 13 13.00 10 - 2
NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
UNDERWRITERS LABORATORIES (UL)
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 SYSTEM DESCRIPTION
Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in all areas of the building . Except as modified herein, the system shall be designed and installed in accordance with NFPA 13D. Pipe sizes which are not indicated on drawings shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.
1.2.1 System Design
Pipes shall be sized using one of the following techniques:
a. General pipe sizing method in NFPA 13D.
b. Prescriptive pipe sizing method in NFPA 13D.
c. Hydraulic calculation procedure per NFPA 13 .
d. Manufacturers listed installation instructions.
1.2.1.1 Basis for Calculations
The design of the systems shall be based upon a water supply with a static pressure of 62 psi, and a flow of 1,034 gpm at a residual pressure of 52 psi for quarters in Group 1. A domestic water pump is being added to boost water pressures to 70 psi in the buildings, refer to plumbing drawings and specs for pump size. Water supply shall be presumed available at the point of connection to existing. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 150 for copper tubing, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping.
21 13 13.00 10 - 3
1.2.1.2 Hydraulic Calculations
Submit hydraulic calculations, if method is chosen for pipe sizing, including a drawing showing hydraulic reference points and pipe segments and as outlined, except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall be based on the water supply data shown on the drawings to substantiate that the design area used in the calculations is the most demanding hydraulically.
Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, actual discharge pressures and actual flows. Elevations of hydraulic reference points (nodes) shall be indicated. Documentation shall identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe. For gridded systems, calculations shall show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. Also for gridded systems, a flow diagram indicating the quantity and direction of flows shall be included. A drawing showing hydraulic reference points (nodes) and pipe designations used in the calculations shall be included and shall be independent of shop drawings.
1.2.2 Sprinkler Coverage
Sprinklers shall be uniformly spaced on branch lines. In buildings protected by automatic sprinklers, sprinklers shall provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces.
Coverage per sprinkler shall be in accordance with NFPA 13D and manufacturer's listing, but shall not exceed 100 square feet for extra hazard occupancies, 130 square feet for ordinary hazard occupancies, and 225 square feet for light hazard occupancies. Exceptions are as follows:
a. Facilities that are designed in accordance with NFPA 13D.
b. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101 .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings; G, AE As-Built Drawings
SD-03 Product Data
21 13 13.00 10 - 4
Fire Protection Related Submittals Materials and Equipment; G, AE Spare Parts Preliminary Tests; G, AE Final Acceptance Test; G, AE Fire Protection Specialist; G, AE Sprinkler System Installer; G, AE
SD-05 Design Data
Hydraulic Calculations; G, AE
SD-06 Test Reports
Preliminary Test Report Final Acceptance Test Report
SD-07 Certificates
Inspection by Fire Protection Specialist
1.4 QUALITY ASSURANCE
Compliance with referenced NFPA standards is mandatory. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification governs. Interpret reference to "authority having jurisdiction" to mean the Contracting Officer.
1.4.1 Fire Protection Specialist
Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or who is certified as a Level IV Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 .
Submit the name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations. The Fire Protection Specialist shall prepare and submit a list of the fire protection related submittals, no later than 7 days after the approval of the Fire Protection Specialist, from the Contract Submittal Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government. The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.2 Sprinkler System Installer
Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and who has
21 13 13.00 10 - 5 served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
Submit the name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.
1.4.3 Shop Drawings
Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13 . Submit 3 copies of the Sprinkler System shop drawings, no later than 21 days prior to the start of sprinkler system installation. Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:
a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.
b. Floor plans drawn to a scale not less than 1/4" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.
c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.
e. Details of each type of riser assembly; pipe hanger; and electrical devices and interconnecting wiring.
1.5 DELIVERY, STORAGE, AND HANDLING
All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.
1.6 EXTRA MATERIALS
Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.
21 13 13.00 10 - 6
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
2.2 NAMEPLATES
All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.
2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE
Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE. Submit manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity.
2.4 ABOVEGROUND PIPING COMPONENTS
Aboveground piping shall be steel, copper, or plastic.
2.4.1 Steel Piping Components
2.4.1.1 Steel Pipe
Except as modified herein, steel pipe shall be black as permitted by NFPA 13D and shall conform to applicable provisions of ASTM A795/A795M , ASTM A53/A53M, or ASTM A135/A135M . Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of
1.0 or greater after threads or grooves are cut or rolled formed. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.
2.4.1.2 Fittings for Non-Grooved Steel Pipe
Fittings shall be cast iron conforming to ASME B16.4 , steel conforming to ASME B16.9 or ASME B16.11 , or malleable iron conforming to ASME B16.3 .
Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.
2.4.1.3 Grooved Mechanical Joints and Fittings
Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer; segmented welded fittings shall not be used. Fitting and coupling houses shall be
21 13 13.00 10 - 7 malleable iron conforming to ASTM A47/A47M, Grade 32510; ductile iron conforming to ASTM A536, Grade 65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts shall be heat-treated steel conforming to ASTM A183 and shall be cadmium plated or zinc electroplated.
2.4.1.4 Flanges
Flanges shall conform to NFPA 13 and ASME B16.1 . Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21 , 1/16 inch thick, and full face or self-centering flat ring type.
2.4.1.5 Bolts, Nut, and Washers
Bolts shall be conform to ASTM A449, Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque. Nuts shall be hexagon type conforming to ASME B18.2.2 . Washers shall meet the requirements of ASTM F436. Flat circular washers shall be provided under all bolt heads and nuts.
2.4.2 Copper Tube Components
2.4.2.1 Copper Tube
Copper tube shall conform to ASTM B88, Types L and M.
2.4.2.2 Copper Fittings and Joints
Cast copper alloy solder-joint pressure fittings shall conform to ASME B16.18 and wrought copper and bronze solder-joint pressure fittings shall conform to ASME B16.22 and ASTM B75/B75M. Cast copper alloy fittings for flared copper tube shall conform to ASME B16.26 and ASTM B62.
Brass or bronze adapters for brazed tubing may be used for connecting tubing to flanges and to threaded ends of valves and equipment. Extracted brazed tee joints produced with an acceptable tool and installed as recommended by the manufacturer may be used. Grooved mechanical joints and fittings shall be designed for not less than 125 psig service and shall be the product of the same manufacturer. Grooved fitting and mechanical coupling housing shall be ductile iron conforming to ASTM A536.
Gaskets for use in grooved joints shall be molded synthetic polymer of pressure responsive design and shall conform to ASTM D2000 for circulating medium up to 230 degrees F. Grooved joints shall conform to AWWA C606.
Coupling nuts and bolts for use in grooved joints shall be steel and shall conform to ASTM A183.
2.4.3 Plastic Piping Components
2.4.3.1 Plastic Pipe
Plastic pipe shall be chlorinated polyvinyl chloride (CPVC) conforming to ASTM F442/F442M , 175 psi rating and listed in UL Fire Prot Dir for use in wet pipe sprinkler systems.
2.4.3.2 Plastic Fittings
Plastic fitting shall be chlorinated polyvinyl chloride (CPVC) as listed in UL Fire Prot Dir for use in wet pipe sprinkler systems.
21 13 13.00 10 - 8
2.4.4 Pipe Hangers
Hangers shall be listed in UL Fire Prot Dir or FM APP GUIDE and of the type suitable for the application, construction, and pipe type and sized to be supported.
2.4.5 Valves
2.4.5.1 Control Valve and Gate Valve
Sprinkler system shall share the shutoff valve from the domestic system.
2.5 SPRINKLERS
2.5.1 Residential Sprinkler
Residential sprinkler shall be the concealed pendent or sidewall in areas with finished ceilings and upright in areas without finished ceilings type with nominal 1/2 inch orifice. Residential sprinkler shall have a white polyester or brass finish.
2.6 ACCESSORIES
2.6.1 Pendent Sprinkler Escutcheon
Escutcheon shall be one-piece metallic type with a depth of less than 3/4 inch and suitable for installation on pendent sprinklers. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.
PART 3 EXECUTION
3.1 FIELD MEASUREMENTS
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 INSTALLATION REQUIREMENTS
The installation shall be in accordance with the applicable provisions of NFPA 13D, NFPA 24 , and publications referenced therein.
3.3 INSPECTION BY FIRE PROTECTION SPECIALIST
Prior to ceiling installation and concurrent with the Final Acceptance Test Report, certification by the Fire Protection Specialist that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports. The Fire Protection Specialist shall: 1) inspect the sprinkler system periodically during the installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements, 2) witness the preliminary and final tests, and sign the test results, 3) after completion of the system inspections and a successful final test, certify in writing that the system has been installed in accordance with the contract requirements. Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.
21 13 13.00 10 - 9
3.4 ABOVEGROUND PIPING INSTALLATION
3.4.1 Piping in Exposed Areas
Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom.
3.4.2 Piping in Finished Areas
In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings.
Piping shall be inspected, tested and approved before being concealed.
Risers and similar vertical runs of piping in finished areas shall be concealed.
3.4.3 Pendent Sprinklers
Drop nipples to pendent sprinklers shall consist of minimum 1 inch pipe with a reducing coupling into which the sprinkler shall be threaded.
Hangers shall be provided on arm-overs to drop nipples supplying pendent sprinklers when the arm-over exceeds 12 inches for steel pipe or 6 inches for copper tubing. Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling shall not extend more than 1 inch below the underside of the ceiling. On pendent sprinklers installed below suspended or dropped ceilings, the distance from the sprinkler deflector to the underside of the ceiling shall not exceed 4 inches.
Recessed pendent sprinklers shall be installed such that the distance from the sprinkler deflector to the underside of the ceiling shall not exceed the manufacturer's listed range and shall be of uniform depth throughout the finished area. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grid.
3.4.4 Upright Sprinklers
Riser nipples or "sprigs" to upright sprinklers shall contain no fittings between the branch line tee and the reducing coupling at the sprinkler.
Riser nipples exceeding 30 inches in length shall be individually supported.
3.4.5 Pipe Joints
Pipe joints shall conform to NFPA 13 , except as modified herein. Not more than four threads shall show after joint is made up. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints shall be provided where indicated or required by NFPA 13 . Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer.
For copper tubing, pipe and groove dimensions shall comply with the tolerances specified by the coupling manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall
21 13 13.00 10 - 10 be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances. Grooved joints shall not be used in concealed locations, such as behind solid walls or ceilings, unless an access panel is shown on the drawings for servicing or adjusting the joint.
3.4.6 Reducers
Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. The use of grooved-end or rubber-gasketed reducing couplings will not be permitted. When standard fittings of the required size are not manufactured, single bushings of the face type will be permitted.
Where used, face bushings shall be installed with the outer face flush with the face of the fitting opening being reduced. Bushings shall not be used in elbow fittings, in more than one outlet of a tee, in more than two outlets of a cross, or where the reduction in size is less than 1/2 inch.
3.4.7 Escutcheons
Escutcheons shall be provided for pipe penetration of ceilings and walls.
Escutcheons shall be securely fastened to the pipe at surfaces through which piping passes.
3.4.8 Drains
Main drain piping shall be provided to discharge at the location indicated.
3.5 PRELIMINARY TESTS
The system, shall be tested to assure that equipment and components function as intended. Submit proposed procedures for Preliminary Tests, no later than 14 days prior to the proposed start of the tests and proposed date and time to begin the preliminary tests. The aboveground interior piping systems and attached appurtenances subjected to system working pressure shall be tested in accordance with NFPA 13D and NFPA 24 .
Upon completion of specified tests, submit 3 copies of the completed Preliminary Test Report, no later than 7 days after the completion of the Tests. The Report shall include both the Contractor's Material and Test Certificate for Underground Piping and the Contractor's Material and Test Certificate for Aboveground Piping. All items in the Preliminary Tests Report shall be signed by the Fire Protection Specialist.
3.5.1 Aboveground Piping
3.5.1.1 Hydrostatic Testing
Aboveground piping shall be hydrostatically tested in accordance with NFPA 13D at not less than the maximum system operating pressure and shall maintain that pressure without loss for 2 hours. There shall be no drop in gauge pressure or visible leakage when the system is subjected to the hydrostatic test. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested.
3.6 FINAL ACCEPTANCE TEST
Begin the Final Acceptance Test only when the Preliminary Test Report has been approved. Submit proposed procedures for Final Acceptance Test, no later than 14 days prior to the proposed start of the tests, and proposed
21 13 13.00 10 - 11 date and time to begin the Test, submitted with the procedures.
Notification shall be provided at least 14 days prior to the proposed start of the test. Notification shall include a copy of the Contractor's Material & Test Certificates. The Fire Protection Specialist shall conduct the Final Acceptance Test and shall provide a complete demonstration of the operation of the system. This shall include operation of control valves. After operation of control valves has been completed, the main drain test shall be repeated to assure that control valves are in the open position. Submit as-built shop drawings, at least 14 days after completion of the Final Tests, updated to reflect as-built conditions after all related work is completed. Drawings shall be on reproducible full-size mylar film. In addition, the representative shall have available copies of as-built drawings and certificates of tests previously conducted. The installation shall not be considered accepted until identified discrepancies have been corrected and test documentation is properly completed and received. Submit 3 copies of the completed Final Acceptance Test Report no later than 7 days after the completion of the Final Acceptance Tests. All items in the Final Acceptance Report shall be signed by the Fire Protection Specialist.as specified.
-- End of Section --
21 13 13.00 10 - 12
SECTION 22 00 00
PLUMBING, GENERAL PURPOSE
11/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z21.10.1/CSA 4.1 (2017) Gas Water Heaters Vol. I, Storage Water Heaters with Input Ratings of 75,000 Btu Per Hour or Less
ANSI Z21.10.3/CSA 4.3 (2017) Gas-Fired Water Heaters Vol.III, Storage Water Heaters With Input Ratings Above 75,000 Btu Per Hour, Circulating and Instantaneous
ANSI Z21.22/CSA 4.4 (2015) Relief Valves for Hot Water Supply Systems
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME A112.18.1/CSA B125.1 (2018) Plumbing Supply Fittings
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1001 (2016) Performance Requirements for Atmospheric Type Vacuum Breakers
ASSE 1003 (2009) Performance Requirements for Water Pressure Reducing Valves for Domestic Water Distribution Systems - (ANSI approved 2010)
ASSE 1010 (2004) Performance Requirements for Water Hammer Arresters (ANSI approved 2004)
ASSE 1011 (2004; Errata 2004) Performance Requirements for Hose Connection Vacuum Breakers (ANSI approved 2004)
ASSE 1012 (2009) Performance Requirements for Backflow Preventer with an Intermediate Atmospheric Vent - (ANSI approved 2009)
ASSE 1013 (2011) Performance Requirements for Reduced Pressure Principle Backflow Preventers and Reduced Pressure Fire Protection Principle Backflow Preventers - (ANSI approved 2010)
22 00 00 - 1
ASSE 1018 (2001) Performance Requirements for Trap Seal Primer Valves - Potable Water Supplied (ANSI Approved 2002
ASSE 1019 (2011; R 2016) Performance Requirements for Wall Hydrant with Backflow Protection and Freeze Resistance
ASSE 1020 (2004; Errata 2004; Errata 2004) Performance Requirements for Pressure Vacuum Breaker Assembly (ANSI Approved 2004)
ASSE 1072 (2017) Performance Requirements for Barrier Type Floor Drain Trap Seal Protection Devices
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA B300 (2010; Addenda 2011) Hypochlorites
AWWA B301 (2010) Liquid Chlorine
AWWA C203 (2008) Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot-Applied
AWWA C606 (2015) Grooved and Shouldered Joints
AWWA C651 (2014) Standard for Disinfecting Water Mains
AWWA C652 (2011) Disinfection of Water-Storage Facilities
AWWA C700 (2015) Cold-Water Meters - Displacement Type, Metal Alloy Main Case
AWWA C701 (2015) Cold-Water Meters - Turbine Type for Customer Service
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8/A5.8M (2011; Amendment 2012) Specification for Filler Metals for Brazing and Braze Welding
AWS B2.2/B2.2M (2016) Specification for Brazing Procedure and Performance Qualification
ASME INTERNATIONAL (ASME)
ASME A112.1.2 (2012; R 2017) Air Gaps in Plumbing Systems (For Plumbing Fixtures and Water-Connected Receptors)
ASME A112.6.1M (1997; R 2017) Floor Affixed Supports for Off-the-Floor Plumbing Fixtures for Public Use
22 00 00 - 2
ASME A112.6.3 (2019) Standard for Floor and Trench Drains
ASME A112.14.1 (2003; R 2017) Backwater Valves
ASME A112.19.1/CSA B45.2 (2013) Enameled Cast Iron and Enameled Steel Plumbing Fixtures
ASME A112.19.2/CSA B45.1 (2018; ERTA 2018) Standard for Vitreous China Plumbing Fixtures and Hydraulic Requirements for Water Closets and Urinals
ASME A112.19.3/CSA B45.4 (2017; Errata 2017) Stainless Steel Plumbing Fixtures
ASME A112.36.2M (1991; R 2017) Cleanouts
ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)
ASME B16.5 (2017) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.15 (2018) Cast Copper Alloy Threaded Fittings Classes 125 and 250
ASME B16.18 (2018) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.22 (2018) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.23 (2011) Cast Copper Alloy Solder Joint Drainage Fittings - DWV
ASME B16.29 (2017) Wrought Copper and Wrought Copper Alloy Solder-Joint Drainage Fittings - DWV
ASME B16.34 (2017) Valves - Flanged, Threaded and Welding End
ASME B16.50 (2013) Wrought Copper and Copper Alloy Braze-Joint Pressure Fittings
ASME B31.1 (2018) Power Piping
ASME B31.5 (2016) Refrigeration Piping and Heat Transfer Components
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
ASME BPVC SEC IV (2017) BPVC Section IV-Rules for Construction of Heating Boilers
ASME CSD-1 (2016) Control and Safety Devices for Automatically Fired Boilers
22 00 00 - 3
ASTM INTERNATIONAL (ASTM)
ASTM A74 (2017) Standard Specification for Cast Iron Soil Pipe and Fittings
ASTM A105/A105M (2018) Standard Specification for Carbon Steel Forgings for Piping Applications
ASTM A193/A193M (2017) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A515/A515M (2017) Standard Specification for Pressure Vessel Plates, Carbon Steel, for Intermediate- and Higher-Temperature Service
ASTM A516/A516M (2017) Standard Specification for Pressure Vessel Plates, Carbon Steel, for Moderate-and Lower-Temperature Service
ASTM A888 (2018) Standard Specification for Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications
ASTM B32 (2008; R 2014) Standard Specification for Solder Metal
ASTM B42 (2015a) Standard Specification for Seamless Copper Pipe, Standard Sizes
ASTM B88 (2016) Standard Specification for Seamless Copper Water Tube
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B306 (2013) Standard Specification for Copper Drainage Tube (DWV)
ASTM B370 (2012) Standard Specification for Copper Sheet and Strip for Building Construction
ASTM B813 (2016) Standard Specification for Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube
ASTM B828 (2016) Standard Practice for Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings
ASTM C564 (2014) Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings
ASTM C920 (2018) Standard Specification for
22 00 00 - 4
Elastomeric Joint Sealants
ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2235 (2004; R 2016) Standard Specification for Solvent Cement for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe and Fittings
ASTM D2241 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D2466 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2564 (2012) Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems
ASTM D2665 (2014) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
ASTM D2672 (2014) Joints for IPS PVC Pipe Using Solvent Cement
ASTM D2822/D2822M (2005; R 2011; E 2011) Standard Specification for Asphalt Roof Cement, Asbestos-Containing
ASTM D2855 (2015) Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings
ASTM D3138 (2004; R 2016) Standard Specification for Solvent Cements for Transition Joints Between Acrylonitrile-Butadiene-Styrene (ABS) and Poly(Vinyl Chloride) (PVC) Non-Pressure Piping Components
ASTM D3139 (1998; R 2011) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM D3212 (2007; R 2013) Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals
ASTM D3311 (2017) Standard Specification for Drain, Waste, and Vent (DWV) Plastic Fittings Patterns
ASTM E1 (2014) Standard Specification for ASTM Liquid-in-Glass Thermometers
ASTM F409 (2017) Standard Specification for
22 00 00 - 5
Thermoplastic Accessible and Replaceable Plastic Tube and Tubular Fittings
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F891 (2016) Standard Specification for Coextruded Poly (Vinyl Chloride) (PVC) Plastic Pipe with a Cellular Core
ASTM F1760 (2016) Standard Specification for Coextruded Poly(Vinyl Chloride) (PVC) Non-Pressure Plastic Pipe Having Reprocessed-Recycled Content
CAST IRON SOIL PIPE INSTITUTE (CISPI)
CISPI 301 (2012) Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications
CISPI 310 (2012) Coupling for Use in Connection with Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications
COPPER DEVELOPMENT ASSOCIATION (CDA)
CDA A4015 (2016; 14/17) Copper Tube Handbook
INTERNATIONAL CODE COUNCIL (ICC)
ICC A117.1 COMM (2017) Standard And Commentary Accessible and Usable Buildings and Facilities
ICC IPC (2018) International Plumbing Code
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-25 (2018) Standard Marking System for Valves, Fittings, Flanges and Unions
MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
MSS SP-67 (2017; Errata 1 2017) Butterfly Valves
MSS SP-70 (2011) Gray Iron Gate Valves, Flanged and Threaded Ends
MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and Threaded Ends
MSS SP-72 (2010a) Ball Valves with Flanged or Butt-Welding Ends for General Service
22 00 00 - 6
MSS SP-78 (2011) Cast Iron Plug Valves, Flanged and Threaded Ends
MSS SP-80 (2013) Bronze Gate, Globe, Angle and Check Valves
MSS SP-85 (2011) Gray Iron Globe & Angle Valves Flanged and Threaded Ends
MSS SP-110 (2010) Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends
NACE INTERNATIONAL (NACE)
NACE SP0169 (2015) Control of External Corrosion on Underground or Submerged Metallic Piping Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA MG 1 (2018) Motors and Generators
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 54 (2018) National Fuel Gas Code
NFPA 90A (2018) Standard for the Installation of Air Conditioning and Ventilating Systems
NSF INTERNATIONAL (NSF)
NSF 372 (2016) Drinking Water System Components - Lead Content
NSF/ANSI 14 (2018) Plastics Piping System Components and Related Materials
NSF/ANSI 61 (2019) Drinking Water System Components - Health Effects
PLASTIC PIPE AND FITTINGS ASSOCIATION (PPFA)
PPFA Fire Man (2016) Firestopping: Plastic Pipe in Fire Resistive Construction
PLUMBING AND DRAINAGE INSTITUTE (PDI)
PDI WH 201 (2010) Water Hammer Arresters Standard
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J1508 (2009) Hose Clamp Specifications
22 00 00 - 7
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA SM 9223 (2004) Enzyme Substrate Coliform Test
PL 93-523 (1974; A 1999) Safe Drinking Water Act
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 430 Energy Conservation Program for Consumer Products
40 CFR 141.80 National Primary Drinking Water Regulations; Control of Lead and Copper;
General Requirements
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation "AO" following the "G" designation identifies that the Government Area Office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Plumbing System; G , AE
Detail drawings consisting of schedules, performance charts, instructions, diagrams, and other information to illustrate the requirements and operations of systems that are not covered by the Plumbing Code. Detail drawings for the complete plumbing system including piping layouts and locations of connections ; dimensions for roughing-in, foundation, and support points; schematic diagrams and wiring diagrams or connection and interconnection diagrams. Detail drawings shall indicate clearances required for maintenance and operation. Where piping and equipment are to be supported other than as indicated, details shall include loadings and proposed support methods. Plumbing drawing plans, elevations, views, and details, shall be drawn to scale.
SD-03 Product Data
Recycled Content for Steel Pipe; G, AO
Recycled Content for Cast Iron Pipe; G, AO
Fixtures
List of installed fixtures with manufacturer, model, and flow rate.
Flush Tank Water Closets; G, AE
22 00 00 - 8
WaterSense Label for Flush Tank Water Closet; G, AE
Countertop Lavatories; G, AE
WaterSense Label for Lavatory Faucet
Kitchen Sinks; G, AE
Bathtubs, Cast Iron; G, AE
WaterSense Label for Showerhead
Laundry Tub Sinks; G, AE
Pedestal Sinks; G, AE
Water Heaters; G , AE
Energy Star Label for Gas Storage Water Heater
Pumps; G , AE
Backflow Prevention Assemblies; G , AE
Shower Faucets; G , AE
Lavatory Faucets; G , AE
Plumbing System; G, AO
Diagrams, instructions, and other sheets proposed for posting.
Manufacturer's recommendations for the installation of bell and spigot and hubless joints for cast iron soil pipe .
SD-06 Test Reports
Tests, Flushing and Disinfection; G, AO
Test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, completion and testing of the installed system. Each test report shall indicate the final position of controls.
Test of Backflow Prevention Assemblies; G, AO
Certification of proper operation shall be as accomplished in accordance with state regulations by an individual certified by the state to perform such tests. If no state requirement exists, the Contractor shall have the manufacturer's representative test the device, to ensure the unit is properly installed and performing as intended. The Contractor shall provide written documentation of the tests performed and signed by the individual performing the tests.
SD-07 Certificates
Materials and Equipment; G, AO
22 00 00 - 9
Where equipment is specified to conform to requirements of the ASME Boiler and Pressure Vessel Code, the design, fabrication, and installation shall conform to the code.
Bolts
Written certification by the bolt manufacturer that the bolts furnished comply with the specified requirements.
SD-10 Operation and Maintenance Data
Plumbing System; G, AO
Submit in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
1.3 STANDARD PRODUCTS
Specified materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products.
Specified equipment shall essentially duplicate equipment that has performed satisfactorily at least two years prior to bid opening.
Standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
1.3.1 Alternative Qualifications
Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.3.2 Service Support
The equipment items shall be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations shall be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.3.3 Manufacturer's Nameplate
Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .