AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the bid schedule and clause information.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR21B0027

X 9B. DATED (SEE ITEM 11)

13-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Aug-2021

CODE

USACE, BALTIMORE, RSFO

300 SENTINEL DRIVE, STE 400

ANNAPOLIS JUNCTION MD 20701-0548

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR21B0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

STATEMENT OF WORK

DATE: March 17, 2021 USACE PROJECT MANAGER: Shawn Hazel

PHONE: 301-412-2170

STATEMENT OF WORK: DESIGN-BID-BUILD

RFP – Bldg. 51450 & 51451 Renovation Fort Huachuca, AZ

This Statement of Work contains the following sections:

- PROJECT DESCRIPTION

- STATEMENT OF SERVICES

- PROJECT REQUIREMENTS (Construction)

- SAFETY

- QUALITY CONTROL

- DD FORM 1354

- APPLICABLE TECHNICAL CRITERIA, CODES, REGULATION AND POLICY GUIDANCE

- SUBMISSION REQUIREMENTS

- SUBMISSION SCHEDULE

- PROPOSAL BREAKDOWN

- ATTACHMENT A: Applicable Codes, Regulations, and Policy Guidance

- ATTACHMENT B: Customer Requirements

- ATTACHMENT C: Contract Drawings, Basis of Design and Specifications

PROJECT DESCRIPTION

The U.S. Army Corps of Engineers, Baltimore District (CENAB) requires Firm Fixed Price (FFP) Construction services to renovate the existing motor pools/ Warehouse Building 51450 & 51451 and demolish several existing former WWII Building barracks in order to accommodate customer requirements. Refer to Attachments B for additional information. The project requires the renovation of two existing motor pools buildings, demolition of WWII Barracks, and parking lot construction.

A Top Secret (TS) SCI clearance is not required for construction. However, all personnel working on this project must be U.S. citizens, and must be vetted through the Customer’s Security process, and Fort Huachuca Security process.

The Contractor shall provide services under this delivery order to accomplish this task as described in this Statement of Work (SOW) and required by this construction contract. The Unified Facilities Criteria (UFC) and Unified Facilities Guide Specifications (UFGS) shall be the basis of all designs and construction under this SOW.

The total project duration shall be 365 calendar days.

STATEMENT OF SERVICES

GENERAL: The scope of this project shall consist of the Contractor providing all necessary Construction services to construct the required project. The Government shall review and approve all actions of the Contractor in the accomplishment of this project. The redline, final construction documents shall be assimilated into one submittal package. The Contractor shall provide all services required with the objective of developing and completing this project that satisfies U.S. Army Corps of Engineers (USACE) and user requirements and meets USACE construction criteria, state and local government building codes, and all applicable regulations listed in this SOW under APPLICABLE TECHNICAL CRITERIA, CODES, REGULATION AND POLICY GUIDANCE.

Where guidance conflicts, the MOST STRINGENT REQUIREMENT SHALL PREVAIL. The project shall be accomplished IAW the schedule described in this SOW under SUBMISSION SCHEDULE.

MEETINGS: A construction “kickoff” meeting and safety meeting per EM 385-1-1 Safety and Health Requirements Manual shall be held immediately prior to the start of the construction. Weekly progress meetings shall be held during the construction. Additional meetings may be called with the mutual consent of both parties (government and owner). Meeting(s) will be held at the project site or at a placed designated by the Government.

MINUTES OF THE MEETINGS: The Contractor shall prepare minutes of the meetings and all telephone conversations relating to this project and shall further distribute electronic copies to the USACE project manager(s). Distribution of meeting minutes shall occur no later than three (3) working days after meeting occurs.

USACE project manager(s) shall always be provided copies regardless of attendance at meeting(s). Minutes of the meeting shall record all significant topics of discussion including, but not limited to, mutually agreed resolutions to project problems.

PROJECT REQUIREMENTS

CONSTRUCTION SERVICES

SERVICES TO BE FURNISHED BY CONTRACTOR:

a. Permits

The Contractor shall be responsible for providing all permits, as required by the Contract, for this project.

b. Pre-Construction Submittals and Meetings The Contractor and all sub-Contractors (at all tiers) shall attend a Pre-Construction Meeting and Safety Meeting (can be combined). The Contractor shall be responsible for assuring that the Pre-construction Submittals are submitted in a binder to USACE-CENAB-R-E PM a minimum of two weeks prior to the scheduled Pre-Construction Meeting. The Pre-Construction submittals as per the Contract consist of the following, as a minimum:

1. List of Contact Personnel

2. Subcontractor list

3. Signed site Specific Safety Plan and Activity Hazard Analysis per USACE Safety and

Health Requirements Manual 385-1-1 http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm . See Appendix A in Manual 385-1-1, 15 Sept. 2008. This plan shall have a two week minimum review period by USACE. Construction cannot begin until the USACE approves this document.

4. Schedule of Values

5. Updated Project Schedule

6. Equipment Submittals on ENG Form 4025

7. Signed Quality Control Plan

c. Schedule

The Contractor shall be responsible for assuring that the design-bid-build work is completed on schedule as indicated in the SUBMISSION SCHEDULE in this Statement of Work. The schedule shall be the basis for measuring Contractor progress and shall be in Microsoft Project format. The schedule shall comply with all contract requirements. Lack of an approved schedule shall result in an inability of the Contracting Officer to evaluate Contractor’s progress for the purposes of payment. The Critical Path Method (CPM) shall be used to generate the Construction Schedule. The Project Schedule is to be precise and complete, including design package submissions and reviews, any phasing required for the work, anticipated lead times for equipment, administrative requirements (i.e. submittal review) and the total calendar days required for Contract completion. The schedule shall be updated on a monthly basis and submitted with the request for payment. Changes in logic or re-base lining require Government approval. Reference the Division 1 specification sections 01 32 01.00 10, Progress Schedule, 01 32 17.00 20 Network Analysis Schedules (NAS), 01 45 00.00 10 Quality Control, and 01 45 00.10 10 Quality Control System (QCS), on schedules and quality control, which are all a part of this contract.

d. Construction The Contractor shall be responsible for assuring that the construction work is completed on schedule as indicated in the SUBMISSION SCHEDULE in this Statement of Work. The Contractor shall also be responsible for assuring that all construction conforms to the project documents and requirements, Contract requirements, and governing codes and regulations. The Contractor shall comply with all requirements of Contractor Quality Control as specified by the Contract. On projects valued at $1.0 M or more the Project Manager, Contract Quality Control Manager, and Site Superintendent shall be required to complete the Construction Quality Management for Contractors course offered by the Baltimore District of the USACE. The following web site shall provide necessary information to register for the course: http://www.nab.usace.army.mil/contracts/cqc.htm The Contractor shall provide written documentation of successful course completion.

e. Monthly Exposure Hours The Contractor shall also be responsible for providing the monthly exposure hours by the second day of every month.

f. Close Out Documents

The Close-Out Documents shall be submitted per the Contract. The submission includes, but is not limited to, the following:

1. Red-line drawings

2. As-Built Record Drawings in compliance with the required CADD standard

3. Operation and Maintenance manuals

4. Commissioning and testing documentation

5. Warranty Management Plan which includes but is not limited to: description of item, model and serial number, description of required maintenance, name and number to call for warranty service.

6. Release of Claims

SAFETY

The Contractor shall identify the Safety and Health Manager in accordance with the Contract. The Safety and Health Manager shall have certification by one of the following: American Board of Industrial Hygiene, Board of Certified Safety Professionals or American Board of Health Physicist. The Safety and Health Manager shall be responsible for writing and signing the Safety Plan and Activity Hazard Analysis. The Safety Plan shall include an Emergency Response Plan and Accident Reporting Plan which shall incorporate contacting the USACE PM.

The Safety and Health Manger shall review the Pre-Construction submittal to the Government and ensure all required documentation is included. The Safety and Health Officer shall attend the Pre-Construction Safety Meeting and shall be responsible for additional safety meetings as required by EM 385-1-1 dated 15 September 2008, including all changes to date. The USACE PM and Safety Representatives shall be invited to and, upon request, receive copies of all safety meeting minutes held during construction.

QUALITY CONTROL

The Contractor shall identify the Contractor Quality Control (CQC) System Manager and Quality Control Manager(s) in accordance with the Contract. The Contractor shall furnish for review by the Government, in accordance with the Contract, the Contractor Quality Control (CQC) Plan. The plan shall identify features of work, personnel, procedures, equipment list, controls, instructions, tests, records, and forms to be used. Design and Construction shall be permitted to begin only after acceptance of the CQC plan or acceptance of an interim plan applicable to the feature of work to be started. The CQC system manager shall also review the Close-Out submittals to the Government and ensure that all required documentation is included. Construction portion of Contractor Quality Control Plan shall meet the requirements of Engineer Regulation (ER) 1180-1-6, Construction Quality Management.

DD Form 1354

The Contractor shall assist the Government in the completion of DD Form 1354, Transfer and Acceptance of DoD Real Property. The designer(s) shall be responsible for completing DD Form 1354, Blocks 8 through 22, inclusive. The contractor shall submit Interim and Final versions of the DD Form 1354 for this project. The Government will comment, review, and approve the work of the designers on the preparation and content of this form. All work shall be done in accordance with UFC 1-300-08, change 1, dated March 2010.

APPLICABLE TECHNICAL CRITERIA, CODES, REGULATION AND POLICY

GUIDANCE

The construction for this project shall comply with the information as summarized below:

Applicable Codes, Regulations and Policy Guidance. See Attachment A.

Customer Requirements. See Attachment B.

Contract Drawings, Design Analysis and Specifications. See Attachment C.

SUBMISSION REQUIREMENTS

1. SUBMITTALS:

a. (5) sets of submittals listed on register for government approval.

2. REDLINES:

a. (3) sets Original drawings with redline construction changes.

3. RED ZONE MEETING:

a. (5) sets three ring binder with spine marked with project name and all documents required including:

Warranty Maintenance Plan(s) per the contract requirements. (Make, model, serial numbers listed and contact information for sub-Contractors responsible for warranty.)

Operations and Maintenance Documents.

Commissioning, testing, and training documentation.

CD-ROMs with all drawings (meeting required CADD standards) and documents included.

Completed Interim DD Form 1354, installed equipment list and personal property list.

3. AS-BUILTS:

a. (3) sets of original drawings with redline construction changes.

b. (5) sets of blue lines marked "As-Built" professionally stamped and sealed.

c. (5) CD-ROMs with all drawings (meeting required CADD standards) and documents included.

4. CLOSE OUT:

a. (1) Copy of the Release of Claims with raised seal

b. (5) sets of blue lines marked "As-Built" professionally stamped and sealed.

c. (5) sets three ring binder with spine marked with project name and all documents required including:

Warranty Maintenance Plan(s) per the contract requirements. (Make, model, serial numbers listed and contact information for sub-Contractors responsible for warranty.)

Operations and Maintenance Documents.

Commissioning, testing, and training documentation.

CD-ROMs with all drawings (meeting required CADD standards) and documents included.

Final DD Form 1354, installed equipment list and personal property list.

SUBMISSION SCHEDULE

1. Pre-Construction and Construction Submittals shall be delivered within (45) calendar days NTP.

2. Construction Contract Completion (365) calendar days after receipt of all required Permits and Approvals and as specified by the Contract.

3. Construction Punch List completion (7) calendar days after acceptance of Beneficial Occupancy Date

(BOD).

4. Construction red-line drawings (7) calendar days after completion of punch list.

5. As-Built drawings and other documents on CD-ROM and in hard copy (stamped and sealed) (7) calendar days after receipt and approval of red-line drawings.

6. Close-Out Documents (including documents for final payment) submitted (7) calendar days after construction completion and As-Built drawing approval for compliance with all CADD Standards.

NOTE: The Government has scheduled 14 calendar days for review between receipt of construction submissions and delivery of comments for each submission required.

REQUESTED WORK BREAKDOWN STRUCTURE

CLIN 1. Repair Cost of Buildings 51450 CLIN 2. Repair Cost of Buildings 51451 CLIN 3: Generator CLIN 4. Demolition of Building 51449 and all associated utilities CLIN 5. Demolition of Building 51452 and all associated utilities CLIN 6. Demolition of Building 51453 and all associated utilities CLIN 7. Demolition of Building 51454 and all associated utilities CLIN 8. Site Work

STATEMENT OF WORK: DESIGN-BID-BUILD

INSCOM

RFP – Bldg. 51450 & 51451 Renovation

Fort Huachuca, AZ

Shawn Hazel Date RSFO, Project Manager

Customer Representative Date

Sandra Tucker Date Chief, Infrastructure Development Section

END

ATTACHMENT A

Applicable Codes, Regulations, and Policy Guidance

1. NFPA 101: Life Safety Code, 2009 edition.

2. Unified Facilities Criteria (UFC) – 1-200-01 General Building Requirements, 27 November 2007 including Change 2, 27 January 2010.

3. Unified Facilities Criteria (UFC) 1-300-02, Unified Facilities Guide Specifications (UFGS) Format

Standard, September 2004, Change 4 December 2006

4. Unified Facilities Criteria (UFC) – 1-300-09N Design Procedures, 25 May 2005 including Change

7, 27 January 2010.

5. Unified Facilities Criteria (UFC) 3-120-10, Interior Design, June 2006 including Change 1, July

6. Unified Facilities Criteria (UFC) – 3-600-01 Design: Fire Protection Engineering for Facilities, 26

September 2006 including Change 1, 14 July 2009.

7. Unified Facilities Criteria (UFC) – 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, 8

October 2003 including Change 1, 22 January 2007.

8. Unified Facilities Criteria (UFC) – 4-010-02 DoD Minimum Antiterrorism Standoff Distances for

Buildings (FOUO), 8 October 2003 including Change 1, 19 January 2007.

9. Unified Facilities Criteria (UFC) – 4-020-01 DoD Security Engineering Facilities Planning Manual, 11 September 2008.

10. Unified Facilities Criteria (UFC) – 4-020-02 DoD Security Engineering Facilities Design Manual

11. State of Maryland and Anne Arundel County codes, regulations, and requirements - All related

Documents.

12. NFPA 10 Standard for Portable Fire Extinguishers, 2010 Edition

13. NFPA 13 Standard for the Installation of Sprinkler Systems, 2010 Edition

14. NFPA 70 National Electrical Code (NEC) Handbook, 2008 Edition.

15. NFPA 70E Standard for Electrical Safety in the Workplace, 2009 Edition

16. NFPA 72 National Fire Alarm and Signaling Code, 2010 Edition

17. NFPA 72E Automatic Fire Detectors, 2010 Edition (incorporated into NFPA 72).

18. NFPA 75 Standard for the Protection of Information Technology Equipment, 2009 Edition

19. NFPA 80 Standards for Fire Doors and Other Opening Protectives, 2010 Edition.

20. NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems, 2009 Edition

21. NFPA 92 Standards for Smoke Management Systems. Current Edition: Proposed Standard Next

Edition: 2012

22. Americans with Disabilities Act of 1990

23. American with Disabilities Act Amendments Act of 2008 (ADAAA)

24. Uniform Federal Accessibility Standards (UFAS)

25. Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG)

26. ANSI/ASHRAE 52.2 Method of Testing General Ventilation Air-Cleaning Devices for Removal

Efficiency by Particle Size, 1999

27. ANSI/ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality, 2007

28. ANSI/ASHRAE 90.1, Energy Standards for Buildings, Except Low Rise Residential Buildings, American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE)

29. SMACNA Duct Standards - All Applicable Standards (including Duct Leakage).

30. PHCC National Standard Plumbing Code 2009

31. (ARI) Air Conditioning and Refrigeration Institute - All related Documents

32. (AHRI) Air-Conditioning, Heating and Refrigeration Institute - All related Documents

33. (ADC) Air Diffusion Council, Flexible Duct Performance & Installation Standards, 4th Edition

34. (ADC) Air Diffusion Council FD 72-R1, Flexible Duct Test Code, 3rd Edition

35. (ASME) American Society of Mechanical Engineers - All related Documents

36. (ANSI) American National Standards Institute - All related Documents

37. (IEEE) Institute of Electrical and Electronics Engineers - All related Documents

38. Occupational Safety and Health Administration (OSHA) - All related Documents

39. (AABC) Associated Air Balance Council - All related Documents

40. Air Movement and Control Association (AMCA) International, Inc. - All related Documents

41. ASTM International - All related Documents

42. AWS American Welding Society - All related Documents

43. Builders Hardware Manufacturers Association (BHMA) - All related Documents

44. Door and Hardware Institute (DHI) - All related Documents

45. FM Factory Mutual System - All related Documents.

46. Gypsum Association - All related Documents

47. IES Illuminating Engineering Society of North America - All related Documents

48. SDI Steel Door Institute - All related Documents

49. SDI Steel Deck Institute – All related Documents

50. UL Underwriters Laboratories, Inc. - All related Documents

51. US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, 15 September

2008 with all up to date changes

52. International Building Code (IBC) – 2009 version - All applicable criteria

53. Unified Facilities Criteria (UFC) - All current applicable criteria

54. Intelligence Community Directive (ICD) 705 and the associated Intelligence Community Policy

Guidance (ICPG).

55. Unified Facilities Guide Specifications (UFGS) – Divisions 1 through 48.

ATTACHMENT B

ACCESS CONTROLLED FACILITY: Building 51450 & 51451 is inside the Fort Huachuca Installation and shall require submission of Contractor information to receive Daily access pass. All contractor vehicles shall be required to undergo inspection at the delivery gate for every access. Required information for access: Name, Social Security Number, Date of Birth, Place of Birth, Citizenship and shall be on company letterhead.

UTILITY INTERRUPTIONS: It is essential that all work be performed with minimal interruption of the existing utilities or facility operations. The construction shall incorporate solutions based on construction procedures and the contract documents that shall avoid operational impacts to the existing building and occupants.

WORK HOURS: All work shall be performed during normal work hours typically defined as (7:00 am to 5:00 pm.) Any outages or shut down of the building mechanical, electrical and/or any other systems shall require coordination and scheduling in advance with the USACE Construction office, Project Manager and User. Work done outside of normal working hours shall be coordinated with the Building Facility Manager, and approved in advance of starting work activities.

CONSTRUCTION DOCUMENTS PROVIDED WITH THIS SOW:

FHR_100pct Design Analysis_IFC IFC Submittal March 12, 2021

FHR_Combined Drawings_IFC (100pct Drawings) IFC Submittal March 12, 2021

FHR_Specification_IFC IFC Submittal March 12, 2021

FHR_Hazardous Materials Reports IFC Submittal March 12, 2021

A2_FHR_Building_Commissioning Plan IFC Submittal March 12, 2021

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 SF LLL 3 Attachment 2 EFT UFC Form 23 2

Attachment 3 Statment of Affiliation 8 Attachment 4 FHR Specifications 1414 Attachment 5 FHR Combined Drawings 172 Attachment 6 Construction Security

Plan

7 23-MAR-2020

Attachment 7 FHR Building Commisioning Plan

Attachment 8 FHR Design Analysis 1343 Attachment 9 FHR Hazardous Materials

Report to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 SF LLL 3 Attachment 10 Sight Survey Attendace

Log

Attachment 2 EFT UFC Form 23 2 Attachment 3 Statment of Affiliation 8 Attachment 4 FHR Specifications 1414 Attachment 5 FHR Combined Drawings 172 Attachment 6 Construction Security

Plan

7 23-MAR-2020

Attachment 7 FHR Building Commisioning Plan

Attachment 8 FHR Design Analysis 1343 Attachment 9 FHR Hazardous Materials

Report

SECTION 00 10 00 - SOLICITATION

CLIN 0003

This CLIN has been renumbered to CLIN 0004.

The CLIN extended description has changed from:

Demolition of building 51449 to satisfy site improvement and Anti-Terrorism Force Protection (ATFP) requirements related to renovation/conversion of buildings 51450 and 51451 for the proposed INSCOM Consolidated Mission Facility.

To:

Demolition of building 51449 and all associated utilities as described in Bid Option 2 on the

Drawings (ED100), to satisfy site improvement and Anti-Terrorism Force Protection (ATFP) requirements related to renovation/conversion of buildings 51450 and 51451 for the proposed INSCOM Consolidated Mission Facility.

CLIN 0004

This CLIN has been renumbered to CLIN 0005.

The CLIN extended description has changed from:

Demolish of building 51452 to satisfy site improvement and Anti-Terrorism Force Protection

Demolish of building 51452 all associated utilities as described in Bid Option 2 on the Drawings (ED100), to satisfy site improvement and Anti-Terrorism Force Protection (ATFP) requirements related to renovation/conversion of buildings 51450 and 51451 for the proposed INSCOM Consolidated Mission Facility.

CLIN 0005

This CLIN has been renumbered to CLIN 0006.

The CLIN extended description has changed from:

Demolish of building 51453 to satisfy site improvement and Anti-Terrorism Force Protection

Demolish of building 51453 all associated utilities as described in Bid Option 2 on the Drawings (ED100), to satisfy site improvement and Anti-Terrorism Force Protection (ATFP) requirements related to renovation/conversion of buildings 51450 and 51451 for the proposed INSCOM

CLIN 0006

This CLIN has been renumbered to CLIN 0007.

The CLIN extended description has changed from:

Demolish of building 51454 to satisfy site improvement and Anti-Terrorism Force Protection

Demolish of building 51454 all associated utilities as described in Bid Option 2 on the Drawings (ED100), to satisfy site improvement and Anti-Terrorism Force Protection (ATFP) requirements related to renovation/conversion of buildings 51450 and 51451 for the proposed INSCOM

CLIN 0007

This CLIN has been renumbered to CLIN 0008.

The CLIN description has changed from Associated Project Scope to Site Work.

The CLIN extended description has changed from:

Associated project scope includes construction costs related to supporting facility and site work related to renovation/conversion of buildings 51450 and 51451 for the proposed INSCOM Consolidated Mission Facility. Site improvements include minor site preparation/earthwork/grading, removal of existing asphalt within 80 feet of both buildings, new sidewalks, asphalt parking lot and drive lanes, screened vehicle fence for GOV, site lighting, dumpster enclosure, etc.

Site work includes construction costs related to renovation/conversion of buildings 51450 and 51451, to include the parking plan. Site improvements include minor site preparation/earthwork/grading, removal of existing asphalt within 80 feet of both buildings, new sidewalks, asphalt parking lot and drive lanes, screened vehicle fence for GOV, site lighting, dumpster enclosure, and additional work as listed under the Site Plan on Drawing CS100 and

CP100

CLIN 0003 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Project OPTION Generator

FFP

Referred to as Bid Option 1 on Drawings. Provide natural gas engine-generator sets consisting of a water cooled engine direct connected to an ac generator with a brushless excitation system and accessories. Equipment and materials must be the manufacturer's standard products offered in catalogs for commercial or industrial use.

FOB: Destination

NET AMT

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS – ALTERNATE I (JAN 2020)

(a)(1) The North American Industry Classification System (NAICS) codes and corresponding size standards for this acquisition are as follows; the categories or portions these NAICS codes are assigned to are specified elsewhere in the solicitation:

NAICS code Size standard

[Contracting Officer to insert NAICS codes and size standards].

(2) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture (i.e., nonmanufacturer), is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.

(D) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.219-31 NOTICE OF SMALL BUSINESS RESERVE (MAR 2020)

(a) This solicitation contains a reserve for one or more small business concerns identified at 19.000(a)(3). The small business program eligibility requirements apply.

(b) The small business concern(s) eligible for participation in the reserve shall submit one offer that addresses each portion of the solicitation for which it wants to compete. Award of the contract will be based on criteria identified elsewhere in the solicitation.

252.225-7971 PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN

FEDERATION—REPRESENTATION (DEVIATION 2020-O0018) (MAY 2020)

(a) Definitions. As used in this clause—

“Covered military installation” means a military installation in Europe identified by the Department of Defense as a main operating base; and

“Furnished energy” means energy furnished to a covered military installation in any form and for any purpose, including heating, cooling, and electricity.

(b) Prohibition. Section 2821 of the National Defense Authorization Act for Fiscal Year 2020 (Pub. L. 116-92) prohibits contracting officers from entering into a contract for the acquisition of furnished energy for a covered military installation that uses any energy sourced from inside the Russian Federation as a means of generating the furnished energy for the covered military installation.

(c) Representation. By submission of its offer, the Offeror represents that the Offeror will not use any energy sourced from inside the Russian Federation as a means of generating the furnished energy for the covered military installation in the performance of any contract, subcontract, or other contractual instrument resulting from this solicitation.

252.225-7973 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT

SYSTEMS - REPRESENTATION (MAY 2020) (DEVIATION 2020-O0015)

(a) Prohibition. Section 848 of the National Defense Authorization Act for Fiscal Year 2020 (Pub. L. 116-92) prohibits DoD from using or procuring -

(1) An unmanned aircraft system (UAS), or any related services or equipment, that -

(i) Is manufactured in the People’s Republic of China or by an entity domiciled in the People’s Republic of China;

(ii) Uses flight controllers, radios, data transmission devices, cameras, or gimbals manufactured in the People’s Republic of China or by an entity domiciled in the People’s Republic of China;

(iii) Uses a ground control system or operating software developed in the People’s Republic of China or by an entity domiciled in the People’s Republic of China; or

(iv) Uses network connectivity or data storage located in, or administered by an entity domiciled in, the People’s Republic of China; or

(2) A system for the detection or identification of a UAS, or any related services or equipment, that is manufactured-

(i) In the People’s Republic of China; or

(ii) By an entity domiciled in the People’s Republic of China.

(b) Representations. By submission of its offer, the Offeror represents that it will not provide or use -

(1) A UAS, as described in paragraph (a)(1) of this provision, in the performance of any contract, subcontract, or other contractual instrument resulting from this solicitation; and

(2) A system for the detection or identification of a UAS, as described in paragraph (a)(2) of this provision, in the performance of any contract, subcontract, or other contractual instrument resulting from this solicitation.

252.232-7015 PERFORMANCE-BASED PAYMENTS--REPRESENTATION (APR 2020)

(a) In accordance with 10 U.S.C. 2307(b)(4)(A), the Contractor's financial statements shall be in compliance with Generally Accepted Accounting Principles in order to receive performance-based payments.

(b) The Offeror represents that its financial statements are [ ] are not [ ] in compliance with Generally Accepted Accounting Principles.

252.232-7016 NOTICE OF PROGRESS PAYMENTS OR PERFORMANCE-BASED PAYMENTS (APR 2020)

(a) The need for customary progress payments in accordance with subpart 32.5 of the Federal Acquisition Regulation (FAR) or performance-based payments in accordance with FAR subpart 32.10 will not be considered as a handicap or adverse factor in the award of the contract.

(b) This solicitation includes a FAR and Defense Federal Acquisition Regulation Supplement (DFARS) clause for performance-based payments and a FAR clause for progress payments. The resultant contract will include either performance-based payments or progress payments, not both, except as may be authorized on separate orders subject to FAR 32.1003(c).

(1) The performance-based payments clauses will be included in the contract if--

(i) The Offeror has provided positive representation in response to DFARS 252.232-7015, Performance-Based Payments--Representation;

(ii) The Offeror proposes a performance-based payment arrangement in accordance with FAR 52.232-28, Invitation to Propose Performance-Based Payments, including proposed events and timing, event completion criteria, event values, and expected expenditure profile; and

(iii) The Offeror and the Government reach agreement on all aspects of the arrangement.

(2) If performance-based payments clauses are not included in the resultant contract, the progress payments clause included in this solicitation will be included in any resultant contract, modified or altered if necessary in accordance with FAR 52.232-16 and its Alternate I. Even though the progress payments clause is included in the contract, the clause shall be inoperative during any time the contractor's accounting system and controls are determined by the Government to be inadequate for segregation and accumulation of contract costs.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0003:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

52.219-32 ORDERS ISSUED DIRECTLY UNDER SMALL BUSINESS RESERVES (MAR 2020)

(a) Applicability. This clause applies only to contracts that were reserved for any of the small business concerns identified at 19.000(a)(3).

(b) If there is only one contract award to any one type of small business concern identified in 19.000(a)(3) as a result of the reserve, the Contracting Officer may issue an order or orders directly to the concern.

(End of clause)

52.219-33 NONMANUFACTURER RULE (MAR 2020) (DEVIATION 2020-O0008)

(a) Definitions. As used in this clause— “Manufacturer” means the concern that transforms raw materials, miscellaneous parts, or components into the end item. Concerns that only minimally alter the item being procured do not qualify as manufacturers of the end item.

Concerns that add substances, parts, or components to an existing end item to modify its performance will not be considered the end item manufacturer, where those identical modifications can be performed by and are available from the manufacturer of the existing end item.

“Nonmanufacturer” means a concern, including a supplier, that provides an end item it did not manufacture, process, or produce.

(b) Applicability.

(1) This clause does not apply to contracts awarded pursuant to the unrestricted portion of a partial set-aside or to a contractor that is the manufacturer of the product or end item.

(2) This clause applies to—

(i) Contracts that have been awarded pursuant to a competitive 8(a) procurement;

(ii) Contracts that have been awarded on a sole-source basis in accordance with subpart 19.8; and

(iii) Orders competed among 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); and

(iv) Orders issued directly to an 8(a) participant under multiple-award contracts as described in 19.504(c)(1)(ii).

(c) Requirements.

(1) The Contractor shall—

(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;

(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and

(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.

(2) For contracts or orders for multiple end items, at least 50 percent of the total value of the contract or order shall be manufactured, processed, or produced in the United States or its outlying areas by small business concerns.

52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)

(a) Definitions. As used in this clause--

Foreign person means any person other than a United States person.

United States person, as defined in 26 U.S.C. 7701(a)(30), means--

(1) A citizen or resident of the United States;

(2) A domestic partnership;

(3) A domestic corporation;

(4) Any estate (other than a foreign estate, within the meaning of 26 U.S.C. 7701(a)(31)); and

(5) Any trust if--

(i) A court within the United States is able to exercise primary supervision over the administration of the trust; and

(ii) One or more United States persons have the authority to control all substantial decisions of the trust.

(b) This clause applies only to foreign persons. It implements 26 U.S.C. 5000C and its implementing regulations at 26 CFR 1.5000C-1 through 1.5000C-7.

(c)(1) If the Contractor is a foreign person and has only a partial or no exemption to the withholding, the Contractor shall include the Department of the Treasury Internal Revenue Service Form W-14, Certificate of Foreign Contracting Party Receiving Federal Procurement Payments, with each voucher or invoice submitted under this contract throughout the period in which this status is applicable. The excise tax withholding is applied at the payment level, not at the contract level. The Contractor should revise each IRS Form W-14 submission to reflect the exemption (if any) that applies to that particular invoice, such as a different exemption applying. In the absence of a completed IRS Form W-14 accompanying a payment request, the default withholding percentage is 2 percent for the section 5000C withholding for that payment request. Information about IRS Form W-14 and its separate instructions is available via the internet at www.irs.gov/w14.

(2) If the Contractor is a foreign person and has indicated in its offer in the provision 52.229-11, Tax on Certain Foreign Procurements--Notice and Representation, that it is fully exempt from the withholding, and certified the full exemption on the IRS Form W-14, and if that full exemption no longer applies due to a change in circumstances during the performance of the contract that causes the Contractor to become subject to the withholding for the 2 percent excise tax then the Contractor shall--

(i) Notify the Contracting Officer within 30 days of a change in circumstances that causes the Contractor to be subject to the excise tax withholding under 26 U.S.C. 5000C; and

(ii) Comply with paragraph (c)(1) of this clause.

(d) The Government will withhold a full 2 percent of each payment unless the Contractor claims an exemption. If the Contractor enters a ratio in Line 12 of the IRS Form W-14, the result of Line 11 divided by Line 10, the Government will withhold from each payment an amount equal to 2 percent multiplied by the contract ratio. If the Contractor marks box 9 of the IRS Form W-14 (rather than completes Lines 10 through 12), the Contractor must identify and enter the specific exempt and nonexempt amounts in Line 15 of the IRS Form W-14; the Government will then withhold 2 percent only from the nonexempt amount. See the IRS Form W-14 and its instructions.

(e) Exemptions from the withholding under this clause are described at 26 CFR 1.5000C-1(d)(5) through (7). Any exemption claimed and self-certified on the IRS Form W-14 is subject to audit by the IRS. Any disputes regarding the imposition and collection of the 26 U.S.C. 5000C tax are adjudicated by the IRS as the 26 U.S.C. 5000C tax is a tax matter, not a contract issue.

(f) Taxes imposed under 26 U.S.C. 5000C may not be--

(1) Included in the contract price; nor

(2) Reimbursed.

(g) A taxpayer may, for a fee, seek advice from the Internal Revenue Service (IRS) as to the proper tax treatment of a transaction. This is called a private letter ruling. Also, the IRS may publish a revenue ruling, which is an official interpretation by the IRS of the Internal Revenue Code, related statutes, tax treaties, and regulations.